Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | marybeth-kelly |
View: | 214 times |
Download: | 1 times |
1
IPv6 and ETSI : some initiativesIPv6 and ETSI : some initiatives
[email protected] Interoperability service manager+ 33 4 92 94 43 06
SEE MORE AT WWW.ETSI.ORG/PLUGTESTS
3rd IPv6 Interoperability event – Cannes September 2002
- Reference to IPV6 by committees (e.g. 3GPP)
- Interoperability events
- IP-T (testing) committee
- IPv6 logo programme
2
44thth IPv6 Task Force Meeting IPv6 Task Force MeetingIPv6 Roadmap RecommendationsIPv6 Roadmap Recommendations
Approved recommendations:
….The requirement for IPv6 implies a need for coordinated trials and tests …. – which are more likely to succeed via both harmonisation of standards and readily available interoperability events (such as those offered by ETSI). ….
European Industry is called to: … Support and fully participate in interoperability events
organised notably by ETSI, … …
3
The ETSI interoperability service: The ETSI interoperability service: a new permanent service since end 2000.a new permanent service since end 2000.
• Experiment in the period ’99 – 2000 the Experiment in the period ’99 – 2000 the interest to complement the standardisation interest to complement the standardisation works using regular meetings by the works using regular meetings by the organisation of « bake-offs » where organisation of « bake-offs » where participants bring implementations/products;participants bring implementations/products;
• Confirm at the GA 35, nov. 2000, the interest Confirm at the GA 35, nov. 2000, the interest of such service and create a permanent one: of such service and create a permanent one: the ETSI Interoperability Service;the ETSI Interoperability Service;
• July 2001: change the name « bake-off » , a July 2001: change the name « bake-off » , a trade-mark of Pillsbury by « Plugtests » trade-mark of Pillsbury by « Plugtests »
• End 2002, 600 companies send about 2000 End 2002, 600 companies send about 2000 engineers to 26 interoperability eventsengineers to 26 interoperability events
4
We organize We organize PlugtestsPlugtests events events
• PlugtestsPlugtests: : interoperability tests event where engineers interoperability tests event where engineers of competing companies get together to test a (draft) of competing companies get together to test a (draft) standard and their implementationsstandard and their implementations
• Plugtests event:Plugtests event:
– open event, I.e. everyone implementing the standard is open event, I.e. everyone implementing the standard is welcome to participatewelcome to participate
– closed event, i.e. no sales & marketing representatives, closed event, i.e. no sales & marketing representatives, no customersno customers
• Goal: improving interoperability by enhancing the quality Goal: improving interoperability by enhancing the quality of the specificationof the specification
• Open to all communication standardsOpen to all communication standards
5
28 ETSI Interoperability events28 ETSI Interoperability events organised (at Jan ’03 ):organised (at Jan ’03 ):
VoIP Telephony & Multimedia ( 5 events)VoIP Telephony & Multimedia ( 5 events)
Bluetooth ( 4)Bluetooth ( 4)
IPv6 (2000, 2001, 2002)IPv6 (2000, 2001, 2002)
Speech Quality (2)Speech Quality (2)
OMA SyncML (1+1 in 2002)OMA SyncML (1+1 in 2002)
SIP (2)SIP (2)
SCTP/SIGTRAN (3)SCTP/SIGTRAN (3)
Smart Card (2) including JavacardSmart Card (2) including Javacard
Hiperlan2 (2)Hiperlan2 (2)
J2ME (1) – new concept of Virtual interoperability eventJ2ME (1) – new concept of Virtual interoperability event
DSL (1)DSL (1)
OMA IMPS (Wireless Village) (1)OMA IMPS (Wireless Village) (1)
6
Plan for 2003 : 15 to 20Plan for 2003 : 15 to 20 2nd Hiperlan22nd Hiperlan2 January January
Lawfull Interception Lawfull Interception FebruaryFebruary
MPLSMPLS February February
SMSSMS March or JuneMarch or June
OSA/PARLAYOSA/PARLAY AprilApril
Remote IPv6Remote IPv6 12-14 May12-14 May
SMSSMS June if not MarchJune if not March
33rdrd Hiperlan2 Hiperlan2 JulyJuly
IPsecIPsec JulyJuly
44thth IPv6 IPv6 22-26 September22-26 September
BluetoothBluetooth SeptemberSeptember
Electronic SignatureElectronic Signature OctoberOctober
Smart CardSmart Card OctoberOctober
J2MEJ2ME OctoberOctober
IPCableIPCable NovemberNovember
PowerlinePowerline NovemberNovember
3G, OPIUM, DSL, PKI, TETRA, LBS, …3G, OPIUM, DSL, PKI, TETRA, LBS, … To be allocatedTo be allocated
