1
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
MOBIL OIL CORPORATIONMOBIL OIL CORPORATIONBeaumont RefineryBeaumont Refinery
PROFIT IMPROVEMENT PROGRAMPROFIT IMPROVEMENT PROGRAMManagement ReviewManagement Review
2
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Today’s AgendaToday’s Agenda
PIP Status
Opportunity development update Reformer and Aromatics Gasoline Blending Udex Hydrocracker Coker FCC Other
What’s next
3
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PIP StatusPIP Status
9 months into PIP program
Many opportunities screened Technical feasibility; Preliminary economics Reviewed with operations Actions taken on many operational opportunities
PETROfine refinery simulation Validated versus base month Refinery-wide economics to be determined
Especially stream management items Anticipate additional ideas will surface
4
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Reformers/AromaticsReformers/Aromatics
Overview: Major drivers:
Benzene sales Octane-barrels
Undersized reformate splitter and UDEX result in blending of about 5 TBD of aromatics concentrate
Some improvements made PTR-4 rate and yields likely to increase
Some PTR-4 aromatics capacity “wasted” 10-20% C9+ in feed High IC6 content in feed Some recycle of PTR-3 products
Potential for additional xylene recovery Low-capital options for Afrac Economics currently poor
5
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Reformate Splitter OptionsReformate Splitter Options
Current Hardware & Specs Limit Benzene Production C7 IP spec in bottoms to MTPX requires high reboiler duty Increasing reflux to reduce toluene in overhead floods tower High concentrations of toluene in overhead (aromatics concentrate)
takes up UDEX capacity
Add Tower Capacity Refinery investigating use of out-of-service UDEX xylene tower Requires about one mile of piping and condenser/exchanger
replacements
Increase Depentanizer Pressure Results in higher splitter feed temperature Improves fractionation at constant tray loading Requires 400# steam to depent reboiler $1.2MM/yr potential
6
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Reformate Splitter (2)Reformate Splitter (2)
Modify Splitter Configuration Move feed tray up and replace 10 trays with 4-pass Improves fractionation Requires minor capital and tower shutdown/bypass $3.0MM/yr potential
Bypass Portion of Splitter Feed to Blending Unloads tower and allows improved fractionation Run down bypassed stream with aromatics concentrate to keep
benzene segregated for gasoline blending Bypass enough to reduce aromatics concentrate blending to zero Net result is improved benzene/toluene separation
+720 BPD benzene from UDEX (constant aromatics charge) Up to $3.0MM/yr potential if 5 TBD aromatics concentrate going to
blending Requires short jump-over ($50k rough cost)
7
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PTR-3PTR-3
Improve PTR-3 Debutanizer Fractionation Tower was losing C6+ in overhead during G-season (high unit rates) Resulted in recycle of PTR-3 C6+ to PTR-4 feed Current operation shows improvement even at high rates Profit improvement of $0.7MM/yr+
PTR3 Debutanizer Overhead Quality
0
5
10
15
20
Dec-96 Mar-97 Jun-97 Sep-97 Jan-98 Apr-98
OH
Yie
ld (
Vo
l%)
0
20
40
60
80
100
Deb
ut
OH
C6+
8
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PTR-3 (2)PTR-3 (2)
Improve Stripper Fractionation/Control Stripper overhead LPG production has varied between zero and 2 TBD
Some feed quality variation Reflux on flow control; top temperature ranges between 150-250oF No LPG GC sample taken; performance test showed 35% C6+
C6+ in stripper overhead is reprocessed C5’s pretreated again at Isom; C6+ pretreated again at PTR-4
PTR-3 pretreater often limits reformer charge C6+ lost to stripper overhead is lost PTR-3 charge rate ($3/bbl)
Assuming roughly 1 TBD of C6+ in LPG can be charged to PTR-3 reformer, incentive is $0.7MM/yr
