1 st Course Data Project Team meeting Samantha Scott – Project Manager 18 June 2012 http:// blogs.staffs.ac.uk/coursedata. Agenda. 3.00pm Meet the team (1 0 mins informal catch up with Tea and coffee) 3.10pm Introductions/Round the table – (all 10 -15 mins ) - PowerPoint PPT Presentation
Popular Tags:
23
1 st Course Data Project Team meeting Samantha Scott – Project Manager 18 June 2012 http://blogs.staffs.ac.uk/coursedata
Transcript
Page 1: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

1st Course Data Project Team meeting Samantha Scott – Project Manager

18 June 2012

http://blogs.staffs.ac.uk/coursedata

Page 2: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Agenda

Meeting objectives: • To introduce each of the team members to each other• Officially “kick start” the Project• Establish a shared understanding of the project and what we are working

together to achieve• Understanding roles and responsibilities by being the project leads within

each area

3.00pm Meet the team (10 mins informal catch up with Tea and coffee)3.10pm Introductions/Round the table – (all 10 -15 mins)3.25pm Project Overview and vision – presentation by Sam Scott and

sharing of overview document (10-15 mins) Discussion re: Work Packages and Roles/responsibilities (30 mins)4.10pm Project Admin – Zoe Hargrave)4.20pm Questions/discussion – all4.30pm Close

Page 3: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

What are we trying to do

Project Objective: This project will aggregate our course data from a variety of identified sources into a single database and embed this into ongoing course management processes

Project Benefits:

• Increase efficiency – through the increased consistency and accuracy of our data (for internal audit purposes and marketing material, literature, online content)

• Reduce duplication, better use of staff time and reduced data entry (with the focus on the creation of a single trusted source of course information).

• It will support in our readiness for future requirements (use by partners, 3rd party sites such as UK Hot courses etc)

Page 4: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The Vision

JISC XCRI-CAP Course Data DatabaseConsistent fields, descriptions and character length – “Data definitions” for PG courses. The “single truth source” for PG course data. This is to be built

with the functionality and requirements we spec based on understanding the users needs (e.g. reporting, marketing, web presentation etc)

New PG course data entered directly into database (through the “to be” processes that we will design with users starting at the start of the process of the creation of Validation info)

Existing information held about our PG courses will be migrated into the new database (manual entry or interfaced from multiple sources inc.Thesis and other databases held locally – which we will need to identify)

Quality and accuracy of info will need to be checked

Web pages presentation of accurate information with defined authors and consistent presentation

Functionality

Reliable source of information that can be accessed by users across the University to support recruitment

Document creation with accurate source of info that is currently held in PDF’s/docs on local drives (e.g. validation docs, award handbooks)

Link to 3rd party aggregators sites – e.g. UCAS therefore reduced levels on manual entry and increased accuracy

Feed information to existing systems within the University (Thesis and the new Student Records system Tridion, CRM etc)

Page 5: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The Vision• This be the agreed “single source of truth” for PG course data – with

the functionality that could apply to all courses• Provide the functionality required so that users use it• Inter-operability with existing systems• Reduce duplicate sources of information which can lead to

inaccuracy and mis-information• Consider the longer terms view of our systems (i.e. paving the way

for the new student records systems through establishing processes that will have synergy/compatibility– future proofing)

• Enable us to be more responsive• Use data creatively – online personalised prospectus, reduce

manual entry required on web pages and 3rd party sites, meaningful and personalised direct mail to existing customers etc.

• Responsive – to customers needs – internal and external• Use technology more effectively to support the business

requirements that will help us realise and achieve the things we want – and need to, in a competitive marketplace

Page 6: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

How we are going to get there

• The Project Plan• The work packages and milestones• Ownership of tasks and activities• Ensuring the quality of what we do is of a high standard• Reporting• Communication• Identify challenges, risks and issues quickly and document it• Adhere to the project governance arrangements• Be willing and open to learn and share your learning - this is a

positive thing when working on a project

Help each other and work as a team!! Any shortcomings are a reflection of the team not an individual

Page 7: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The “C” word…Change!

The Project Mantra• “The “product” isn’t the I.T. system/database that we build, the

product is the environment we (as and organisation) create, plus the people who act within in and what we do with that system as a

result”

• “Change doesn’t just happen, it is about the change in behaviours across the organisation that is key to this projects success”

(source: Me!!!! Samantha Scott - May 2012 after listening to the JISC webinar Managing Large Scale Organisational Change and taking some inspiration from it!)

Page 8: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

What do we need to do toreach our goal?

• An understanding of how we currently operate both centrally and within faculties “As is” position – document processes to give us an accurate starting point to work from These may already be documented in a formal way – or will require workshops and consultation to find out and then be recorded

• Educate and enlighten the rest of the organisation as to why this project is positive and will generate shared benefits – be an advocate!