8
IPT GroupIPT Group• MTS IP Testing groupMTS IP Testing group
– See See http://www.http://www.etsietsi.org/.org/ptccptcc//ptccIPTptccIPT..htmhtm
• Formed in October 2002Formed in October 2002
– Well supportedWell supported
– Will work on both conformance and interoperabilityWill work on both conformance and interoperability
– IPv6IPv6
» Scoping phase started (STF236)Scoping phase started (STF236)
• Finish April 2003Finish April 2003
• Proposal for eEurope 2005Proposal for eEurope 2005
» Test methods, TPs, Test SuitesTest methods, TPs, Test Suites
» close cooperation with IPv6 Forum and 3GPPclose cooperation with IPv6 Forum and 3GPP
– SIGTRANSIGTRAN
» voluntary work (12 organizations so far)voluntary work (12 organizations so far)
» specifying conformance tests for M3UA and SCTspecifying conformance tests for M3UA and SCT
– Others to be definedOthers to be defined
9
The IPv6 Ready Logo ProgrammeThe IPv6 Ready Logo Programme
Laurent ToutainLaurent Toutain
César Viho César Viho
10
Why a Logo ProgrammeWhy a Logo Programme
• Avoid confusion in the mind of customers with a Avoid confusion in the mind of customers with a unique programmeunique programme
• Give a strong signal to the market of IPv6 Give a strong signal to the market of IPv6 availabilityavailability
• Prove the interoperability degree of various IPv6 Prove the interoperability degree of various IPv6 productsproducts
• Enhance confidence of users that IPv6 is Enhance confidence of users that IPv6 is currently operationalcurrently operational
To summarize, this logo programme will contribute to the feeling that IPv6 is available and ready to be used
11
A SMOOTH AND GRADUAL APPROACHA SMOOTH AND GRADUAL APPROACH
• Two phases :Two phases :
– Short-term period (Bootstrap) Short-term period (Bootstrap)
» Pragmatic approachPragmatic approach
» Mainly based on existing interoperability eventsMainly based on existing interoperability events
IPv6 mandatory core protocols and interoperability IPv6 mandatory core protocols and interoperability
– Long-term periodLong-term period
» Formal approach Formal approach
» Based on requirements issued by the IPv6 Logo Based on requirements issued by the IPv6 Logo Committee (v6LC)Committee (v6LC)
product has successfully satisfied strong formal product has successfully satisfied strong formal requirements requirements
12
THE IPv6 LOGO PROGRAMME COMMITTEE THE IPv6 LOGO PROGRAMME COMMITTEE (v6LC)(v6LC)
• Giving the right to affix the IPv6 logos for Giving the right to affix the IPv6 logos for productsproducts
• Composed by 21 persons representative of Composed by 21 persons representative of the expertise of the different main actors the expertise of the different main actors involved in IPv6 : members are either involved in IPv6 : members are either equipment vendors, providers, academics, equipment vendors, providers, academics, organizations, and test laboratoriesorganizations, and test laboratories
13
HOW TO REQUEST AN IPv6 LOGO?HOW TO REQUEST AN IPv6 LOGO?
• Procedures to request will be based on self Procedures to request will be based on self declaration modedeclaration mode
• The IPv6 Logo Committee will define The IPv6 Logo Committee will define procedures and rules (including application procedures and rules (including application forms) to obtain an IPv6 Logoforms) to obtain an IPv6 Logo
• Companies interested in obtaining an IPv6 Companies interested in obtaining an IPv6 logo for a product must contact the v6LC logo for a product must contact the v6LC and send the appropriate application forms and send the appropriate application forms
14
CONCLUSIONCONCLUSION
-> Come to ETSI World wide interoperability events-> Come to ETSI World wide interoperability events
- May remote multi-sites- May remote multi-sites
- September Brussels, 22-26- September Brussels, 22-26
http://www.etsi.org/plugtestshttp://www.etsi.org/plugtests - > Contribute to the work on test specification - > Contribute to the work on test specification
coordinate by MTS IPT groupcoordinate by MTS IPT group
http://www.http://www.etsietsi.org/.org/ptccptcc//ptccIPTptccIPT..htmhtm
-> follow up and support the logo programme -> follow up and support the logo programme
and the french team INRIA/IRISA/ENST ..and the french team INRIA/IRISA/ENST ..
See also See also www.irisa.fr/tipiwww.irisa.fr/tipi
THANK YOU THANK YOU