Recommend improved control/monitoring: Put reflux on top temperature control (done) Begin sampling stripper LPG; target <5% C6+
9
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PTR-3 (3)PTR-3 (3)
PTR3 Stripper Overhead Control
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Aug-97 Sep-97 Sep-97 Oct-97 Nov-97 Nov-97 Dec-97 Jan-98 Jan-98 Feb-98 Mar-98
Str
ipp
er O
verh
ead
Yie
ld (
Vo
l%)
0
50
100
150
200
250
300
350
Str
ipp
er T
op
Tem
per
atu
re (
F)
10
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PTR-4PTR-4
Process CHD-2 Naphtha CHD-2 naphtha has normally been processed in PTR-3
High C5/C6 content results in high LPG yields 15% of feed (750 BPD) to stripper LPG; takes up pretreater
capacity 25% of feed to debut overhead; aggravates debut flooding High nitrogen content (20 ppm) fouls debut trays and overhead
Processing in PTR-4 appears to make more sense Allows additional PTR-3 feed at constant pretreater capacity Reduces PTR-3 reformate benzene content
Accounts for 20% of benzene in full-range reformate Recently a blending constraint for RFG
PTR-4 debut has a water-draw tray to allow on-line washing for salts Refinery has implemented
All CHD-2 naphtha now going to PTR-4 Incentive of $0.4MM/yr +
11
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PTR-4 (2)PTR-4 (2)
Purchase Amoco Whiting Light Naphtha for PTR-4 Higher benzene yield than typical light naphtha
30% C6 N+A (Mobil Isom C6+ has 12%) <10% C7 N+A
Ideal PTR-4/UDEX feed for benzene production Term arrangement may be possible Reformate of this naphtha may also be available for UDEX feed
Segregated processing on Amoco reformer 32% Benzene, 8% Toluene (minimum) Typical UDEX Feed: 29% Benzene, 21% Toluene
KBC to evaluate incentives
12
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
IsomIsom
Route Wharf Natural Gasoline to CUA Depentanizer Incentive exists to increase natural gasoline purchases
NC5 upgraded to IC5 at Isom C6+ upgraded to aromatics/reformate at PTR-4
Volume of purchases currently limited by Isom pretreater capacity Capital project under development by Mobil to repipe depentanizer
upstream of pretreater Alternative is to process natural gasoline at CUA depent
C6+ portion (40%) goes direct to PTR-4 pretreater C5- portion (60%) goes to GP5E/Isom
Some concern with GP5E depropanizer loading CUA depentanizer currently underutilized
Max 50% of tower flood now Roughly 1500 ft of 4” piping needed (about $150k capital) Ballpark incentive of $1.5MM/yr (+2.0 TBD natural gasoline
purchases during G-season)
13
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Aromatics FractionationAromatics Fractionation
Relocate Xylene Tower Feed Tray Xylene tower (“#1 debut”) bottoms typically contains >40% mixed
xylenes Feed point is currently too high in the tower for optimum operation
More trays between feed and overhead xylene product required Increased xylene purity at constant flow Increased xylene product at constant purity
Moving feed point from tray 17 to tray 11 increases xylene potential >300 BPD increase Nozzles exist on every tower tray Current incentive only $120k/yr with current economics
Should consider if xylene price improves An additional 1-2 TBD of xylene recovery from C9+ is possible
More reboiler and condenser duties needed “Uniflux” trays may need replacement with valve or high-capacity
trays
14
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Aromatics Fractionation (2)Aromatics Fractionation (2)
Produce “Crystal Clear” Reformate from Afrac Afrac xylene tower can be operated to make 30 Saybolt C8/C9+
Trial performed by Mobil to confirm Stock could be sold to Amoco during G-season for water-white
premium production May also be valuable to Mobil to reduce endpoint blending problems
Maximize xylene tower overhead while controlling FBP Minimize bottoms (high FBP)
Segregate to blending pool Route to FCC fractionator? Blend as jet or diesel?
