Date post: | 01-Apr-2015 |
Category: |
Documents |
Upload: | renee-taplin |
View: | 214 times |
Download: | 1 times |
1Istanbul, Turkey
October 26-28, 2004
Hazard Risk Hazard Risk Management Management
in Europe and Central in Europe and Central Asia Asia
WorkshopWorkshop
Albania
Mihallaq SpirollariMihallaq SpirollariNational Project OfficerNational Project OfficerDisaster Management and Emergency Preparedness ProjectDisaster Management and Emergency Preparedness Project
Findings of the Findings of the
Risk Assessment Risk Assessment Study in AlbaniaStudy in Albania
2
DISASTER MANAGEMENT ANDEMERGENCY PREPAREDNESS PLANS
Planning elements in terms of:
Physical damage to identified elements at risk
Related economic losses
Homelessness
Human casualty for each hazard are separately quantified.
Albania
3
RISK ANALYSIS, QUANTIFICATIONS, MAPPING
Earthquakes
Floods
Landslides and Rockfalls
Forest Fires
Winter-storms, Snowstorms
Epidemics
Mapping of critical industrial
and other facilities
Albania
4
ELEMENTS AT RISK
Population
Housing (individual, collective)
Public Buildings (Schools, Hospitals)
Sections/Facilities of Vital
Transportation routes
Critical industrial facilities & Dams Albania
5
Networking Ministry of Local Government &
Decentralization, GOV of Albania Ministry of Public Works Ministry of Health Ministry of Agriculture Ministry of Transportation Ministry of Education and Science Ministry of Environment Academy of Science
Albania
6
For each year, the annual frequencies of respective district are normalized by the annual Country frequency and presented as percents.
Y 2001 (9.6%)
9,6
Y 1995Y 1996Y 2000
DEVOLL
KOLONJE
POGRADEC
KORCE
BULQIZE
DIBER
LIBRAZHD
HAS
KUKES
PUKE
TROPOJE
ELBASAN
GRAMSH
SKRAPAR
DELVINE
SARANDA
TEPELENA
PERMET
GJIROKASTER
MAT
MIRDITE
KRUJE
TIRANA
BERAT
MALLAKASTER
KUCOVE
VLORA
LUSHNJE
PEQIN
MALESI EMADHE
SHKODER
DURRES
LEZHE
KURBIN
FIER
KAVAJA
Year of 2001
0
1 ,63 ,24 ,86 ,48 ,0
to to to to to to
1 ,63 ,24 ,86 ,48 ,09 ,6
(10)
(14) (6)
(5)
(0)
(1)
[% of Country Total]
60,958.4 Cases
An
nu
al F
req
uen
cy o
f D
iarr
ho
eal
Dis
ease
s B
y D
istr
icts
Albania
7 100
Yea
rs R
etu
rn P
erio
d o
f th
e M
axim
um
Flo
od
Po
ten
tial
Map
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
Flood Risk Zone
Extreme
Low
Moderate
Considerable
High
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
Flooding of 1962/63
Flooded Area
Lakes
Rivers
100
Yea
rs R
etu
rn P
erio
d W
est
Pla
in F
loo
d R
isk
Map
Albania
8Sta
bili
ty o
f N
atu
ral S
lop
es A
lon
g t
he
Ro
ad N
etw
ork
in R
elat
ion
to
RP
-200
S
eism
ic E
xcit
atio
n
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
0.30 – 0.45 g
< 0.15 g
0.15 – 0.30 g
Excitation Level
National Roads
Principal Roads
Relatively Stable
Unstable
Stable
Stability of Natural Slopes
Sta
bili
ty o
f N
atu
ral S
lop
es A
lon
g t
he
Rai
lway
Net
wo
rk in
Rel
atio
n t
o R
P-2
00
Sei
smic
Exc
itat
ion
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
Railway SystemAlbania
9
Low Risk Medium Risk High Risk Very High Risk
Fo
rest
Fir
e R
isk
Map
of
Alb
ania
/b
y D
istr
icts
/
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
Avalanche Risk Region
Lake
Regional
National
Road Type
Sn
ow
Ava
lan
che
Ris
k M
ap
Albania
10
5-D
ays
Sn
ow
Co
ver
Ris
k
Albania
25.2
> 120
5
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
RP - 2, AP=50%
RP - 5, AP=20%
RP -10, AP=10%
RP -20, AP=5%
RP>20, AP<5%
National
Regional
Road Type
Table 41.1 Population by Snow-Cover Duration Zones (% of Country Population)
