+ All Categories
Home > Documents > 1. RM wastage during the month - see 1 RM WIP is provided ...

1. RM wastage during the month - see 1 RM WIP is provided ...

Date post: 22-Jan-2022
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
15
1. RM wastage during the month - see 1 RM WIP is provided , this + backflush can help in generating Waste reports 2. energy consumption (cost/kw of mseb and diesel and cost/kg of material injected) - see 2
Transcript

1. RM wastage during the month - see 1

RM WIP is provided , this + backflush can help in generating Waste reports

2. energy consumption (cost/kw of mseb and diesel and cost/kg of material injected) - see 2

3. breakdown analysis – see 3

4. oee – see 4

5. manpower turnover, overtime, attendance analysis – see 5

7. customer delivery update – see 7

9. load / capacity planning - see 9

Machine wise work order generated

10. month production plan - see 10

Other expectations / points of discussion:

11. what QC reports are available?

12. what graphs are available?

14. defect-wise analysis of in-process inspection

15. defect-wise analysis of final inspection

16. overall OEE of the month and comparison YTD, previous and current year

17. Budget vs Actual analysis


Recommended