61
Pacific Area Delivery Programs Support 1 Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the Course to Success
Transcript
Page 1: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 1

Delivery Management In Our Current Environment

Handbooks and Manuals as well as DOIS Utilization will Chart the

Course to Success

Page 2: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 2

Successful DOIS Scheduling

Page 3: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 3

Our Current Challenges

Continuing Declines in Cased Volumes Continuing Declines in Carrier Delivered

Volume Regular Scheduled Pivoting by Regular

Carriers, that Minimizes Impacts to Service.

MOUs Controlling Route Adjustment Timeframes and Methods.

Page 4: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 4

It Goes Without Saying, This Needs to Be Said

DOIS Utilization Compliance● Accurate Route & Unit Maintenance● Validated E3999/Current 3999 on DOIS

Mainframe● Complete & Accurate Travel Tab/ 1564A● Current Comprehensive Pivot Plans● Current MSP Scans/Regular Data Reviews● Use DOIS Scheduler w/Accurate Budget

loads● Proper Utilization of the Workload Status

Report● Regular Review/Application of

Performance Reports

Page 5: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 5

Analyze Average Office Earned Hours

Office ● AM Office Earned by Day of Week● AM Office Earned by Route/Day

Divide the Current Average Office Earned for the Unit by the Average Office Scheduled Leave Time = Number of Carriers to Schedule in the AM by Day● Pull DOIS RBI Report to locate Average

Office Time, I.E. 2:30 minutes● I.E. 72.25 hours/2.5 average Office Leave

Time = 28.9 Carriers can be scheduled in AM. With 34 routes, 5 must be vacant.

Page 6: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 6

Schedule Office Carriers By Day of Week● Use the previous process to determine for

each day of the week how many carriers may report in the AM.

● Review data every 30 days and make necessary weekly scheduling adjustments.

● Enter “Primary” Carriers into DOIS Scheduler weekly

On a Daily Basis adjust previously determine assignments using the Workload Status Report by balancing the “Leave Time Variance” Column

Successful DOIS Scheduling

Page 7: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 7

As they assign Office Pivot/Aux the “Leave time Variance” column will show “+/-”; when

the column is close to “0:00” total variances, they have successfully captured the office undertime and

minimized the impact on service by leaving as scheduled.In addition, to scheduling to the weekday projection averages, they must refer here for office success.

Page 8: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 8

Analyze Average e3999 Validated Street Time

Street● Schedule Number of Carriers by using the

average validated Street Time multiplied by the number of routes = Target Street Base.

● Identify established PM Operational Window = Scheduled PM End Tour 16:00 minus the Previously Identified Average Leave Time of 10:00AM = 6.0 hrs minus :30 minute lunch equals 5.5 hour PM Operational Window.

Page 9: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 9

Successful DOIS Scheduling

Divide the Current Average Validated Street for the Unit by the PM Operational Window = Number of Carriers to Schedule for the Street.● I.E. 178.25 hours/5.5 average PM

Operational Window = 32.40 Carriers can be scheduled for the Street. With 34 routes, 1.5 must be vacant.

Page 10: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 10

Successful DOIS Scheduling

Schedule Street Carriers● Review data every 30 days and make

necessary weekly scheduling adjustments.● Enter “Primary” Carriers into DOIS

Scheduler weekly

Page 11: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 11

SUCCESSFUL DOIS SCHEDULING PROCESS

File maintenance information needs to match actual assignments and match TACS. If it does not click on the “Route and Unit Maintenance” Tab and select “Maintain Carrier Route Assignments” button. Correct any carriers that have been awarded new bids, are borrowed or have been hired to your facility. Process appropriate HRSS paperwork to accomplish your personnel actions and changes. If changes are not processed as requested contact HRSS and notify TACS via email or fax so that employee pay will be processed correctly.

Retrieve all approved bid and spot leave 3971s. Extended leave can be input into eRMS as much as 30 days in advance, Annual Leave can be input as much as a year in advance.

Open ERMS and minimize the screen.

Click on the “Planning and Scheduling” Tab and select the “Weekly Schedule” button.

Create all approved vacancies using the “Create Vacancy” button. Complete the right hand margin of each 3971 as the vacancies are created, record the actual NS days & hours of leave approved for each day and initial in this margin under the appropriate column.

Page 12: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 12

SUCCESSFUL DOIS SCHEDULING PROCESS

Right click on any cell within the schedule and select “show” on the drop down menu, then select “vacant routes only”. Right click in any cell once again and select “show” and then select “carrier work status”. Scroll down to your unassigned regulars, part time flexibles and casuals to see who is available. Cover any vacant assignments, unless desiring to leave vacant.

To schedule a PTF or Casual for a particular day & time, right click on the cell for the day desired and click on “Assignment Details”, click on “Schedule” and use the spin box to set the time. The time scheduled will only show once you print the schedule and not on the screen.

After all desired vacancies are covered, click on “Print Preview” button and print your schedule. Post with the PTF page to the front.

Maximize ERMS and enter all approved leave slips to the appropriate 3972 if you have the “Attendance Control Supervisor” role in ERMS, remember to sign the “Signature of Person Recording Absence and Date” block of the 3971. If you do not have the access level turn in leave slips to designated Supervisor or Postmaster with this level of access. File 3971s. DO NOT ENTER LEAVE IN TACS.

