1 MISSOULA 2012 LONG RANGE TRANSPORTATION PLAN UPDATE SEPTEMBER 24, 2012
Transcript
Page 1: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

1

MISSOULA 2012 LONG RANGE TRANSPORTATION PLAN UPDATESEPTEMBER 24, 2012

Page 2: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

2

Project Tasks and Schedule

January to

March

• Issues and Needs

March to

May

• Funding Alternatives

May to

September

• Development of Preferred Plan

September

to December

• Plan Review and Approval

Page 3: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

3

Summary of Key Issues• Transportation funding is severely limited.• As the transportation system ages, an increased percent

of funds will be required for maintenance.• Congestion is inevitable.• Outward expansion is unaffordable.• The bicycle and pedestrian network provides a good

backbone but gaps need to be filled to create a complete network.

• Transit service is adequate but needs increased frequency and hours of service to attract choice riders.

• Need continued focus on reducing VMT through inward investment, TDM and ITS.

Page 4: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

4

Project Evaluation & Selection Process

Phase 1: Alternatives Development and Goals

1. Participants at the first public meeting purchased transportation improvements through the Connections Exercise to generate a range of ideas to address the region’s transportation needs. Expenditures by mode were calculated to determine range and themes.

2. Participants at the public meeting and members of the TAC and CAC weighted the project goals to be used for evaluating projects.

Page 5: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

5

Project Evaluation & Selection ProcessLRTP Project Goals1. Maintain our Existing Transportation

System.2. Improve the Efficiency, Performance

and Connectivity of a Balanced Transportation System.

3. Maximize the Cost Effectiveness of Transportation.

4. Promote consistency between land use and transportation plans to enhance mobility and accessibility.

5. Provide Safe and Secure Transportation.6. Support Economic Vitality. 7. Protect the Environment and Conserve

Resources.

Page 6: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

6

Funding Sources

Page 7: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

7

Funding SourcesSurface Transportation Program (STP) - Enhancement

ELIGIBILITY: Transportation enhancement activity.--The term "transportation enhancement activity" means, with respect to any project or the area to be served by the project, any of the following activities as the activities relate to surface transportation:• Provision of facilities for pedestrians and bicycles. • Provision of safety and educational activities for pedestrians and bicyclists. • Acquisition of scenic easements and scenic or historic sites (including historic battlefields). • Scenic or historic highway programs (including the provision of tourist and welcome center

facilities). • Landscaping and other scenic beautification. • Historic preservation. • Rehabilitation and operation of historic transportation buildings, structures, or facilities (including

historic railroad facilities and canals). • Preservation of abandoned railway corridors (including the conversion and use of the corridors for

pedestrian or bicycle trails). • Inventory, control, and removal of outdoor advertising. • Archaeological planning and research. • Environmental mitigation • Establishment of transportation museums.

Page 8: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

8

Funding SourcesCongestion Mitigation and Air Quality (CMAQ)

ELIGIBILITY: Eligible projects/programs include:• transportation activities in an approved State Implementation Plan, • transportation control measures to assist areas designated as nonattainment under the Clean Air

Act Amendments (CAAA) of 1990, • pedestrian/bicycle facilities, • traffic management/monitoring/congestion relief strategies, • transit (new system/service expansion or operations), • alternative fuel projects (including vehicle refueling infrastructure, clean fuel fleet programs and

conversions), • vehicle inspection and maintenance (I/M) programs, • intermodal freight,• telework/telecommuting programs, • travel demand management, • development activities in support of eligible projects (e.g. NEPA studies),• public education and outreach activities, • rideshare programs, • establishing/contracting with transportation management associations (TMAs),• fare/fee subsidy programs (operating subsidies have a 3-year limit),• HOV programs, including HOT lanes, • diesel retrofits, • truck-stop electrification, • experimental pilot projects, and• other transportation projects with air quality benefits.

