+ All Categories
Home > Documents > 1. Introduction

1. Introduction

Date post: 11-Jan-2016
Category:
Upload: luvnica-verma
View: 212 times
Download: 0 times
Share this document with a friend
Description:
event
38
EUROPEAN INTERNATIONAL COLLEGE EVENT MANAGEMENT Dr. Luvnica Verma 1
Transcript
Page 1: 1. Introduction

1

EUROPEAN INTERNATIONAL COLLEGE

EVENT MANAGEMENTDr. Luvnica Verma

Page 2: 1. Introduction

Systems Design:Activity-Based Costing

Chapter

4

Page 3: 1. Introduction

After studying this chapter, you should be able to:

1 Recognize the difference between traditional costing and activity-based costing.

2 Identify the steps in the development of an activity-based costing system.

3 Identify the activity cost pools used in activity-based costing.

4 Identify and use the activity cost drivers in activity-based costing.

Chapter 4Activity-Based Costing

Page 4: 1. Introduction

After studying this chapter, you should be able to:

5 Understand the benefits and limitations of activity-based costing.

6 Differentiate between value-added and nonvalue-added activities.

7 Understand the value of a hierarchy of activity levels to activity-based costing.

8 Explain just-in-time (JIT) processing.

Chapter 4Activity-Based Costing

Page 5: 1. Introduction

Preview of Chapter 4

ABC vs. Traditional Costing• Traditional Costing Systems• Need for New Costing Systems• Activity-Based Costing

Illustration of Traditional Costing Versus ABC

• Unit Costs Under Traditional Costing

• Unit Costs Under ABC• Comparing Unit Costs

ACTIVITY-BASED COSTING

Page 6: 1. Introduction

Preview of Chapter 4

ABC: A Closer Look• Benefits• Limitations• When to Switch to ABC• Value-Added Versus Nonvalue-

Added Activities• Hierarchy of Activity Levels

Just-in-Time Processing• Objective• Elements• Benefits

ACTIVITY-BASED COSTING

Page 7: 1. Introduction

Recognize the difference between traditional costing and activity-based

costing.

Study Objective 1

Page 8: 1. Introduction

Assigning Overhead Costs to Products

Plantwide Overhead RateA single overhead rate used throughout

an entire factory. A simple method,but one that can distort unit product costs.

Plantwide Overhead RateA single overhead rate used throughout

an entire factory. A simple method,but one that can distort unit product costs.

Direct labor has often used as the allocation base for overhead.

Page 9: 1. Introduction

Plantwide Overhead RateToday, direct labor may no longer be a

satisfactory base for allocation of overhead.Direct labor may no longer be highly correlated with overhead costs.

No single allocation basis may be able to adequately reflect the demands that products place on overhead.

Today, direct labor may no longer be a satisfactory base for allocation of overhead.

Direct labor may no longer be highly correlated with overhead costs.

No single allocation basis may be able to adequately reflect the demands that products place on overhead.

Page 10: 1. Introduction

The allocation bases depend on the nature of the work

performed in each department. In the machining department,overhead may be based on machine-hours, but in the

assembly departmentoverhead is based on labor-

hours.

The allocation bases depend on the nature of the work

performed in each department. In the machining department,overhead may be based on machine-hours, but in the

assembly departmentoverhead is based on labor-

hours.

Finishing Department

Shipping Department

Painting Department

Departmental Overhead Rates

Unfortunately, even departmental rates will not correctly assign overhead in situations where a company has a

range of products and complex overhead costs.

Unfortunately, even departmental rates will not correctly assign overhead in situations where a company has a

range of products and complex overhead costs.

Page 11: 1. Introduction

Activity-Based Costing (ABC)Cost Objects

(e.g., products and customers)Cost Objects

(e.g., products and customers)

ActivitiesActivities

Consumption of ResourcesConsumption of Resources

CostCost

A number of allocation bases are used for assigning costs to

products.

Page 12: 1. Introduction

Activity-Based Costing (ABC)

Activity Cost Pool

a “cost bucket in which costs related to a

particular activity are accumulated

Each activity has its own activity rate that is used to apply overhead costs.

Page 13: 1. Introduction

Designing an ABC System

Steps for Implementing ABCIdentify and define activities and activity pools and

develop an activity dictionary.Trace or assign costs to activities and cost objects.Calculate activity rates.Assign costs to cost objects.Prepare necessary reports.