• Work with and listen to colleagues to ensure we understand their requirements – their input and confidence into the way the system works will hopefully encourage sustainability and use

• Change the way we/the organisation works day to day when it comes to managing our Postgraduate course data through processes and training to use the new database that we create as the “single source of truth”

Page 9: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Can we do it alone or do we need help?

Admin, Business Managers, Quality Administrators, Faculty Champions,

Award leaders(Users)

Faculty StaffMarketing and PR

Central Services Teams

IS/Development Team

Recruitment Marketing, Digital Marketing/Web team and Project

Support(User)

? External developers

Quality, Admissions, Student Records, Management (EPVC/SLT)

(Users)

JISC and best practise

62 other institutions and Programme Manager, JISC resources, Project

blogs(Customer due to funding

the project)

Strategic, build, implementation, “aftercare”

support(Supplier)

Learning, Development and Innovation (LDI)

colleaguesExperience on other JISC Projects,

“Critical friend” to the project

Page 10: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Project Team Structure and Governance

• Project Team – Work package leads

• Project Board – advise, guide, communicate, support, approve

• JISC Project Management Guidelines – with synergy to PRINCE2 principles (PRojects IN Controlled Environments)

“PRINCE2 doesn’t do the work for you, it cannot guarantee a project will be successful. Good projects that deliver quality results, on-time

and within budget are dependant on the quality of the people involved from Project Board down to individual members.

www.jiscinfonet.ac.uk/infokits/project-management/prince2.pdf

• Roles and responsibilities

Page 11: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The team structureJISC Programme Manager

Ruth Drysdale

Project Champion (Staffordshire University)Georgina Kelly

Project Manager Samantha Scott

Project SupportZoe Hargrave

Project BoardGeorge Kelly, Rosie Crehan, Alison Phillips,

Paul Richards, Mary Hulford, Samantha Scott

Project Team (consisting of the

Workpackage Leads below)

ISAllison Phillips

Marketing and PR Katrina

Hutchins

(Digital

Marketing

)Graham

Brown

(Rec Mktg

)

Business

Analyst

Pete

Moss/Owen Carr

Business

ChangeSue

Barnett

Quality

and Admissio

nsQuality - Mary Hulford/Chris

Grey Admissions -Chris Alcock

Student

OfficeHelen Ferneyhough

Faculty representation through user group/leads to be

identified

Finance

SupportBabis Petrou

Critical FriendFleur Corfield

Appendix 2 (from the Progress Report to JISC 25.5.12) – revisions made to original 18.6.12JISC XCRI CAP: Course Data Management Project Governance structure

Page 12: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The Work Packages (WP’s)•WP1 (Project Management) –Sam

•WP2 (Detailed review of Course marketing processes and procedures)– Katrina Hutchins (Digital Marketing) and Graham Brown (Recruitment Marketing) – IS to prepare schema

•WP3 – (Detailed review of Course Processes and procedures) – Chris Gray (Quality) with support from Quality, Student Office, Faculty input, and LDI. This includes the analysis of current validation data and processes taking into account upcoming HEAR and KIS Requirements

•WP4 – (Definition of Combined Marketing and Course Model) – Graham Brown and Katrina (some support from Sam if req) input from Quality, Student Office, IS, Faculty, LDI

•WP5 (Requirements analysis of Course Database and XCRI CAP field) Pete (IS) and Sam based on Workshops; IS, Marketing, Quality, Student Office and Faculties. To develop a requirements Document. Activity includes definition of scope and requirements of a course information database (Joint Business and IS Lead) Get requirements for course database, system interface and XCRI-CAP 1.2 feed with Cool URI.

Page 13: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

The Work Packages (WP’s)

• WP6 – Definition of the processes and procedures that need to be in place alongside the course database to ensure the ongoing management and update of course data - Sue Barnett (Business Change), supported by Helen Ferneyhough, (Student Records) Graham Brown (Mktg) and Chris Grey (Quality)

• WP7 - Development, Test and Implementation of Courses Database and XCRI-feed Pete Moss (IS) with support on user testing from wider team

•WP8 – Manual data entry /migration of PG Dip, PGCert and PG Masters data into the course database For discussion - Helen Ferneyhough and Chris Grey to co-ordinate, Marketing to resource?

.

Page 14: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Work package owners

In teams:• Can you define what a work package is?

• What are the responsibilities of a work package owner/lead?

For each one you can think of use a separate post-it note

Page 15: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Work package owners/team leads• A work package can be thought of as a mini project, that when

combined with other work package units, form the completed project.

• An individual work package contains essential steps involved in completion of the work package along with a deadline by which each of the steps must be completed in order for project management to stay on track.