Page 9: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

9

Funding Sources

Page 10: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

10

Project Evaluation & Selection Process

CategoriesBicycle + Trails

Emphasis ($M)

Transit Emphasis

($M)

Safety Emphasis

($M)

Roadway Emphasis

($M)

Maintenance Local + State Local + State Local + State Local + State

Pedestrian Local Local Local Local

Bicycle Lanes + Trails 25 10 10 10

Transit No Federal Funds for Capital

15 Federal Capital Funds

No Federal Funds for Capital

No Federal Funds for Capital

Roadway 8 8 8 23

Safety 6 6 21 6

ITS 1 1 1 1

TDMCommitted (Pending

Completion of TDM Programs Review)

Committed (Pending Completion of TDM Programs

Review)

Committed (Pending Completion of TDM Programs

Review)

Committed (Pending Completion of TDM Programs

Review)

Total 40 40 40 40

Transportation Investment Alternatives from Phase 1

Optional Slide

Page 11: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

11

Project Evaluation & Selection Process

Phase 2: Alternatives Analysis

1. Based on four investment themes, each alternative was evaluated regarding performance.

2. Participants at the second public meeting developed recommended fundning levels of each category.

3. CAC and TAC requested minor modificaitons.

Page 12: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

12

Project Evaluation & Selection Process (Version 1)

$%

FundingITS Safety

Adjusted Workshop Funidng

%Funding

Bike and Pedestrian $15,000,000 37.5% $15,000,000 37.5%

Safety $6,000,000 15.0% $1,500,000 $7,500,000 18.8%

Transit $12,000,000 30.0% -$750,000 $11,250,000 28.1%

Roadway Total $6,000,000 15.0% -$3,250,000 -$1,500,000 $1,250,000 3.1%

Sub Total $39,000,000 97.5% -$4,000,000 $0 $35,000,000 87.5%

ITS $1,000,000 2.5% $4,000,000 $5,000,000 12.5%

TDM (Maintain Committed) $0 0.0% $0 0.0%

Total $40,000,000 100% $40,000,000 100%

TAC & CAC Funding Alternative

Category

Workshop Funding (Non-Committed)

Optional Slide

Page 13: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

13

Project Evaluation & Selection Process (Version 2)

$%

Funding$

%Funding

ITS SafetyAdjusted

Workshop Funidng%

FundingTotal Funding

$%

Funding

Bike and Pedestrian $9,413,650 6.6% $15,000,000 37.5% $15,000,000 37.5% $24,413,650 13.4%

Safety $8,415,800 5.9% $6,000,000 15.0% $1,500,000 $7,500,000 18.8% $15,915,800 8.7%

Transit $33,785,265 23.7% $12,000,000 30.0% -$750,000 $11,250,000 28.1% $45,035,265 24.7%

Roadway Vehicular $59,950,880 42.0%

Roadway Bike Ped $14,987,720 10.5%

Roadway Total $74,938,600 52.6% $6,000,000 15.0% -$3,250,000 -$1,500,000 $1,250,000 3.1% $76,188,600 41.7%

ITS $0 0.0% $1,000,000 2.5% $4,000,000 $5,000,000 12.5% $5,000,000 2.7%

TDM (Maintain Committed) $16,035,688 11.2% $0 0.0% $0 0.0% $16,035,688 8.8%

Total $142,589,003 100.0% $40,000,000 100.0% $40,000,000 100.0% $182,589,003 100.0%

Category

Committed FundingWorkshop Funding (Non-Committed)

TAC & CAC Funding Alternative

Total Funding Allocation

Optional Slide

Page 14: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

14

Project Evaluation & Selection ProcessPhase 3: Finalize Funding and Project Selection1. Refine available funding based

on total funding minus committed funding.

2. Allocate remaining funding to each category.

3. Evaluated projects based on project goals.

4. Sort projects by score5. Select projects that scored high

within the available budget.

Project Evaluation ProcessEach project was scored high (3), medium (2), or Low (1) for each goal. A project score was the cumulative sum of each goal score times the goal’s weight. Project scores were prioritized from high to low, with the highest being selected for LRTP funding and the lower score projects as illustrative.

