1 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 2 3 4 June 20, 2017 - 1:48 p.m. DAY 18 49 Donovan Street Afternoon Session ONLY 5 Concord, New Hampshire 6 {Electronically filed with SEC on 07-05-17} 7 IN RE: SEC DOCKET NO. 2015-06 8 Joint Application of Northern Pass Transmission, LLC, and 9 Public Service Company of New Hampshire d/b/a Eversource 10 Energy for a Certificate of Site and Facility. 11 (Hearing on the merits) 12 PRESENT FOR SUBCOMMITTEE/SITE EVALUATION COMMITTEE: 13 Chrmn. Martin P. Honigberg Public Utilities Comm. (Presiding as Presiding Officer) 14 Cmsr. Kathryn M. Bailey Public Utilities Comm. 15 Dir. Craig Wright, Designee Dept. of Environ. Serv. Christopher Way, Designee Dept. of Resources & 16 Economic Development William Oldenburg, Designee Dept. of Transportation 17 Patricia Weathersby Public Member Rachel (Whitaker) Dandeneau Alternate Public Member 18 19 ALSO PRESENT FOR THE SEC: 20 Michael J. Iacopino, Esq., Counsel to the SEC (Brennan, Caron, Lenehan & Iacopino) 21 Pamela G. Monroe, SEC Administrator 22 (No Appearances Taken) 23 COURT REPORTER: Susan J. Robidas, NH LCR No. 44 24 {SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}
Transcript
Page 1: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

1

1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE

2

3

4 June 20, 2017 - 1:48 p.m. DAY 18 49 Donovan Street Afternoon Session ONLY

5 Concord, New Hampshire

6 {Electronically filed with SEC on 07-05-17}

7 IN RE: SEC DOCKET NO. 2015-06

8 Joint Application of Northern Pass Transmission, LLC, and

9 Public Service Company of New Hampshire d/b/a Eversource

10 Energy for a Certificate of Site and Facility.

11 (Hearing on the merits)

12 PRESENT FOR SUBCOMMITTEE/SITE EVALUATION COMMITTEE:

13 Chrmn. Martin P. Honigberg Public Utilities Comm. (Presiding as Presiding Officer)

14 Cmsr. Kathryn M. Bailey Public Utilities Comm.

15 Dir. Craig Wright, Designee Dept. of Environ. Serv. Christopher Way, Designee Dept. of Resources &

16 Economic Development William Oldenburg, Designee Dept. of Transportation

17 Patricia Weathersby Public Member Rachel (Whitaker) Dandeneau Alternate Public Member

18

19 ALSO PRESENT FOR THE SEC:

20 Michael J. Iacopino, Esq., Counsel to the SEC (Brennan, Caron, Lenehan & Iacopino)

21 Pamela G. Monroe, SEC Administrator

22 (No Appearances Taken)

23 COURT REPORTER: Susan J. Robidas, NH LCR No. 44

24

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 2: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

2

1 I N D E X

2

3 WITNESS PANEL: DENNIS MAGEE ROBERT VARNEY

4 LEE CARBONNEAU SARAH BARNUM

5 JACOB TINUS PAGE

6 EXAMINATION

7 Cross-examination by Ms. Pastoriza 4 Cross-examination by Ms. Meyer 13

8 Cross-examination by Mr. Lakes 31 Cross-examination by Mr. Cunningham 97

9 Cross-examination by Ms. Lee 112

10

11 EXHIBITS PAGE

12 APOBP 42 Excerpt from transcript 43

13 APOBP 43 10/5/16 DOT Conference Report 55

14 APOBP 44 Excerpt from transcript 58

15 APOBP 45 Paris Climate Agreement 69 Article 5 (2)

16 APOBP 46 The Concord Monitor Article 73

17 APOBP 47 The Concord Monitor Article 73

18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee

19 APOBP 49 4/21/16 Letter to DES 79

20 from Mr. Bisbee

21 APOBP 50 Robert Varney resume 82

22 APOBP 51 Washington State University study

23 DNA 60 DES Document re: Windham 102

24

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 3: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

3

1 AFTERNOON SESSION

2 (Hearing resumed at 1:48 p.m.)

3 CHAIRMAN HONIGBERG: All right.

4 Ms. Pastoriza, are you ready to go?

5 MS. PASTORIZA: I'm ready.

6 CHAIRMAN HONIGBERG: You may

7 proceed.

8 CROSS-EXAMINATION

9 BY MS. PASTORIZA:

10 Q. So this is a question for Mr. Tinus.

11 MS. PASTORIZA: Can you put on

12 Apple TV?

13 MS. FILLMORE: Dawn, can you try

14 again, please? Having technical difficulty.

15 It says, "Unable to connect. Network signal is

16 too weak."

17 CHAIRMAN HONIGBERG: All right.

18 Let's go off the record for a second.

19 (Discussion off the record)

20 CHAIRMAN HONIGBERG: All right.

21 Ms. Pastoriza, you may proceed.

22 BY MS. PASTORIZA:

23 Q. So, Mr. Tinus, Photo 1, I'll represent to you

24 that this photograph was taken last summer on

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 4: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

4

1 Route 116, Easton, and shows an uncovered

2 slurry tub and an open bore hole. It was

3 left overnight on the side of the road.

4 Assuming these representations are accurate,

5 does that conform with the BMPs?

6 A. (Tinus) It looks as though they have a

7 tankful of slurry as you noted and then

8 there's some straw waddles around it. But

9 those are the typical type of BMP we would

10 use.

11 Q. It's typical to leave an open slurry tub

12 overnight by the side of the road?

13 A. (Tinus) You didn't ask that. You asked if it

14 was typical. I was looking at the straw

15 waddle, and presumably that's the downstream

16 side. It's hard to tell from a photo the

17 angle, obviously, but... is there another

18 question, I guess?

19 CHAIRMAN HONIGBERG: Mr. Tinus,

20 can you move your microphone closer to your

21 mouth so that when you turn your head right and

22 left we don't lose you?

23 WITNESS TINUS: Sure.

24 BY MS. PASTORIZA:

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 5: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

5

1 Q. I'll ask the question again. Is it Best

2 Management Practices to leave an open slurry

3 tub and an open casing on a bore hole

4 overnight without an addition of

5 bentonite-specific silt fence?

6 A. (Tinus) I've never seen this done before.

7 Q. Is it Best Management Practices?

8 A. I would probably say not.

9 Q. Okay. Photo No. 2, I'll represent to you

10 that this is ACCU-VIS slurry additive that

11 was dumped or spilled next to a Northern Pass

12 drilling site in the White Mountain National

13 Forest on the side of the road and it was

14 covered with hay.

15 CHAIRMAN HONIGBERG: Just for

16 purposes of this question, Mr. Tinus, and maybe

17 the subsequent questions, assume what Ms.

18 Pastoriza is saying is true. You don't --

19 we're not saying for sure that it is. But just

20 purposes of these questions, assume that it's

21 true.

22 WITNESS TINUS: Understood.

23 BY MS. PASTORIZA:

24 Q. ACCU-VIS contains acrylamide, a male

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 6: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

6

1 reproductive toxin, developmental toxin, and

2 is carcinogenic. The site was 4 feet by 5

3 feet. It was unposted with any Material

4 Safety Data Sheets. Is this BMP?

5 A. (Tinus) Is this BMP what?

6 Q. Is leaving spilled ACCU-VIS slurry and

7 covering it up with hay and not cleaning it

8 up and not putting a Materials Safety Data

9 Sheet at the site to let people know what is

10 there, is that Best Management Practices?

11 A. (Tinus) I think cleaning up is part of good

12 housekeeping measures that should be

13 followed. As far as leaving an MSDS sheet at

14 the site, I've never seen that done before.

15 Q. So, leaving this ACCU-VIS slurry at the site

16 is not Best Management Practices?

17 A. (Tinus) In my mind, that should have been

18 cleaned up.

19 Q. So it's not Best Management Practices.

20 A. (Tinus) I guess, yes, I would agree with

21 that.

22 Q. Okay. Photo No. 3, this is... zooming. This

23 is an S.W. Cole employee straddling -- well,

24 standing on either side of the slurry tub,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 7: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

7

1 leaving a bunch of five-gallon buckets full

2 of slurry, with a sagging, poorly-staked silt

3 fence ready to funnel the spilled slurry into

4 the stream if someone happens to knock it

5 over. Is this considered Best Management

6 Practices?

7 A. (Tinus) I can't actually see the condition of

8 the silt fence, so I can't comment on that.

9 I don't know where those hoses are leading,

10 to be honest with you. So it's hard to

11 comment on this. I would take issue with the

12 gentleman standing on the bucket.

13 Q. Is it Best Management Practices to leave open

14 five-gallon buckets of slurry where, if they

15 tip over, they will flow down into a stream?

16 A. (Tinus) Well, if they're using the material,

17 you know, they'd have to have it at the

18 ready, I presume, and then they would take it

19 away. But there's so many things that could

20 be drawn from a photo like this. I mean, I

21 don't...

22 Q. What they do with the slurry is, in the

23 drill, as they shovel out the solids from the

24 bottom of the tub, they put them into those

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 8: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

8

1 buckets. Normally if you're doing the job

2 properly, you have a slurry recycling tank

3 which filters all this stuff out and keeps it

4 contained and goes off site. In this case,

5 they were shoveling slurry from the tub into

6 those buckets in anticipation of how they

7 were going to get rid of it. So that's what

8 that slurry is in the buckets for. It's not

9 awaiting being used.

10 A. (Tinus) Did they take it away?

11 Q. Yes, they took it away.

12 A. (Tinus) Okay. I don't... is there another

13 question about this?

14 Q. Is that Best Management Practices?

15 A. (Tinus) In general, the things that I noted,

16 it's inconclusive to me.

17 Q. So we can expect in the future that Northern

18 Pass may leave some five-gallon buckets full

19 of slurry in a stream bed, and that will be

20 something we can't report because it's

21 appropriate?

22 A. (Tinus) I don't think that's a good practice

23 that anybody would want to see happen, no,

24 and I don't think Eversource would allow that

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 9: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

9

1 either with the monitoring that's going to

2 take place with the Project going forward.

3 Q. So is it okay then, but it's not going to be

4 okay later?

5 A. (Tinus) I don't know anything about where

6 this photo was taken or much about the issue

7 other than what you're stating, so it's -- I

8 can't come to any other conclusions other

9 than what I just said.

10 Q. So, Photo No. 4, it's a little bit later.

11 Same drilling site. It's a Northern Pass

12 inspector in orange looking on while the S.W.

13 Cole employees load up those five-gallon

14 buckets into the back of their open pickup

15 truck. They also drained and then loaded up

16 and refilled the slurry bucket. That was all

17 driven out without any kind of covering

18 through White Mountain National Forest. Is

19 that Best Management Practices?

20 A. (Tinus) I would assume the buckets should

21 have been covered. Had I been the

22 environmental monitor, I would have made sure

23 they were covered.

24 Q. So it's not Best Management Practices.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 10: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

10

1 A. (Tinus) Well, not knowing, not seeing an

2 active video of the truck pulling way with

3 buckets in it, and assuming that what you're

4 saying is what happened, I would agree.

5 Q. Photo 6. So this is a Northern Pass

6 contractor. What he has is equivalent of a

7 slurry tub. That's just a different kind of

8 slurry tub. Slurry and the tailings are

9 being knocked and scraped out onto the ground

10 before being hosed into the undergrowth,

11 which they spent several minutes doing.

12 Is that Best Management Practices to

13 dump your slurry tailings from your tub onto

14 the ground and hosing it into the

15 undergrowth, especially near a water supply

16 and a stream?

17 A. (Tinus) That shouldn't be directly discharged

18 to a water supply or a stream or a wetland.

19 However, it can be done into an upland area.

20 So it's hard to tell where those resources

21 are located from this photo.

22 Q. Do you not need a permit from White Mountain

23 National Forest, where this was, to discharge

24 slurry into an upland, which it wasn't?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 11: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

11

1 A. (Tinus) I believe they had the proper

2 permissions to do the work through the White

3 Mountain National Forest.

4 Q. Is it appropriate and Best Management

5 Practices to dump slurry that contains

6 ACCU-VIS, which is carcinogenic, on the side

7 of the road and hose it.

8 A. (Tinus) I can't say. I don't know enough

9 about this particular part of the operation,

10 to be honest with you.

11 MS. PASTORIZA: That's the end

12 of my questions. Thank you.

13 CHAIRMAN HONIGBERG: All right.

14 Mr. Palmer, then I think we're going to return

15 to your group. And I guess Mr. Lakes is going

16 to pick up with the questioning?

17 MR. PALMER: Yes, that's right.

18 CHAIRMAN HONIGBERG: Mr. Lakes,

19 are you going to work from back there or come

20 up here? Okay. Change in plans.

21 MS. MEYER: Yes, change in

22 plans. Barbara Meyer. I'd like to go in

23 advance of Carl Lakes.

24 CHAIRMAN HONIGBERG: Okay. You

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 12: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

12

1 all can see Ms. Meyer from the witness bench?

2 All right. You may proceed.

3 CROSS-EXAMINATION

4 BY MS. MEYER:

5 Q. Okay. By way of introduction to the Panel --

6 CHAIRMAN HONIGBERG: You're

7 going to need to introduce yourself into the

8 microphone.

9 BY MS. MEYER:

10 Q. Okay. By way of introduction to the Panel,

11 I'm Barbara Meyer. I live on 116 in Easton,

12 so I'm a member of the Abutting Property

13 Owners, Bethlehem to Plymouth Group, and so

14 my questions will focus on the underground

15 portion of the route.

16 Let's see. First of all, I wanted to

17 ask how many wells there are in close

18 proximity to the underground route. And you

19 can pick your own definition of what's "close

20 proximity." You know, is it 200 feet? Is it

21 50 feet? What numbers are you working with?

22 A. (Tinus) I don't know, off the top of my head,

23 the exact number.

24 Q. Do you agree that in general it would be

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 13: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

13

1 better to have fewer rather than more wells

2 in close proximity to the route from an

3 environmental standpoint, a water-quality

4 standpoint?

5 A. (Tinus) In terms of what? Just by location?

6 Q. Yes. Would it be better to have fewer wells

7 along your route or more wells along the

8 route?

9 A. (Tinus) I really don't have an answer for

10 that. They are where they're at and the

11 roads where it's at.

12 Q. If you're concerned about water-quality

13 impact from the construction project,

14 wouldn't you, just by definition, rather see

15 fewer wells than more?

16 A. (Tinus) Well, I think the Project needs to --

17 and we are aware of where the wells are and

18 other utilities. So, to the extent they

19 cause complications with construction, that's

20 all part of, you know, understanding what

21 they're doing. And so it adds complexity. I

22 think that's what you're getting at.

23 Q. Well, another thing I'm getting at is the

24 potential for something going wrong, damage

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 14: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

14

1 occurring to the well either in terms of the

2 water quality, the structure of the well

3 itself. I mean, wouldn't it be prudent

4 avoidance to choose a route that has fewer

5 wells rather than more?

6 A. (Tinus) Well, I think as Lee and others have

7 stated, I mean, siting the Project is an

8 acknowledgment of trying to find, you know,

9 the location for the facility in the road

10 where it's going to have the least impacts to

11 those resources. And some folks are probably

12 aware that design efforts are still

13 continuing in that regard to look at the

14 underground location, to provide further

15 avoidance to various features along the

16 route.

17 Q. Right. And I realize there are a lot of

18 other factors that would go into choosing an

19 optimal route. But I'm just asking with

20 regard to that one specific characteristic of

21 number of wells. Wouldn't it be nice to have

22 fewer wells rather than more to contend with

23 when you're building a project like this?

24 A. (Tinus) Sure. But it's through a developed

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 15: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

15

1 or a partially developed area, so there are

2 wells there.

3 Q. Okay. Wouldn't, for example, siting the

4 Project down the median of I-93 provide a

5 natural buffer away from wells? Wouldn't

6 that be a particular advantage to that route?

7 A. (Tinus) I don't believe the I-93 route was

8 studied. I know that there's limitations in

9 terms of what the state allows.

10 Q. Yeah, other issues. But just when it comes

11 to wells and avoiding that, the nature of

12 that problem, the water quality in people's

13 wells, doesn't it seem like 93 would provide

14 a natural buffer?

15 A. (Tinus) You're asking a hypothetical question

16 that I just don't have an answer to. I'm

17 sorry. We haven't looked at comparing the

18 route location to other hypothetical

19 locations like that.

20 Q. Okay. Now, your analysis of the underground

21 portion of the route was based on Company

22 plans that had it under the pavement,

23 largely; isn't that correct?

24 A. (Tinus) Either under or directly adjacent to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 16: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

16

1 the pavement, right. On the road shoulder.

2 Q. Right. And the residents here, and Mr.

3 Oldenburg, the other day, confirmed that on

4 116 there's really no shoulder of that road.

5 You've got maybe a foot but -- okay. I'll

6 let that go.

7 So have you updated your analysis to

8 reflect the fact that the DOT says that they

9 would rather see this towards the outer edge

10 of the right-of-way, meaning away from the

11 pavement into front yards?

12 A. (Tinus) The engineering team is currently

13 working on that very effort, considering what

14 the DOE -- DOT has provided for feedback.

15 And I know they are looking at the design now

16 and tweaking it to do what they need to do to

17 make this work right for everybody, including

18 folks that have wells.

19 Q. And wouldn't you expect the environmental

20 impact to get worse the farther you move away

21 from the pavement?

22 A. (Tinus) I can't agree to that. That's a

23 broad generalization.

24 Q. Would it have a greater impact on vegetation,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 17: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

17

1 for example?

2 A. (Tinus) Perhaps.

3 A. (Carbonneau) I would say that's possible if

4 you're not in the roadbed or the developed

5 shoulder and you go beyond that, it's more

6 likely that there will be natural vegetation.

7 Q. And in terms of impact on wells, if, for

8 example, like in my case, where my well is

9 50 feet from the pavement, the further you

10 advance into the right -- or into the front

11 yard, the closer you get to the well. I

12 would imagine that's also another potential

13 adverse environmental impact by moving away

14 from the pavement and into yards. Would you

15 agree with that? The potential is there.

16 A. (Carbonneau) I guess there is a potential.

17 But it's not a given that there will be any

18 impact to the well at all. But I guess, I

19 suppose if it's a little closer, it would

20 seem logical that there could be a slight

21 increase in the potential at least.

22 Q. Can you think of any other adverse

23 environmental impacts that might happen as

24 you move the Project away from the pavement

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 18: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

18

1 and out into the yards?

2 A. (Carbonneau) I think that I don't know if I

3 would say into the yards. But as you get

4 further away from the developed portion of

5 the road right-of-way, there's a potential

6 for other natural resource effects, yes.

7 Q. Can you enumerate some of those?

8 A. (Carbonneau) Could be wetlands, could be

9 streams, could be mature trees. In some

10 cases there could be a rare, threatened or

11 endangered plant at the edge of the

12 right-of-way.

13 Q. So would you still be able to say, then, that

14 there's no unreasonable adverse effect of

15 this project?

16 A. (Carbonneau) I can't speculate on that. It

17 would have to be an evaluation, and we have

18 not done that evaluation.

19 Q. One of the other things that has changed with

20 regard to the plans is the fluidized thermal

21 backfill, and also, I believe, the plan for

22 the trenches to now be 4 feet by 7 feet deep

23 instead of 4 feet by 4 feet. So we have --

24 we had earlier testimony from Ms. Carbonneau.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 19: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

19

1 You said you thought that the trenches were

2 lined and so there wouldn't be any effect on

3 well or groundwater. But Mr. Tinus said it

4 is indeed an open trench with the fluidized

5 backfill that contains heavy metals but that

6 won't leach out.