Page 13: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 13

Necessary Steps to Change a Carrier Assignment or Start Time

Notify HRSS of the changes in assignment, days off, pay location, start time and the effective date.

In DOIS on the “Route And Unit Maintenance Tab”; Select the “Route Base Information” button. Use the drop down menu to select the desired route and click on display. Make any desired changes to the start, leave, return and end times. Do not forget to make changes on the “Travel Tab” in case the carrier is lunching at a

different time or location, this is important to your MSP reports.

Click on the “Maintain Carrier Route Assignments” and make any desired changes.

Please Follow the Cluster SOP on Pivot Plan Maintenance. Do not forget to insert the new lunch time and or locations.

Page 14: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 14

Necessary Steps to Change a Carrier Assignment or Start Time

Now go to the “Street Management” tab and click on the “MSP Base Information Maintenance” use the drop down menu to select the route you are changing and view the new times that have come over from the other entries. Make sure that the expected leave and return times are matching depart to route and return to office scheduled scan times on your “Route Base Information Report”. If significant amounts of time default to the last scan time your lunch is not entered correctly in the “Pivot Plan”.

It is important to note that these steps must be followed in this order for the reports and data to be accurate. An easy way to determine if TACS has the correct start time for the carrier is to click on “Daily Assignments” on the “Daily Workload Management” tab, whatever is in TACS will be displayed here, compare it to the “Route Base Information Report” to ensure start time accuracy. Review MSP reports on “Schedule Scan Times” for significant times defaulting to the end of the day as these indicate incorrect lunch or the need to redo the pivot plan.

Page 15: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 15

Post MIARAP Requirements

Page 16: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 16

After completion of the MIARAP Adjustmentyou must complete the following activities in order to establish and maintain quality reference data to successfully manage the adjustment:

1. Review and Validate the Reference Volumes, Establish the “Normal Day” for Each Route and Post (Cased letters, Cased flats, Parcels, Sequenced & DPS, Contact your District DOIS Coordinator for Corrections)

2. Using The MIARAP Unit Summary - Develop Carrier Leave and Return Time Groups (Use M39 Section 122 Schedule Guidelines)

3. Update DOIS RBI Schedule Using Developed Leave and Return Time groupings.

4. Complete A New 3999 (Use e3999 Validation Process).

5. Update 1564A Data In DOIS RBI.

6. Update the Pivot Plan Data

7.Update DOIS MSP Data.

