16
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE
Transcript
Page 1: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

1paul drumm; Jan’05; MICE RF Needs

MICE RF Power

Paul DrummISIS Facility

Rutherford Appleton Laboratory&

MICE

Page 2: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

2

MICE

• Cost/Efficiency of the Neutrino Factory– Cannot be done without a demonstration of

ionisation cooling;– Essential for a muon collider– Accelerator aperture is a strong cost driver– Ionisation cooling reduces transverse beam

emittance

• MICE = Cooling Channel Demonstration

Page 3: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

3

The Neutrino Factory

e e +

Decay

Japan

Europe

USA

Factor of 10 in performance

Page 4: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

4

MICE

DetectorsSC-SolenoidCryogenic AbsorberRF -Cavities Diffuser

EU design study 44/88 MHz; US design study 201 MHzMICE Reproduces part of study II channel: 201 MHz

• to design, engineer, and build a section of cooling channel capable of giving the desired performance for a Neutrino Factory;• to place this apparatus in a muon beam and measure its performance in a variety of modes of operation and beam conditions.

Bz

Page 5: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

5

Page 6: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

6

RF Module Overview

SC Coil

Page 7: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

7

Baseline specification

• 201 MHz• 8 cavities in 2 modules• Each cavity is isolated by Be windows

– In principle each cavity is independent (f,)

• Cavities operated in a magnetic field ~few T• 4 cavities replace energy lost in one absorber

– ~10 MV/m E~10 MeV

• >1 MW power per cavity• Pulse duty cycle ~ 1:1000 (1ms/1s)

Page 8: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

8

Solutions

• Cost estimate for MICE ~£3M for 8MW

• MICE Strategy:– 201 MHz typical on (old) linacs– ISIS, CERN, LBNL, Los Alamos, BNL, KEK!– 2x2MW amplifiers from LBNL (at DL)– 2x2MW amplifiers from CERN– 3x300kW amplifiers from LBNL– Power supplies promised by Los Alamos– Procure missing parts

Page 9: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

9

LBNL Circuits

TH170 amplifier

Page 10: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

10

4616 driver & test stand

Burle willing to refurbish/make 4th

Page 11: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

11

2 MW Amplifier

Master OscillatorControls etc

201 MHz Cavity Module

2 MW Amplifier

2 MW Amplifier

201 MHz Cavity Module

CERN300 kW Amplifier

300 kW Amplifier

300 kW Amplifier

300 kW Amplifier

HT Supplies

Los Alamos

HT Supplies

ASTeC

2 MW Amplifier

LBNL

Page 12: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

12

Page 13: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

13

Page 14: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

14

ISSUES for MICE R&D

• Old Tubes – Future supply uncertain– 116 ex ISIS– 170 ex CERN– 4616 still available

• Output power levels – limitations of circuits

• 8 Cavities fed from 4 amplifiers– Cavity interactions, reflected power, stability– Circulators– Hybrids

Page 15: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

15

MICE Tasks

• Refurbishing & Recommissioning existing kit• Procure missing items

– New– In house build– Beg, borrow (steal held in reserve)

• Aim to assemble at least one complete system as a test stand over next two FYs

• Future task – 4 power systems/8 cavities– MICE potential test bench for power sources

Page 16: 1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.

paul drumm; Jan’05; MICE RF Needs

16

Effect of Stong Magnetic Fields

RF dark currents were measured at Fermilab on 805 MHz cavities in magnetic field

Extrapolation to 201 MHz uncertain tests on 201 MHz prototype 2005 Environmental issue for MICE


Recommended