Return Period (Years)
2 5 10 20
> 5 25.8 51.2 55.4 57.5
> 10 20.4 32.4 36.2
> 15 13.5 21.9 24.3 26.0
> 20 5.6 17.8 22.0 23.7
> 25 3.1 13.0 18.1 21.8
> 30 1.9 7.0 15.7 18.1
> 60 0.1 0.4 1.5 3.3
> 90 0.1 0.1 0.4
0.0 0.1
50 20 10
Annual Probability (in %)
Nu
mb
er o
f C
on
secu
tive
Sn
ow
-Co
veri
ng
Day
s
11
15 Earthquake ScenariosFor Return Periods: 50, 100, 200, 475, 1000, 5000 & 10000 Years
1- ScE-01 Shkodra 6- ScE-06 Vlora 11- ScE-11 Diber
2- ScE-02 Lezhe 7- ScE-07 Himare 12- ScE-12 Pogradec
3- ScE-03 Tirana 8- ScE-08 Tapeline 13- ScE-13 Kukes
4- ScE-04 Durres 9- ScE-09 Saranda 14- ScE-14 Leskovik
5- ScE-05 Berat 10- ScE-10 Elbasan 15- ScE-15 Petrovac
Mapping for PGA = 0.15 and 0.30g, g=9.81 m/s/s
15 Earthquake ScenariosFor Return Periods: 50, 100, 200, 475, 1000, 5000 & 10000 Years
1- ScE-01 Shkodra 6- ScE-06 Vlora 11- ScE-11 Diber
2- ScE-02 Lezhe 7- ScE-07 Himare 12- ScE-12 Pogradec
3- ScE-03 Tirana 8- ScE-08 Tapeline 13- ScE-13 Kukes
4- ScE-04 Durres 9- ScE-09 Saranda 14- ScE-14 Leskovik
5- ScE-05 Berat 10- ScE-10 Elbasan 15- ScE-15 Petrovac
Mapping for PGA = 0.15 and 0.30g, g=9.81 m/s/s
Albania
12
RP-200 Years
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
KORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCAKORCA
POGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADECPOGRADEC
PESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPIPESHKOPI
KUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKESKUKES
BAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRIBAJRAM CURRI
BULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZABULQIZA
SARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDASARANDA
GIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTROGIROKASTRO
ELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASANELBASAN
BERATBERATBERATBERATBERATBERATBERATBERATBERAT
TIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANATIRANA
FIERFIERFIERFIERFIERFIERFIERFIERFIER
SHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRASHKODRA
DURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRESDURRES
VLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORAVLORA
11
22
33
44
55
66
77
88
99
1010
1111
1212
1313
1414
1515
Albania
13
Evacuation
0
50,000100,000
150,000200,000
250,000
300,000350,000
400,000450,000
500,000
10 100 1000
Shkodra
Lezha
Tirana
Durres
Berat
Vlora
Himara
Tepelena
Saranda
Elbasan
Dibra
Pogradec
KukesReturn Period, Years
Mortality/10,000 Population
0102030405060708090
100
10 100 1000
Lezha
Tirana
Durres
Berat
Vlora
Himara
Tepelena
Saranda
Elbasan
Dibra
Pogradec
KukesReturn Period, Years
Damage States D3+D4
0
5000
10000
15000
20000
25000
30000
1 2 3 4 5
BERAT
BULQIZE
DELVINE
DEVOLL
DIBER
DURRES
ELBASAN
FIER
GRAMSH
GJIROKASTER
HAS
KAVAJE
KOLONJE
KORÇE
KRUJE
KUÇOVE
KUKES
KURBINReturn Period, Years
50 100 200 475 1000
Damage State D5
0
2000
4000
6000
8000
10000
12000
14000
1 2 3 4 5
BERAT
BULQIZE
DELVINE
DEVOLL
DIBER
DURRES
ELBASAN
FIER
GRAMSH
GJIROKASTER
HAS
KAVAJE
KOLONJE
KORÇE
KRUJE
KUÇOVE
KUKES
KURBINReturn Period, Years
50 100 200 475 1000
Albania
14
Table Eq.8 Scenario Earthquake Estimates on Human Casualty and Homelessness for Return Periods of 50, 100, 200 and 475 Years /per 10,000 of Country Population/
Return Period 50 Years Return Period 100 Years
I1 I2+I3 M Homeless
Scenario Earthquake I1 I2+I3 M Homeless
- - - 71 Shkoder - - - 135 - - - 95 Lezhe - - - 158 - - - 99 Tirana - - - 174 - - - 125 Durres 0.01 0.04 0.01 322 - - - 153 Berat - 0.01 - 272