Page 15: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

15

Funding Allocation

CategoryPreviously Committed

TAC & CAC Suggested

Uncommitted Allocations

Recommended New

Commitment Allocations

Bike and Pedestrian $9,413,650 37.5% $6,880,000 Safety $8,415,800 18.8% $1,500,000 Transit $33,785,265 28.1%

Roadway $74,938,600 3.1%ITS $0 12.5% $1,500,000 TDM $16,035,033 0.0%Total $142,588,348 100.0% $9,880,000

Page 16: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

16

Non-Motorized Project Evaluation

Page 17: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

17

Proposed Non-Motorized Projects

Page 18: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

18

Proposed Safety Projects

Page 19: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

19

Proposed Safety Projects

Page 20: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

20

Mountain Line Transit• Transit Plan based on “Focus Inward” land use plan

⁻ Less congestion,⁻ Shorter trip times,⁻ Increased travel options,⁻ Less infrastructure costs to taxpayers, and ⁻ Preservation of open space and agricultural/recreational areas.

• Five-phase Short and Long Range Plan that is a blueprint for Mountain Line through the year 2040.

• The Plan coordinates transit investments with land use by establishing a Primary Transit Network.

• The Primary Transit Network is supported by other important transit services that include: ⁻ Lower frequency collector routes, ⁻ Regional express routes, ⁻ Bike and pedestrian facilities, and ⁻ Paratransit services.

Page 21: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

21

Mountain Line Transit• The Primary Transit Network is for all-day transit service that,

at full build-out, operates every 15 minutes or better on weekdays and every 30 minutes or better on Saturdays, for at least 16 hours a day.

• The network focuses on six key dimensions of transit quality: frequency, span of operation, speed, reliability, loading, and coverage.

• Achieving full build-out of the Primary Transit Network requires: ⁻ Years of transit investment, ⁻ Transit-oriented development to increase ridership along priority

corridors. ⁻ Phases I and II are planned for implementation within the MUTD five-

year plan

Page 22: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

22

Mountain Line Transit

Phase 2 and 5 maps

Page 23: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

23

Roadway Project Evaluation

Page 24: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

24

Proposed Roadways

Page 25: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

25

Intelligent Transportation Systems (ITS)

The Missoula area traffic signals regulate traffic flow and has. Updated signal systems have reported up to a 20 percent decrease in travel time and delay.

• Update Signal Controllers

• Install Advanced Vehicle Detection

• Adaptive Traffic Signal Control

• Transit Signal Priority

Page 26: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

26

Transportation Demand ManagementTravel Options Program Goals• Goal 1 Equity: Provide safe and accessible travel options for people of all

abilities and for all modes. • Goal 2 Economic Development: Focus travel options investments to ensure

businesses thrive and residents and visitors can access employment, education, recreation, and community services.

• Goal 3 Health and Environment: Reduce vehicle miles traveled to improve air quality, reduce congestion, help existing infrastructure endure, enhance community health, and improve the quality of life for all Missoulians.

• Goal 4 Shifting Culture: Focus travel options marketing and outreach to commuters, non-commuters, youth, and the elderly to contribute to a shift in culture that embraces non-single-occupancy vehicle travel options.

• Goal 5 Performance: Develop a dynamic performance monitoring process to ensure transportation dollars are spent responsibly to increase the lifetime of existing transportation infrastructure.

• Goal 6 Safety: Improve the understanding of the rules of the road by all users to reduce conflict and improve safety.

Page 27: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

27

Transportation Demand Management

Page 28: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

28

Transportation Demand Management

Page 29: 1 M ISSOULA 2012 L ONG R ANGE T RANSPORTATION P LAN U PDATE S EPTEMBER 24, 2012.

29

What’s Next

• Complete questionnaire and provide comments on boards for input into draft report.

• Month of October refine funding forecasts, project lists and prepare draft report

• November receive comments from public, TAC and CAC and update to Draft Final

• Review and approval by TAC, CAC and Policy Board


Recommended