Requires further evaluation
15
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Gasoline BlendingGasoline Blending
Increase RFG Sales PETROfine blending studies show incentive to increase RFG
production Up to $1MM/yr/TBD RFG increase Raffinate and MTBE for incremental RFG volume available Similar results to Mobil back-casts RFG production currently constrained by marketing
Increasing export volume also has favorable economics Price is close to incremental conventional Specs are not as tight (RVP, benzene) Opportunity to push sulfur & benzene to limits
RFG constraints/opportunities still under study
16
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Gasoline Blending (2)Gasoline Blending (2)
Many Gulf Coast refiners make more RFG than Mobil
% RFG TBDRFG
0
10
20
30
40
50
60
70
% RFG TBDRFG
MobilRefinery ARefinery B
17
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
UdexUdex
Strong economic drivers $ ~7 /bbl Benzene recovery; $ ~2 /bbl Toluene recovery Extract rate limited; Trading purity and recovery for more capacity
Serious corrosion problems due to chlorides from reformate Solvent regeneration helps; carbon beds not very effective Upstream water washing would minimize chlorides
Simulation confirms unit bottlenecks Stripper flooding in bottom section; Flash drum vapor overloaded
Debottleneck by reducing solvent flow Unloads stripper and flash drum; reduces energy
Simulation shows potential of 10% more capacity $ ~4 MM/yr Preliminary plan for test being review this week
Process highly integrated Sensitive to changes; slow to reach steady-state Path to new operation difficult but achievable
18
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
HydrocrackerHydrocracker
Major economic drivers Improve yield selectivity
Increase LN and HN yield Reduce LPG yield
Improve fractionation Recover benzene processors to LN Recover HN/Kero from recycle oil (2nd stage feed)
Reduce catalyst deactivation; extend catalyst life
Process simulation model enhanced Rigorous tray-to-tray fractionation integrated with reactor models
19
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (2)Hydrocracker (2)
Optimize second stage conversion - In Progress Maximize recycle feed to 2nd stage to minimize temperatures
Lower reactor temperatures, higher recycle rate improves selectivity
Increased LN and HN production Decreased light ends production benefits stabilizer fractionation
Hydrogen demand decreases with less light ends production Benefits
Increased high value product yields ( R3 - 5 F ) $ 2.2 million/yr Based on incremental gasoline value Aromatics recovery upgrade determined by downstream units
Decreased total hydrogen demand ( 67 SCFB ) Decreased purchase naphtha requirements
Costs Increased utilities at higher recycle rates; Reboilers limiting
20
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (3) Hydrocracker (3)
Reduced Rx Temperature and Increased Recycle Rate
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
28 29 30 31 32 33 34 35 36 37
Recycle Rate TBD
Pro
du
ct
Ra
te T
BD
Butane Gasoline Lt Naphtha HyNaphtha Kero Diesel
21
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (4) Hydrocracker (4)
0
1.46
0.44
2.61
-1.0
0.0
1.0
2.0
3.0
Pro
du
ct
Va
lue
, $M
M/y
rIncentive for Increased Recycle
Constant RCOIncreased RCO
Dist TBD 1.1 1.1 0.4 0.4RCO TBD 29 33 29 35 R3 T Base -5 +2 -5
22
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (5) Hydrocracker (5)
Recover C6+ from gasoline stream - In Progress Stabilizer/splitter simulation confirms plant experience
Flooding in top of stabilizer with high light ends production Gasoline stream maximized to keep C5s out of splitter Poor fractionation below gasoline draw; dry trays Reboilers limiting for stabilizer and splitter
Improved fractionation from optimizing conversion Decreased light ends yield Gasoline pumparound could help control
Benefits Recover C6+ from gasoline (50% of C6+) $~2.0 million/yr Decreased purchase naphtha requirements (2-4TBD)
Notes Product upgrade based on incremental gasoline Potential aromatics recovery determined downstream
23
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (6) Hydrocracker (6)
Improved Stabilizer FractionationVolume % C6+ in Gasoline Stream
0
10
20
30
40
50
60
12/1/97 1/1/98 2/1/98 3/4/98
Daily Average
C6
+ V
ol %
~2 TBD benzene-rich C6+ recovered to PTR-4 feed
24
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (7) Hydrocracker (7)
Process 142 Extract vs. ALGO 142 Extract ( 2.78 TBD ) has extremely high hydrogen consumption
Additional 55 SCFB hydrogen on total feed 2 F Reactor temperature increase to maintain conversion 2 F Diligent PNA monitoring of recycle a must Benefits
Increased product yields vs ALGO $ 4.5 million / yr Improved FCC feed quality Decreased LCO production Increased FCC capacity
Costs Increased hydrogen consumption (at fuel cost) $ 1.4 million / yr. Catalyst deactivation ( -2 month run length) $ 0.2 million / yr. Facilities to segregate 142 extract to HDC
Worth further investigation
25
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (8)Hydrocracker (8)
Increase 1st stage recycle gas purity Purge recycle gas; increase make-up
Increased H2 partial pressure increases conversion and reduces catalyst deactivation
Purge rate high due to low purity make-up H2 ( 91.8%) One percent increase in recycle gas purity worth $ 700 / day in yields
Can increase now with higher purity hydrogen (94%) Benefits for 3 % increase in recycle gas purity
Increased conversion and yields $ .75 million/yr. Decrease catalyst deactivation $ .25 million/yr.