8. Monitor Post MIARAP Changes / Respond To Changes

MIARAP – DOIS Requirements

Page 17: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 17

Establish the “Normal Day” Post MIARAP

Delivery Unit: 9258301

Date Range: through 04/30/2009

Route # Regular

Avg Office

Est Std Office

Carrier Off Input

Avg Street

Base Street

3999 Street

Carrier St Input

Cased Letters

Cased Flats Office Street Total Router FOT Office Street Total Router

Act/Std %

82006 CHRISTIANSON, A M 1:36 1:46 !:30 5:45 6:14 5:53 5:45 162 445 1:36 5:45 7:21 0:00 0:33 1:43 6:21 8:04 0:00 91.8%

82007 CERVANTES, L C 1:42 1:46 1:30 5:27 6:14 5:08 5:30 200 426 1:42 5:27 7:09 0:00 0:33 1:53 6:10 8:03 0:00 98.0%

82015 ASH, L E 1:44 2:03 1:45 6:03 6:29 6:12 6:00 222 538 1:44 6:00 7:44 0:00 0:33 1:45 6:14 7:59 0:00 83.5%

82017 MANZANARES, D A 1:45 1:51 1:45 6:15 6:26 5:33 6:15 187 470 1:51 6:15 8:06 0:00 0:33 1:42 6:17 7:59 0:00 94.2%

82019 SANCHEZ, A B 1:29 1:33 1:33 6:06 5:46 5:26 5:26 147 359 1:33 5:26 6:59 0:00 0:33 1:21 3:48 5:09 0:00 93.7%

83001 NICKS, T T 1:41 1:22 2:00 5:58 6:34 5:26 6:00 146 280 1:22 5:58 7:20 0:00 0:33 1:30 6:34 8:04 0:00 123.9%

83002 BASOCO, J R 1:41 1:36 1:36 4:25 4:43 4:35 4:25 244 334 1:36 4:25 6:01 0:00 0:33 106.5%

83003 EVANS, F R 1:36 1:53 1:40 6:13 6:35 5:55 6:00 226 462 1:36 6:00 7:36 0:00 0:33 1:44 6:19 8:03 0:00 84.6%

83004 SMITH, K J 1:51 1:45 1:45 5:49 6:15 5:35 5:45 209 415 1:45 5:45 7:30 0:00 0:33 1:43 6:18 8:01 0:00 101.5%

83005 ASH, J A 1:40 1:41 1:30 5:45 6:19 5:28 5:30 216 383 1:40 5:30 7:10 0:00 0:33 1:21 3:47 5:08 0:00 97.8%

83008 SCHLAGETTER, C 1:43 2:12 2:00 5:35 6:06 5:44 5:00 354 533 1:43 5:17 7:00 0:00 0:33 1:53 6:14 8:07 0:00 75.4%

83009 WILLIAMS, M N 1:49 1:34 1:45 5:30 6:20 5:12 5:30 207 337 1:34 5:30 7:04 0:00 0:33 1:51 6:07 7:58 0:00 114.1%

83010 KESLER, A A 1:47 2:04 1:30 6:14 6:39 6:21 6:00 240 535 1:47 6:00 7:47 0:00 0:33 1:49 6:12 8:01 0:00 87.8%

83011 LOYD, J A 1:43 1:46 1:30 5:50 6:18 4:30 5:00 157 449 1:43 5:00 6:43 0:00 0:33 2:00 6:06 8:06 0:00 98.3%

83012 FERNANDEZ, S A 1:40 1:52 1:30 5:54 6:06 4:44 5:00 172 482 1:40 5:25 7:05 0:00 0:33 1:50 6:13 8:03 0:00 89.0%

83013 COX, D K 1:39 2:03 1:45 6:27 6:23 6:01 6:30 218 541 1:39 6:27 8:06 0:00 0:33 1:38 6:20 7:58 0:00 79.1%

83014 DANIEL, T M 1:49 1:53 1:45 5:39 6:26 5:20 5:30 162 492 1:49 5:30 7:19 0:00 0:33 1:57 6:04 8:01 0:00 98.0%

Unit Total 29:01 30:50 26:49 99:04 0:00 93:03 95:06 3,469 7,481 28:20 95:40 124:00 0:00 9:21 27:40 95:04 122:44 0:00

Final Adjustment Times - Right side of 1840 reverseAnalysis Times Evaluation Times Selected - Left side of 1840 reverse

Unit Summary Report

03/01/2009

Post MIARAP Base Cased Volume

Post MIARAP Data Does Not Provide Total CDV

(Missing DPS/Parcels/Sequence Volumes)

Page 18: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 18

Establish the “Normal Day” Post MIARAP

Use DPS/PP/Sequence Volumes Data From MIARAP

Evaluation Period To Establish Base CDV

Page 19: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 19

Establish The Post MIARAP “Normal Day” City Delivered Volume (CDV): CLV = 175 CLF = 675 DPS = 2800 SEQ = 450

CDV = 4100 Base Accountable Mail = 5 Base Parcels = 8 PD’s 560

Daily -Manage to Post MIARAP CDV

Carriers office and street is managed daily to variances in “Actual Workload To Established CDV”. Carriers must be managed daily to actual CDV and not to MIARAP volumes that may have significantly declined.