Page 14: 1. Introduction

Hierarchy of ActivitiesLevel Activities Activity MeasureUnit-level Processing units on machines Machine-hours

Processing units by hand Direct labor-hoursConsuming factory supplies Units produced

Batch-level Processing purchase orders Purchase orders processedProcessing production orders Production orders processedSetting up equipment Number of setupsHandling materials Pounds of material handled

Product-level Testing new products Hours of testing timeAdministering parts inventories Number of part typesDesigning products Hours of design time

Facility-level General factory administration Direct labor-hoursPlant building and grounds Direct labor-hours

Page 15: 1. Introduction

Activity-Based Costing at Classic BrassDirect

MaterialsDirect

MaterialsDirectLaborDirectLabor

ShippingCosts

ShippingCosts

ProductsProducts

LaborRelated Pool

LaborRelated Pool

MachineRelated Pool

MachineRelated Pool

SetupPool

SetupPool

ProductionOrder PoolProductionOrder Pool

GeneralFactory Pool

GeneralFactory Pool

First-Stage Allocation

Second-Stage Allocations

$/DLH$/DLH $/MH$/MH $/Setup$/Setup $/Order$/Order

Overhead CostsOverhead Costs

$/MH$/MH

Unit-Level Activity Batch-Level Activity Facility-LevelActivity

Page 16: 1. Introduction

Using Activity-Based Costing

Comtek Sound, Inc. makes two products, a radio with a built-in tape player and one with a built-in compact disc player. For

the current year, Comtek has budgets sales of 50,000 CD units and 200,000 tape units.

Both products require two direct labor-hours to complete.The company plans to work 500,000 hours to meet the

budgeted production.All production is sold to auto manufacturers for

installation in new cars and trucks.Direct materials cost $90 per unit for the CD unit and $50

for the Tape unit.Direct labor costs at $10 per hour are $20 for both the CD

and Tape unit.

Comtek Sound, Inc. makes two products, a radio with a built-in tape player and one with a built-in compact disc player. For

the current year, Comtek has budgets sales of 50,000 CD units and 200,000 tape units.

Both products require two direct labor-hours to complete.The company plans to work 500,000 hours to meet the

budgeted production.All production is sold to auto manufacturers for

installation in new cars and trucks.Direct materials cost $90 per unit for the CD unit and $50

for the Tape unit.Direct labor costs at $10 per hour are $20 for both the CD

and Tape unit.

Page 17: 1. Introduction

Direct Labor-Hours as a BaseTotal manufacturing overhead costs for the current year are estimated to

be $10,000,000. The company develops the following overhead rate based upon labor-hours:

Total manufacturing overhead costs for the current year are estimated to be $10,000,000. The company develops the following overhead rate

based upon labor-hours:

Predeterminedoverhead rate

$10,000,000500,000 DLH = $20 per DLH=

CD Unit Tape UnitDirect materials 90$ 50$ Direct labor 20 20 Manufacturing overhead 40 40 (2 DLH x $20/DLH)

Unit product cost 150$ 110$

Page 18: 1. Introduction

Computing Activity RatesThe ABC project team at Comtek has developed the following basic

information.

Activity and Activity Measures

Estimated Overhead

Cost Total CD Tape

Labor related (DLH) 800,000$ 500,000 100,000 400,000 Machine related (MH) 2,100,000 1,000,000 300,000 700,000 Machine setups (setups) 1,600,000 4,000 3,000 1,000 Production orders (orders) 450,000 1,200 400 800 Product testing (tests) 1,700,000 20,000 16,000 4,000 Material receipts (receipts) 1,000,000 5,000 1,800 3,200 Parts administration (part types) 350,000 700 400 300 General factory (MH) 2,000,000 1,000,000 300,000 700,000

10,000,000$

Expected Activity

Page 19: 1. Introduction

Computing Activity RatesUsing the basic information, we can calculate the following activity

rates:

Activity and Activity Measures

Estimated Overhead

Cost

Total Expected Activity

Labor related (DLH) 800,000$ 500,000 1.60$ per DLHMachine related (MH) 2,100,000 1,000,000 2.10 per MHMachine setups (setups) 1,600,000 4,000 400.00 per setupProduction orders (orders) 450,000 1,200 375.00 per orderProduct testing (tests) 1,700,000 20,000 85.00 per testMaterial receipts (receipts) 1,000,000 5,000 200.00 per receiptParts administration (part types) 350,000 700 500.00 per par typeGeneral factory (MH) 2,000,000 1,000,000 2.00 per MH

10,000,000$

Activity Rate

Using the new activity rates, let’s assign overhead to the two products based upon activity.