Costs Facilities to treat high H2S purge gas Same H2S Purge 0.43 MMSCFH ; Make up 0.5 MMSCFH Fuel vs. Fuel Operation of third make up compressor
Energy ( 3000 HP x $ 15,000/100 HP) $ .50 million/yr. Maintenance cost over cycle $ .25 million/yr.
26
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (9)Hydrocracker (9)
Hydrocracker Recycle H2 Purity and Purge
0
10
20
30
40
50
60
70
78 79 80 81 82 83 84
First Stage Recycle Gas Purity % H2
MM
SC
FD
Purge Rate
LP Make Up Rate
27
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker (10)Hydrocracker (10)
Increased splitter reboiler firing - In Progress Reboilers limiting HN removal from recycle Firing limit relaxed Product upgrade $ 90 /day less $ 50 /day fuel cost per 1 MMBTU/Hr
Benefits Increased splitter reboiler environmental limit and firing
(55 - 64 MMBTU/Hr ) $ 0.29 million/yr. Costs
Increased utilities $ 0.16 million/yr. Investigate heater options to increase duty
May be able to get duty from waste heat
28
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Hydrocracker - SummaryHydrocracker - Summary
Opportunity Status / Comments Net Value
($ million/yr.)
Second Stage Conversion In progress $ 2.2 +
Recover C6+ from Gasoline In progress ( 50% ) $ 2.0 +
Correct feed metering Implemented $ 1.0 - $ 2.0
Process 142 Extract at HDC Facilities Required $ 1.0 - $ 2.9
First Stage Recycle Purity Facilities Required $ 0.25 +
Increase Splitter Reboiler Firing In progress $ 0.13 +
Total $ 6.5 - $ 9.4
29
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Coker OpportunitiesCoker Opportunities
Warm Tar Circulation Line
Recirculates resid from tankage through CUB fin fan using current FCCU CSO line
Benefits Reduces cold tar production Postpones the need for a hot feed tank Reduces Hydrocracker feed from Coker Cutter fed to heaters is reduced from 1700 BPD to 1000 BPD
Economic Incentive Approximately $3 MM/year
Increases resid feed capacity by 600 BPD Reduces degradation of CUB kerosene by 2300 BPD
Postpones spending capital for a hot feed tank
30
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
WARM-UP LINE CONFIGURATIONWARM-UP LINE CONFIGURATION
31
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Coker Opportunities (2)Coker Opportunities (2)
Controlled Recycle (with Warm Tar Circulation Line in service)
Flow Scheme Hot Feed is fed to Preflash Tower bottoms Cold Feed is fed to the top of the Preflash Tower for stripping of cutter Hot feed and stripped cold feed are fed to heaters
Benefits Debottlenecks heaters Cutter fed to heaters is reduced from 1000 BPD to 50 BPD More stable heater charge Longer heater run lengths between decokings are expected
Center radiant section used to preheat feed to approximately 716oF 10% reduction in radiant heat flux Maximum tubewall temperature lower by 15oF
Economic Incentive $6 - $7 MM/year due to increasing resid feed capacity by 2200 BPD
32
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
WARM-UP LINE CONFIGURATIONWARM-UP LINE CONFIGURATION
33
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
PREFLASH WITH NEW FURNACE PUMPPREFLASH WITH NEW FURNACE PUMP
34
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
FURNACE CONFIGURATIONFURNACE CONFIGURATION
35
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
TOWER AND PREFLASHTOWER AND PREFLASH
36
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
FCC ALGO Test RunFCC ALGO Test Run
Purpose Evaluate yield change when average FCCU feed replaced with CUB
ALGO
Unit Mass Balance 94.4-96.8% after meter corrections Feed rate reduced for each case to 100% weight balance, 4-6 TBD
Note: Unit charge meter indicating 4 TBD rate after shutdown Balance includes Inerts from regenerator