7 A. (Carbonneau) It was not my testimony that

8 these are lined trenches.

9 Q. Oh, okay. Can you correct what you said? If

10 that was a mistake, then I'm sorry. What was

11 your understanding about the trenches?

12 A. (Carbonneau) Not that they were lined. I

13 can't recall exactly what the conversation

14 was about, but it was not regarding lining of

15 the trench.

16 Q. Okay. I thought the idea was that there was

17 something there that would mean that any

18 fluidized backfill wouldn't be exposed to the

19 soil, so that it was encased in a concrete

20 box or the trench was lined or there was

21 something there.

22 A. (Carbonneau) No. The fluidized backfill goes

23 into the trench. But below that, the cables

24 themselves are encased. And as it turns out,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 20: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

20

1 I guess it's in concrete and not necessarily

2 in a duct bank that is open without any fill

3 in it. So the cables themselves are not in a

4 porous material. But then there is a

5 fluidized thermal backfill above that which

6 is inside the trench. But it is not lined.

7 It will be in contact with the soil.

8 Q. Okay. So is it fair to say, then, you're

9 both on the same page in terms of the

10 construction of the trench, both Mr. Tinus

11 and Ms. Carbonneau?

12 A. (Carbonneau) I think we're on the same page,

13 yes.

14 A. (Tinus) Yes.

15 Q. Okay. So with regard to the fluidized

16 backfill, we have Mr. Tinus saying it does

17 include potentially heavy metals but that it

18 will not leach these heavy metals into the

19 groundwater. Now, this line is going to be

20 in place forever. How do we know that 80

21 years down the line this is not impervious

22 anymore to years and years of erosion,

23 movement in the ground, that kind of thing,

24 and things do start leaching out of this

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 21: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

21

1 product?

2 A. (Tinus) We haven't studied that. And I don't

3 know that the line is scheduled to be in

4 service for 80 years. I don't think -- I

5 think it's half that. But I could be wrong.

6 Q. Okay. But it's your call as to when you

7 would go in there and replace it. So the

8 homeowner bears the risk of this

9 deterioration potentially occurring and

10 nobody coming in willing to replace the line.

11 A. (Tinus) Well, I think whatever maintenance is

12 required on the trench and the line will be

13 done on whatever schedule is necessary.

14 Q. Okay. Another thing I wanted to ask you

15 about is with regard to fly ash. Now, my

16 understanding is that it's not a homogeneous

17 material, that different batches of fly ash

18 could have different contaminants in it, that

19 some may have a high quantity of mercury, for

20 example, and another batch wouldn't show much

21 mercury at all. So if that's the case, when

22 the Company tests this product and says it's

23 safe, how do you know that the batch that

24 goes in in front of my house doesn't contain

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 22: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

22

1 different contaminants, different things than

2 the one you tested in the lab?

3 A. (Tinus) I don't know anything about how that

4 works, but I assume they have a document

5 trail that proves that it is tested as to

6 what they claim it is and that they're

7 following certain standards or protocols as

8 required by law. There is that requirement

9 in the law. In order to use this material,

10 it needs to be tested, and it needs to not

11 have exceedances, for your example, of

12 mercury and other constituents that if in

13 larger quantities could be toxic. But these

14 are lower thresholds that are allowed.

15 Q. But do you agree with my statement that fly

16 ash is not a uniform product, not a

17 uniform --

18 A. (Tinus) I think that's why they have testing,

19 because it can vary from the source,

20 depending on what kind of coal it came from.

21 Q. Okay. So it's possible that as this is being

22 installed in our front yards, if we took a

23 sample of the product, the fluidized

24 backfill, and say we took it to an

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 23: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

23

1 independent lab and had it tested and I find

2 high levels of mercury in this particular

3 sample, what happens? What does the

4 homeowner do? How do you stop the Project

5 and say wait a minute, this has got an

6 unusually high level of mercury?

7 A. (Tinus) I don't know. That's a hypothetical

8 I don't have an answer for. Sorry.

9 Q. Another topic that I wanted to raise is with

10 regard to excavating and then reusing

11 roadside soils and that that can stir up and

12 release petroleum products from car exhaust

13 that might be adjacent to the road. What do

14 you think the impact would be on a nearby

15 well water from just the stiring up of the

16 topsoil and releasing these petroleum --

17 freeing up these petroleum byproducts?

18 A. (Tinus) Never heard of that as an issue

19 before. Construction is done all the time

20 along roadsides. Municipalities install

21 various utilities, repair pipes, replace

22 things, upgrade them. Many years doing this,

23 I've never heard of that brought up as an

24 issue.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 24: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

24

1 Q. If this project were going in a few feet from

2 your own wells at your own homes, if you have

3 well water, how long after installation would

4 you be testing your well, and what would you

5 test it for? So this would encompass all

6 possible things that you might be concerned

7 about. Just wanting to be sure what you test

8 for.

9 A. (Tinus) I would follow the DES regulations

10 for homeowners and testing wells. They have

11 good guidance, and that covers a lot of the

12 parameters.

13 Q. And how long would you test your well for to

14 make sure there weren't any changes?

15 A. (Tinus) I think you'd test it once, and with

16 the assumption that everything is okay, then

17 you're fine. I know personally I have my own

18 well. I test it about every three or four

19 years.

20 Q. Okay. What about in the instance of

21 blasting? What sort of pre-blasting testing

22 do you do, and how long do you follow-up with

23 monitoring of wells that are near blasting

24 sites?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 25: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

25

1 A. The Project intends to follow the blasting

2 protocol that it will have in place based on

3 the DES recommendations. Some of that

4 includes water testing. It's also checking

5 for physical things to the structure

6 beforehand. So there would be a baseline

7 analysis done to look at the structural

8 integrity of the properties and testing the

9 well to see if there's anything in there

10 presently. I believe what the construction

11 panel testified to was any wells within

12 500 feet of blasting, DES would like to see

13 that done when there's 5,000 cubic yards of

14 material removed in any location.

15 Q. And what do they test for?

16 A. (Tinus) Typical things tested for in water,

17 including nitrates, hydrocarbons that could

18 be released from the blasting process.

19 Q. Despite the DOT using Best Management

20 Practices, some of the blasting that was done

21 for highway construction in Windham, New

22 Hampshire in 2009 and 2013 resulted in

23 nitrate contamination of groundwater. So are

24 BMPs adequate protection from the risk of

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 26: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

26

1 blasting near wells?

2 A. (Tinus) I think that's an extremely large

3 area that they blasted, if I'm understanding

4 your reference correctly. The amount of

5 blasting for the Northern Pass Project is

6 going to be pretty small, quite frankly,

7 aside from some of the transition stations;

8 those would be largest area. But I don't

9 even know if blasting is going to be required

10 along the underground route itself. We'll

11 know more when they take additional boring

12 information, you know, within the

13 right-of-way and other select locations. But

14 until we have a blasting plan, it's hard to

15 draw conclusions about what the effects of it

16 might be.

17 Q. Okay. I guess, bottom line, I get to a

18 fundamental question, and it's going to sound

19 like a rhetorical question, but it's really

20 not. I'd like to hear what you have to say

21 about that.

22 The question is: Who pays the price for

23 being wrong? For the homeowners along the

24 route, you know, this could cost us a lot of

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 27: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

27

1 money because we bear the risks of the

2 contamination in the backfill. We bear the

3 risk of stirring -- what I think is a risk of

4 stirring petroleum byproducts down into the

5 soil. I remember kids with lead poisoning,

6 and that was an issue that people were

7 looking at as to whether that's where their

8 lead exposure was coming from. We've got the

9 risk of blasting. You know, our families are

10 drinking the water from wells that are

11 30 feet from the construction.

12 So my question is: If things go wrong,

13 does anybody on your side bear any personal

14 responsibility? I mean, is the decision

15 made, and then you just deliver us bottled

16 water if something goes wrong?

17 A. (Tinus) I think what we've been talking about

18 up here is that, first off, DES has by

19 fact -- by virtue of the fact they have

20 indicated that we've addressed the concerns,

21 and we'll continue to do so during

22 construction and even after by following all

23 the permit conditions, that we've

24 acknowledged that we've done a good job

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 28: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

28

1 looking at the issues you're talking about.

2 But furthermore, the construction panel

3 I know has mentioned that if there are any

4 issues, that they will be addressed at the

5 time. We don't want to go there. That costs

6 money. That costs people's clean water. You

7 know, we want to avoid that. By following

8 the Best Management Practices, by doing

9 pre-blast surveys, by doing water-quality

10 monitoring and those kinds of things we've

11 been talking about, we feel that we'll keep

12 that at bay, that it won't rise to that level

13 that you're expressing.

14 Q. I guess I'd have to question if one person

15 finds a high level of mercury or finds

16 nitrates in their well or finds something

17 like that as a result of the Project. That

18 impact filters down to everybody else that's

19 along the line of the Project. So, even if

20 the risk is small, it affects all of us that

21 are lining the Project. It affects all of

22 our property values.

23 So, to get around to a question, I guess

24 it would be: Doesn't it make some sense,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 29: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

29

1 doesn't it make a lot of sense to move this

2 into a situation where it's away from homes

3 and away from wells, like the median of I-93?

4 Isn't that preferable to taking the risks,

5 asking all of us to take these risks that I

6 just outlined with our water quality, with

7 our property values? We've got real money on

8 the line. This comes out of our hide. You

9 people are making the decision, an executive

10 decision, and nothing really wrong happens to

11 you if you're wrong. I mean, nothing

12 financial happens to you if you're wrong.

13 There are no penalties. So doesn't it make

14 sense to try to locate this as far away from

15 an impactful place as possible, like I-93?

16 A. (Tinus) I know you mentioned I-93. I mean,

17 again, we've looked at the Project from the

18 location where it's at and we're continuing

19 to acknowledge the issues that folks like

20 yourself are bringing up and keeping them in

21 mind. And through the coming months, as the

22 contractors are getting engaged, they're

23 going to be made fully aware of these issues,

24 that they need to exercise extreme caution

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 30: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

30

1 and common sense and do their jobs correctly.

2 And that's why we're all working on this

3 project. And some of us have been working on

4 this for a very long time to bring it to this

5 point, so...

6 Q. Well, and part of the reason it's taking so

7 long is because folks like us are fighting

8 you because of exactly these kinds of

9 concerns. But I think that's --

10 MS. MEYER: That concludes my

11 questioning.

12 CHAIRMAN HONIGBERG: Mr. Lakes,

13 I think that brings us to you.

14 CROSS-EXAMINATION

15 BY MR. LAKES:

16 Q. Hello. I am Carl Lakes. I'm an intervenor

17 on Route 116 in Easton, on the underground

18 route. And I'll try to get through this as

19 fast as possible. "Yes" and "No" answers are

20 probably the best, but I guess sometimes you

21 just have to say more than that. Let's

22 begin.

23 When planning a project of this scope,

24 are there regular meetings with Eversource to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 31: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

31

1 discuss various environmental issues?

2 Anybody can answer that. I don't know who

3 would be the best.

4 A. (Carbonneau) Yes.

5 Q. Who attends these meetings from Eversource?

6 A. (Carbonneau) A project director and sometimes

7 an environmental person from Eversource. It

8 depends on what the issues are that are being

9 discussed. And also in some cases their

10 legal department will attend as well,

11 sometimes engineers who are working on the

12 Project also.

13 Q. Does upper management attend any of these

14 meetings, say a VP? Is there a VP of

15 environmental at Eversource?

16 A. (Carbonneau) Yes, there are definitely

17 high-level environmental folks at Eversource

18 that attend from time to time.

19 Q. Okay. And you have high-level Eversource

20 construction folks in the room as well?

21 A. (Carbonneau) Yes, if there's a -- typically

22 more engineering than construction, but

23 high-level engineers are sometimes involved

24 in those meetings.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 32: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

32

1 Q. Is there coordination between contractors

2 where kind of the left hand knows what the

3 right hand is doing and so forth, where you

4 try to work in harmony?

5 A. (Carbonneau) Well, during the planning of the

6 Project, the contractors that have since been

7 hired were not necessarily participating in

8 those meetings during the planning process of

9 the Project. They have been engaged more

10 recently. In some cases they attend meetings

11 where environmental issues are discussed.

12 But they're not contracted through my

13 company. They are contracted through the

14 Northern Pass team, so -- but there is

15 internal discussions. And there are many

16 other meeting types that take place. So

17 there are different groups of people meeting.

18 There's a fairly good amount of

19 cross-pollination of ideas and planning

20 documents.

21 Q. So you were saying that there actually is a

22 vice-president of environmental services at

23 Eversource?

24 A. (Carbonneau) I don't know if it's a

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 33: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

33

1 vice-president. I'm not sure exactly what

2 her title is. But Catherine Finneran has

3 been involved in our meetings as well.

4 Q. At least my corporate life has normally been

5 where corporations take the environment very

6 seriously and usually have very high-level

7 people attend meetings. And in this day and

8 age, where maybe there's too many VPs, a lot

9 of times they do show up at these meetings

10 for input as well. But you have not seen a

11 vice-president of environmental resources in

12 these meetings. Is that what you're saying?

13 A. (Carbonneau) I'm not saying that. I'm saying

14 I'm not sure what all of their titles are, if

15 they're actually vice-presidents of

16 environmental or not. Sorry.

17 Q. Okay. So, say you have an issue such as a

18 wetland that will potentially be completely

19 destroyed, never to be returned to its

20 pristine condition. What process do you go

21 through to finding a solution for that?

22 A. (Carbonneau) Well, this is a hypothetical

23 question, so I'm not sure.

24 Q. I don't know if it's hypothetical. I mean,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 34: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

34

1 you have to have some -- if you have a

2 wetland that's going to be destroyed, my

3 question is -- let me just elaborate further

4 then.

5 So, say if it's going to be destroyed,

6 you may look for an alternate route. Would

7 that be something that might be a

8 possibility?

9 A. (Carbonneau) Well, for the most part, I don't

10 think we have too many wetlands that are

11 going to be "completely destroyed" by this

12 project, so I wouldn't use that term. We

13 have wetlands that will be impacted by the

14 Project. And to the extent that we can avoid

15 them by rerouting an access path or a work

16 pad or even a structure itself, then that is

17 an effort that's worth doing.

18 Q. And obviously you've been working through the

19 DES, and there are times when you need to

20 find a variance or get a variance from the

21 DES to move the Project along at a certain

22 point; is that correct?

23 A. (Carbonneau) I'm not sure a variance is the

24 correct legal term. There may be a

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 35: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

35

1 possibility that an impact that has not been

2 approved previously may be necessary, in

3 which case we would need to seek a permit

4 amendment.

5 Q. So I'm not sure if this is a permit

6 amendment. But basically at that point,

7 perhaps Eversource needs to pay compensatory

8 damages and, you know, or some sort of a

9 cost. And I had seen where there's something

10 like a $3- to $4 million set aside of funds

11 with regard to some of the destruction along

12 the route.

13 How is the cost determined when putting

14 the value on killing and displacement of

15 wildlife is the subject at hand? What is it

16 worth? How is the final number reached, and

17 is it negotiated?

18 A. (Carbonneau) I can describe to you what the

19 mitigation requirements are under the law.

20 The New Hampshire Wetlands Bureau

21 requires that you identify your wetland

22 impacts. They have what's -- and there are a

23 couple options for mitigation. So there's

24 the preservation option. But you may be

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 36: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

36

1 referring to the ARM Fund, which is the

2 Aquatic Resource Mitigation Fund. They have

3 an online formula, a worksheet that you put

4 information into. It's the area of the

5 impact, and then it calculates based on what

6 it might cost to actually construct

7 replacement wetlands at a higher ratio, what

8 that cost would be. And they turn that into

9 what's called an Aquatic Resource Mitigation

10 Fund payment. So it's based on the area of

11 impact, what the land values are in that

12 town, what it would cost to construct a

13 replacement wetland. And that's all

14 prescribed in the rules for the New Hampshire

15 Wetlands Bureau.

16 As far as actual wildlife impacts, there

17 are currently no specific rules or guidelines

18 about mitigation for direct impacts to

19 wildlife. However, New Hampshire DES does

20 ask that we coordinate with New Hampshire

21 Fish & Game to make sure they're aware of the

22 impacts that are proposed and determine if

23 there is something in addition that might be

24 required. So, New Hampshire Fish & Game and

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 37: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

37

1 the other resource agencies have been

2 provided with our compensatory mitigation

3 plan so they can determine if it's adequate

4 to meet their needs.

5 So our mitigation plan, in addition to

6 the cost for mitigation, includes some

7 preservation of parcels that not only have

8 high-value wetlands with upland buffers

9 around them, but valuable wildlife habitat

10 based on the types of impacts that we're

11 expecting of wildlife habitat as well.

12 Q. Would I assume that Eversource urges you to

13 put forth a study which minimizes the cost to

14 the corporation?

15 A. (Carbonneau) No, I disagree with that

16 assumption.

17 Q. I didn't say they did. But I asked if there

18 may be the assumption because you're working

19 for Eversource, the impetus to find ways to

20 mitigate the costs or minimize the costs

21 associated with some of these issues

22 encountered with wetlands and so forth.

23 A. (Carbonneau) Well, we've made many

24 recommendations on the Project for avoiding

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 38: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

38

1 and minimizing wetland impacts. And within

2 the right-of-way within the Project area,

3 cost has never come up as a reason why they

4 could not further avoid or minimize an

5 impact. It's always been some technological

6 issue based on safety clearances or terrain

7 or some other reasons. So cost has never

8 been an issue there. And it's never been an

9 issue with the mitigation package either. In

10 fact, we have way more mitigation than is

11 even required under the rules, and the

12 Northern Pass team never balked at our

13 recommendation on that.

14 Q. Okay. Let's move on.

15 In a project this size, you will

16 invariably destroy lots of trees, crush and

17 smother wildlife, displace habitat,

18 permanently destroy habitat, et cetera. One

19 has to wonder about the environmental cost

20 versus monetary value, versus not doing the

21 Project at all.

22 I want you to think along these lines:

23 Say you could pay $50,000 to a landowner to

24 avoid a pristine wetland. Is this action

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 39: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

39

1 actually explored along the whole route? In

2 other words, you know, you have an easement

3 and you're cutting trees down and so forth,

4 and here's this pristine wetland. And, jeez,

5 you know, if we could only go 30 feet more

6 over to this side and avoid it completely

7 rather than having to deal with it in some

8 way or hurt it or harm it in some way. Is

9 there a reach-out to landowners in those

10 situations to see if in fact Eversource could

11 pay that landowner to extend the easement

12 over to the side to avoid that wetland? Is

13 there any actions like that?

14 A. (Carbonneau) Well, my -- not that I'm aware

15 of.

16 Q. Okay.

17 A. (Carbonneau) But my understanding is the

18 easement is -- I mean, the easement is

19 already there. There's already a clearing

20 with the structures in it. If we were to ask

21 for additional easements somewhere else, then

22 it would only increase the area of impact by

23 building outside of the existing

24 right-of-way. So it would be a worse

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 40: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

40

1 impact --

2 Q. Sorry. Well, not necessarily so. If you're

3 avoiding something that's pristine, that may

4 be worth, you know, the act of cutting down a

5 certain portion of trees on a dry piece of

6 land where you're avoiding it -- anyway, I'm

7 just making a point. I just wanted to know

8 if you actually do that, yes or no.

9 A. (Carbonneau) No, and I don't think any of the

10 resources in the existing right-of-way would

11 qualify as pristine. They've all been

12 managed for decades.

13 Q. I don't know. I heard about a few pristine

14 wetlands today.

15 Getting back to internal meetings with

16 Eversource on environmental issues. Mr. --

17 is it Tinus or Tinnus?