Page 20: 1. Introduction

Computing Activity Rates

Activity and Activity MeasuresExpected

Activity AmountExpected

Activity AmountLabor related (DLH) 100,000 160,000$ 400,000 per DLH640,000$ Machine related (MH) 300,000 630,000 700,000 per MH1,470,000 Machine setups (setups) 3,000 1,200,000 1,000 per setup400,000 Production orders (orders) 400 150,000 800 per order300,000 Product testing (tests) 16,000 1,360,000 4,000 per test340,000 Material receipts (receipts) 1,800 360,000 3,200 per receipt640,000 Parts administration (part types) 400 200,000 300 per par type150,000 General factory (MH) 300,000 600,000 700,000 per MH1,400,000 Total overhead cost assigned 4,660,000$ 5,340,000$ Number of units produced 50,000 200,000 Overhead cost per unit 93.20$ 26.70$

CD Units Tape Units

÷ ÷

ABC overhead rate per unitABC overhead rate per unit

Page 21: 1. Introduction

Computing Activity Rates

CD Units Tape Units CD Units Tape UnitsDirect material 90.00$ 50.00$ 90.00$ 50.00$ Direct labor 20.00 20.00 20.00 20.00 Manufacturing overhead 93.20 26.70 40.00 40.00 Unit product cost 203.20$ 96.70$ 150.00$ 110.00$

Activity-Based Costing Direct-Labor Costing

Notice that the unit product cost of a tape unit decreased from $110 to $96.70 . . . . .

Notice that the unit product cost of a tape unit decreased from $110 to $96.70 . . . . .

. . . . . while the unit cost of a CD unit increased from $150 to $203.20.

. . . . . while the unit cost of a CD unit increased from $150 to $203.20.

Page 22: 1. Introduction

Shifting of Overhead Cost

CD Units Tape Units CD Units Tape UnitsDirect material 90.00$ 50.00$ 90.00$ 50.00$ Direct labor 20.00 20.00 20.00 20.00 Manufacturing overhead 93.20 26.70 40.00 40.00 Unit product cost 203.20$ 96.70$ 150.00$ 110.00$

Activity-Based Costing Direct-Labor Costing

When a company implements activity-based costing, overhead cost often shifts from high-volume to low-

volume products with a higher unit product cost resulting for the low-volume products.

When a company implements activity-based costing, overhead cost often shifts from high-volume to low-

volume products with a higher unit product cost resulting for the low-volume products.

Low-volume product

Page 23: 1. Introduction

Targeting Process ImprovementsActivity-Based Management

involves focusing on activities to eliminate waste, decrease processing time, and reduce defects.

Activity-Based Managementinvolves focusing on activities to eliminate waste, decrease processing time,

and reduce defects.

Benchmarkingis a systematic approach to identifying the activities with the greatest room for

improvement. It is based on comparing the performance in an organization with the performance of other, similar organizations known for their outstanding performance.

Benchmarkingis a systematic approach to identifying the activities with the greatest room for

improvement. It is based on comparing the performance in an organization with the performance of other, similar organizations known for their outstanding performance.

Page 24: 1. Introduction

Evaluation of Activity-Based Costing

Benefits of ABC– Improves the accuracy

of product costs.– Activity cost pools are

more homogeneous than departmental cost pools.

– Allocates overhead on the basis of activities that cause overhead costs.

Benefits of ABC– Improves the accuracy

of product costs.– Activity cost pools are

more homogeneous than departmental cost pools.

– Allocates overhead on the basis of activities that cause overhead costs.

Page 25: 1. Introduction

Evaluation of Activity-Based Costing

Limitations of ABC– Cost of implementation may exceed benefits.– Products costs are not always relevant when

making decisions.

Limitations of ABC– Cost of implementation may exceed benefits.– Products costs are not always relevant when

making decisions.

Benefits of ABC– Improves the accuracy of product costs.– Activity cost pools are more homogeneous than

departmental cost pools.– Allocates overhead on the basis of activities that

cause overhead costs.

Benefits of ABC– Improves the accuracy of product costs.– Activity cost pools are more homogeneous than

departmental cost pools.– Allocates overhead on the basis of activities that

cause overhead costs.

Page 26: 1. Introduction

ABC and Service IndustriesActivity-based costing has been implemented

in a wide variety of service industries including railroads, hospitals, banks, and data

service companies.

Activity-based costing has been implemented in a wide variety of service industries

including railroads, hospitals, banks, and data service companies.

Page 27: 1. Introduction

Cost Flows in an ABC SystemSarvik Company uses activity-based costing. The company has five cost

pools shown below.Sarvik Company uses activity-based costing. The company has five cost

pools shown below.

Activity Cost Pool Activity Measure

Estimated Overhead

CostExpected

ActivityMachine related Machine-hours 175,000$ 5,000 MHsPurchase orders Number of orders 63,000 700 ordersMachine setups Number of setups 92,000 460 setupsProduct testing Number of tests 160,000 200 testsGeneral factory Direct-labor hours 300,000 25,000 DLHs

790,000$

Page 28: 1. Introduction

Cost Flows in an ABC SystemAt the beginning of the year, the company had inventory balance as follows.At the beginning of the year, the company had inventory balance as follows.