Page 20: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 20

Delivery Unit: 9258301

Date Range: through 04/30/2009

Route # Regular

Avg Office

Est Std Office

Carrier Off Input

Avg Street

Base Street

3999 Street

Carrier St Input

Cased Letters

Cased Flats Office Street Total Router FOT Office Street Total Router

Act/Std %

82006 CHRISTIANSON, A M 1:36 1:46 !:30 5:45 6:14 5:53 5:45 162 445 1:36 5:45 7:21 0:00 0:33 1:43 6:21 8:04 0:00 91.8%

82007 CERVANTES, L C 1:42 1:46 1:30 5:27 6:14 5:08 5:30 200 426 1:42 5:27 7:09 0:00 0:33 1:53 6:10 8:03 0:00 98.0%

82015 ASH, L E 1:44 2:03 1:45 6:03 6:29 6:12 6:00 222 538 1:44 6:00 7:44 0:00 0:33 1:45 6:14 7:59 0:00 83.5%

82017 MANZANARES, D A 1:45 1:51 1:45 6:15 6:26 5:33 6:15 187 470 1:51 6:15 8:06 0:00 0:33 1:42 6:17 7:59 0:00 94.2%

82019 SANCHEZ, A B 1:29 1:33 1:33 6:06 5:46 5:26 5:26 147 359 1:33 5:26 6:59 0:00 0:33 1:21 3:48 5:09 0:00 93.7%

83001 NICKS, T T 1:41 1:22 2:00 5:58 6:34 5:26 6:00 146 280 1:22 5:58 7:20 0:00 0:33 1:30 6:34 8:04 0:00 123.9%

83002 BASOCO, J R 1:41 1:36 1:36 4:25 4:43 4:35 4:25 244 334 1:36 4:25 6:01 0:00 0:33 106.5%

83003 EVANS, F R 1:36 1:53 1:40 6:13 6:35 5:55 6:00 226 462 1:36 6:00 7:36 0:00 0:33 1:44 6:19 8:03 0:00 84.6%

83004 SMITH, K J 1:51 1:45 1:45 5:49 6:15 5:35 5:45 209 415 1:45 5:45 7:30 0:00 0:33 1:43 6:18 8:01 0:00 101.5%

83005 ASH, J A 1:40 1:41 1:30 5:45 6:19 5:28 5:30 216 383 1:40 5:30 7:10 0:00 0:33 1:21 3:47 5:08 0:00 97.8%

83008 SCHLAGETTER, C 1:43 2:12 2:00 5:35 6:06 5:44 5:00 354 533 1:43 5:17 7:00 0:00 0:33 1:53 6:14 8:07 0:00 75.4%

83009 WILLIAMS, M N 1:49 1:34 1:45 5:30 6:20 5:12 5:30 207 337 1:34 5:30 7:04 0:00 0:33 1:51 6:07 7:58 0:00 114.1%

83010 KESLER, A A 1:47 2:04 1:30 6:14 6:39 6:21 6:00 240 535 1:47 6:00 7:47 0:00 0:33 1:49 6:12 8:01 0:00 87.8%

83011 LOYD, J A 1:43 1:46 1:30 5:50 6:18 4:30 5:00 157 449 1:43 5:00 6:43 0:00 0:33 2:00 6:06 8:06 0:00 98.3%

83012 FERNANDEZ, S A 1:40 1:52 1:30 5:54 6:06 4:44 5:00 172 482 1:40 5:25 7:05 0:00 0:33 1:50 6:13 8:03 0:00 89.0%

83013 COX, D K 1:39 2:03 1:45 6:27 6:23 6:01 6:30 218 541 1:39 6:27 8:06 0:00 0:33 1:38 6:20 7:58 0:00 79.1%

83014 DANIEL, T M 1:49 1:53 1:45 5:39 6:26 5:20 5:30 162 492 1:49 5:30 7:19 0:00 0:33 1:57 6:04 8:01 0:00 98.0%

Unit Total 29:01 30:50 26:49 99:04 0:00 93:03 95:06 3,469 7,481 28:20 95:40 124:00 0:00 9:21 27:40 95:04 122:44 0:00

Unit Avetage 1:42 1:48 1:40 5:49 #DIV/0! 5:28 5:35 204 440 1:40 5:37 7:17 0:00 0:33 1:43 5:56 7:40 0:00 95.1%

Final Adjustment Times - Right side of

1840 reverseAnalysis Times Evaluation Times Selected - Left side of 1840 reverse

Unit Summary Report

03/01/2009

Adjust final Unit Summary into Leave and Return time groups per the

M39, Section 122

MIARAP – Unit Summary Report

Page 21: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 21

Scheduling Carriers M-39 Sect 122

122 Scheduling Carriers 122.1 Establishing Schedules 122.11 Consider the following factors in establishing schedules:

a. Schedule carriers to report before 6 a.m. only when absolutely necessary.b. Fix schedules to coincide with receipt and dispatch of mail. At least 80 percent of the carriers’ daily mail to be cased should be on or at their cases when they report for work.c. Schedule carriers by groups. Form groups of carriers who make the same number of delivery trips and whose office time is approximately the same.d. Generally, schedule carriers of the same group to begin, leave, return, and end at the same time.e. Schedule so that delivery to customers should be approximately the same time each day.f. Make a permanent schedule change when it is apparent that one or more days’ mail volume varies to where it is causing late leaving.g. Schedule carriers’ non-work days in accordance with the National Agreement.

122.12 Post all schedules and keep them up to date.

Page 22: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 22

Scheduling Carriers M-39 Sect 122

122.2 Carriers’ Leaving Schedules 122.21 Establishing Leaving Schedule The leaving time for the carrier is determined

by the following:a. Workload. The normal workload for the route;b. Availability of Mail. The time all the mail for the same

day’s delivery is available;c. Necessary Office Time. Time required to case this mail,

withdraw, tray or strap out mail, obtain parcel post, and complete other required office duties; and

d. Business Hours. Normal community business hours.

Page 23: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 23

Scheduling Carriers M-39 Sect 122

122.22 Maintaining Leaving Schedule Carriers must be trained and motivated to complete their office

work so that they may leave the office on time each day. The delivery unit manager must be aware of and record the daily workload for each route, and:

a. Provide assistance where necessary for carriers to meet scheduled leaving times;

b. Recognize when a judicious use of curtailment of non-preferential mails is appropriate; and (not appropriate in our current environment)

c. Use carrier late leaving reports to help determine performance efficiency and also to indicate possible training needs. Delivery managers at all levels must take positive steps to instill every employee with a sense of importance in the daily need to maintain schedules and perform all assigned duties within the allocated time.

Page 24: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 24

Use MIARAP Unit Summary to establish groups within 5-10 minutes of like office times.

Set new Leave Times, I.E. 7:30 start

● :50 (:45-:55) = 8:20 (Route:22)● 1:00 (:56-1:05) = 8:30 (-0-)● 1:10 (1:06-1:15) = 8:40 (-0-)● 1:20 (1:16-1:25) = 8:50 (Routes: 2,4,5,11,12,15,19,23,25,32,34)● 1:30 (1:26-1:35) = 9:00 (Routes:1,3,7,8,9,10,13,16,17)● 1:40 (1:36-1:45) = 9:10 (Routes: 6,14,20,27,28,29,33,40)● 1:50 (1:46- 1:55) = 9:20 (Route: 30)