18 A. (Tinus) Tinus.

19 Q. Would such things as horizontal directional

20 drilling and the possible consequences of

21 frack-out be discussed in these internal

22 meetings?

23 A. (Tinus) With the contractors now on board,

24 those discussions will be occurring, yes.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 41: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

41

1 Q. You're part of those contractors; correct?

2 A. (Tinus) I am not. I work for Burns &

3 McDonnell, the engineering folks that did

4 preliminary engineering for the Project.

5 Q. Okay. So once you're done with the

6 preliminary engineering, your company walks

7 away? Is that what it is?

8 A. (Tinus) No, not at all.

9 Q. So you're in those meetings. Or you should

10 be in those meetings.

11 A. (Tinus) Yes.

12 Q. And you are --

13 A. Me personally, though, I don't know if I'll

14 be involved. It's more of the contractors,

15 and then probably as needed I'll be in

16 meetings, as might Lee and others from the

17 environmental side.

18 Q. Yeah, I do get it. But I would think that

19 there should be an environmental person there

20 at every meeting, which I guess you're

21 representing.

22 A. (Tinus) It's a good recommendation.

23 Q. Thank you.

24 Would you agree that polymers that are

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 42: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

42

1 mixed with bentonite for lubrication are

2 harmful to fish, invertebrates,

3 bottom-dwelling species and can be possible

4 carcinogens? Yes or no?

5 A. (Tinus) When they're used in proper dosage,

6 they don't cause those effects.

7 Q. But they do cause the effects, just like

8 drugs and everything else, I mean, if you

9 overdose on a drug versus not overdosing.

10 Anyway, I understand and we'll move forward.

11 So is Eversource upper management,

12 particularly those in charge of engineering

13 and construction, made aware of the possible

14 harmful effects of the polymers used in

15 drilling mixtures?

16 A. (Tinus) I don't know.

17 Q. From my cross-examination of the construction

18 panel, the attendees pleaded ignorance to any

19 knowledge of the harmful properties of these

20 products.

21 I'd like to put up Exhibit No. APOBP 42.

22 (Exhibit APOBP 42 marked for

23 identification.)

24 Q. And on this exhibit I asked Mr. Bowes the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 43: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

43

1 following: Horizontal directional drilling

2 uses bentonite and drilling fluids made up --

3 (Court Reporter interrupts)

4 CHAIRMAN HONIGBERG: Slow down.

5 MR. LAKES: Sorry.

6 CHAIRMAN HONIGBERG: Hang on

7 just one second. That is a very common

8 problem. Virtually everyone has the same

9 problem. And the stenographers know it, and

10 they are ready.

11 MR. LAKES: Yeah, I don't know

12 how they do it either. I'd go insane.

13 BY MR. LAKES:

14 Q. So, anyway, "Horizontal directional drilling

15 uses bentonite and drilling fluids made up of

16 polymer additives for lubrication. Are you

17 aware" -- and this would be to Mr. Bowes --

18 "that these materials have been found to be

19 toxic to fish and invertebrates and can

20 negatively affect the aquatic environment?"

21 Mr. Bowes says, "I am not."

22 Going on further to the bottom, and then

23 we'll move over to the next exhibit

24 afterwards. "Are you aware that the fluid

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 44: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

44

1 polymer ACCU-VIS that was used with the

2 bentonite contains carcinogens possibly

3 harmful to humans?"

4 MR. LAKES: And you can put on

5 the next one.

6 BY MR. LAKES:

7 Q. Again Bowes says, "I don't have any knowledge

8 of the polymers or the fluids that are used

9 besides the bentonite."

10 In your professional opinion, then, Mr.

11 Tinus, should a company such as Eversource

12 that is authorizing third parties to perform

13 work in their name be aware of harmful

14 products or possible negative consequences

15 prior to the start of any project? Shouldn't

16 all levels of management be aware?

17 A. (Tinus) That seems to be a prudent

18 suggestion, yes.

19 Q. Moving on. Who specifies the drilling fluids

20 to be used in HDD? To go further, does

21 Normandeau or Burns & McDonnell review the

22 fluids, third-party oversight? Is there any

23 knowledge on that at all?

24 A. (Tinus) We haven't talked about that

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 45: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

45

1 specifically.

2 Q. Will you be talking about it specifically? I

3 guess that's --

4 A. (Tinus) Now that you've mentioned it, I think

5 that's prudent.

6 Q. Are you aware that there are low-toxicity,

7 water-based polymers out there?

8 A. (Tinus) I'm not personally aware of that, no.

9 Q. Perhaps somebody should investigate that.

10 Is there anyone on the panel that worked

11 with Eversource during the underground

12 project from Middletown to Norwalk?

13 A. (Carbonneau) Normandeau was not involved in

14 that, so...

15 Q. Mr. Tinus?

16 A. (Tinus) I haven't personally been. But I

17 know that our company has worked on it.

18 Q. Okay. We can skip that whole area then.

19 We'll move along quicker.

20 Mr. Tinus, can frack-outs get into

21 homeowners' wells?

22 A. (Tinus) If they're not properly managed, I

23 suppose the answer is yes.

24 Q. And I'm sure, as you may be aware, frack-out

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 46: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

46

1 can travel many hundreds of feet. Will

2 Eversource screen wells and test for

3 contamination either from frack-out or

4 blasting within 500 feet of all wells along

5 the route?

6 A. (Tinus) Pretty sure the construction panel

7 indicated that that would be the case.

8 Q. All right. What is the procedure for

9 cleaning a contaminated well from frack-out

10 or blasting materials?

11 A. (Tinus) I don't know specifically.

12 Q. Who does know that within either -- on this

13 panel? Is there anybody else that knows this

14 on this panel?

15 A. (Carbonneau) No.

16 Q. I would think that's something that an

17 environmental panel should know.

18 Will all frack-outs, spills, incidents

19 of contamination, fuel spills be reported to

20 town governments immediately and followed up

21 by written report?

22 A. (Tinus) There will be a reporting protocol in

23 place with all of these monitoring plans that

24 are being prepared for blasting and for the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 47: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

47

1 HDD, for the spill prevention/containment

2 countermeasures plan. So that will have

3 reporting requirements in there.

4 Q. And that will be reported to towns?

5 A. (Tinus) I assume the towns would be copied on

6 those communications as well, yes.

7 Q. I would hope so, because if it's something

8 that's affecting any of the residents in the

9 town, then the town government and

10 conservation commissions should be

11 knowledgeable of that.

12 Let me ask you: If there is an event,

13 how much damage will require follow-up?

14 A. (Tinus) I mean, without very specific -- it's

15 hard to pinpoint what damage would require

16 what kind of follow-up. So I don't know that

17 I can provide a specific answer --

18 Q. Will there be some -- sorry.

19 Will there be some written sheet that

20 can be dispersed among the communities that

21 says, you know, this is what you can expect

22 from us if there is a frack-out or some

23 damage done to somebody's well, this is the

24 follow-up, this is how we're going to do it?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 48: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

48

1 A. (Tinus) I'm familiar with other projects

2 having a similar process in place, so I think

3 that would be done as well as part of the

4 outreach, ongoing outreach. It's going to be

5 extensive when construction starts. And it

6 is now trying to get together with

7 municipalities, to sit down with them to

8 identify issues like the kinds that you're

9 raising, to get a Memorandum of Understanding

10 or agreement together that specifically

11 outlines some of these things and hopefully

12 some solutions to some, or answers to the

13 questions.

14 Q. Okay. The way I understand it, fresh water

15 is necessary for HDD. Does Eversource and

16 its contractors plan on accessing streams,

17 rivers and ponds as a source of fresh water?

18 A. (Tinus) I think, in terms of obtaining enough

19 water, it depends how much they'll need at a

20 particular crossing. There are certainly

21 requirements that the DES has in terms of

22 withdrawal, water withdrawals. And, you

23 know, permission may be required from the

24 state and obviously private landowners where

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 49: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

49

1 the water is withdrawn. But I also

2 understand they're considering trucking in

3 water.

4 Q. Okay. Will vacuum systems be on site at all

5 HDD locations to quickly clean up frack-outs,

6 spoils or spills before they can enter the

7 streams, wetlands or other sensitive areas?

8 A. (Tinus) I think the crews will have

9 appropriate equipment as specified in the

10 plan. I don't know where that would be or

11 how many, but they will need to have that.

12 Q. Are they going to have the same equipment

13 that the geotechnical boring folks had on

14 Route 12 and 116, leaving dispersed polymers

15 and bentonite all over the sides of the road?

16 Will we improve on that?

17 MR. WALKER: Objection.

18 CHAIRMAN HONIGBERG: Grounds?

19 MR. WALKER: He's testifying and

20 with no foundation. I hate to use the word "no

21 foundation," but there is zero foundation for

22 that.

23 CHAIRMAN HONIGBERG: Mr. Lakes.

24 MR. LAKES: Okay. We'll move

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 50: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

50

1 on.

2 BY MR. LAKES:

3 Q. The DOT calls for the transmission line to be

4 outside the pavement where "practicable."

5 There's that word again. Has any

6 environmental study been performed to help

7 DOT determine the placement of the line, of

8 the underground line?

9 A. (Carbonneau) We have done environmental work

10 all along the underground route and provided

11 our information to the project team and the

12 engineers. It includes natural resources

13 within the existing road right-of-way, and it

14 includes everything else that we would have

15 surveyed for in the overhead portion of the

16 route. So it would have included wetlands

17 and streams, rare plants, et cetera,

18 archeological sites, all of that information.

19 Q. So tell me what's going to happen if DOT says

20 you must have the transmission line off of

21 the road. In Easton, there are places where

22 the wetlands come right up to the side of the

23 road, literally. How do they go through that

24 wetland with a underground transmission line

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 51: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

51

1 if DOT says that's the only place you can put

2 it?

3 A. (Carbonneau) They would do that as they would

4 almost anywhere else. They would have to

5 excavate a trench, backfill the trench and

6 then put the topsoil that had been taken out

7 back over the top of it.

8 Q. So Normandeau, whom you represent, wouldn't

9 have an issue going through wetlands or

10 swamps with a transmission line?

11 A. (Carbonneau) Well, it's not up to us. We're

12 telling everyone what the resources are. I'm

13 just telling you how that would be

14 constructed if you had an underground trench

15 that goes through a wetland alongside of the

16 road. Clearly, that's not in our current

17 Wetland Applications everywhere to be outside

18 of the disturbed roadbed in the road

19 right-of-way. So if there were additional

20 wetland impacts resulting from a final design

21 that expected to have greater wetland

22 impacts, then we submit it in our

23 Application, and we would either need to

24 revise our Application materials or request

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 52: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

52

1 an amended permit.

2 Q. So I would assume that it would have to

3 probably be a variance. Variances seem to be

4 what DOT does. That's what Eversource seems

5 to go after are variances. And there may be

6 compensatory damages as a result of going

7 through one of these wetlands on the side of

8 the road. Does that sound reasonable?

9 A. (Carbonneau) Whether or not there is

10 mitigation required depends whether it's

11 permanent or temporary impact. Certainly, if

12 you have to ask for a greater amount of

13 wetland impacts, there's an application fee

14 associated with that. So it will be a

15 monetary issue whether or not mitigation is

16 required.

17 Q. Thank you. Next I'd like to talk about

18 trenching. Some of this may be a little

19 redundant, but after hearing what I haven't

20 heard and have heard today, I think it bears

21 a little more talking about.

22 First the trench is excavated, conduit

23 put in place, a cement pad goes over the top

24 of the conduit, and then it's filled in with

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 53: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

53

1 thermal backfill, which is a cementitious

2 type of product.

3 As background, Route 116 has many areas

4 of swamp and wetlands. I know there has been

5 a lot of back and forth on this, but today I

6 was just given some evidence that I want to

7 introduce right now. And here we go.

8 (Pause in proceedings)

9 BY MR. LAKES:

10 Q. So, again, I know there's been a lot of back

11 and forth on this business about the fill.

12 But I was just given some evidence that I

13 want to introduce. This is from the DOT

14 Conference Report, dated October 5th, 2016,

15 for a meeting held on September 27th. And

16 the host was -- there was a whole host of

17 Eversource attendees there, but this was a

18 DOT conference with Eversource people

19 present.

20 CHAIRMAN HONIGBERG: Mr. Lakes,

21 can you show us the first page of this

22 document?

23 MR. LAKES: Yes. Can you flip

24 that over, please?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 54: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

54

1 I meant to do that. Came up

2 so recently, I hadn't put total thought into

3 it. But that is the cover page of that

4 meeting. States all of the people that were

5 there for this meeting. And DOT was

6 presenting -- or not presenting, but they

7 were running the meeting. But Eversource was

8 also presenting information.

9 CHAIRMAN HONIGBERG: Is this

10 already an exhibit?

11 MR. LAKES: No, it just

12 happened. I'm going to have to add a number to

13 it.

14 CHAIRMAN HONIGBERG: You don't

15 happen to know what number that would be, do

16 you?

17 MR. LAKES: I might be able to

18 tell you, actually.

19 CHAIRMAN HONIGBERG: That's all

20 right. It's whatever the current number is

21 plus one.

22 (Exhibit APOBP 43 marked for

23 identification.)

24 MR. LAKES: And then if you

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 55: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

55

1 would, Campbell, please flip that over.

2 BY MR. LAKES:

3 Q. In it Eversource presented to DOT fluidized

4 thermal backfill information, and this is

5 what it says: FTB, fluidized thermal

6 backfill, is water-permeable, similar to DOT

7 gravels, does not create water dams and

8 behaves as a French drain in poor soils.

9 First, I must ask again after hearing

10 this back and forth today about what this

11 stuff really is. And I think Mr. Tinus kind

12 of gave the last word on it, but this seems

13 to go in direct opposition to what you were

14 saying, where you were saying it was a solid

15 block, basically impervious. Which is it?

16 A. (Tinus) Right. What I was commenting on was

17 the concrete encasement for the lines, for

18 the underground cable. This material as

19 noted is more permeable.

20 Q. Okay. Maybe I misunderstood. I heard, you

21 know, the FTB so many times back and forth, I

22 wasn't sure what I was listening to.

23 So you agree with Eversource that this

24 material is permeable and acts as a French

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 56: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

56

1 drain.

2 A. (Tinus) That seems right, yeah. I'm sure an

3 engineer wrote this.

4 Q. Yup. Yeah, they always get us in trouble.

5 Second, is it possible that a

6 longitudinal line could act as a French drain

7 redirecting water and groundwater away from

8 one area and causing issues in another? Is

9 that possible? Has it been studied?

10 A. (Tinus) That particular scenario described

11 has not been studied, no.

12 Q. Could the existence of a trenched

13 transmission duct bank cause wetlands to

14 become unbalanced and cause environmental

15 damage either by not flowing through the

16 transmission line or by flowing along the

17 line?

18 A. (Tinus) I think that's contrary to what this

19 is saying, a French drain meaning that it

20 flows from one side of the road to the other,

21 if that's the scenario you're trying for us

22 to -- presenting for us.

23 Q. Well, the scenario I'm trying to paint is

24 that the French drain allows water to just --

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 57: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

57

1 you got to remember there's a solid thing

2 inside this thing which is blocking water, at

3 the same time allowing it to flow along the

4 line.

5 And I guess my next question would be:

6 If this is possible, would this or could this

7 be mitigated through permanent trench

8 breakers or trench plugs which are used

9 extensively in the pipe industry

10 particularly, but I did find it used within

11 transmission lines particularly in the

12 Tennessee area, particularly where slopes are

13 involved and water could run from a higher

14 location along the transmission line to a

15 lower location?

16 A. (Tinus) I think we'd have to direct that to

17 the engineering team and see what they think

18 about that.

19 Q. Could you do that for us?

20 A. (Tinus) I will.

21 Q. Thank you.

22 MR. LAKES: Okay. Could you

23 please put up Exhibit 44.

24 (Exhibit APOBP 44 marked for

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 58: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

58

1 identification.)

2 BY MR. LAKES:

3 Q. Okay. Mr. Tinus, you said in your Prefiled

4 Testimony, as per the exhibit, that no new

5 impervious surfaces will be created by the

6 undergrounding activities. Well, isn't the

7 cement pad over and around the line

8 impervious? I don't understand that

9 statement.

10 A. (Tinus) That's buried. It's the concrete I

11 was talking about the around cable, so it's

12 not on the surface.

13 Q. I'm going to say that again. It says, "No

14 new impervious surfaces will be created by

15 the undergrounding activities." Isn't the

16 cable and the cement pad which you said

17 earlier is impervious, impervious?

18 A. (Tinus) But it's not at the surface. I was

19 pointing out that we're not creating an

20 impervious surface, because this is talking

21 about in the context of the alteration of

22 terrain. So we're not adding an additional

23 paved surface over the top of the cable, if

24 you will.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 59: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

59

1 Q. Okay. I may have misunderstood that.

2 And then looking further down on the

3 page, it says, "Because the underground work

4 will be located within and along the edge of

5 existing roadways," which we know we don't

6 even know, "the underground cable

7 installation work is not likely to create a

8 high potential for impacts to water quality

9 if appropriate BMPs are followed."

10 So, based on some of the things I've

11 mentioned about French drains and things of

12 that nature, I think you would agree that it

13 may be at least worth studying some of that

14 to see if that underground installation could

15 in fact, where it's placed next to streams or

16 wetlands or in wetlands, that that be

17 studied.

18 A. (Tinus) It's certainly a consideration as the

19 engineering is moving forward.

20 Q. I've noted in the Tennessee Department of

21 Environmental and Conservation State Manual

22 that no blasting will be permitted in the

23 excavation of trenches that are parallel or

24 lie within 50 feet of a stream or wetland,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 60: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

60

1 including all stream crossings. Does this

2 sound like a sensible BMP?

3 A. (Tinus) I think it's hard to conjecture not

4 knowing what they're planning to do and

5 geologic conditions which we don't have all

6 the information in on yet, so...

7 Q. What does the current New Hampshire law say

8 on this?

9 A. (Tinus) For blasting?

10 Q. Yes, in terms of proximity to streams and

11 wetlands, et cetera.

12 A. (Tinus) That you need to have appropriate

13 blasting protocols in place, Best Management

14 Practices. So, understanding what the

15 underlying materials are, understanding where

16 the water is flowing, certainly understanding

17 how much blasting you're going to need to do,

18 what sort of charges, the amount of

19 detonating material, where the rocks are

20 going to go, I mean, a whole host of factors

21 for each spot where you're doing blasting.

22 Q. So, say you're going to lay the cable -- or

23 trench the cable through a wetland on 116.

24 You get down a few feet and there's ledge and

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 61: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

61

1 you've got to blast it open. What Best

2 Management Practice is going to cover that

3 particular scenario?

4 A. (Tinus) I don't know. We'd have to get our

5 heads together on that one.

6 Q. Hmm. Okay. I'm going to jump to something

7 new. The next thing I want to talk about is

8 the issue of climate change.

9 With worldwide temperatures rising and

10 changing, rainfall patterns --

11 CHAIRMAN HONIGBERG: Mr. Lakes,

12 just let me stop you.

13 MR. LAKES: Yeah.

14 CHAIRMAN HONIGBERG: Would this

15 be a good time for you to take a break?

16 MR. LAKES: Sure.

17 CHAIRMAN HONIGBERG: Sounds like

18 you were ramping up a new topic.

19 MR. LAKES: Yeah.

20 CHAIRMAN HONIGBERG: All right.

21 So let's take a ten-minute break.

22 MR. LAKES: Yeah, thank you.

23 (Recess taken at 3:08 p.m., and the

24 hearing resumed at 3:25 p.m.)

