1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa
Transcript
Page 1: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

1

LNG REFIT

“EIGER – NORDWAND”

Ben Maelissa,25 September 2014

Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 2: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

o Privately owned companyo Founded in 1982o Headquarters in Sliedrechto Branch offices :

o Sliedrecht (NL)o Antwerp (B)o Brussels (B)o Basel (CH)o Strasbourg (F)o Ottmarsheim (F)o Lille (F)

o Number of employees : 140 o Danser owned vessels : 4 o Danser chartered vessels : 60 o Transported in 2013 : > 1,0 million

TEU

Company profile

2Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 3: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Operating Area

3Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 4: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

“ Eiger-Nordwand”

Built 2000Overall lenght 177 meterWidth 11,45 meterDraft 2,56 meterTonnage 5300 tonnesCapacity (4 layers) 348 TEUEngines 2x 900 kW

Vessel particulars

1st LNG Refi t on In land Vesse l

4Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 5: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Project Targets

• Meet customer demand; green transportation• Meet upcoming legislation by ports and governments • Meet Danser Group strategy: Frontrunner in clean & safe

transportation • Emission meeting (expected) CCR4 requirements• Pilot for LNG refit on 4 more container vessels

How:• Installation Dual-Fuel propulsion system

(Wärtsilä Engine, Tank/ Coldbox)• Increased performance; fully redundant • Safety leading parameter in overall design

5Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 6: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

REFIT Arrangement

• Proven design of all major components, based on multiple years of experience • Dual-Fuel Engine: automatic switch over to gasoil in case of failure/ alarm• Dual-Fuel Engine: designed for LNG as main fuel (minimum 95%)• Dual-Fuel Engine with a/o double wall piping; gas safe Machinery Room ! • Gas detection and auto shut down of main LNG valve • Double redundant ventilation• Trained crew & management

6Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 7: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Project Summery

• Feb 2012• Jun 2012• July 2012• Dec 2012• Feb 2013• Mar 2013• Aug 2013• Sept 2013• Oct 2013• Feb 2014• Apr 2014• Jun 2014• Jul 2014

• Start project, initial discussions• Conceptual design by project team • Presentation to LRoS• Introduction to Ministery of Infrastructure (IL&T, I&M)• Submission call for TEN-T project• Start detailed design • Presentation at ADN meeting in Geneve• Presentation at CCR meeting in Strasbourg• HAZID study by LROS• Recommendation of CCR is recieved• Start refit• Tests, commissioning & trials • Refitted ship started its normal operations

7Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 8: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Reflecting current operations

• Between 20-25% reduction on fuel costs

• 95-99% LNG

• Building up confidence of crew on “working with” – “sailing on” LNG

• Less noise generation

• Bunkering time reduced to 3 hours

8Co-financed by European UnionTrans-European Transport Network (TEN-T)

Ben Maelissa

Page 9: 1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

THANK YOUQUESTIONS ?

www.danser.nl 9Co-financed by European Union

Trans-European Transport Network (TEN-T)Ben Maelissa