FCCU charge rate, ~73 TBD; replaced 10 TBD
CUB ALGO Properties Pour Point +35 F Watson K 11.8 vs. 11.6 for Average FCC Feed
Cetane Index 50 Paraffinic Feed
API 32.8-33.0
37
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
FCC ALGO Test Run (2)FCC ALGO Test Run (2)
Tests criteria Constant feed rate Constant riser top temperature Constant CO2/CO ratio Adjust feed preheat and/or air to regenerator Limited on upper and lower preheat temperature
Test Sequence Base Add LAGO, hold preheat temperature constant Constant Coke - Lower preheat temperature Constant Cat to Oil - Increase preheat temperature Return to Base Feed Rate plus 5 TBD of LAGO Return to Base Feed Rate, Base Conditions
38
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
FCC Test Run ResultsFCC Test Run Results
Base Incremental ALGOConst C/O Const Coke LP Yields
C2- wt% 5.0 3.5 4.0C3= LV% 9.1 11.1 11.4 12.8C3 LV% 3.7 4.5 7.1 5.3IC4 LV% 6.6 9.2 14.8 10.4NC4 LV% 2.1 2.6 4.2 3.0C4= LV% 9.5 6.5 7.7 14.1C5-430 Gaso LV% 50.0 49.7 53.9 57.1LCO LV% 17.0 19.6 15.1 11.1CSO LV% 9.3 5.5 -2.7 -4.2
Coke wt% 7.2 2.3 6.5 7.2
Conversion LV% 73.7 74.9 87.6 93.1
Prod Value Summer $/bbl 24.36 25.56 25.70 Winter $/bbl 24.30 25.43 25.16 Delta to base Summer $/bbl 1.20 Winter $/bbl 1.13
39
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
FCC Test Run Results (2)FCC Test Run Results (2)
Summer WinterC2- FOEB 11.46 14.58C3= 28.28 28.69C3 14.90 16.69IC4 18.27 19.90NC4 17.33 18.24IC4= 27.66 26.96C4= 17.61 13.67C5-430 Gaso 24.73 23.71LCO 21.98 23.49CSO 12.93 13.99
Pricing Basis:
Optimum ALGO disposition to be confirmed with refinery PETROfine simulation
40
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
GP5W Propylene RecoveryGP5W Propylene Recovery
Current operation is to use reformate and LLO Simulation results
Increasing the sponge oil (reformate) rate recovers more C3+ material then increasing the LLO rate.
Reformate more effective sponge oil than FCC Gasoline Better recovery of C4+ molecules
Increasing Sponge Oil /LLO Rate will increase C3+ Recovery 1997 Depropanizer limits
Feed max. rate of 35 TBD Column maximum differential pressure
Worth $1.5 MM/yr during May and Third Quarter Optimum sponge oil and LLO rates depends on GP5W feed rates
Reduction in HP liquid and vapors from FCC require less sponge oil rate for high C3 recovery
Evident during last part of 1997 fourth quarter
41
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
GP5W Propylene Recovery (2)GP5W Propylene Recovery (2)
GP5WEST DEPROPANIZER FEED/DP
20.00
25.00
30.00
35.00
40.00
4/30/97 6/19/97 8/8/97 9/27/97 11/16/97 1/5/98
DATE
TB
D
4.00
9.00
14.00
19.00
24.00
29.00
DEPROP_FEED
DEPROP_DP
42
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Increase Stripping of AHGO
Implemented shortly after November review
~ 500 bbl/day of Naphtha and Kero recovered Consumes capacity in FCC/Hydrocracker
Over 100 F improvement in IBP $200-300,000/yr @ $ 1-2+/bbl upgrade from FCC feed
Operations review/troubleshooting- first week of March Entrainment in AHGO
Test run being planned for March Vacuum resid cut point
Reduced slop to CUB Economics to be quantified
Crude Unit BCrude Unit B
43
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Lubes OpportunitiesLubes Opportunities
Opportunities Previously Presented: Reduce VI/Pour Point Giveaway Produce 6160 Raffinate at DuoSol with Modified FCC Mode
D/W Model Indicates Incentives for Shifting Diln Solv to Cold Wash Ketone-2 Analyzed Using Base Month Data -- 141, 142, 311 Operations Constant Total Solvent Circulation Assumed Shift 0.2-0.4 V/V Solvent from Dilution to Cold Wash
