+ All Categories
Home > Documents > 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

Date post: 06-Jan-2018
Category:
Upload: agatha-lindsay-small
View: 220 times
Download: 0 times
Share this document with a friend
Description:
3 The Bullwhip Effect… … describes the phenomenon in which order variability is amplified as it moves up the supply chain from end- consumers through distribution and manufacturing to raw material suppliers.
22
1 Miscellaneous John Vande Vate Spring, 2007
Transcript
Page 1: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

1

Miscellaneous

John Vande VateSpring, 2007

Page 2: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

2

Agenda

• Bull Whip• IT• Summary• Project Presentations

Page 3: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

3

The Bullwhip Effect…

… describes the phenomenon in which order variability is amplified as it moves up the supply chain from end-consumers through distribution and manufacturing to raw material suppliers.

Page 4: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

4

Example

Procter & Gamble: Pampers• Smooth consumer demand• Fluctuating sales at retail stores• Highly variable demand on distributors• Wild swings in demand on manufacturing• Greatest swings in demand on suppliers

Page 5: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

5

IllustrationConsumer Sales at Retailer

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Con

sum

er d

eman

d

Retailer's Orders to Distributor

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Ret

aile

r O

rder

Page 6: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

6

IllustrationRetailer's Orders to Distributor

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Ret

aile

r O

rder

Distributor's Orders to P&G

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Dis

trib

utor

Ord

er

Page 7: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

7

IllustrationDistributor’s Orders to P&G

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Dis

trib

utor

Ord

er

P&G's Orders with 3M

0

100

200

300

400

500

600

700

800

900

1000

1 4 7 10 13 16 19 22 25 28 31 34 37 40

P&G

Ord

er

Page 8: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

8

IllustrationConsumer Sales at Retailer

0

100

200

300

400

500

600

700

800

900

1000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Con

sum

er d

eman

d

P&G's Orders with 3M

0

100

200

300

400

500

600

700

800

900

1000

1 4 7 10 13 16 19 22 25 28 31 34 37 40

P&G

Ord

er

Page 9: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

9

Efforts to Resolve• CPFR: Collaborative Planning, Forecasting &

Replenishment– Share forecasts, plans for promotions, etc.

• VMI: Vendor Managed Inventory– Let the supplier manage the inventory (consigned to

the customer)• Visibility:

– ASN (Advanced Shipment Notices)– Track & Trace– Event-driven notifications

Page 10: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

10

Events Opposing

• SKU Proliferation• Shorter product life cycles• Consignment Inventory practices• Globalization• Tight global transport capacity• Supply Chain Disruptions

Page 11: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

11

IT• Y2K Threat helped justify revamp of corporate

software• By 2000 companies were spending nearly 50% of

capital investment $ on technology, up from 30% in the early 90’s.

• Consequences– Internet bubble and ill-considered investments in IT

applications much of it in the SC arena– Huge investments in ERP systems– Emergence of the CIO role– Prominence of Supply Chain Mgt

Page 12: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

12

Post Mortem• Consolidation in ERP providers

– SAP and Oracle• Standardization and Integration

– Diminishing role for CIO• Evolving cloud of bolt-on technologies

– APS: Advanced Planning & Scheduling Systems• I2, Ilog, Manugistics, Aspen Technologies, SAP, Oracle

– S&OP: Sales & Operations Planning• Balance supply and demand• Interlace, Steelwedge, Logility, …

– TMS: Transportation Management Systems• Consolidation, Carrier Selection, Routing, Tracking, Invoice Audit, Labeling, Export compliance, …• I2, Manugistics, Red Prairie, Tranzact, …

Page 13: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

13

More Bolt-ons

• WMS: Warehouse mgmt systems• CRM: Customer relationship management• Procurement solutions• …

Page 14: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

14

Evolving Architecture

• Layered approach– Decomposes complexity– Reuse functionality– Separate evolutin– Less reliance on single provider

Client

Presentation Layer

Business Logic Layer

Data Layer

Page 15: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

15

Projects• Deliverables:

– Presentation to the Class– Presentation to the Client– Documented CD to the client and to me

• Presentation to the Class < 30 minutes– What is the Issue and business context– What value does your approach provide– How does it fit/fail to fit the context– Some technical details (and backup slides)– A proposed exam question

Page 16: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

16

Projects

• Presentation to the Client– Can be combined with class presentation or

separate– Can be via teleconference– What the client wants– Focus on value, fit, requirements and

limitations– Be prepared to discuss techniques– CLARITY

Page 17: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

17

Projects• Documented CD

– Index and explanation– Data– Models– Tools– Presentations– …

• Imagine a similar team will be asked to extend the project. What will they need?

Page 18: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

18

Some Basics

• Remember to do the simple thing first• Process is as important as result• Fit with context is more important than

“optimality” and “technology”• Is your process worth the effort, as simple

as possible, sustainable, supportable, …• Why, Value, What,

Page 19: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

19

Course Review• Introduction to modes and transportation rates

– There are economies of scale in transportation costs– Consolidation helps us capitalize on these economies of

scale• Introduction to Finance & SCM

– Focus on Working Capital• Transportation & “Deterministic” Inventory

– The “magic” of consolidation– The EOQ: Balancing Transport & Inventory costs

• Consolidation– Multi-Stop– Load-Driven

Page 20: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

20

Review• Location: • Retail Pricing: Pricing what you have• Sport Obermeyer: Sourcing what you need• Inventory Management:

– Techniques– Pooling– Postponement

• SCM: BMW Case Study• IT: Lightening overview• Projects

Page 21: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

21

Projects• April 12: NS

– Mikac– Lai– Dayagi

• April 17: Coca Cola– Solveling– Lee– Kwan

• April 19: XYZ & GE Appliances– Meidl– Green– Tandon

Page 22: 1 Miscellaneous John Vande Vate Spring, 2007. 2 Agenda Bull Whip IT Summary Project Presentations.

22

Projects

• April 24: GE Energy– Walker– Sanchez– Gupte

• April 26: BMW & Children’s Hospital– VPS– Ship-to-Average– Children’s Hospital


Recommended