Scheduling Leave Time Per M39-Section 122

Page 25: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 25

Scheduling Leave Time Per M39-Section 122

Delivery Unit: 9258301

Date Range: through 04/30/2009

Route # Regular

Avg Office

Est Std Office

Carrier Off Input

Avg Street

Base Street

3999 Street Carrier

St InputCased Letters

Cased Flats Office Street Total Router FOT Office Street Total Router

Act/Std %

Group Leave Time

82019 SANCHEZ, A B 1:29 1:33 1:33 6:06 5:46 5:26 5:26 147 359 1:33 5:26 6:59 0:00 0:33 1:21 3:48 5:09 0:00 93.7% 8:50

83005 ASH, J A 1:40 1:41 1:30 5:45 6:19 5:28 5:30 216 383 1:40 5:30 7:10 0:00 0:33 1:21 3:47 5:08 0:00 97.8% 8:50

83001 NICKS, T T 1:41 1:22 2:00 5:58 6:34 5:26 6:00 146 280 1:22 5:58 7:20 0:00 0:33 1:30 6:34 8:04 0:00 123.9% 9:00

83013 COX, D K 1:39 2:03 1:45 6:27 6:23 6:01 6:30 218 541 1:39 6:27 8:06 0:00 0:33 1:38 6:20 7:58 0:00 79.1% 9:10

82017 MANZANARES, D A 1:45 1:51 1:45 6:15 6:26 5:33 6:15 187 470 1:51 6:15 8:06 0:00 0:33 1:42 6:17 7:59 0:00 94.2% 9:10

82006 CHRISTIANSON, A M 1:36 1:46 !:30 5:45 6:14 5:53 5:45 162 445 1:36 5:45 7:21 0:00 0:33 1:43 6:21 8:04 0:00 91.8% 9:10

83004 SMITH, K J 1:51 1:45 1:45 5:49 6:15 5:35 5:45 209 415 1:45 5:45 7:30 0:00 0:33 1:43 6:18 8:01 0:00 101.5% 9:10

83003 EVANS, F R 1:36 1:53 1:40 6:13 6:35 5:55 6:00 226 462 1:36 6:00 7:36 0:00 0:33 1:44 6:19 8:03 0:00 84.6% 9:10

82015 ASH, L E 1:44 2:03 1:45 6:03 6:29 6:12 6:00 222 538 1:44 6:00 7:44 0:00 0:33 1:45 6:14 7:59 0:00 83.5% 9:10

83010 KESLER, A A 1:47 2:04 1:30 6:14 6:39 6:21 6:00 240 535 1:47 6:00 7:47 0:00 0:33 1:49 6:12 8:01 0:00 87.8% 9:20

83012 FERNANDEZ, S A 1:40 1:52 1:30 5:54 6:06 4:44 5:00 172 482 1:40 5:25 7:05 0:00 0:33 1:50 6:13 8:03 0:00 89.0% 9:20

83009 WILLIAMS, M N 1:49 1:34 1:45 5:30 6:20 5:12 5:30 207 337 1:34 5:30 7:04 0:00 0:33 1:51 6:07 7:58 0:00 114.1% 9:20

82007 CERVANTES, L C 1:42 1:46 1:30 5:27 6:14 5:08 5:30 200 426 1:42 5:27 7:09 0:00 0:33 1:53 6:10 8:03 0:00 98.0% 9:20

83008 SCHLAGETTER, C 1:43 2:12 2:00 5:35 6:06 5:44 5:00 354 533 1:43 5:17 7:00 0:00 0:33 1:53 6:14 8:07 0:00 75.4% 9:20

83014 DANIEL, T M 1:49 1:53 1:45 5:39 6:26 5:20 5:30 162 492 1:49 5:30 7:19 0:00 0:33 1:57 6:04 8:01 0:00 98.0% 9:30

83011 LOYD, J A 1:43 1:46 1:30 5:50 6:18 4:30 5:00 157 449 1:43 5:00 6:43 0:00 0:33 2:00 6:06 8:06 0:00 98.3% 9:30

83002 BASOCO, J R 1:41 1:36 1:36 4:25 4:43 4:35 4:25 244 334 1:36 4:25 6:01 0:00 0:33 106.5%

Unit Total 29:01 30:50 26:49 99:04 0:00 93:03 95:06 3,469 7,481 28:20 95:40 124:00 0:00 9:21 27:40 95:04 122:44 0:00

Unit Avetage 1:42 1:48 1:40 5:49 #DIV/0! 5:28 5:35 204 440 1:40 5:37 7:17 #DIV/0! 0:33 1:43 5:56 7:40 #DIV/0! 95.1%

Final Adjustment Times - Right side of

1840 reverseAnalysis Times Evaluation Times Selected - Left side of 1840 reverse

Unit Summary Report

03/01/2009

In accordance with the M39 Section 122, Schedule

carriers into:

“Leave Time Groups”

Page 26: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 26

Scheduling Return Time Per M39-Section 122

Add Average Street Time, Do Not Forget the Lunch to add the Leave time to set the Return Time.

● 5:00 (4:55-5:05) + Add Lunch: 5:30● 5:10 (5:06-5:15) + Add Lunch: 5:40● 5:20 (5:16-5:24) + Add Lunch: 5:50● 5:30 ( 5:25-5:35) + Add Lunch: 6:00● 5:40 ( 5:36-5:45) + Add Lunch: 6:10● 5:50 ( 5:46-5:55) + Add Lunch: 6:20● 6:00 ( 5:56-6:05) + Add Lunch: 6:30● 6:10 ( 6:06-6:15) + Add Lunch: 6:40● 6:20 ( 6:16-6:25) + Add Lunch: 6:50● 6:30 ( 6:26-6:35) + Add Lunch: 7:00● 6:40 ( 6:36-6:45) + Add Lunch: 7:10