Increase Lean Filtrate Recycle to Maintain Wash Acceptance DWO Yields Improve by ~0.7-1.4 LV%
Shifts Oil from Soft Wax to DWO Product Worth 230-410 k$/yr, Based on Yield Credits Alone
Reflects DWO vs. Soft Wax at $9.56/B -- May be Higher Excludes Throughput Credits due to Reduced Soft Wax
Recovery Loading Increasing Lean Filtrate Recycle Increases Refrigeration Load
Credits Reflect 10% Discount on top of 90% Service Factor
44
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Lubes Opportunities -- What’s NextLubes Opportunities -- What’s Next
Complete Ketone Unit Solvent Optimization Studies
Continue Review of Selected MRTC-BMT Proposals for Hardware/Operational Improvements
Optimize/Standardize Ketone D/W Filter Hot Wash Procedures
Investigate Alternatives for Debottlenecking Ketone-2 Soft Wax Recovery
45
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Other Areas Being EvaluatedOther Areas Being Evaluated
Potential alkylate or raffinate sales
FCCU gasoline/LCO swing cut to hydrocracker vs. diesel blending during D-season
RFG blending strategy Overshooting conventional toxics limit during G-season and reducing
to make annual average during D-season
Diesel blending options HDC premium distillate as CARB diesel
MTBE conversion/catalyst activity
Utility systems
Heater limitations
Etc.
46
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Beaumont - Major OpportunitiesBeaumont - Major OpportunitiesPotential
Description $MM/yr Status / CommentsIn Progress/Implemented
Optimize hydrocracker conversion 2+ Improve yield selectivityCorrect hydrocracker feed metering 1-2 Plus feed at RV limitRecover C6+ from HDC gaso 2+ Recover Bzn precursors to PTR4PTR4 Ref Splitter fractionation 1+ Increased benzenePTR3 Debut operation 0.7 Increases benzenePTR3 Stripper top temp control 0.7 Reduces C6+ lossCHD2 naphtha to PTR4 0.4 Reduces PTR3 BznIncrease HDC splitter reboiler firing 0.1Maximize GP5W lean oil rate 1-2 Increases C3= recoveryCustody transfer accounting 4-5** Hull transfers correctedCUB AHGO steam stripping 0.2-0.3 Recovers naphtha/kero
Operational - Recommended Udex operational improvements 2-4 Increased aromatics capacityIncrease RFG production 1 Marketing limitsKetone-2 Solvent Strategy 0.2-0.4+ Improved DWO yield
** One-time credit, procedures corrected
47
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
Beaumont - Major Opportunities (2)Beaumont - Major Opportunities (2)Potential
Description $MM/yr Status / CommentsModifications Required PTR4 Debut btms bypass to gaso ~3 Requires jump-over
Modify Reformate splitter configuration ~3 Move feed trayIncrease PTR4 Depent pressure 1.2 Requires 400# steam to reboilerRoute Nat Gaso to CUA Depent 1.5 Requires pipingBypass Splitter feed to blending up to 3.0 Increases Bzn in Udex feed142 Extract to hydrocracker 1-3 Under evaluationIncrease HDC recycle purity 0.3 Yields/Reduced catalyst deactDebottleneck FCCU feed circuit 1+ Increases feed capacityProcess coker slop in coker 0.8-1.0 Project initiatedWarm tar circulation for Coker feed 3+ Postpones hot VTB tankCoker controlled recycle 6-7 Low cost heater debottleneck Optimize cutters for #6 oil blending 1.7Requires piping
48
MOBIL OIL CORPORATION - Beaumont Refinery
PIP PROGRESS REVIEW - Management Review
Ref: 4000321
March 3, 1998
SummarySummary
Opportunities identified total ~$ 40-48MM/yr $ 16-22 MM/yr immediate potential $ 13-16 MM/year partially or fully implemented
What’s Next Continued opportunity development
Refinery-wide economics Support implementation New ideas
Furnace/Heater operations review - this week Rotating equipment review - early April Utilities systems analysis Opportunity review - early May Potential of continuing support