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 62: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

62

1 [Mr. Way not present for remainder of

2 afternoon proceedings.]

3 CHAIRMAN HONIGBERG: Mr. Lakes,

4 you may proceed.

5 BY MR. LAKES:

6 Q. So I was going to go on to something new

7 until I came up with a few more questions in

8 between.

9 So, Mr. Tinus, did you mention that

10 there will be more geotechnical boring along

11 the underground route? Was that mentioned by

12 you at all?

13 A. (Tinus) I think they need to do a few more in

14 certain locations, but mostly along the

15 overhead route.

16 Q. Would you agree that it certainly needs to be

17 done on the underground portions where it was

18 in the road and now it's off the road? Maybe

19 there needs to be more found out about that,

20 particularly around wetlands, streams, things

21 of that nature.

22 A. (Tinus) I don't know exactly where they're

23 proposing doing it, so we'll have to wait for

24 the engineers to tell us where they need the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 63: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

63

1 additional data.

2 Q. Okay. And finally there's this business with

3 the fly ash and so forth with that meeting

4 that Eversource had that I mentioned, the DOT

5 meeting about the FTB, the fluidized thermal

6 backfill being permeable, acting like a

7 French drain. Would fly ash be more prone to

8 be released from a surface that is not solid,

9 enclosed and encased?

10 A. (Tinus) The way this material behaves is,

11 even though it's permeable, it's even more

12 solid than I think you're indicating. I

13 think this is a constituent of material that

14 starts out as fluid or flowable and then it

15 hardens. It does harden. And again, from

16 the source of the material, it's all tested

17 and approved to meet certain standards,

18 whatever those are. And that's the material

19 that's used everywhere for projects like this

20 and others around the state and New England

21 and other locations in all the uses I've

22 already mentioned. So this is ubiquitous

23 material.

24 Q. Can Eversource give us a written guaranty

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 64: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

64

1 that no fly ash will come out of the thermal

2 backfill that's being used?

3 [No verbal response]

4 Q. Let's move on. Okay. The issue I want to

5 talk about now is climate change.

6 With worldwide temperatures rising and

7 changing, rising and changing rainfall

8 patterns, future water flow could be

9 restricted. In Brazil, for instance, there

10 are plans to dam the Amazon, but the fear is

11 that there will not be enough water to

12 produce electricity a hundred percent of the

13 time, so other dams on other rivers are being

14 considered to supplement this. So the only

15 solution that developers have developed is to

16 dam and dam and dam more rivers. The fear

17 still persists that if climate change affects

18 output, then the Project will have created

19 deep environmental damage and not fulfilled

20 its goal of continuously supplying

21 electricity. In fact, issues like this with

22 water supply are happening regularly all over

23 the world.

24 Can anybody on this panel today say that

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 65: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

65

1 10, 15, 20 or 30 years from now that the

2 rivers in Quebec will continue flowing and be

3 able to meet the needs of Quebec and the

4 continuously growing number of transmission

5 lines coming into the U.S.A? Don't all step

6 up.

7 A. (Varney) I have not heard anyone suggest that

8 rivers in Canada would dry up within the next

9 20 years.

10 Q. I wouldn't -- I wouldn't expect it since the

11 Province of Quebec makes so much money off of

12 doing that. I would doubt very much even if

13 they did know they would say it.

14 But basically what I'm saying here is it

15 is possible with what's going on today with

16 climate change that there could be drastic

17 changes in the future that could cause the

18 rivers from the north to dwindle to the point

19 where a project like this could be totally

20 useless.

21 A. (Varney) Highly unlikely.

22 Q. But likely. But possible; right?

23 A. (Varney) Highly unlikely.

24 Q. Okay. And as an addendum to that, isn't it

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 66: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

66

1 true that Hydro-Quebec is already planning on

2 damming additional sites as a result of the

3 future demand? Perhaps you, Mr. Varney, know

4 more about this.

5 A. (Varney) I don't know about their long-term

6 plans. I do know that they have a project

7 under construction now, La Romaine Project,

8 which is four generating units, I believe.

9 There's information about it that's been

10 provided as part of discovery, I believe by

11 the Applicant. And two of the generation

12 units have already been constructed, I

13 believe about 910 megawatts. Another one is

14 being completed this year. And the final

15 one, which is about 245 megawatts, the final

16 piece of it will be in operation beginning in

17 2020, according to the schedule that was

18 submitted as part of discovery. And I

19 believe it's also on the HQ web site. I

20 believe I saw it there.

21 Q. Okay. So Quebec is probably doing the same

22 thing that Brazil is doing by moving to more

23 and more rivers. Not sure if it's all about

24 water flow. But it continues to put more

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 67: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

67

1 rivers in danger, as far as future climate

2 change.

3 A. (Varney) What I do know is that the state

4 developed a strategy -- the Government of

5 Quebec developed a strategy to expand their

6 hydroelectric production to go along with

7 wind and other sources to provide for the

8 needs of the province, as well as other

9 provinces in Canada, and also to import to

10 the United States after the needs of Quebec

11 were accomplished. And they've been

12 undertaking these projects independent of

13 Northern Pass. Northern Pass is not causing

14 them to build anything. They have undertaken

15 these projects as part of a government

16 strategy. And I believe that part of their

17 initiative is associated with the fact that

18 it's relatively clean energy and reduces CO2

19 emission in the province and within Canada.

20 Q. All right. We'll talk some more about that

21 later.

22 Continuing on the subject of climate

23 change, I'd like to ask the panel if they

24 believe climate change is real, directly

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 68: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

68

1 affected by man and a threat to ecosystems

2 around the world. "Yes" or "No" would be the

3 best answer.

4 A. (Varney) Yes.

5 Q. I'd like everybody to answer that question.

6 A. (Carbonneau) Yes.

7 A. (Barnum) Yes.

8 A. (Tinus) Yes.

9 A. (Magee) Yes.

10 MR. LAKES: Please put up

11 Exhibit 45.

12 (Exhibit APOBP 45 marked for

13 identification.)

14 Q. This is Article 5(2) of the Paris Climate

15 Agreement. Note that the parties are

16 encouraged to take action to implement and

17 support a policy which approaches -- which

18 has positive incentives for activities

19 relating to reducing emissions from

20 deforestation and forest degradation, and the

21 role of conservation, sustainable management

22 of forests and enhancement of carbon stocks.

23 Would not the permanent deforestation

24 along the transmission line in New Hampshire

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 69: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

69

1 and the tremendous deforestation of old and

2 new reservoirs in Quebec be in direct

3 violation of this directive?

4 A. (Varney) As I indicated, the reservoirs are

5 either already completed or under

6 construction and are independent of the

7 Northern Pass Project, not caused or

8 triggered by the Northern Pass Project. And

9 as you know from the frown on your face, you

10 probably know that the construction started

11 before this Application was submitted, well

12 in advance.

13 The other part of your question related

14 to forest cutting. And yes, this project

15 will primarily follow existing rights-of-way,

16 which will minimize the amount of forest

17 cutting that will need to occur associated

18 with the Project. And there'll be a

19 relatively narrow right-of-way within the

20 existing managed forest areas where they will

21 be placing new rights-of-way. In addition,

22 they of course are following some

23 transportation corridors as well. There will

24 be some reduction, but that reduction is a

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 70: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

70

1 very small percentage of the forest cover

2 within the state. You know, we're the second

3 most forested state in the country. It's

4 obviously well forested in the North Country

5 as well. And the amount of cutting is

6 relatively small in comparison to the total

7 forest cover. I believe it's about

8 .0022 percent. And in terms of numbers, it's

9 a very small fraction of the overall CO2

10 benefits that are associated with the

11 Project. Probably wouldn't even move the

12 decimal point.

13 Q. I do take issue with your statement that

14 Northern Pass will not be a part of the

15 use -- or be part of new construction of

16 reservoirs up in Canada. It really becomes a

17 cog along with the rest of the transmission

18 lines, et cetera, that are being built in the

19 United States which then forces

20 Hydro-Quebec --

21 MR. WALKER: Objection.

22 Q. -- to go further.

23 CHAIRMAN HONIGBERG: Mr. Lakes,

24 don't argue with the witness. Just move on to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 71: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

71

1 your next witness.

2 MR. LAKES: Okay.

3 BY MR. LAKES:

4 Q. So, would you agree that Northern Pass will

5 be one of the parties to increased usage of

6 electricity from Hydro-Quebec, which will

7 cause them to continually dam more rivers for

8 export of electricity?

9 A. (Varney) I disagree.

10 Q. Tell me why you disagree.

11 A. (Varney) They have their own policies. They

12 have their own NEPA process. They have their

13 own permitting processes. And I don't know

14 anything about trying to increase number of

15 reservoirs post-Northern Pass. I haven't

16 seen or heard anything about that. And I

17 don't think it's related. It's coming from

18 the existing system, in the same way that we

19 have a ISO-New England grid and we draw out

20 of the grid. In this case, it would be out

21 of their reservoir system, and it's not

22 triggered by the construction of this

23 project. It was started well before this

24 project ever came before the state of New

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 72: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

72

1 Hampshire.

2 Q. I understand that. But isn't Northern Pass

3 and then the other Northern Passes that are

4 going to happen after that --

5 A. (Varney) You're speculating --

6 (Court Reporter interjects.)

7 A. (Varney) I can't speculate.

8 Q. All right. Let's move on.

9 WITNESS VARNEY: That was my

10 fault. I interrupted him. I'm sorry.

11 MR. LAKES: Please put up

12 Exhibit APOBP 46 from The Concord Monitor.

13 (Exhibit APOBP 46 marked for

14 identification.)

15 Q. This is titled, "Sununu Says New Hampshire

16 Won't Join Climate Alliance."

17 "Republican Governor Chris Sununu says

18 New Hampshire won't join a growing number of

19 states that are pledging to uphold the Paris

20 Climate Agreement following President...

21 Trump's decision to back out."

22 MR. LAKES: Now let's move on to

23 the next exhibit, Campbell.

24 (Exhibit APOBP 47 marked for

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 73: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

73

1 identification.)

2 BY MR. LAKES:

3 Q. And continuing in this article, it says,

4 "While the initiative was launched last week

5 by Democratic governors in California, New

6 York and Washington, Republican leaders in

7 Vermont and Massachusetts have also signed

8 on. Democratic governors in Connecticut and

9 Rhode Island have made their states part of

10 the coalition," as well. Says, "Our

11 administration looks forward to continued

12 bipartisan collaboration with other states to

13 protect the environment, grow the economy and

14 deliver a brighter future for the next

15 generation." That of course is the governor

16 of Massachusetts, not the governor of New

17 Hampshire.

18 And just going down a little further as

19 I was reading, it says Mr. Sununu said, "You

20 know, it's not my job to go through the whole

21 Accord and look at the in-depth impacts

22 across the country economically... The

23 President has done that, his team has done

24 that, and they've made the decision they feel

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 74: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

74

1 is in the best interest of the United States,

2 and I stand by that." Even Charlie Baker,

3 the Republican Governor of Massachusetts, the

4 coveted prize of Eversource sees merit in

5 this alliance.

6 Are you aware, Mr. Varney, that Mr.

7 Sununu is a staunch supporter of Northern

8 Pass and was for ramming the Project through

9 the White Mountain National Forest even

10 before the underground was introduced?

11 A. (Varney) No.

12 Q. Are you aware that he's a staunch supporter

13 now with the way it is?

14 A. (Varney) I've read that he is in support of

15 the Project in the media, general media. I

16 have not spoken with him directly.

17 Q. I'd like to ask each member of the panel if

18 they agree with Mr. Sununu not joining the

19 Climate Alliance. "Yes" if you agree with

20 Mr. Sununu, or "No" if you do not agree.

21 MR. WALERS: Objection.

22 Relevance, Mr. Chairman.

23 CHAIRMAN HONIGBERG: Mr. Lakes,

24 how is this relevant?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 75: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

75

1 MR. LAKES: Well, my retort I

2 guess to that is I look at Mr. Sununu as being

3 the 900-pound elephant in the room. He's head

4 of the Executive Branch, the DOT, DES, SEC.

5 They're all under his purview. And his

6 environmental leanings are appropriate to

7 explore since he has made his position quite

8 clear. And at the end of the day, I want to

9 find out if, again, the panel, which earlier

10 did say that they're in favor of the Paris

11 Climate Accord, is not in agreement with Mr.

12 Sununu's leaning in that regard.

13 CHAIRMAN HONIGBERG: I don't see

14 how this is relevant. I'm going to sustain the

15 objection.

16 MR. LAKES: Okay. Let us move

17 on.

18 BY MR. LAKES:

19 Q. Moving on to maybe simpler things.

20 During construction and after, will any

21 herbicides or pesticides be used along the

22 underground route?

23 A. (Carbonneau) Eversource currently does not

24 use pesticides and herbicides in New

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 76: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

76

1 Hampshire. And to my knowledge, there are no

2 plans to do that in the future. I can't

3 speak to what New Hampshire DOT does or

4 doesn't do. And to the extent that this

5 could overlap their right-of-way, I don't

6 know.

7 Q. Okay. Thank you. That's great to know.

8 How many environmental monitors will

9 police the underground route? Does anybody

10 know that?

11 A. (Carbonneau) We don't know the exact number

12 of environmental monitors. We do expect

13 there will be more than one. They will be

14 deployed as needed around the state as work

15 occurs in different locations. But I can't

16 tell you how many.

17 Q. Okay. Since Northern Pass is hiring these

18 monitors, why should we believe their

19 intentions to do good by the people versus

20 Eversource's instructions?

21 A. (Carbonneau) Their role is to make sure the

22 Project complies with all of the permit

23 conditions and all of the regulations that

24 will apply to the work. They have the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 77: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

77

1 ability to stop the work if there is a

2 compliance problem that is significant. It's

3 in the Applicant's best interest to make sure

4 they comply with all of the requirements

5 because the consequences of not complying are

6 very substantial. They could have their work

7 stopped. They could be fined. There's lots

8 of issues. It's in their best interest to

9 make sure that they are in compliance with

10 all of the permit conditions and rules.

11 Q. Okay. Will there be proactive monitoring and

12 remediation of trenching in HDD sites to

13 verify such issues as trench settling, frost

14 heave issues, precipitation, pooling of water

15 or any other remaining impacts associated

16 with construction? And how long will this

17 monitoring go on for?

18 A. (Carbonneau) Jake, do you have any --

19 A. (Tinus) I would just say I think some of

20 those issues were raised by DOT. So I think

21 the construction guys and engineering folks

22 are in discussions over issues like that.

23 DOT is certainly concerned about the roads

24 after we go through them, as have been

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 78: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

78

1 expressed by some intervenors, too.

2 MR. LAKES: Okay. Next I'd like

3 to put up Exhibit No. 48.

4 (Exhibit APOBP 48 marked for

5 identification.)

6 Q. This is a letter to Craig Rennie of the DES,

7 sent by George Dana Bisbee. This was a

8 response to comments submitted by the Society

9 for the Protection of New Hampshire Forests,

10 dated April 21st, 2016.

11 Please put up number 49.

12 (Exhibit APOBP 49 marked for

13 identification.)

14 BY MR. LAKES:

15 Q. It's part of the same letter and says the

16 following about complete burial. This is

17 from Mr. Bisbee. "Even if complete burial of

18 the Project were practicable, impacts would

19 be less only if the burial occurred in the

20 disturbed roadbed or shoulder of a

21 transportation corridor. Outside of a

22 disturbed road footprint, burial impacts

23 could be greater than overhead structure

24 impacts in existing transmission ROWs. This

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 79: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

79

1 would be the case, for example, along

2 interstate highways like I-93, where DOT

3 restrictions require infrastructure, if

4 allowable, to be located at the edge of

5 highway corridor far outside the disturbed

6 roadbed. Unlike a linear... line where there

7 is little opportunity to change the location

8 to minimize impact, NPT's design reflects the

9 major effort taken [sic] to avoid and reduce

10 impacts by shifting transmission structure

11 foundations out of wetlands along the

12 overhead line."

13 My contention is that the same argument

14 that Mr. Bisbee is making for I-93 holds

15 entirely true for the whole underground route

16 of 302, 18, 116, 112 and Route 3. Would the

17 panel care to comment?

18 A. (Carbonneau) My understanding is that there

19 may be different standards associated with a

20 limited access highway such as I-93 and the

21 need to put the construction out of the edge

22 of the right-of-way because access to the

23 construction sites, my understanding is it's

24 not a allowed from the highway or from the on

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 80: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

80

1 and off ramps. So access would require

2 constructing a whole access path and road and

3 trench at the very outer edge of the

4 right-of-way. That was my understanding.

5 Q. May I interrupt?

6 A. (Carbonneau) That may not be the case on some

7 of the secondary roads.

8 Q. If I could, the same rules apply to the roads

9 on which we live. Exactly the same rules.

10 They don't change on I-93. They don't change

11 on 116. They're the same. And if the DOT

12 forces them to follow the Manual and put it

13 as far over to the side, then they're

14 creating as much if not more destruction that

15 would happen along I-93. Do you agree with

16 that?

17 A. (Carbonneau) I haven't evaluated either

18 alternative that is outside of the very edge

19 of the right-of-way. I'm sure the resources

20 within those locations differ. I can't say

21 by how much. But certainly if you are not in

22 the disturbed roadbed, there are greater

23 impacts to natural resources if you are out

24 at the very edge of the right-of-way and it

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 81: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

81

1 happens to run through people's yards and

2 wetlands and streams that are not culverted.

3 Q. Okay. Going to move on. Mr. Varney, I see

4 you have a very colorful resume.

5 A. (Varney) Thank you.

6 MR. LAKES: Please put up

7 Exhibit APOBP 50. I don't know whoever came up

8 with those numbers...

9 (Exhibit APOBP 50 marked for

10 identification.)

11 BY MR. LAKES:

12 Q. At the bottom of that particular exhibit it

13 says, From 1989 to 2001, I served as

14 Commissioner of the New Hampshire Department

15 of Environmental Services. By virtue of that

16 position, I also served as a member and as

17 Chairman of the New Hampshire Site Evaluation

18 Committee for that same period of 12 years;

19 is that correct?

20 A. (Varney) Yes.

21 Q. Now going to ask you some questions with

22 regard to your past experience in relation to

23 your present capacity as president of

24 Normandeau.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 82: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

82

1 Have you, in your capacity as president

2 of Normandeau and a contractor of Eversource,

3 had face-to-face meetings with DES?

4 A. (Varney) Yes.

5 Q. Have you, in your capacity as president of

6 Normandeau and a contractor with Eversource,

7 had face-to-face meetings with the SEC?

8 A. (Varney) Only at the hearings along with the

9 public.

10 Q. Okay. In your own mind and actions, how do

11 you see your role in this project within the

12 context of your job history?

13 A. (Varney) My job history?

14 Q. Yeah, as being a SEC Chairman, DES and so

15 forth, and now you're sitting on the other

16 side of the table. Just wondering what goes

17 on in your mind in terms of how you address

18 that internally.

19 A. (Varney) Stick to the facts, stick to the

20 science and be honest.

21 Q. Okay. Do you think that your past experience

22 could unduly influence appointed officials?

23 A. (Varney) No.

24 Q. So, moving on, Mr. Varney. In your Prefiled

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 83: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

83

1 Testimony, you said this about the purpose of

2 your testimony. And this actually is on the

3 same page, just at the top. It says, "What

4 is the purpose of your testimony?" And you

5 answered, "The purpose of this testimony is

6 to provide the SEC with my assessment of the

7 benefits that the operation of Northern Pass

8 Transmission Project... will have on air

9 quality and the Project's consistency with

10 the goals of state, regional and national air

11 quality and climate quality" -- sorry -- "and

12 climate change policies." And I think, just

13 to elaborate on that... that you have

14 mentioned in your Prefiled Testimony as well

15 that you concur with Julia Frayer's London

16 Economics Analysis; correct?

17 A. (Varney) I've used her analysis and her

18 modeling to calculate the significant

19 emission reductions and significant

20 greenhouse gases that are associated with the

21 Project.

22 Q. And you have a lot of experience from prior

23 work in doing that sort of thing; correct?