• A work package may in itself be thought of as a deliverable. Work packages allow for simultaneous work on many different components of a project at the same time by multiple teams.

• Each team follows the steps defined in the work package and completes them by the specified deadline. When all teams have finished their individual work packages, the whole project comes together with seamless integration.

Source: http://www.prince2primer.com/prince2-work-packagehttp://www.prince2primer.com/managing-product-delivery

Useful reading/handout source: http://www.businesschangeacademy.com/prince2-controlling-a-stage-cs-process/

Page 16: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Timescales WORKPACKAGES Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1. Project Management

Jan-MarMay - Mar x

2: Detailed Review of Course Marketing Processes and Procedures

Jan-MarJun-Jul

3: Detailed Review of Course Processes and Procedures

Jan-MarJul Aug

4: Definition of Combined Marketing and Course Model

Mar-AprSept

5: Requirements Analysis of Course Database and XCRI-CAP field

May-JunAug - Sep

6: Design to-be processes and procedures for on-going management of Course Data

Jun-SepMid Oct - Nov

7: Development, Test and Implementation of Course Database and XCRI-CAP Feed

Jul-NovInitial dev (Aug-Sep)Customisation Dec-Jan

8: Data migration / Data Entry

Nov-MarJan-Feb

9: Implementation of new Processes and Procedures

Jan-MarJan-Mar

Appendix 1(From Project Progress Report 25.5.12)

Page 17: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Scope and activities required

• Review of the project plan – detailed timescales

• Workpackage leads – you will need to be clear on the outputs you are responsible for delivering and work with the Project Manager to ensure the steps taken are adequate and that the outputs are fit for purpose before we move to the next stage

• Further discussion with each work stream lead re: time allocated is required

Page 18: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Time and moneyBudget: £80,000 (JISC)Institutional contribution: £36,000

Database build (from JISC funding): £10,000 (estimate)Deadline or delivery: end of March 2013

Time = money also!Time driven and outcome dependant – no meetings for

meetings sake

Ensure we are clear on what we are trying to achieve before a meeting to ensure that we begin to see outputs/actual results as a product of the meeting or discussions that support the steps of change that we need to achieve our goal

Page 19: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

• The remainder of the budget is to ensure we have people on this project that engage and create engagement within their sphere of influence and work with others to increase that sphere and generate momentum.

• In order to change we need to know where we are starting from and where we are trying to get to

• Creating change is the challenge!

• Communicating the vision may be challenging

• Enabling our organisation to work SMARTER and not harder, be more responsive and the provision of accurate, high quality information will be the reward

Time and money

Page 20: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Risks and challenges

There are a number of key issues and risks that would need to be addressed and these are:

1. Different steps of the project requires leadership from different areas with all areas contributing and driving this forward.

2. This is a large cross university project, and because we are not starting in a position where we already have a centralised store of course information nor are we in a position where this data can be simply accessed and fed into a database - process analysis is required as a first step within this and the project has not been able to identify who in the organisation can fulfil this role.

3. The interface to our student records system is proposed as a later stage but the analysis may impact this and mean that this needs to be in place sooner and therefore impact the project.

4. This project may be impacted by the review of whether the in-house student records system will be replaced and the impact of this depending upon the scope of the new system. However this project would collect and cleanse the course data which could then be imported into another system if required.

Page 21: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Organising ourselves and the work we doZoe Hargrave – Project Support

The shared folder and mapping to itHow the folder is structuredVersion controlDocument namingAmending/deleting informationRecording the time you spend on project related activites – getting

an accurate pictureResource planning – recording leave on the calendar

Page 22: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012

Next team meeting: 4/7/12

TASKS FOR ALL (for the next meeting)

1. Think about any process maps/diagrams/documents that you may already have in your area that could support in establishing the “as is” position – save them in the relevant WP folder

2. Write few sentences that you would use to describe/sum up this project and its benefits if you were to have 30 seconds with Michael Gunn e.g. having a stairway/lift encounter – to present to each other on 4.7.12 so we have an agreed one. Email to Zoe by Mon 2.7.12 to collate them

3. Ensure you have linked to the shared drive and calendar4. Record time that you have already spent doing work for the project – a

monthly return to finance will be based on what is recorded in the calendar5. Familiarise yourself with the ABCD reporting template6. Sign up to the JISC newsletter7. Printing for meetings8. Looked at the project bloghttp://blogs.staffs.ac.uk/coursedata and if you tweet/twitter please join the conversation #StaffsXcri or follow @platformsedge.. and tell others – take it to a team mtg, talk to people!

Page 23: 1 st  Course Data Project Team meeting  Samantha Scott – Project Manager 18 June 2012