Page 27: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 27

Delivery Unit: 9258301

Date Range: through 04/30/2009

Route # Regular

Avg Office

Est Std Office

Carrier Off Input

Avg Street

Base Street

3999 Street Carrier

St InputCased Letters

Cased Flats Office Street Total Router FOT Office Street Total Router

Act/Std %

Group Return Time / With

Lunch

82019 SANCHEZ, A B 1:29 1:33 1:33 6:06 5:46 5:26 5:26 147 359 1:33 5:26 6:59 0:00 0:33 1:21 3:48 5:09 0:00 93.7% 12:50

83005 ASH, J A 1:40 1:41 1:30 5:45 6:19 5:28 5:30 216 383 1:40 5:30 7:10 0:00 0:33 1:21 3:47 5:08 0:00 97.8% 12:50

83011 LOYD, J A 1:42 1:46 1:30 5:27 6:14 5:08 5:30 200 426 1:42 5:27 7:09 0:00 0:33 1:53 6:10 8:03 0:00 98.0% 15:00

83008 SCHLAGETTER, C 1:49 1:34 1:45 5:30 6:20 5:12 5:30 207 337 1:34 5:30 7:04 0:00 0:33 1:51 6:07 7:58 0:00 114.1% 15:20

82006 CHRISTIANSON, A M 1:40 1:52 1:30 5:54 6:06 4:44 5:00 172 482 1:40 5:25 7:05 0:00 0:33 1:50 6:13 8:03 0:00 89.0% 15:30

83004 SMITH, K J 1:44 2:03 1:45 6:03 6:29 6:12 6:00 222 538 1:44 6:00 7:44 0:00 0:33 1:45 6:14 7:59 0:00 83.5% 15:50

83012 FERNANDEZ, S A 1:47 2:04 1:30 6:14 6:39 6:21 6:00 240 535 1:47 6:00 7:47 0:00 0:33 1:49 6:12 8:01 0:00 87.8% 15:50

83009 WILLIAMS, M N 1:43 1:46 1:30 5:50 6:18 4:30 5:00 157 449 1:43 5:00 6:43 0:00 0:33 2:00 6:06 8:06 0:00 98.3% 16:00

82007 CERVANTES, L C 1:36 1:46 !:30 5:45 6:14 5:53 5:45 162 445 1:36 5:45 7:21 0:00 0:33 1:43 6:21 8:04 0:00 91.8% 16:00

83001 NICKS, T T 1:51 1:45 1:45 5:49 6:15 5:35 5:45 209 415 1:45 5:45 7:30 0:00 0:33 1:43 6:18 8:01 0:00 101.5% 16:00

83014 DANIEL, T M 1:49 1:53 1:45 5:39 6:26 5:20 5:30 162 492 1:49 5:30 7:19 0:00 0:33 1:57 6:04 8:01 0:00 98.0% 16:00

83003 EVANS, F R 1:36 1:53 1:40 6:13 6:35 5:55 6:00 226 462 1:36 6:00 7:36 0:00 0:33 1:44 6:19 8:03 0:00 84.6% 16:00

82015 ASH, L E 1:45 1:51 1:45 6:15 6:26 5:33 6:15 187 470 1:51 6:15 8:06 0:00 0:33 1:42 6:17 7:59 0:00 94.2% 16:00

82017 MANZANARES, D A 1:39 2:03 1:45 6:27 6:23 6:01 6:30 218 541 1:39 6:27 8:06 0:00 0:33 1:38 6:20 7:58 0:00 79.1% 16:00

83010 KESLER, A A 1:43 2:12 2:00 5:35 6:06 5:44 5:00 354 533 1:43 5:17 7:00 0:00 0:33 1:53 6:14 8:07 0:00 75.4% 16:00

83013 COX, D K 1:41 1:22 2:00 5:58 6:34 5:26 6:00 146 280 1:22 5:58 7:20 0:00 0:33 1:30 6:34 8:04 0:00 123.9% 16:00

Final Adjustment Times - Right side of

1840 reverseAnalysis Times Evaluation Times Selected - Left side of 1840 reverse

Unit Summary Report

03/01/2009

Scheduling Leave Time Per M39-Section 122

In accordance with the M39 Section 122, Schedule

carriers into:

“Return Time Groups”

Page 28: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 28

Route Base Information Update

After Establishing Leave and Return Time Groups:

Update DOIS RBI Schedule

Complete a New 3999

Update DOIS 1564A / Travel Information

Update Pivot Plans

Update MSP

Page 29: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 29

DOIS – Supervisor Workbench

Log in to DOIS

Page 30: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 30

Route and Unit Maintenance Tab

To begin click on the Route and Unit Maintenance Tab then click on the Route Base Information MaintenanceButton.

Page 31: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 31

Route Base Information Maintenance

Enter Established Route Group Leave and Return Times

Page 32: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 32

Carrier Completes 1564A

M41 Section 25: Carrier’s Route Book, Instructions and Report

251.5 Lines of TravelThis shows lines of travel to reach the

beginning of the route, reach the lunch place, return to next delivery location,

and return to unit.251.6 Lunch Information

This shows time of authorized lunch, location of authorized lunch stop(s), and location where carrier is authorized to leave route

for lunch. (See instructions on Form 1564–A where this applies.) Similar

information for any deviation for lunch by carrier technician is entered on the Form

1564–A.251.7 Break Information

This shows location of authorized break stop(s). (See instructions on Form 1564–A where this applies.) Similar information

for any deviation for break by carrier technician T–6 carrier is entered on the

Form 1564–A.

Page 33: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 33

DOIS Lunch / Travel Information

Is all your travel information correct?

Location for MSP lunch should be the same has the location where authorized to leave route for lunch.