24 A. (Varney) I've been involved in climate change

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 84: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

84

1 and air-quality issues for many years.

2 Q. The basic premise being that, you know, as

3 part of these -- well, let me back up a

4 little bit.

5 She did say that the Northern Pass line

6 would avoid 3.2 metric tons of CO2 in New

7 England. Do you agree with that?

8 A. (Varney) Those were the numbers that she

9 calculated for the Project in her most recent

10 update, which were just very close to her

11 original estimates.

12 Q. Yeah, I'm not trying to take it apart.

13 A. (Varney) No, that's okay.

14 Q. I can't understand half of the things she

15 says.

16 But isn't her basic premise that clean

17 hydropower is the key asset in reaching these

18 carbon savings? Is that reasonable to say?

19 A. (Varney) It's the displacement of fossil fuel

20 generation in New England.

21 Q. Do you know how her calculations were arrived

22 at?

23 A. (Varney) Through a modeling effort.

24 Q. So did you study those models --

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 85: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

85

1 A. No.

2 Q. -- and so forth?

3 A. No.

4 Q. So you agree with it, but you don't know how

5 exactly it was calculated.

6 A. (Varney) I have accepted her numbers which

7 have been presented to the SEC and her

8 reports and testimony that was associated

9 with that.

10 MR. LAKES: Okay. Now I'll move

11 on to Exhibit 51.

12 (Exhibit APOBP 51 marked for

13 identification.)

14 BY MR. LAKES:

15 Q. So what you're going to be seeing here is

16 this information is based on a groundbreaking

17 study of emissions by Washington State

18 University, by experts in this field. I just

19 outlined the title, which is "Greenhouse Gas

20 Emissions from Reservoir Water Surfaces: A

21 New Global Synthesis" is the title of the

22 report.

23 MR. LAKES: Please put on

24 Exhibit 61 [sic]. And please excuse me. I

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 86: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

86

1 have to go back and forth on these things. I

2 have bad eyes.

3 Q. Anyway, the gist of this report says that

4 hydropower is usually touted as clean energy,

5 but a new study has found man-made reservoirs

6 are producing far more greenhouse gases than

7 previously believed, with most of those

8 emissions in the form of methane, a potent

9 climate warming gas. It goes on to say, We

10 weren't super-surprised at the magnitude of

11 the emissions. But one thing we were

12 surprised to see is the per area rate of

13 methane emissions. They are 25 percent

14 higher than previously thought.

15 This is Washington State University

16 researcher Bridget Deemer, lead author of the

17 study.

18 And they go on to say methane emissions

19 contribute about 80 percent of the total

20 global warming impact of the gases from

21 reservoirs. The remaining emissions are

22 carbon dioxide and nitrous oxide. Methane is

23 34 times more potent than carbon dioxide in

24 gathering heat in the atmosphere, and

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 87: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

87

1 emissions have previously been difficult to

2 measure. But new research is using tools

3 such as bubble tracking sonar to measure

4 methane bubbles.

5 MR. LAKES: And it goes on to

6 the next page, Campbell, on 62 [sic].

7 BY MR. LAKES:

8 Q. Researchers from the Washington State

9 University, along with colleagues from around

10 the world, looked at the results of more than

11 a hundred studies of emissions from 250

12 reservoirs around the world. The startling

13 results are leading the calls for reservoir

14 emissions to be included in calculations made

15 by countries and organizations such as the

16 Intergovernmental Panel on Climate Change

17 when gauging greenhouse gas emissions.

18 So my question to you, Mr. Varney, is:

19 Did Ms. Frayer use the amount of methane

20 being produced off of the reservoirs as part

21 of her calculations?

22 A. (Varney) She did while calculating the social

23 cost of carbon, which she testified to during

24 this proceeding.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 88: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

88

1 Q. Can you explain that further? What do you --

2 A. (Varney) She made a deduction as she was

3 making her calculations associated with the

4 cost of carbon, the social cost of carbon and

5 the economic benefits associated with those

6 reductions and avoided costs and so on. So

7 she did account for that.

8 And I would also just say that, again,

9 in the information that's been provided in

10 response to this, to some comments about this

11 study, that generally speaking, methane

12 emissions are lower in northern climates than

13 they are in southern climates. So this is a

14 worldwide study. And your decomposition

15 associated with the reservoir in a tropical

16 climate or a very warm climate tends to be

17 much higher. And that's why some of the more

18 northern states have not made a deduction

19 because of the mixing zones and the

20 oxygenation in the water supply in those

21 reservoirs and the very low methane emissions

22 associated with them. So there are some very

23 low methane emissions or CO2 emissions

24 associated with existing reservoirs that have

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 89: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

89

1 been in place for a long time. They tend to

2 be higher with new construction and then

3 quickly drop off during the first ten years

4 or so is my understanding of the issue, and

5 which has been submitted on the record, I

6 believe.

7 Q. Okay. Do you know what calculations she used

8 for the methane? Are you aware of the

9 numbers, how they impacted the final carbon

10 dioxide figure?

11 A. (Varney) Well, it didn't affect her estimates

12 for the emission reductions in New England at

13 all. It was under the calculation related to

14 the social cost of carbon, so it remains at

15 the 3.2 figure. The draft EIS, I believe

16 before and after, I believe their

17 consultants, which is a bit outdated because

18 it was in 2015, was about 2.9.

19 Q. So the methane was basically buried in some

20 social cost of carbon figure as opposed to

21 being put into the --

22 A. That's where she --

23 (Court Reporter interrupts)

24 Q. -- in the actual CO2 estimate of 3.2 million

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 90: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

90

1 metric tons?

2 A. (Varney) If I could again further explain

3 that the generation occurs in Canada, and it

4 would be in their emission inventory, and

5 that's where it's accounted for, not in New

6 Hampshire's inventory, not in New England's

7 inventory. There's actually a reduction in

8 fossil fuel generation, which is the

9 3.2 million metric tons reduction that we're

10 talking about for this project.

11 Q. Yup. Well, we all live in the same world,

12 so, you know, parsing numbers from here to

13 there, it's still being produced.

14 Many experts in the field, based on the

15 information that hydropower is no cleaner

16 than gas-fired power plants -- that's after

17 studies of this particular, the field studies

18 that were taken by the Washington State

19 University.

20 Are you aware, Mr. Varney, that in

21 addition to methane gas, reservoirs are

22 polluted with methyl mercury, have decimated

23 salmon populations, physically displaced and

24 culturally eviscerated Pessamit Innu Indians?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 91: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

91

1 A. (Varney) I disagree with that statement. But

2 I am aware there is mercury associated with

3 reservoirs and that there have been some

4 studies, and usually those studies conclude

5 that there need to be more studies.

6 Q. That's unfortunate, isn't it, when the truth

7 is there and people don't recognize it.

8 Would you agree --

9 A. (Varney) The scientists are the ones that are

10 recommending more studies at the conclusion

11 of their studies.

12 Q. Well, unfortunately, and you may agree with

13 this as well, there's too many scientists

14 that you can pay to come up with whatever you

15 want to satisfy your own needs. Would you

16 agree with that?

17 A. (Varney) I disagree strongly.

18 Q. Then I'm not sure --

19 A. (Varney) I think there are a lot of people

20 with very high integrity in this world.

21 Q. I totally agree with you. And I know there's

22 a lot of good people in the world. But we

23 know that money talks. And you don't believe

24 that.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 92: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

92

1 A. (Varney) I do not believe it. I think that

2 there may be some people in this world that

3 are influenced. But by and large, we have

4 many good scientists who do peer-reviewed

5 work and are able to stand by that

6 peer-reviewed work. We have many great

7 scientists in this world, and we're lucky to

8 have them.

9 Q. Okay. So you said you disagree with some of

10 the other things I said. Do you disagree

11 that the Pessamit Indian population has been

12 physically displaced and culturally

13 eviscerated?

14 A. (Varney) I'm simply saying that there are

15 various degrees of mercury in the environment

16 and that we've made a lot of progress in

17 reducing mercury in our environment and the

18 build-up of mercury in the food web. And so

19 I would not use such extreme language.

20 Q. Well, you didn't answer my question about the

21 Indians. We agree on the methyl mercury.

22 But what about the Indians?

23 A. (Varney) There have -- obviously in some

24 areas there have been impacts. But again, I

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 93: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

93

1 would say that as it relates, if you're

2 speaking of Canada, they have a process, a

3 NEPA process, and they review all of those

4 issues as part of their siting process that

5 they have within Canada.

6 Q. If the Indians are happy with their way of

7 life as it is today, why do you think that

8 René Simon came down, the Chief of the

9 Pessamit Innu, to talk about the devastating

10 effects of these dams on their population?

11 Why did he come? I'm sure it's not for our

12 scenery.

13 MR. WALKER: Objection.

14 Q. Why did he come?

15 CHAIRMAN HONIGBERG: There's an

16 objection to that question.

17 What's the grounds for the

18 objection?

19 MR. WALKER: Calls for

20 speculation as to what the Indians thought.

21 CHAIRMAN HONIGBERG: It's not a

22 bad objection, Mr. Lakes. Do you think -- what

23 makes -- do we think Mr. Varney has any

24 knowledge about that?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 94: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

94

1 MR. LAKES: Well, all I can

2 answer is he may. But I may not hear what I

3 want to hear, so I will move on.

4 BY MR. LAKES:

5 Q. My last question will be with regard to Julia

6 Frayer's mathematical estimates on

7 everything, since everything's turned into a

8 number it seems.

9 What type of mathematical formula do you

10 put the type of devastation that's going on

11 in Canada to justify this project?

12 A. (Varney) As I've indicated, this project is

13 not causing devastation in Canada.

14 Q. Let's move on. And I think I'm to my last

15 question.

16 Okay. Since all of you on the panel are

17 professionals, Ph.D.s, doctors, et cetera,

18 learned in your fields of expertise, I'd like

19 you all to answer the following question with

20 a "Yes" or "No": Isn't it true that the very

21 best BMP, as far as wetlands are concerned,

22 wildlife preservation, preservation of

23 habitat, preservation of forest, that the

24 least destructive path through New Hampshire

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 95: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

95

1 is to not build a project at all? Yes or no?

2 I'd like everybody on the panel to answer

3 that, please.

4 A. (Varney) I'll just start with the fact that

5 you referred to this as a "BMP," and a BMP

6 suggests something is happening, and you're

7 suggesting the no-action alternative. We

8 were not engaged in evaluating each of the

9 alternatives, including the no-action

10 alternative. And with that said, always when

11 you do something in the environment, whether

12 you build a house or you drive a car, there's

13 environmental impacts associated with it.

14 Q. The rest of the people on the panel, "Yes" or

15 "No."

16 A. (Carbonneau) I agree with Bob. If you need

17 energy, there's going to be some kind of

18 impact. If you don't build a project, this

19 particular project, you won't have the

20 impacts associated with this particular

21 project, but you might get something else.

22 A. (Barnum) I would agree with what Lee just

23 said. If you don't build a project, there

24 will be no impact, but there might be

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 96: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

96

1 something else.

2 A. (Magee) I agree with both Lee and Bob. If

3 you don't build a project, there'll be

4 implications in other ways.

5 Q. Could you please speak up? I couldn't catch

6 a word you said.

7 A. (Magee) I agree with the others. If you

8 don't build the Project which we worked on

9 and involved in evaluating, then certainly

10 there'd be a reduction of environmental

11 impacts or no environmental impacts, but

12 there'd be other implications.

13 A. (Tinus) We're not here evaluating no project.

14 We're evaluating a project, and that's what

15 we're asking for the evaluation of. We

16 presented a project. That's why we're here.

17 MR. LAKES: Thank you very much.

18 I'm done with my cross-examination.

19 CHAIRMAN HONIGBERG: Mr.

20 Cunningham.

21 CROSS-EXAMINATION

22 BY MR. CUNNINGHAM:

23 Q. My name's Art Cunningham. I'm an attorney,

24 mostly retired. I represent Kevin Spencer

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 97: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

97

1 and Mark Legasse. Kevin and Mark are

2 building a lodge in a campground in Stark,

3 beautiful Stark. And this project is part of

4 the overhead project, and the overhead lines

5 will run right behind their lodge. But I'm

6 here mainly today -- and I think I can be

7 brief. When I cross-examined the

8 construction panel, I had questions about

9 blasting. And they advised that the

10 environmental panel could follow-up on the

11 blasting issues. So, Mr. Tinus, you're in

12 the barrel.

13 A. (Tinus) Hopefully I can help.

14 Q. So I'm concerned about -- and I think by

15 virtue of your earlier testimony, you

16 discussed my questions or somebody's

17 questions with the construction panel. And I

18 think you already told us that blasting could

19 result in nitrates in groundwater and in

20 folks' drinking water wells.

21 A. (Tinus) That was one of the parameters that

22 might be tested for.

23 Q. Yeah. Can you tell me about nitrates?

24 A. (Tinus) They're a substance that is part of

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 98: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

98

1 the mix for a blasting material, ammonium

2 nitrate fertilizer, I believe. And so

3 nitrates, if not properly combusted, can be

4 liberated into water.

5 Q. And do you know what the health effects of

6 nitrates are on the human body?

7 A. (Tinus) I think you want nitrate levels to be

8 low. I'm not a human toxicologist, though.

9 Q. And do you know what the nitrate level or the

10 water quality standard for nitrates is in New

11 Hampshire?

12 A. (Tinus) I can't recall that exact number.

13 Q. Okay. And what exactly are the health

14 effects, if you know?

15 A. (Tinus) I don't really know, sir.

16 Q. Do you know that nitrates cause "blue

17 babies"?

18 A. (Tinus) I've heard of that.

19 Q. And do you know what "blue babies" are?

20 A. (Tinus) Other than the name suggests, it's a

21 condition that somehow affects the

22 metabolism, I presume.

23 Q. And the oxygen levels in a baby; does it not?

24 A. (Tinus) Yeah, I think so. I did read

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 99: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

99

1 something on it quite some time ago.

2 Q. So you and I can agree that infiltration of

3 nitrates into groundwater is dangerous.

4 A. (Tinus) If there's nitrates getting into

5 water from blasting, it could be dangerous.

6 Q. And you're the water quality expert. Can you

7 explain to the panel and to all the

8 intervenors that are worried about blasting

9 how that works? How does nitrate from

10 blasting get into groundwater?

11 MR. CUNNINGHAM: Sorry.

12 (Discussion off the record.)

13 BY MR. CUNNINGHAM:

14 Q. So how is it that nitrate gets into

15 groundwater and into people's wells?

16 A. (Tinus) If material isn't properly combusted,

17 then it can get into the water supply. In

18 other words, if the charge doesn't go off

19 correctly, if there's too much used, an

20 incorrect dosage --

21 Q. And do you know how -- I heard you say in an

22 earlier, a good cross-examination, that the

23 larger the area makes a difference, the

24 blasting area. It was a good question about

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 100: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

100

1 significant blasting down on I-93 in Windham.

2 Are you familiar with that project?

3 A. (Tinus) Yes, as mentioned by someone

4 testifying earlier.

5 Q. And can you explain to the panel and to the

6 other intervenors how the size of the Project

7 matters?

8 A. (Tinus) Well, presumably larger quantities of

9 rock would require a large amount of

10 blasting.

11 Q. Well, explain to me how the blasting takes

12 place. How does the blasting emulsion or the

13 ANFO, ammonium nitrate, get into the water in

14 the first place?

15 A. (Tinus) I don't exactly know. I've seen it

16 in the field. They drill holes where the

17 material is put in with the fuel oil and it's

18 ignited by charges. But that's my extent of

19 understanding.

20 Q. So I understand blasting. They drill holes

21 at whatever depth is necessary, and then they

22 pump the ANFO or other blasting emulsion into

23 the hole.

24 A. (Tinus) Yes, that's what I understand.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 101: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

101

1 Q. So what difference would it make what the

2 size of the blast area would be if they're

3 pumping ANFO or blasting emulsion into a

4 drill hole for blasting.?

5 A. (Tinus) Well, part of the planning for such

6 an event is an understanding about the nature

7 and characteristics of the rock, where the

8 water table is, where the water is flowing,

9 and then, you know, making the correct

10 determination to use the right dosage of

11 blasting material so that you don't have the

12 issues that you're talking about. And as we

13 mentioned before, and I know the construction

14 panel mentioned, part of the planning effort

15 will include adherence to the DES guidance on

16 this matter.

17 Q. And let's -- I've got an exhibit. I'm going

18 to show it to you.

19 This is a DES exhibit that was prepared

20 as a result of the issues that arose in

21 Windham. Can everybody see it? And this

22 exhibit is going to be Dummer Stark No. 60.

23 That's not been marked previously.

24 (Exhibit DNA 60 marked for

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 102: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

102

1 identification.)

2 Q. Could we just take a look at that, Mr. Tinus.

3 Look at No. 1, contamination of groundwater

4 resulting from release of regulated or

5 unregulated substance due to groundwater.

6 And look down to the subparagraphs,

7 incomplete combustion with blasting bore

8 holes. Do you agree with that statement?

9 A. (Tinus) Yes.

10 Q. The injection of substances used for blasting

11 into blasting bore holes that intersect a

12 fracture network resulting in the release of

13 substance beyond the influence of a blasting

14 area. I think that's a good question to ask

15 you.

16 How does that work in groundwater? How

17 would that blasting material infiltrate

18 groundwater through fractures in rock?

19 A. (Tinus) Well, I mean, I think as it's stated

20 in here, it could flow along with the water

21 through the rock.

22 Q. And is there a range that that water can flow

23 in a groundwater aquifer?

24 A. (Tinus) Yeah, and it varies from site to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 103: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

103

1 site. And that kind of background

2 information needs to be taken into

3 consideration.

4 Q. And do we have that background information in

5 this docket?

6 A. (Tinus) Groundwater flow rates?

7 Q. Yes.

8 A. (Tinus) To my knowledge, no, not in the

9 docket. The contractors are typically

10 responsible for obtaining this information to

11 help them size the appropriate blast.

12 Q. Has anybody in the Project, to this date of

13 record in this docket, done any groundwater

14 aquifer analysis that would help this

15 Committee make this decision?

16 A. (Tinus) No, it's not something that was asked

17 for by DES, nor is it typically done. Again,

18 I think the construction panel testified that

19 the amount of blasting is not expected to be

20 significant. The example that was

21 illustrated earlier, my understanding was a

22 much bigger, larger -- you know, they were

23 taking down a hillside, a giant bedrock area

24 several hundreds or thousands of feet long.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 104: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

104

1 That's a very substantial cut. We're not

2 having anything like that with this project.

3 Q. But we don't know that for sure, do we,

4 because they haven't done a geophysical

5 examination, for example, of the overhead

6 route.

7 A. (Tinus) But even in those locations there's

8 expected to be very little blasting. I

9 believe Ken Bowes testified to that.

10 Q. But my point is we don't know that yet, do

11 we? For example, in Dummer, Stark and

12 Northumberland, there's going to be 320

13 foundations for monopoles. And I asked them

14 specifically which of those 320 Dummer,

15 Northumberland, Stark foundation holes will

16 require blasting, and they couldn't answer

17 it.

18 A. (Tinus) They should be able to have an answer

19 to that once they get the geotechnical

20 borings done out there. But they haven't

21 done those yet along the right-of-way.

