PCBs and PBDEs on the Guadalupe River
WYs 2003 – 2006
John Oram, Jon Leatherbarrow, and Lester McKee
Sources Pathways and Loadings WorkgroupNovember 13th 2006
Item #2b
2
Methods for Estimating Loads of PCBs and PBDEs
1. Examine relationship between instantaneous SSC and contaminant conc.
2. Examine spatial/temporal patterns of precip and Q at various locations in watershed to determine source.
3. Use 1 and 2 to build regression model(s) where appropriate.
4. Use regression model to estimate 15-minute concentrations.
5. Use 15-minute Q and 15-minute conc to calculate loads.
Iter
ativ
e P
roce
ssItem #2b
3
WY 03 (n=21)
WY 04 (n=19)
WY 05 (n=13)
WY 06 (n=14)
Sampling FrequencyItem #2b
4
Sampling Frequency Item #2b
5
PCBs vs SSC (previous water years)
WY 2005
Item #2b
6
PCBs vs SSC WY 2006
• Did not see ‘split’ regression this water year.
y = 76.713x - 2295.7
R2 = 0.9929
y = 65.063x + 10450
R2 = 0.7437
0
10000
20000
30000
40000
50000
60000
0 100 200 300 400 500 600 700 800
SSC (mg/L)
Sum
of P
CB
s (p
g/L) Upper
Lower
Base
Linear (Upper)
Linear (Lower)
y = 75.539x + 4119.6
R2 = 0.7151
0
10000
20000
30000
40000
50000
60000
0 100 200 300 400 500 600 700 800
SSC (mg/L)
Su
m o
f P
CB
s (p
g/L
)
Item #2b
7
PBDEs vs SSCWY 2005
Item #2b
8
PBDE Concentrations, Discharge, and Instantaneous SSC
Item #2b
9
PBDEs vs SSCWY 2006
• Attempted to split regression by upper/lower/base flow designations.– Didn’t work this year
for PBDEs or PCBs
• Two Regressions:
– All data
– No Outlier
Item #2b
10
Previously Reported LoadsItem #2b
11
WY 2006 LoadsWY 2006 Oct Nov Dec Jan Feb Mar Apr Total Regression EquationDischarge (Mm3) 2.5 2.4 11.5 14.6 6.6 21.9 48.5 108.0Percent of Total 2.3% 2.2% 10.6% 13.6% 6.1% 20.2% 44.9%
SSC (t) 47.8 48.8 1,630.1 1,286.8 732.4 1,539.1 6,466.6 11,751.6Percent of Total 0.4% 0.4% 13.9% 10.9% 6.2% 13.1% 55.0%
PBDEs (Kg) 0.02 0.02 0.66 0.52 0.30 0.63 2.63 4.8 pbdes = 406.53 x SSCPercent of Total 0.4% 0.4% 13.9% 10.9% 6.2% 13.1% 55.0%
PBDEs (Kg) 0.04 0.04 0.55 0.51 0.26 0.66 2.21 4.3 pbdes = 243.48 x SSC + 1.31e4Percent of Total 1.0% 1.0% 12.8% 11.8% 6.2% 15.5% 51.7%
PCBs (Kg) 0.00 0.00 0.16 0.10 0.07 0.05 0.58 1.0 With OutlierPercent of Total 0.0% 0.0% 16.5% 10.7% 7.6% 5.1% 60.0%
PCBs (Kg) 0.01 0.01 0.17 0.16 0.08 0.21 0.69 1.3 No OutlierPercent of Total 1.1% 1.1% 12.8% 11.9% 6.2% 15.5% 51.7%
Item #2b
12
Source ID by PCB Homologs?
From WY05 Report
Source activationof ‘new’ PCBs during high flow?
Transport ofweathered material?
Item #2b
13
Source ID by PBDE Homologs?Item #2b
14
How did WY05 and WY06 compare to previous years?
Item #2b
15
How did WY05 and WY06 compare to previous years?
Item #2b
16
April 2006• 2.21 Kg PBDEs (52% of Seasonal Load)
• 30% of 2.21 kg delivered on April 4th = 0.73 kg.
Item #2b
17
PBDE PCB
Source (kg/yr) (kg/yr)
Wastewater 37 2.5
Small tributaries ~64 9-15
Delta ~11 6-23
Atmosphere 1-2 -7
Total ~114 10-34
Sources: RMP special study on wastewater discharges; L. McKee; CARB (2005); D. Yee
Annual Loading EstimatesPBDE loads are 3-11x PCB loads.
Estimates or Preliminary!
Item #2b
18
Modeling PBDEs*Predicted inventories are consistent with those estimated from monitoring.
Source: J. Oram, SFEI
Model predictions are preliminary.
Loads
Item #2b