Page 34: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 34

Daily Management – Post MIARAP

Addressing Compliance Is Often Easier Than Performance

Monitoring Changes + Responding To Change = Success

Page 35: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 35

Daily Management – Compliance

FOCUS ON COMPLIANCE

COMPLIANCE ON: LEAVE ON TIME / RETURN ON TIME / 1813 CDV VOLUME REFERENCE / 3996 EXTENSION OF STREET / 1564A / 1017B DISCRETIONARY EFFORT / 1838C / 3999“It is not reasonable to expect the company to provide you with individual supervision

on a daily basis in order to obtain your BEST discretionary effort.”

Page 36: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 36

Daily Management – Labor Relations Support

112.1 Efficient Service

Provide reliable and efficient service. Federal statutes provide penalties for persons who knowingly or willfully obstruct or retard the mail. The statutes do not afford employees immunity from arrest for violations of law.

112.2 Diligence and Promptness

112.21 Obey the instructions of your manager.

112.22 Report for work promptly as scheduled.

112.23 Complete time records to accurately reflect the hours employed each day.

112.24 Display a willing attitude and put forth a conscientious effort in developing skills to perform duties assigned.

Page 37: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 37

Daily Management – Labor Relations Support

112.2 Diligence and Promptness (Continued):

112.25 Be prompt, courteous, and obliging in the performance of duties. Attend quietly and diligently to work and refrain from loud talking and the use of profane language.

112.26 Do not report at cases or racks before tour of duty is scheduled to begin or linger about cases or racks after tour has ended.

112.27 Do not move mail from place to place on or adjacent to your case. Do not engage in any time wasting practices before placing mail in the proper separation.

112.28 Do not loiter or stop to converse unnecessarily on your route.

112.29 Return to the delivery unit immediately on completion of assigned street duties and promptly clock in on arrival. A motorized carrier unloads his vehicle and then immediately records returning time. 112.32 Return all mail, money, and equipment to the post office at the end of the workday.

112.33 Do not place mail in your pockets or clothing, lockers or desks, or in parcels, hand grips, lunch containers, or other luggage.

Page 38: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 38

M39, Section 131.213

Late Leaving / Late Returning-Analyzing Form 1813

Determine whether one or more carriers frequently left late. If so, there is indication that:

a. Routes may not be adjusted properly.

b. The starting or leaving time may be improper.

c. There is a pattern in late leaving on the same day.

d. There may be heavy (now more often, light) volume days where a pattern of late leaving is prevalent. Possible solution: Provide for possible schedule changes, staggering of mail flow, curtailment of mail, or auxiliary assistance within the office.

e. Possible inefficiency exists.

LOT / ROT Compliance Management

Page 39: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 39

LOT / ROT Compliance Management

Page 40: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 40

Discuss Excessive Variances With The Employee. Is There A 1017B Entry For Unauthorized OT?

LOT / ROT Compliance Management

Page 41: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 41

Daily Management-Manage To Daily CDV

Evaluate The Impact:MIARAP RESULTS: CLV = 175 CLF = 675 DPS = 2800 SEQ = 450 CDV = 4100 Base Accountable Mail = 5 Base Parcels = 8 PD’s 560

“MIARAP Adjustment Was 8:06”

POST MIARAP REALITY: CLV = 75 CLF = 400 DPS = 2550 SEQ = 450 CDV = 3725 Base Accountable Mail = 5 Base Parcels = 8 PD’s 560

“Current Value Of The Route Post MIARAP Due

To Declining Volumes Is Now: 7:17

Page 42: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 42

Daily Management- Manage to Daily CDV

REASONABLE LOGIC CLV = DOIS Computes CFV = DOIS Computes Pull Down =DOIS Computes CDL,CDF,DPS & SEQ =

CDV +/- 8 min = 250 pcs Accountable = +/-2 min Parcels = +/-1 min PDs = +/- .33 min

POST MIARAP REALITY: CLV = 75 CFV = 400 DPS = 2550 SEQ = 450 CDV = 3725 Base Accountable Mail = 5 Base Parcels = 8 PD’s 560

“Current Value Of The Route Post MIARAP Due To Declining Volumes Is Now: 7:17 @ 100% to Standard”

Page 43: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 43

Post MIARAP Conference Process

Decreasing volumes will require continual monitoring of variances.

Performance Conferences may be required to capture variances after the MIARAP adjustment, prior to the MOU Reviews. This is critical to your success.

Review conference meeting format.

Review ELM section 370 (Supervision).

Page 44: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 44

Performance Conference Support - The ELM

370 Performance Evaluation371 IntroductionPostal Service employees are expected to

conduct themselves in a manner that reflects favorably upon the organization and perform their duties in the most efficient manner. Both the supervisor and employee have a mutual responsibility to achieve these goals. When properly used, performance evaluation strengthens the daily supervisor–employee relationship in working toward this end.

Page 45: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 45

Performance Conference Support - The ELM

372 Sound SupervisionThe principles of sound supervision require that

supervisors evaluate employee performance daily. Supervisors should counsel and instruct their employees as necessary, giving attention to evidence of good performance, as well as to areas where the employees need improvement.

Page 46: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 46

Performance Conference Support - The ELM

373 Performance Evaluation Systems373.1 Formal EvaluationPostal Service Headquarters prescribes

formal evaluation systems for a variety of purposes. A formal evaluation consists of defined standards of performance, instructions for establishing a measure of where an employee fits within the standards, and a form to record information.