22 Q. As of this date we don't know the answer to

23 that question, do we?

24 A. (Tinus) We do not know the answer to that

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 105: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

105

1 question right now, no.

2 Q. I note in Brandon Kurtman's(?) evaluation of

3 blasting practices, he suggests that

4 municipalities enact blasting ordinances to

5 protect against dangers of blasting and

6 contaminating groundwater aquifers. What

7 official entity is going to do that kind of

8 regulatory oversight in the context of this

9 project since no municipalities are permitted

10 to be involved?

11 A. (Tinus) I don't have an answer for that. I

12 don't know. I will say, though, that the

13 concepts presented in this document have

14 already been agreed to by the client. So any

15 of the pre-blast survey, the planning, a lot

16 of the elements that we've included in this

17 document are going to be considered in how

18 they go about the work.

19 Q. Okay. I think we've already agreed that no

20 pre- blast survey has been done of the

21 groundwater aquifers in blast areas.

22 A. (Tinus) That's true. But that will happen.

23 In terms of understanding the characteristics

24 of the nature of what's going on under the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 106: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

106

1 ground, they have to have that information in

2 order to make an intelligent decision on how

3 much of a charge to use.

4 Q. And when will we know that information so we

5 can assure all the folks that are going to be

6 subject to blasting?

7 A. (Tinus) I don't know when the geotechnical

8 borings are up for -- I don't know. But not

9 until we get a certificate for site and

10 facility --

11 Q. So we won't know that until --

12 (Court Reporter interjects)

13 A. (Tinus) I believe it's after we get a

14 certificate or if we get a certificate of

15 site and facility.

16 Q. So the risk of blasting will only be known if

17 and when those geotechnical borings are done

18 after the certificate of site and facility?

19 A. (Tinus) I think so. And, you know, DES has

20 indicated that, you know, for example,

21 following this plan, that we've addressed

22 their concerns over this issue.

23 Q. And after pre-blast surveys are done?

24 A. (Tinus) I don't understand the question.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 107: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

107

1 What after pre-blast?

2 Q. Well, I'm talking about analysis of aquifers,

3 groundwater aquifers.

4 A. (Tinus) You know, the contractors have a lot

5 of planning to do yet on all of these -- this

6 is one plan that will be required. There's a

7 lot of them. But that's just being

8 undertaken this summer and fall, in terms of

9 how these are going to lay out specifically

10 and the timing of them. They're all due 90

11 days prior to construction. So that I can

12 tell you is a requirement out of the permit

13 letter.

14 A. (Carbonneau) And if I could point out that

15 this Northern Pass Project has to comply with

16 the 401 Water Quality Certificate. And my

17 understanding is these guidelines probably

18 are for municipalities to use in the event

19 that there isn't state oversight of the

20 blasting work that's being done. In this

21 case, there is going to be all kinds of state

22 oversight of the work. And all of the Best

23 Management Practices that have been proposed

24 and associated with actual blasting have to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 108: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

108

1 be complied with, as well as all of the

2 water-quality standards that are associated

3 with the DES approvals which cover a lot of

4 these issues.

5 Q. Well, that's your general answer to

6 everything; is it not?

7 Just a few more questions. Both of you

8 work for Normandeau, or three of you do?

9 A. (Carbonneau) Four of us do.

10 A. (Varney) Four.

11 Q. Four of you work for Normandeau. Can I ask

12 you a couple questions about your

13 relationship with Eversource? How long has

14 that relationship been in place?

15 A. (Carbonneau) You mean how long has Eversource

16 been a client?

17 Q. Yes.

18 A. (Carbonneau) For quite some time in different

19 capacities. Our company has worked for

20 Public Service Company on a variety of

21 projects for some of their fisheries work on

22 the Merrimack River. We've done several

23 transmission-related projects for them in the

24 past. They're one of many of our

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 109: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

109

1 private-sector clients. And we have a whole

2 array of different client types. Energy is

3 just one sector.

4 Q. I'm particularly interested in Eversource.

5 How many projects have you done for

6 Eversource?

7 A. (Carbonneau) Oh, I wouldn't know.

8 A. (Varney) I honestly don't know.

9 Q. And it extends back quite some years; does it

10 not?

11 A. (Varney) Yes, and many other competitors of

12 Eversource and many government agencies as

13 well.

14 Q. And would you be good enough to tell me what

15 your rate, your hourly rate is? I assume

16 you're on an hourly rate. Could you tell me

17 what your hourly rate is on the Northern Pass

18 Project?

19 A. (Varney) I don't recall. It's my normal

20 rate. There's no elevated rate.

21 Q. And could you tell us what that rate is?

22 A. (Varney) I can't recall.

23 Q. Anybody else on the Normandeau Group, from

24 the Normandeau Group?

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 110: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

110

1 A. (Varney) It changes every year with a rate

2 sheet, so we generally wouldn't know.

3 Q. Did Normandeau work on the EIS for the

4 Department of Energy?

5 A. (Varney) Yes, for a brief time. And we then,

6 due to some concerns about potential conflict

7 of interest associated with our role in

8 working on the permitting side, we stepped

9 aside and Eversource hired another company

10 to -- or recommended another company, I

11 should say. It was DOE that selected them in

12 that role.

13 Q. Is it fair to say that the Department of

14 Energy asked you to step aside because of

15 your close relationship with Eversource?

16 A. (Varney) We stepped aside voluntarily.

17 Q. At their suggestion or yours?

18 A. (Varney) It was a consensus opinion. We had

19 no interest in raising that issue when it was

20 a perception and so we stepped aside

21 voluntarily.

22 MR. CUNNINGHAM: Thank you, Mr.

23 Chairman, that's all the questions I have.

24 CHAIRMAN HONIGBERG: Ms. Lee,

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 111: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

111

1 are you in a position to go?

2 Off the record.

3 (Discussion off the record)

4 CHAIRMAN HONIGBERG: All right.

5 We're ready to go. Ms. Lee, now you may start.

6 MS. LEE: Thanks.

7 CROSS-EXAMINATION

8 BY MS. LEE:

9 Q. My name is Mary Lee. I live in Northfield.

10 And I have shown the map, the tax map for the

11 town of Northfield, for my property. And I

12 did show this to the construction panel, but

13 this has to do with the wetlands. This Lot

14 7405 right here is my lot. And the line will

15 go through one corner here. And I have an

16 odd lot because it's built in the zoned

17 construction area of Northfield. It's also a

18 part of a Groundwater Protection District.

19 This long dashed line right here is part of a

20 groundwater protection area. The note says,

21 "Conservation zone begins 500 feet west and

22 500 feet west of Oak Hill Road." The name of

23 this road here -- this is a dirt road where I

24 live off of. Oak Hill Road is paved. When

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 112: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

112

1 you come on Oak Hill Road and you get onto

2 the dirt road, Fiddler's Choice, this is all

3 dirt. Right now, this morning, as I came

4 here after the hard rain last night, it's all

5 rutted. In order to get to my property, you

6 go up the dirt road and then you go up in

7 this right-of-way, which is my shared access,

8 deeded right-of-way which will be used for

9 construction access to build the 345 kilovolt

10 line and it's going to go through this

11 property. But if I walk the two tenths of a

12 mile to get to my property here, it's only

13 wide enough for my commuting vehicle, a small

14 compact SUV. This is a Class V road. It's

15 maintained by the town. If you go beyond a

16 certain point, it turns into Class V and it's

17 not really maintained by the road at all --

18 by the town at all.

19 The second note here says, "Groundwater

20 Protection District extends from limits shown

21 to the Merrimack River." So the plan is for

22 the line to go through part of the property,

23 including going down to the Merrimack River.

24 And I live on the line between Boscawen and

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 113: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

113

1 Canterbury and Franklin, so it's all

2 conservation. And it's very, very remote.

3 But I just wanted your panel to be aware that

4 this line is planned to be expanded and have

5 construction pads built and also be accessed

6 by the construction crew, as I learned, using

7 my driveway.

8 CHAIRMAN HONIGBERG: Miss Lee,

9 what do you want to know from the panel?

10 BY MS. LEE:

11 Q. And here's my question: Who on this

12 environmental panel has a direct experience

13 with environmental monitoring in New

14 Hampshire? I know that the construction

15 panel, someone mentioned there's a lot of

16 construction going on all the time by

17 Eversource --

18 CHAIRMAN HONIGBERG: Okay.

19 Stop. Stop. Okay. Your question was who on

20 the panel has environmental monitoring

21 experience.

22 MS. LEE: Yes.

23 CHAIRMAN HONIGBERG: Why don't

24 we have them answer that question.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 114: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

114

1 MS. LEE: Thank you.

2 A. (Carbonneau) There are several people at

3 Normandeau that have done environmental

4 monitoring of right-of-way projects for

5 Eversource.

6 CHAIRMAN HONIGBERG: Ms.

7 Carbonneau, is there anyone on the panel who

8 has that experience?

9 WITNESS TINUS: I do.

10 WITNESS CARBONNEAU: I have a

11 little, and Jake also has some.

12 CHAIRMAN HONIGBERG: All right.

13 So, Mr. Tinus and Ms. Carbonneau both.

14 BY MS. LEE:

15 Q. So you have some experience with the

16 environmental monitoring. And can you give

17 an instance of how an environmental monitor

18 was actually called in and avoidance and/or

19 mitigation resulted? Can you give me a

20 concrete example of what would happen with an

21 environmental monitoring of working in

22 wetlands or conservation areas or in

23 Groundwater Protection Districts?

24 A. (Carbonneau) Well, most of the work takes

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 115: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

115

1 place before the construction to plan

2 appropriately so that avoiding and minimizing

3 impacts takes place before they even get to

4 the construction process. Once construction

5 starts, the environmental monitor is

6 responsible to make sure that wetland matting

7 is put down in the proper place, that erosion

8 and sedimentation controls either are

9 shown -- put in as shown on the plans, or if

10 there is an alternative that is a better

11 technique than was planned is used. They are

12 responsible for verifying that and getting

13 sign-off that that is okay. If there's any

14 modifications that need to be made in the

15 field, the environmental monitor is

16 responsible for documenting those. And if

17 necessary, if they involve a change in impact

18 area, they need to document that and keep

19 track of all of the impacts, the work that's

20 done; take photographs if there are, for

21 example, rare snakes or turtles that are in

22 the right-of-way. The monitor will go ahead

23 of the equipment and make sure that there are

24 none in the path of the equipment that's

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 116: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

116

1 moving through the right-of-way that would be

2 crushed and relocate those if necessary and

3 document all of that. The monitors are part

4 of the tailgate meeting that's held each day

5 prior to construction so that they can alert

6 the construction group to any environmental

7 issues they need to be aware of for that day.

8 Does that answer your question?

9 Q. Well, I'm interested in the mitigation and

10 avoidance part, an exact instance where you

11 actually have an environmental monitor, say,

12 call you. I don't know who they're calling

13 to say halt, stop, come look at this, we

14 didn't expect this. I'd like to know some

15 instances where you are familiar with someone

16 who's used an environmental monitor, called

17 one in for projects in New Hampshire.

18 A. (Carbonneau) You mean have we been called to

19 a construction site that needed a monitor to

20 take a look at something?

21 Q. Right. Yes, and then how has it resulted in

22 any mitigation or avoidance?

23 A. (Carbonneau) I have worked on several

24 projects for Eversource where the monitor was

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 117: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

117

1 not present when they were going somewhere

2 and they found a turtle, for example, that

3 they needed to have identified, or where they

4 needed to have an alternative route to get to

5 a particular location because the terrain was

6 not as they expected based on the field

7 plans, and they requested an alternative

8 route be available for them to use. In that

9 case, an actual permit amendment had to be

10 requested from New Hampshire DES. So they

11 needed to stop work there and wait for DES

12 approval to relocate to a different place.

13 You have to quantify the new impact area. If

14 it's larger than the other way that you were

15 going to go and requires additional impact,

16 then you have to pay an additional fee. And

17 in the cases I've been involved in, it did

18 not result in an increase in mitigation

19 requirement, but it did result in an

20 additional fee for the review of that change

21 by New Hampshire DES.

22 Q. So you actually have used mitigation. You

23 just gave an example of mitigation.

24 A. (Carbonneau) Well, this was more of an

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 118: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

118

1 avoidance and minimization issue where we had

2 come up with the least impacting route. When

3 the contractors actually got out there, they

4 said this isn't going to work. We actually

5 have to go this way and the impacts are going

6 to be greater.

7 Q. So that's more avoidance.

8 A. (Carbonneau) It's avoidance in reverse.

9 Q. Okay. Thank you. What about mitigation?

10 I'm interested in concrete examples of an

11 environmental monitor being called in to

12 mitigate a project.

13 A. (Carbonneau) Typically the mitigation -- if

14 you're talking about mitigation of wetland

15 impacts, that's something that has already

16 occurred during the permitting process of the

17 Project. So I haven't had the experience

18 where I've needed to come up with additional

19 mitigation after the construction project

20 began.

21 A. (Tinus) I can give an example.

22 Q. All right.

23 A. (Tinus) On the Groton Wind Farm, after a

24 certain stretch of the tower arrays or wind

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 119: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

119

1 turbine arrays were constructed, it was found

2 that there was some material that got -- had

3 gone down a slope, some rock; so they

4 overfilled the wetland. They had to remove

5 that material and actually restore it in

6 order to, you know, satisfy the concerns of

7 the groundwater monitor.

8 I just want to add something about the

9 presence of the environmental monitor.

10 They're on the site frequently. Typically

11 one day per week there's going to be several

12 monitors from the Company. The construction

13 firm will have their own monitors looking at

14 the work. They'll also have to go out after

15 rain events, as required by the state and the

16 federal agencies. So let's say after a

17 half-inch rain, they'll have to be out there,

18 or if there's a big storm predicted, they'll

19 want to take a look at all the erosion

20 control measures and things along the Project

21 route to make sure they're in good working

22 condition and that they're going to operate

23 like they should. So there's a lot of

24 presence on the site, if you will, from the

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 120: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

120

1 environmental standpoint.

2 Q. Okay. Thank you. I want to show you a

3 different map. The previous map was the

4 Northfield tax map.

5 This is the construction panel map.

6 This shows the same area, Fiddler's Choice

7 Road. It's all sandy. I believe it's marked

8 on your USACE maps, the Corps of Engineer --

9 Army and Engineer maps, as "Riverine Quality

10 Soil." So it's very, very sandy. There is a

11 proposal to build on my driveway access, the

12 so-called "apron." This red solid line is

13 all new. It's using access to get to what is

14 the dashed red line, which on this map is

15 described as "existing access route." And

16 then it'll go through this, what I call "the

17 dunes." It's all sand. And this actually is

18 from here, Fiddler's Choice Road, all the way

19 through, is two tenths of a mile and then you

20 reach my house. You're going to go through

21 all this access.

22 This is also new construction. And you

23 can see that halfway through this walk or

24 drive you have a lot of wetlands. This green

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 121: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

121

1 area is all wetlands-delineated. And on the

2 key, all this is wetlands. It's either

3 delineated with the dashed light blue line as

4 intermittent. I believe it's intermittent --

5 it's hard to see the color between the

6 ephemeral and intermittent on the key. This

7 aerial photo, you see it's highly forest

8 cover. And this is a construction pad. And

9 I was told by construction that this is going

10 to be possibly not entirely used because they

11 designate a certain area they may not use

12 depending what they find. And as I

13 understand it, there's two of these going on

14 near my property. Here's the corner.

15 There's another pad right here near the

16 corner. And that's where my house is, right

17 here. They're going to cut a line here

18 that's about 30 feet, plus or minus, without

19 a real survey by the engineer from

20 Eversource. And it's about 30 feet from a

21 well that's located about here, right over

22 the edge of the right-of-way. And the other

23 thing over here that's not shown on this map

24 is that I have a granite boundary marker

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 122: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

122

1 here. It was knocked down during tree

2 trim-cut. So I have contacted Eversource.

3 They're going to make sure there is a highly

4 marked way of making sure no one knocks it

5 down again.

6 And my question is: There is a key here

7 delineating the wetlands, and it says -- the

8 green, the little green dot means wetlands.

9 Green with yellow dots, which I don't see on

10 this map, not very clear, has wetlands.

11 What does it mean -- is there a

12 difference when you submit this permit

13 application if you review -- if you have a

14 wetlands that you have on the map versus

15 USACE, or U.S. Army Corps of

16 Engineers-reviewed wetlands? What's the

17 difference in the mapping? Because I was

18 told this map still holds, even though the

19 date on this map is from it says 2/19/2016.

20 When I spoke to the --

21 CHAIRMAN HONIGBERG: Wait, wait

22 wait, wait. So the question is what maps

23 should you be looking at?

24 MS. LEE: Yes.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 123: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

123

1 CHAIRMAN HONIGBERG: All right.

2 Let's get an answer to that question.

3 BY MS. LEE:

4 Q. Yes. Is this the most current map available?

5 Because --

6 CHAIRMAN HONIGBERG: Wait, wait.

7 Stop. Stop talking. Let them answer. The

8 question is for them, not for you.

9 MS. LEE: All right. Thanks.

10 A. (Carbonneau) I believe this is a current map

11 for this location.

12 BY MS. LEE:

13 Q. It is a current map?

14 CHAIRMAN HONIGBERG: Ms. Lee, I

15 think you also seem to want to ask about the

16 difference between wetlands and USACE wetlands;

17 right?

18 MS. LEE: Right.

19 CHAIRMAN HONIGBERG: All right.

20 Why don't we get an answer to that question,

21 okay.

22 MS. LEE: Okay. Thank you.

23 A. (Carbonneau) After we delineated wetlands,

24 the U.S. Army Corps of Engineers came out in

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 124: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

124

1 the field with us, and they spot-checked our

2 delineations. We invited them to places in

3 particular where the delineation was

4 challenging or we had a question about it and

5 we wanted their input. And we also looked at

6 a whole variety of wetlands from one end of

7 the state to the other so they could get a

8 sense of the Project. Those particular

9 wetlands are identified with the little

10 yellow dots. They had asked us specifically

11 if we could show that on the plan so they

12 would remember which ones they had already

13 seen. But they -- all the delineations were

14 done the same way. So there's no difference

15 in the quality of the delineation or anything

16 like that.

17 Q. Okay. Because I met a woman who was

18 surveying for wetlands at the end of my

19 driveway recently, and she referred to an

20 expansion of a wetland. And I was -- I did

21 ask that question at a previous hearing. And

22 as I understand it, it is not an expansion.

23 So that I don't have a true map of the actual

24 wetlands. But I was told that it was an

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 125: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

125

1 expansion of the mapping. So I'm wondering

2 if we as landowners have the actual most

3 recent map. Because I learned at the

4 construction panel for the engineering that

5 there is a map that's not available to

6 landowners and it's being worked on, on your

7 laptops. I believe it's called OneTouch. Is

8 that something you use that we don't have

9 access to? Because I'm waiting for a map

10 that's supposedly made available sometime by

11 June 30th from somebody at Burns & McDonnell,

12 from the engineers --

13 A. (Carbonneau) Okay.

14 Q. -- to show landowners a current map

15 because --

16 CHAIRMAN HONIGBERG: Okay. I

17 think Ms. Carbonneau has some information for

18 you, so why don't we let Ms. Carbonneau try and

19 answer some of the questions in there.

20 A. (Carbonneau) I'm aware that there are some

21 modifications being made to some locations on

22 the Project route that will involve some

23 changes to the plan set. I don't -- I can't

24 say if there's any other specific changes to

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 126: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

126

1 this plan set that incorporates your

2 property. But I do know that the engineers

3 are working to update the plan set.

4 WITNESS CARBONNEAU: Jake, do

5 you have anything to add to that?