Raw materials $3,000

Work in process 4,000

Finished goods - 0 -

Page 29: 1. Introduction

Cost Flows in an ABC SystemTransaction recorded by the company:

a. Raw materials purchased on account, $915,000.

b. Raw materials used in production, $900,000 ($810,000 direct and $90,000 indirect).

c. Factor labor costs, $370,000 ($95,000 direct and $275,000 indirect).

d. Depreciation of factory assets, $180,000.

e. Miscellaneous manufacturing overhead costs, $230,000.

f. Goods costing $1,650,000 manufactured.

Transaction recorded by the company:

a. Raw materials purchased on account, $915,000.

b. Raw materials used in production, $900,000 ($810,000 direct and $90,000 indirect).

c. Factor labor costs, $370,000 ($95,000 direct and $275,000 indirect).

d. Depreciation of factory assets, $180,000.

e. Miscellaneous manufacturing overhead costs, $230,000.

f. Goods costing $1,650,000 manufactured.

Page 30: 1. Introduction

Cost Flows in an ABC SystemManufacturing overhead cost was applied to production. Actual activity

during the year was as follows:

1. Machine related, 4,600 machine-hours.

2. Purchase orders, 800 orders.

3. Machine setups, 500 setups.

4. Product testing, 190 tests.

5. General factory, 23,000 direct-labor hours.

Manufacturing overhead cost was applied to production. Actual activity during the year was as follows:

1. Machine related, 4,600 machine-hours.

2. Purchase orders, 800 orders.

3. Machine setups, 500 setups.

4. Product testing, 190 tests.

5. General factory, 23,000 direct-labor hours.

Page 31: 1. Introduction

Cost Flows in an ABC System

Description Debit Credita. Raw Materials 915,000

Accounts Payable 915,000

b. Work in Process 810,000 Manufacturing Overhead 90,000 Raw materials 900,000

c. Work in Process 95,000 Manufacturing Overhead 275,000 Wages payable 370,000

The following journal entries would be used to record transactions (a) through (c).

The following journal entries would be used to record transactions (a) through (c).

Page 32: 1. Introduction

Cost Flows in an ABC SystemPredetermined overhead rates are determined as follows:Predetermined overhead rates are determined as follows:

Activity Cost Pool

Estimated Overhead

Cost

Total Expected

Activity Activity Rate

Machine related 175,000$ 5,000 MHs 35$ MHsPurchase orders 63,000 700 orders 90$ ordersMachine setups 92,000 460 setups 200$ setupsProduct testing 160,000 200 tests 800$ testsGeneral factory 300,000 25,000 DLH 12$ DLHs

790,000$

Page 33: 1. Introduction

Cost Flows in an ABC SystemOverhead is applied on the basis of actual activities during the year.Overhead is applied on the basis of actual activities during the year.

Activity Cost PoolActivity Rate Actual Activity

Applied Overhead

CostMachine related $35/MH 4,600 MHs 161,000$ Purchase orders $90/order 800 orders 72,000 Machine setups $200/setup 500 setups 100,000 Product testing $800/test 190 tests 152,000 General factory $12/DLH 23,000 DLHs 276,000 Total Overhead Applied 761,000$

Page 34: 1. Introduction

Cost Flows in an ABC SystemThe following journal entry is made to record applied overhead.The following journal entry is made to record applied overhead.

Description Debit CreditWork in Process 761,000 Manufacturing Overhead 761,000

Page 35: 1. Introduction

Cost Flows in an ABC System

Description Debit Creditd. Manufacturing Overhead 180,000

Accumulated Depreciation 180,000

e. Manufacturing Overhead 230,000 Accounts Payable 230,000

f. Finished Goods 1,650,000 Work in Process 1,650,000

The following journal entries would be used to record transactions (d) through (f).

The following journal entries would be used to record transactions (d) through (f).

Page 36: 1. Introduction

Bal. 20,000

Bal. 4,000(b) 810,000(c) 95,000(f) 761,000

(g) 1, 650,000Work in Process

Bal. 14,000

Manufacturing Overhead(b) 90,000(c) 275,000(d) 180,000(e) 230,000

(g) 761,000

Raw MaterialsBal. 3,000(a) 915,000Bal. 18,000

(b) 900,000

Accumulated Depreciation(d) 180,000

Accounts Payable(a) 915,000(e) 230,000

Wages Payable

(c) 370,000

Finished GoodsBal. -0-(g) 1,650,000

Underapplied Overhead

Costs

Underapplied Overhead

Costs

Page 37: 1. Introduction

End of Chapter 3

Page 38: 1. Introduction

38

Thank you!

@EICabudhabiEuropean International College-AbuDhabi EIC Abu Dhabi


Recommended