Page 47: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 47

Performance Conference Support - The ELM

373.2 Informal Evaluation Informal evaluation is based on the

supervisor’s day–to–day observations and is characterized by the absence of forms and instructions. The supervisor should make use of available human resources and give personal encouragement and guidance as a part of his or her daily practice. These practices must be part of a continuous formal and informal process.

Page 48: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 48

Performance Conference Support - The ELM

374 Discussing Performance With EmployeesThe supervisor must discuss job performance

with each employee. If the employee’s performance is unsatisfactory, the supervisor suggests constructive measures for an employee to follow to improve his or her performance to a satisfactory level.

Page 49: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 49

Performance Conference Meeting Format

Carrier Consultation Meeting Format

Page 50: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 50

Explain to the carrier what the goal of the meeting is. Example: “We are here today to review some information about your route. My

goal is that we will come to an agreement concerning the mail volume decline from your previous MIARAP adjustment and the volume of mail you are currently receiving. Additionally, we will discuss the amount of time necessary to case and deliver your current mail volume. I am asking that you actively participate in this process, as this will improve both of our understanding about your route”.

Review all categories concerning base & current volumes, current office and street time being used (CDV).

Review demonstrated performance from MIARAP adjustment process. Review MSP carrier report for days of the week that contain inconsistencies in

scheduled times and or, scheduled times and or scheduled intervals. Review 1564-a with the carrier make necessary corrections explain the required

adherence to these instructions. Discuss any inconsistencies in the carrier’s performance compared to volume

handled. Ask the carrier to explain the causes of these anomalies. Discuss the relevance of these possible causes.

Review leave and return time with the carrier to identify any interim necessary duties due to loss of caseable volume, any new deliveries added to your route, and any additional volume being handled.

In order to provide consistent service, as well as capture time for lost cased volume, I am going to need you to consistently case on additional routes in the office until your MIARAP Review is completed, do you have any suggestions.

Performance Conference Meeting Format

Page 51: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 51

Day to Day Management

When managing in a declining cased volume environment use the Workload Status Leave Time Variance column to ensure the capture of Office Undertime.

When managing in a declining delivered volume environment calculate reductions in street base CDV @ 8 to 10 minutes per 250 pieces reduced.

This practice will improve your post MIARAP Adjustment Review results.

Page 52: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 52

As they assign Office Pivot/Aux the “Leave time Variance” column will show “+/-”; when

the column is close to “0:00” total variances, they have successfully captured the office undertime and

minimized the impact on service by leaving as scheduled.In addition, to scheduling to the weekday projection averages, they must refer here for office success.

Page 53: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 53

DOIS Compliance & Utilization

DOIS Utilization Compliance● Accurate Route & Unit Maintenance● Validated E3999/Current 3999 on DOIS

Mainframe● Complete & Accurate Travel Tab/ 1564A● Current Comprehensive Pivot Plans● Current MSP Scans/Regular Data Reviews● Use DOIS Scheduler w/Accurate Budget

loads● Proper Utilization of the Workload Status

Report● Regular Review/Application of

Performance Reports

Page 54: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 54

Office Time Base Reduction Strategies

Effective scheduling of Discretionary Workforce through DOIS

Reduce Caseable Volume● Increase Directs● Reduce Missorts● FSS

Reduce Fixed Office Time● Reduce Routes = 33-60 min of FOT per

Route● Reduce Individual FOT Line Items

Eliminate All Waiting Time

Page 55: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 55

Street Time Base Reduction Strategies

Reduce Allied Street Time● Reduce Routes = 45-75 minutes Allied Time

per Route● Reduce Individual Allied Line Items

Continue to Monitor/Respond CDV Declines● Discuss Daily Volume CDV Losses With

Carriers and Require Time Reductions● Complete New Validated 3999s● Validate Allied Times when each 3999 is

Completed

Page 56: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 56

Post MIARAP Fall Reviews

Continually Improving your Daily Management Abilities will result in Performance and Budget Success.

Continual Day To Day Interaction with the Carriers Discussing Current and Specific Information About Their Routes will Serve You Well in the Final Outcome.

Page 57: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 57

Inspect to Ensure Compliance

DOIS Utilization Compliance● Accurate Route & Unit Maintenance● Validated E3999/Current 3999 on DOIS

Mainframe● Complete & Accurate Travel Tab/ 1564A● Current Comprehensive Pivot Plans● Current MSP Scans/Regular Data Reviews● Use DOIS Scheduler w/Accurate Budget

loads● Proper Utilization of the Workload Status

Report● Regular Review/Application of

Performance Reports

Page 58: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 58

PAFS Audits to Stay on Target

Page 59: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 59

PAFS Audits to Stay on Target

Page 60: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 60

PAFS Audits to Stay on Target

Page 61: 1 Pacific Area Delivery Programs Support Delivery Management In Our Current Environment Handbooks and Manuals as well as DOIS Utilization will Chart the.

Pacific Area Delivery Programs Support 61

Summary of Tasks

Precise Scheduling Always Input and Finalize All New Data in DOIS Utilize Base Data in All Categories to

Manage Carriers Discuss Performance with Carriers

● Daily, Weekly, Monthly &Yearly● Be Specific, Use Data & Set Improvement

Goals Monitor Changes in the Routes & Respond Follow Up by Inspecting Your Process

Compliance


Recommended