- - - 145 Vlore 0.04 0.17 0.06 324 - - - 41 Himare - - - 71 - - - 84 Tepelena 0.01 0.04 0.02 152 - - - 20 Saranda - 0.01 - 37 - - - 195 Elbasan 0.06 0.25 0.09 347 - - - 111 Diber 0.04 0.11 0.05 177 - - - 145 Pogradec 0.02 0.06 0.02 231 - - - 124 Kukes 0.03 0.14 0.05 196
- - - 21 Leskovik - - - 33
- - - 86 Petrovac - - - 97
Return Period 200 Years Return Period 475 Years
I1 I2+I3 M Homeless
Scenario Earthquake I1 I2+I3 M Homeless
0.10 0.41 0.15 258 Shkoder 4.40 12.27 4.82 546 0.01 0.06 0.02 262 Lezhe 0.72 2.01 0.79 523 0.02 0.07 0.03 296 Tirana 0.42 1.39 0.53 607 2.55 6.68 2.67 795 Durres 29.26 74.46 29.98 1886 0.10 0.48 0.17 524 Berat 6.20 15.99 6.42 1162 2.23 5.71 2.3 713 Vlore 23.17 58.99 23.73 1504 0.01 0.04 0.02 127 Himare 1.09 3.28 1.26 266 0.30 0.88 0.34 289 Tepelena 6.00 16.07 6.37 604
0.14 0.42 0.16 70 Saranda 1.45 4.01 1.58 137 1.95 5.35 2.11 640 Elbasan 13.69 36.85 14.61 1243 1.47 2.38 1.1 279 Diber 8.86 14.70 6.74 409 0.63 1.76 0.69 399 Pogradec 11.02 28.45 11.39 759 0.55 1.73 0.66 272 Kukes 3.45 10.53 4.05 427
- - - 45 Leskovik - - - 69
- - - 151 Petrovac - 0.02 0.01 252
I1 – Light Injuries I2 – Injuries for Hospitalization I3 – Injuries for Immediate Medical Attention M – Mortality
Table Eq.7 Scenario Earthquake Estimates on Structurally Damaged (D3, D4) and Collapsed (D5) Building Stock by Prefectures for Return Periods of 50, 100, 200 and 475 Years
RP-50 Years RP-100 Years RP-200 Years RP-475 Years
D3+D4 D5 D3+D4 D5 Qark
D3+D4 D5 D3+D4 D5
1,263 115 2,295 419 Berat 4,363 1,785 5,071 3,944
3,144 748 4,605 2,392 Diber 5,367 5,751 6,551 7,692
3,450 213 9,481 1,651 Durres 17,102 7,697 17,912 13,041
5,906 674 11,161 2,004 Elbasan 19,378 6,728 22,745 12,997
6,751 508 15,740 2,665 Fier 28,015 11,201 29,567 20,842
2,234 302 3,808 841 Gjirokaster 6,979 2,833 7,710 5,632
5,168 525 9,078 1,608 Korca 16,925 5,877 19,382 12,571
1,008 83 1,892 273 Kukes 3,219 905 3,807 1,794
1,039 35 1,757 137 Lezhe 3,664 579 5,825 1,557
3,124 218 5,835 773 Shkoder 12,294 3,334 15,320 7,998
4,998 192 11,847 1,172 Tirana 26,546 6,729 33,612 16,967
3,177 334 5,297 938 Vlora 10,580 2,852 13,776 7,033
RP-50 Years RP-100 Years RP-200 Years RP-475 Years
D3+D4 (%) D5 (%) D3+D4 (%) D5 (%) Qark
D3+D4 (%) D5 (%) D3+D4 (%) D5 (%)
5.53 0.23 9.20 0.84 Berat 16.72 3.06 31.79 13.01
7.68 0.81 13.66 3.25 Diber 20.01 10.40 23.32 24.99
3.64 0.09 8.34 0.52 Durres 22.93 3.99 41.36 18.62
5.71 0.28 11.29 1.29 Elbasan 21.34 3.83 37.06 12.87
3.93 0.10 10.19 0.77 Fier 23.75 4.02 42.26 16.90
6.65 0.47 11.94 1.62 Gjirokaster 20.35 4.50 37.30 15.14
6.07 0.28 11.42 1.16 Korca 20.05 3.55 37.39 12.98
4.37 0.13 8.70 0.72 Kukes 16.33 2.36 27.78 7.82
3.28 0.08 5.22 0.18 Lezhe 8.83 0.69 18.42 2.91
4.40 0.14 8.06 0.56 Shkoder 15.05 1.99 31.71 8.60
3.81 0.10 6.45 0.25 Tirana 15.28 1.51 34.24 8.68
4.87 0.27 8.52 0.90 Vlora 14.20 2.52 28.35 7.64
Damage percents are calculated in respect to the total number of buildings in each prefecture (Table 1)
Albania
15
Phase I: Risk Assessment
Risk Assessment & Quantification of Elements for Elements for Disaster Management and Emergency Preparedness Disaster Management and Emergency Preparedness of Albania: of Albania: - Completed- Completed
Phase II: Disaster Planning Elements and Tools
Development of Disaster Information and Decision Support GIS system: - Completed- Completed
Development of National Disaster Plan – Underway
Testing of National Disaster Plan
For more: http://intra.undp.org.al/ext/elib/download/?id=638&name=Risk%20Assessment-Eng.pdf
Albania