6 WITNESS TINUS: No, just what

7 you stated, Lee.

8 A. (Carbonneau) Okay.

9 BY MS. LEE:

10 Q. So are we still expecting updated maps to be

11 available to property owners by the end of

12 June?

13 A. (Carbonneau) I'm guessing they will be made

14 public and part of the record. I don't know

15 that there is a plan to actually deliver them

16 to property owners.

17 And I can tell you I don't believe

18 there's any changes to the natural resource

19 information on the plan. If there are

20 changes that the engineers are making, it

21 could be to structures or work pads. But I'm

22 not familiar with any on this plan.

23 Q. All right. Thank you. Sticking to my

24 questions, Dr. Barnum, I think you informed

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 127: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

127

1 us last week that most of the Canada lynx

2 were found in Maine?

3 A. (Barnum) Yes. New England. That's true.

4 Q. Are they reported in New Hampshire?

5 A. (Barnum) Yes, there are reports in New

6 Hampshire from mainly Pittsburg, but also

7 other towns from the White Mountains north.

8 Q. From the White Mountains north?

9 A. (Barnum) Yes.

10 Q. You have a couple escapees. A friend of mine

11 recently sent me a picture of one in his yard

12 in the Lakes Region.

13 A. (Barnum) Canada lynx and the bobcat look very

14 similar. You can tell the difference if you

15 look for specific field marks. But photos

16 and, you know, a quick glimpse of the two

17 animals can be difficult to tell them apart.

18 It's common for folks to think that a bobcat

19 could be a lynx. The verified reports are

20 all from north of the White Mountains.

21 Q. And if you have a Canada lynx or bobcat, is

22 it precious? Is it protected?

23 A. (Barnum) The bobcat currently is protected in

24 the state. There's no season on it. It's

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 128: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

128

1 far more common than a lynx, but it's still a

2 protected species. However, it is not listed

3 as threatened or endangered. There's simply

4 no season on this animal. In most other

5 states, certainly all the surrounding New

6 England states, there's a trapping season for

7 bobcat. The pelt is worth something.

8 Q. I see. Thank you.

9 If you find -- let's say you found a

10 Canada lynx on your property and you are

11 building this construction and you don't

12 have -- do you call in a monitor? Do you

13 actually report this and the work stops if

14 you have a protected animal?

15 A. (Barnum) Yes, if you observe a protected

16 animal on your property, you would want to

17 alert the environmental monitor in the case

18 of this project. If there was no project and

19 you simply observed such an animal, you'd

20 want to contact Fish & Game about that.

21 Q. So we would call Fish & Game, not the

22 environmental monitor to halt work?

23 A. (Barnum) For the Project, you'd contact the

24 environmental monitor. If there were no

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 129: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

129

1 project, if you were simply a landowner who

2 observed such an animal, you'd want to report

3 it to Fish & Game.

4 Q. All right. Thank you.

5 And do you think it's possible there are

6 areas that are habitats for wildlife that are

7 not identified by the Northern Pass

8 environmental panel?

9 A. (Barnum) I feel like the observations of

10 wildlife habitat that we did for the Project,

11 both in the field and through desktop

12 analysis, was very thorough and that we've

13 identified the important locations for

14 protected species.

15 Q. And do you agree that a designated cut

16 area -- and what I mean by "cut area" is it's

17 proposed on this map that there's going to be

18 a new cut once they bring the 115 line over.

19 There's a new area that's cut that's all

20 trees. And I know that's a habitat. Do you

21 agree that a designated cut area for a

22 proposed relocated 115-kilovolt line could be

23 a habitat for wildlife?

24 A. (Barnum) Pretty much any vegetated area

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 130: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

130

1 within the state is habitat for some kind of

2 wildlife, and even some areas that aren't

3 vegetated. A sand pit has habitat value for

4 other species. So if there's land, there's

5 going to be wildlife.

6 Q. Excuse me?

7 A. If there's land out there, there's going to

8 be some amount of wildlife on it.

9 Q. Yes, that's so true.

10 My next question has to do with the

11 habitats for wildlife, birds, wetlands. Do

12 you agree that some driveway and access roads

13 are also the habitat in the site for our

14 wildlife? I mean in the road.

15 A. (Barnum) Certainly there are species of

16 invertebrate which are dependent on bare

17 ground. And invertebrates are classified as

18 wildlife.

19 Q. All right. And I know that you don't map it

20 as such, and neither does the engineering map

21 for wildlife. But I can tell you that in

22 this habitat, the actual roadway, the road,

23 Fiddler's Choice, as well as my driveway, is

24 a habitat.

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 131: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

131

1 A. (Barnum) Yeah, I would agree with that.

2 Q. It's very, very remote. So once construction

3 starts or any kind of motor noise or anything

4 that's unusual for construction, such as

5 bringing in your cranes for clearing or any

6 of the brontosaurus vehicles, that's going to

7 drive away the wildlife, the birds and the

8 wetlands-associated animals, I know.

9 I'd like to ask, is there a BMP or Best

10 Management Practice to re-evaluate and then

11 to adjust the plan designed for avoidance and

12 mitigation due to all that you've heard from

13 landowners thus far up to this date? Is

14 there any plans to actually change the design

15 or adjust the design?

16 A. (Carbonneau) Well, we have an obligation to

17 continue to work to minimize impacts. It's

18 one of the permit conditions that New

19 Hampshire DES has given us. If new

20 information from a landowner about a rare,

21 threatened or endangered species is brought

22 to us, then absolutely we will continue to

23 make modifications to try to minimize such

24 impacts. But we have done a fairly thorough

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 132: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

132

1 job so far in identifying those kinds of

2 things. And we have been working for quite

3 some time now with Fish & Game and the

4 Natural Heritage Bureau and New Hampshire DES

5 to make design adjustments as we can. But if

6 there are opportunities to do some more in

7 the future, then we will continue to do that.

8 Q. Thank you.

9 Does the environmental panel coordinate

10 to adjust, always working with the

11 consultation of landowners when you do those

12 tailgate meetings when the construction

13 happens and they have the daily tailgate

14 meetings and you're hopefully meeting with

15 the landowners? Is the adjustment made to

16 what your work is with the input from

17 landowners, or is that too late?

18 A. (Carbonneau) I have not necessarily seen a

19 landowner attend a tailgate meeting, although

20 we do encounter landowners during

21 construction. I believe that the Company,

22 Eversource, for example, on past projects,

23 does reach out to landowners before the

24 construction and tries to provide them with a

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 133: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

133

1 schedule of when the activities are likely to

2 occur on their property, as well as giving

3 them some contact information, so if they

4 have concerns or they would like to speak

5 with someone involved in the activity, they

6 will have a contact to do that. If there are

7 concerns that are known ahead of time, that's

8 always preferable because you don't want to

9 necessarily have to stop work to have a

10 conversation once all of the equipment is on

11 the site. So the preference is to work

12 things out ahead of time, and I believe that

13 Eversource typically does that.

14 Q. Thank you.

15 Can someone describe -- I saw a couple

16 maps go up earlier today with the mapping of

17 wetlands. But it's really hard to tell. Can

18 someone describe, someone on the panel, what

19 does a wet -- vernal pool water, when it's

20 pooled up, look like? Because on the blow-up

21 it was just a dark spot. What does the water

22 look like?

23 A. (Carbonneau) Well, it depends on what time of

24 year you see that vernal pool. They

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 134: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

134

1 typically have standing water in them during

2 the spring. They oftentimes will dry up

3 later in the summer. Say, August, September

4 they may have no water in them at all. Some

5 have vegetation growing in them, some do not.

6 But they are generally fairly shallow.

7 They're typically not connected to a stream,

8 per se, so they generally do not have fish in

9 them, because the fish would typically eat

10 the eggs or the tadpoles of the species that

11 depend on vernal pools. Does that answer

12 your question?

13 Q. What's the quality of the water in it, and

14 how large is the area in order for it to be

15 qualified on the maps as a vernal pool?

16 A. (Carbonneau) There is no size requirement.

17 So, some of the vernal pools are really

18 small, and some of them are very productive

19 even if they are small. But we do not

20 distinguish size of the vernal pool. There

21 are some considerations. If it's a very

22 shallow vernal pool in a wheel rut, that's

23 probably not going to be a very productive

24 vernal pool. It may dry up too soon. The

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 135: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

135

1 water is usually fairly warm and warms up

2 pretty quickly in the spring if it's not

3 under tree canopy, which most of the ones

4 that are in the existing right-of-way don't

5 have tree canopy. But they're very shallow,

6 so they are typically not cold. They're

7 warm, which aids in the development of eggs

8 to tadpoles to metamorphs.

9 Q. And how long does it last? From spring to --

10 A. (Carbonneau) It varies. It varies.

11 Typically they will dry out in the late

12 summer or fall, but not always. It depends.

13 It could be a wet year and they may not dry

14 out at all. Some dry out every few years.

15 Some are fairly permanently flooded, and yet

16 they do not have fish and they may still

17 function as vernal pools. So it depends very

18 much on the vernal pool. But the key is that

19 they have water standing in them at least

20 during the breeding period. So, ideally from

21 March through July that's ideal.

22 Q. I see. I know that one of the designated

23 construction parking areas for the trim crew,

24 when they came through, left a -- well, it

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 136: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

136

1 was in the fall. But there was a big pool.

2 And I went to check the Caterpillar tracks

3 that were left behind in my driveway and up

4 the parking area, so-called, that was cleared

5 to about 12 inches of shrub. And there was a

6 pool of water there, but it wasn't really

7 clean-looking. And it was where the vehicles

8 had parked. So I was wondering why does it

9 look like that? It's kind of slimy, oily,

10 rusty-colored. And I thought it couldn't

11 have been a deposit from one of the machines.

12 I hope. And I was wondering if vernal pools

13 look like that.

14 A. (Carbonneau) It depends on the vernal pool.

15 Sometimes the clarity of the water is poor.

16 They can sometimes have sediment. Kind of

17 depends on what the substrate material is.

18 Sometimes there is a sheen on them, and in

19 some cases that's natural. If they have a

20 lot of tannins in the water, they can be

21 quite darkly colored. But it varies. It

22 varies from pool to pool and location to

23 location.

24 Q. So if a vehicle parked in that same area and

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 137: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

137

1 there's standing water, that would be a

2 vernal pool; right?

3 A. (Carbonneau) To be a vernal pool under New

4 Hampshire or federal regulations, it has to

5 meet certain criteria. And that usually

6 involves visiting it during a breeding

7 season, which is the spring, and identifying

8 whether it has one or more of the obligate

9 species which is --

10 Q. And what is an "obligate species"?

11 A. It's one that is dependent upon vernal pools

12 for part of its reproductive cycle. Wood

13 frogs, spotted salamanders, Jefferson

14 salamanders. Could also have fairy shrimp.

15 And then there are secondary indicators which

16 could include certain aquatic insects. So it

17 has to meet either -- have the primary or a

18 few secondary indicators, as well as a few

19 other characteristics in order to be

20 considered a vernal pool. So, not every

21 puddle of water would qualify.

22 Q. All right. Thank you.

23 If the work for this project is

24 permitted -- the engineer walked my property

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 138: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

138

1 and found that the well is within 30 feet,

2 plus or minus, without a real proper survey,

3 within the work pad or work construction and

4 the line that's relocated. And is there

5 going to be a before and after test of water

6 from people's wells if it's that near? If

7 it's really 30 feet, plus or minus, is the

8 Project going to test my well water before

9 and after, as you do take photos of before

10 and after so you can remediate the damage?

11 A. (Carbonneau) Well, I might have Jake chime in

12 on this. I don't know if testing will take

13 place unless there's blasting proposed in

14 that portion of the right-of-way.

15 WITNESS CARBONNEAU: Jake, do

16 you know?

17 WITNESS TINUS: Yeah, just like

18 you stated, Lee, I don't think that we've

19 intended to test every well along the way

20 unless there's a blasting event that's needed

21 near there to put the foundations in.

22 Q. So it's only if there's granite or some rock?

23 A. (Tinus) Right.

24 Q. Would you test because that's considered a

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 139: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

139

1 disturbance?

2 A. (Tinus) Correct. Yeah. And so if that

3 location was within 500 feet of that

4 blasting. So any of the wells within 500

5 feet. So, sounds like yours would be

6 included.

7 Q. If you were blasting.

8 A. (Tinus) Yeah, if we were blasting.

9 Q. And we would be notified if you found any

10 rocks to blast.

11 A. (Tinus) Yeah.

12 Q. You must be all thankful. I'm done.

13 CHAIRMAN HONIGBERG: All right.

14 Thank you, Ms. Lee.

15 I think that's all we're going

16 to do today. When we resume on Friday, we

17 still have the Ashland -- I'm sorry -- the

18 Deerfield Abutters and the Ashland-Deerfield

19 Non-abutters, I think, the Pemi River Group

20 and the Grafton County Commissioners and Mr.

21 Thompson. Did I miss anybody who still needs

22 to go? And then the Committee. And we'll

23 see how we do.

24 On Thursday, we'll be here for

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 140: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

140

1 the second scheduled Public Comment Session,

2 and we'll keep our fingers crossed that that

3 one goes as smoothly as the one did last

4 week. And with that we will adjourn for the

5 day. Thank you.

6 (Whereupon the hearing was adjourned at

7 5:10 p.m.)

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 141: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

[WITNESSES: MAGEE|VARNEY|CARBONNEAU|BARNUM|TINUS]

141

1 C E R T I F I C A T E

2 I, Susan J. Robidas, a Licensed

3 Shorthand Court Reporter and Notary Public

4 of the State of New Hampshire, do hereby

5 certify that the foregoing is a true and

6 accurate transcript of my stenographic

7 notes of these proceedings taken at the

8 place and on the date hereinbefore set

9 forth, to the best of my skill and ability

10 under the conditions present at the time.

11 I further certify that I am neither

12 attorney or counsel for, nor related to or

13 employed by any of the parties to the

14 action; and further, that I am not a

15 relative or employee of any attorney or

16 counsel employed in this case, nor am I

17 financially interested in this action.

18

19 ____________________________________________ Susan J. Robidas, LCR/RPR

20 Licensed Shorthand Court Reporter Registered Professional Reporter

21 N.H. LCR No. 44 (RSA 310-A:173)

22

23

24

{SEC 2015-06}[Day 18 AFTERNOON SESSION ONLY]{06-20-17}

Page 142: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

$

$3- (1) 35:10$4 (1) 35:10$50,000 (1) 38:23

[

[Mr (1) 62:1[No (1) 64:3[sic] (3) 79:9;85:24;87:6

A

ability (1) 77:1able (5) 18:13;54:17;65:3; 92:5;104:18above (1) 20:5absolutely (1) 131:22Abutters (1) 139:18Abutting (1) 12:12accepted (1) 85:6access (13) 34:15;79:20,22; 80:1,2;112:7,9; 120:11,13,15,21; 125:9;130:12accessed (1) 113:5accessing (1) 48:16accomplished (1) 67:11Accord (2) 73:21;75:11according (1) 66:17account (1) 88:7accounted (1) 90:5accurate (1) 4:4ACCU-VIS (6) 5:10,24;6:6,15; 11:6;44:1acknowledge (1) 29:19acknowledged (1)

27:24acknowledgment (1) 14:8across (1) 73:22acrylamide (1) 5:24act (2) 40:4;56:6acting (1) 63:6action (2) 38:24;68:16actions (2) 39:13;82:10active (1) 10:2activities (4) 58:6,15;68:18; 133:1activity (1) 133:5acts (1) 55:24actual (7) 36:16;89:24; 107:24;117:9; 124:23;125:2;130:22actually (19) 7:7;32:21;33:15; 36:6;39:1;40:8; 54:18;83:2;90:7; 114:18;116:11; 117:22;118:3,4; 119:5;120:17; 126:15;128:13; 131:14add (3) 54:12;119:8;126:5addendum (1) 65:24adding (1) 58:22addition (5) 5:4;36:23;37:5; 69:21;90:21additional (10) 26:11;39:21;51:19; 58:22;63:1;66:2; 117:15,16,20;118:18additive (1) 5:10additives (1) 43:16address (1) 82:17addressed (3) 27:20;28:4;106:21adds (1) 13:21adequate (2) 25:24;37:3adherence (1)

101:15adjacent (2) 15:24;23:13adjourn (1) 140:4adjourned (1) 140:6adjust (3) 131:11,15;132:10adjustment (1) 132:15adjustments (1) 132:5administration (1) 73:11advance (3) 11:23;17:10;69:12advantage (1) 15:6adverse (3) 17:13,22;18:14advised (1) 97:9aerial (1) 121:7affect (2) 43:20;89:11affected (1) 68:1affecting (1) 47:8affects (4) 28:20,21;64:17; 98:21AFTERNOON (2) 3:1;62:2afterwards (1) 43:24again (15) 3:14;5:1;29:17; 44:7;50:5;53:10; 55:9;58:13;63:15; 75:9;88:8;90:2; 92:24;103:17;122:5against (1) 105:5age (1) 33:8agencies (3) 37:1;109:12; 119:16ago (1) 99:1agree (32) 6:20;10:4;12:24; 16:22;17:15;22:15; 41:24;55:23;59:12; 62:16;71:4;74:18,19, 20;80:15;84:7;85:4; 91:8,12,16,21;92:21; 95:16,22;96:2,7; 99:2;102:8;129:15, 21;130:12;131:1

agreed (2) 105:14,19agreement (4) 48:10;68:15;72:20; 75:11ahead (3) 115:22;133:7,12aids (1) 135:7air (2) 83:8,10air-quality (1) 84:1alert (2) 116:5;128:17Alliance (3) 72:16;74:5,19allow (1) 8:24allowable (1) 79:4allowed (2) 22:14;79:24allowing (1) 57:3allows (2) 15:9;56:24almost (1) 51:4along (33) 13:7,7;14:15; 23:20;26:10,23; 28:19;34:21;35:11; 38:22;39:1;45:19; 46:4;50:10;56:16; 57:3,14;59:4;62:10, 14;67:6;68:24;70:17; 75:21;79:1,11;80:15; 82:8;87:9;102:20; 104:21;119:20; 138:19alongside (1) 51:15alteration (1) 58:21alternate (1) 34:6alternative (6) 80:18;95:7,10; 115:10;117:4,7alternatives (1) 95:9although (1) 132:19always (6) 38:5;56:4;95:10; 132:10;133:8;135:12Amazon (1) 64:10amended (1) 52:1amendment (3) 35:4,6;117:9

ammonium (2) 98:1;100:13among (1) 47:20amount (10) 26:4;32:18;52:12; 60:18;69:16;70:5; 87:19;100:9;103:19; 130:8analysis (8) 15:20;16:7;25:7; 83:16,17;103:14; 107:2;129:12and/or (1) 114:18ANFO (3) 100:13,22;101:3angle (1) 4:17animal (5) 128:4,14,16,19; 129:2animals (2) 127:17;131:8answered (1) 83:5anticipation (1) 8:6anymore (1) 20:22apart (2) 84:12;127:17APOBP (13) 42:21,22;54:22; 57:24;68:12;72:12, 13,24;78:4,12;81:7,9; 85:12Apple (1) 3:12Applicant (1) 66:11Applicant's (1) 77:3Application (5) 51:23,24;52:13; 69:11;122:13Applications (1) 51:17apply (2) 76:24;80:8appointed (1) 82:22approaches (1) 68:17appropriate (7) 8:21;11:4;49:9; 59:9;60:12;75:6; 103:11appropriately (1) 115:2approval (1) 117:12approvals (1)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(1) $3- - approvals

Page 143: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

108:3approved (2) 35:2;63:17April (1) 78:10apron (1) 120:12Aquatic (4) 36:2,9;43:20; 137:16aquifer (2) 102:23;103:14aquifers (4) 105:6,21;107:2,3archeological (1) 50:18area (32) 10:19;15:1;26:3,8; 36:4,10;38:2;39:22; 45:18;56:8;57:12; 86:12;99:23,24; 101:2;102:14; 103:23;111:17,20; 115:18;117:13; 120:6;121:1,11; 129:16,16,19,21,24; 134:14;136:4,24areas (9) 49:7;53:3;69:20; 92:24;105:21; 114:22;129:6;130:2; 135:23argue (1) 70:24argument (1) 79:13ARM (1) 36:1Army (3) 120:9;122:15; 123:24arose (1) 101:20around (11) 4:8;28:23;37:9; 58:7,11;62:20;63:20; 68:2;76:14;87:9,12array (1) 109:2arrays (2) 118:24;119:1arrived (1) 84:21Art (1) 96:23Article (2) 68:14;73:3ash (6) 21:15,17;22:16; 63:3,7;64:1Ashland (1) 139:17Ashland-Deerfield (1)

139:18aside (6) 26:7;35:10;110:9, 14,16,20assessment (1) 83:6asset (1) 84:17associated (20) 37:21;52:14;67:17; 69:17;70:10;77:15; 79:19;83:20;85:8; 88:3,5,15,22,24;91:2; 95:13,20;107:24; 108:2;110:7assume (8) 5:17,20;9:20;22:4; 37:12;47:5;52:2; 109:15Assuming (2) 4:4;10:3assumption (3) 24:16;37:16,18assure (1) 106:5atmosphere (1) 86:24attend (6) 31:10,13,18;32:10; 33:7;132:19attendees (2) 42:18;53:17attends (1) 31:5attorney (1) 96:23August (1) 134:3author (1) 86:16authorizing (1) 44:12available (5) 117:8;123:4;125:5, 10;126:11avoid (8) 28:7;34:14;38:4, 24;39:6,12;79:9;84:6avoidance (9) 14:4,15;114:18; 116:10,22;118:1,7,8; 131:11avoided (1) 88:6avoiding (5) 15:11;37:24;40:3, 6;115:2awaiting (1) 8:9aware (21) 13:17;14:12;29:23; 36:21;39:14;42:13; 43:17,24;44:13,16;

45:6,8,24;74:6,12; 89:8;90:20;91:2; 113:3;116:7;125:20away (15) 7:19;8:10,11;15:5; 16:10,20;17:13,24; 18:4;29:2,3,14;41:7; 56:7;131:7

B

babies (2) 98:17,19baby (1) 98:23back (12) 9:14;11:19;40:15; 51:7;53:5,10;55:10, 21;72:21;84:3;86:1; 109:9backfill (14) 18:21;19:5,18,22; 20:5,16;22:24;27:2; 51:5;53:1;55:4,6; 63:6;64:2background (3) 53:3;103:1,4bad (2) 86:2;93:22Baker (1) 74:2balked (1) 38:12bank (2) 20:2;56:13Barbara (2) 11:22;12:11bare (1) 130:16Barnum (14) 68:7;95:22;126:24; 127:3,5,9,13,23; 128:15,23;129:9,24; 130:15;131:1barrel (1) 97:12based (10) 15:21;25:2;36:5, 10;37:10;38:6;59:10; 85:16;90:14;117:6baseline (1) 25:6basic (2) 84:2,16basically (4) 35:6;55:15;65:14; 89:19batch (2) 21:20,23batches (1) 21:17bay (1) 28:12

bear (3) 27:1,2,13bears (2) 21:8;52:20beautiful (1) 97:3become (1) 56:14becomes (1) 70:16bed (1) 8:19bedrock (1) 103:23beforehand (1) 25:6began (1) 118:20begin (1) 30:22beginning (1) 66:16begins (1) 111:21behaves (2) 55:8;63:10behind (2) 97:5;136:3below (1) 19:23bench (1) 12:1benefits (3) 70:10;83:7;88:5bentonite (6) 42:1;43:2,15;44:2, 9;49:15bentonite-specific (1) 5:5besides (1) 44:9Best (25) 5:1,7;6:10,16,19; 7:5,13;8:14;9:19,24; 10:12;11:4;25:19; 28:8;30:20;31:3; 60:13;61:1;68:3; 74:1;77:3,8;94:21; 107:22;131:9Bethlehem (1) 12:13better (3) 13:1,6;115:10beyond (3) 17:5;102:13; 112:15big (2) 119:18;136:1bigger (1) 103:22bipartisan (1) 73:12birds (2)

130:11;131:7Bisbee (3) 78:7,17;79:14bit (3) 9:10;84:4;89:17blast (6) 61:1;101:2;103:11; 105:20,21;139:10blasted (1) 26:3blasting (56) 24:21,23;25:1,12, 18,20;26:1,5,9,14; 27:9;46:4,10,24; 59:22;60:9,13,17,21; 97:9,11,18;98:1;99:5, 8,10,24;100:1,10,11, 12,20,22;101:3,4,11; 102:7,10,11,13,17; 103:19;104:8,16; 105:3,4,5;106:6,16; 107:20,24;138:13,20; 139:4,7,8block (1) 55:15blocking (1) 57:2blow-up (1) 133:20blue (3) 98:16,19;121:3BMP (8) 4:9;6:4,5;60:2; 94:21;95:5,5;131:9BMPs (3) 4:5;25:24;59:9board (1) 40:23Bob (2) 95:16;96:2bobcat (5) 127:13,18,21,23; 128:7body (1) 98:6bore (4) 4:2;5:3;102:7,11boring (3) 26:11;49:13;62:10borings (3) 104:20;106:8,17Boscawen (1) 112:24both (6) 20:9,10;96:2; 108:7;114:13;129:11bottled (1) 27:15bottom (4) 7:24;26:17;43:22; 81:12bottom-dwelling (1) 42:3

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(2) approved - bottom-dwelling

Page 144: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

boundary (1) 121:24Bowes (5) 42:24;43:17,21; 44:7;104:9box (1) 19:20Branch (1) 75:4Brandon (1) 105:2Brazil (2) 64:9;66:22break (2) 61:15,21breakers (1) 57:8breeding (2) 135:20;137:6Bridget (1) 86:16brief (2) 97:7;110:5brighter (1) 73:14bring (2) 30:4;129:18bringing (2) 29:20;131:5brings (1) 30:13broad (1) 16:23brontosaurus (1) 131:6brought (2) 23:23;131:21bubble (1) 87:3bubbles (1) 87:4bucket (2) 7:12;9:16buckets (9) 7:1,14;8:1,6,8,18; 9:14,20;10:3buffer (2) 15:5,14buffers (1) 37:8build (9) 67:14;95:1,12,18, 23;96:3,8;112:9; 120:11building (4) 14:23;39:23;97:2; 128:11build-up (1) 92:18built (3) 70:18;111:16; 113:5bunch (1)

7:1Bureau (3) 35:20;36:15;132:4burial (4) 78:16,17,19,22buried (2) 58:10;89:19Burns (3) 41:2;44:21;125:11business (2) 53:11;63:2byproducts (2) 23:17;27:4

C

cable (7) 55:18;58:11,16,23; 59:6;60:22,23cables (2) 19:23;20:3calculate (1) 83:18calculated (2) 84:9;85:5calculates (1) 36:5calculating (1) 87:22calculation (1) 89:13calculations (5) 84:21;87:14,21; 88:3;89:7California (1) 73:5call (5) 21:6;116:12; 120:16;128:12,21called (6) 36:9;114:18; 116:16,18;118:11; 125:7calling (1) 116:12calls (3) 50:3;87:13;93:19came (9) 22:20;54:1;62:7; 71:24;81:7;93:8; 112:3;123:24;135:24Campbell (3) 55:1;72:23;87:6campground (1) 97:2Can (62) 3:11,13;4:20;8:17; 10:19;12:1,19;17:22; 18:7;19:9;22:19; 23:11;31:2;34:14; 35:18;37:3;42:3; 43:19;44:4;45:18,20; 46:1;47:17,20,21;

49:6;51:1;53:21,23; 63:24;64:24;88:1; 91:14;94:1;97:6,13, 23;98:3;99:2,6,17; 100:5;101:21; 102:22;106:5; 107:11;108:11; 114:16,19;116:5; 118:21;120:23; 126:17;127:14,17; 130:21;132:5; 133:15,17;136:16,20; 138:10Canada (13) 65:8;67:9,19; 70:16;90:3;93:2,5; 94:11,13;127:1,13, 21;128:10canopy (2) 135:3,5Canterbury (1) 113:1capacities (1) 108:19capacity (3) 81:23;82:1,5car (2) 23:12;95:12carbon (10) 68:22;84:18;86:22, 23;87:23;88:4,4; 89:9,14,20Carbonneau (75) 17:3,16;18:2,8,16, 24;19:7,12,22;20:11, 12;31:4,6,16,21;32:5, 24;33:13,22;34:9,23; 35:18;37:15,23; 39:14,17;40:9;45:13; 46:15;50:9;51:3,11; 52:9;68:6;75:23; 76:11,21;77:18; 79:18;80:6,17;95:16; 107:14;108:9,15,18; 109:7;114:2,7,10,13, 24;116:18,23; 117:24;118:8,13; 123:10,23;125:13,17, 18,20;126:4,8,13; 131:16;132:18; 133:23;134:16; 135:10;136:14; 137:3;138:11,15carcinogenic (2) 6:2;11:6carcinogens (2) 42:4;44:2care (1) 79:17Carl (2) 11:23;30:16case (11) 8:4;17:8;21:21;

35:3;46:7;71:20; 79:1;80:6;107:21; 117:9;128:17cases (5) 18:10;31:9;32:10; 117:17;136:19casing (1) 5:3catch (1) 96:5Caterpillar (1) 136:2Catherine (1) 33:2cause (8) 13:19;42:6,7; 56:13,14;65:17;71:7; 98:16caused (1) 69:7causing (3) 56:8;67:13;94:13caution (1) 29:24cement (3) 52:23;58:7,16cementitious (1) 53:1certain (10) 22:7;34:21;40:5; 62:14;63:17;112:16; 118:24;121:11; 137:5,16certainly (10) 48:20;52:11;59:18; 60:16;62:16;77:23; 80:21;96:9;128:5; 130:15certificate (5) 106:9,14,14,18; 107:16cetera (5) 38:18;50:17;60:11; 70:18;94:17CHAIRMAN (48) 3:3,6,17,20;4:19; 5:15;11:13,18,24; 12:6;30:12;43:4,6; 49:18,23;53:20;54:9, 14,19;61:11,14,17, 20;62:3;70:23;74:22, 23;75:13;81:17; 82:14;93:15,21; 96:19;110:23,24; 111:4;113:8,18,23; 114:6,12;122:21; 123:1,6,14,19; 125:16;139:13challenging (1) 124:4Change (18) 11:20,21;61:8; 64:5,17;65:16;67:2,

23,24;79:7;80:10,10; 83:12,24;87:16; 115:17;117:20; 131:14changed (1) 18:19changes (7) 24:14;65:17;110:1; 125:23,24;126:18,20changing (3) 61:10;64:7,7characteristic (1) 14:20characteristics (3) 101:7;105:23; 137:19charge (3) 42:12;99:18;106:3charges (2) 60:18;100:18Charlie (1) 74:2check (1) 136:2checking (1) 25:4Chief (1) 93:8chime (1) 138:11Choice (4) 112:2;120:6,18; 130:23choose (1) 14:4choosing (1) 14:18Chris (1) 72:17claim (1) 22:6clarity (1) 136:15Class (2) 112:14,16classified (1) 130:17clean (5) 28:6;49:5;67:18; 84:16;86:4cleaned (1) 6:18cleaner (1) 90:15cleaning (3) 6:7,11;46:9clean-looking (1) 136:7clear (2) 75:8;122:10clearances (1) 38:6cleared (1)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(3) boundary - cleared

Page 145: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

136:4clearing (2) 39:19;131:5Clearly (1) 51:16client (3) 105:14;108:16; 109:2clients (1) 109:1climate (19) 61:8;64:5,17; 65:16;67:1,22,24; 68:14;72:16,20; 74:19;75:11;83:11, 12,24;86:9;87:16; 88:16,16climates (2) 88:12,13close (5) 12:17,19;13:2; 84:10;110:15closer (3) 4:20;17:11,19CO2 (5) 67:18;70:9;84:6; 88:23;89:24coal (1) 22:20coalition (1) 73:10cog (1) 70:17cold (1) 135:6Cole (2) 6:23;9:13collaboration (1) 73:12colleagues (1) 87:9color (1) 121:5colored (1) 136:21colorful (1) 81:4combusted (2) 98:3;99:16combustion (1) 102:7coming (5) 21:10;27:8;29:21; 65:5;71:17comment (4) 7:8,11;79:17;140:1commenting (1) 55:16comments (2) 78:8;88:10Commissioner (1) 81:14Commissioners (1)

139:20commissions (1) 47:10Committee (3) 81:18;103:15; 139:22common (4) 30:1;43:7;127:18; 128:1communications (1) 47:6communities (1) 47:20commuting (1) 112:13compact (1) 112:14Company (12) 15:21;21:22;32:13; 41:6;44:11;45:17; 108:19,20;110:9,10; 119:12;132:21comparing (1) 15:17comparison (1) 70:6compensatory (3) 35:7;37:2;52:6competitors (1) 109:11complete (2) 78:16,17completed (2) 66:14;69:5completely (3) 33:18;34:11;39:6complexity (1) 13:21compliance (2) 77:2,9complications (1) 13:19complied (1) 108:1complies (1) 76:22comply (2) 77:4;107:15complying (1) 77:5concepts (1) 105:13concerned (5) 13:12;24:6;77:23; 94:21;97:14concerns (7) 27:20;30:9;106:22; 110:6;119:6;133:4,7conclude (1) 91:4concludes (1) 30:10conclusion (1)

91:10conclusions (2) 9:8;26:15Concord (1) 72:12concrete (6) 19:19;20:1;55:17; 58:10;114:20;118:10concur (1) 83:15condition (4) 7:7;33:20;98:21; 119:22conditions (5) 27:23;60:5;76:23; 77:10;131:18conduit (2) 52:22,24Conference (2) 53:14,18confirmed (1) 16:3conflict (1) 110:6conform (1) 4:5conjecture (1) 60:3connect (1) 3:15connected (1) 134:7Connecticut (1) 73:8consensus (1) 110:18consequences (3) 40:20;44:14;77:5conservation (6) 47:10;59:21;68:21; 111:21;113:2;114:22consideration (2) 59:18;103:3considerations (1) 134:21considered (5) 7:5;64:14;105:17; 137:20;138:24considering (2) 16:13;49:2consistency (1) 83:9constituent (1) 63:13constituents (1) 22:12construct (2) 36:6,12constructed (3) 51:14;66:12;119:1constructing (1) 80:2construction (59)

13:13,19;20:10; 23:19;25:10,21; 27:11,22;28:2;31:20, 22;42:13,17;46:6; 48:5;66:7;69:6,10; 70:15;71:22;75:20; 77:16,21;79:21,23; 89:2;97:8,17;101:13; 103:18;107:11; 111:12,17;112:9; 113:5,6,14,16;115:1, 4,4;116:5,6,19; 118:19;119:12; 120:5,22;121:8,9; 125:4;128:11;131:2, 4;132:12,21,24; 135:23;138:3consultants (1) 89:17consultation (1) 132:11contact (5) 20:7;128:20,23; 133:3,6contacted (1) 122:2contain (1) 21:24contained (1) 8:4contains (4) 5:24;11:5;19:5; 44:2contaminants (2) 21:18;22:1contaminated (1) 46:9contaminating (1) 105:6contamination (5) 25:23;27:2;46:3, 19;102:3contend (1) 14:22contention (1) 79:13context (3) 58:21;82:12;105:8continually (1) 71:7continue (5) 27:21;65:2;131:17, 22;132:7continued (1) 73:11continues (1) 66:24continuing (4) 14:13;29:18;67:22; 73:3continuously (2) 64:20;65:4contracted (2)

32:12,13contractor (3) 10:6;82:2,6contractors (10) 29:22;32:1,6; 40:23;41:1,14;48:16; 103:9;107:4;118:3contrary (1) 56:18contribute (1) 86:19control (1) 119:20controls (1) 115:8conversation (2) 19:13;133:10coordinate (2) 36:20;132:9coordination (1) 32:1copied (1) 47:5corner (3) 111:15;121:14,16corporate (1) 33:4corporation (1) 37:14corporations (1) 33:5Corps (3) 120:8;122:15; 123:24correctly (3) 26:4;30:1;99:19corridor (2) 78:21;79:5corridors (1) 69:23cost (16) 26:24;35:9,13; 36:6,8,12;37:6,13; 38:3,7,19;87:23;88:4, 4;89:14,20costs (5) 28:5,6;37:20,20; 88:6countermeasures (1) 47:2countries (1) 87:15country (3) 70:3,4;73:22County (1) 139:20couple (4) 35:23;108:12; 127:10;133:15course (2) 69:22;73:15Court (4) 43:3;72:6;89:23;

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(4) clearing - Court

Page 146: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

106:12cover (6) 54:3;61:2;70:1,7; 108:3;121:8covered (3) 5:14;9:21,23covering (2) 6:7;9:17covers (1) 24:11coveted (1) 74:4Craig (1) 78:6cranes (1) 131:5create (2) 55:7;59:7created (3) 58:5,14;64:18creating (2) 58:19;80:14crew (2) 113:6;135:23crews (1) 49:8criteria (1) 137:5crossed (1) 140:2CROSS-EXAMINATION (8)

3:8;12:3;30:14; 42:17;96:18,21; 99:22;111:7cross-examined (1) 97:7crossing (1) 48:20crossings (1) 60:1cross-pollination (1) 32:19crush (1) 38:16crushed (1) 116:2cubic (1) 25:13culturally (2) 90:24;92:12culverted (1) 81:2Cunningham (6) 96:20,22,23;99:11, 13;110:22current (7) 51:16;54:20;60:7; 123:4,10,13;125:14currently (4) 16:12;36:17;75:23; 127:23cut (7) 104:1;121:17;

129:15,16,18,19,21cutting (5) 39:3;40:4;69:14, 17;70:5cycle (1) 137:12

D

daily (1) 132:13dam (5) 64:10,16,16,16; 71:7damage (7) 13:24;47:13,15,23; 56:15;64:19;138:10damages (2) 35:8;52:6damming (1) 66:2dams (3) 55:7;64:13;93:10Dana (1) 78:7danger (1) 67:1dangerous (2) 99:3,5dangers (1) 105:5dark (1) 133:21darkly (1) 136:21dashed (3) 111:19;120:14; 121:3Data (3) 6:4,8;63:1date (4) 103:12;104:22; 122:19;131:13dated (2) 53:14;78:10Dawn (1) 3:13day (7) 16:3;33:7;75:8; 116:4,7;119:11; 140:5days (1) 107:11deal (1) 39:7decades (1) 40:12decimal (1) 70:12decimated (1) 90:22decision (7) 27:14;29:9,10;

72:21;73:24;103:15; 106:2decomposition (1) 88:14deduction (2) 88:2,18deeded (1) 112:8Deemer (1) 86:16deep (2) 18:22;64:19Deerfield (1) 139:18definitely (1) 31:16definition (2) 12:19;13:14deforestation (3) 68:20,23;69:1degradation (1) 68:20degrees (1) 92:15delineated (2) 121:3;123:23delineating (1) 122:7delineation (2) 124:3,15delineations (2) 124:2,13deliver (3) 27:15;73:14; 126:15demand (1) 66:3Democratic (2) 73:5,8department (5) 31:10;59:20;81:14; 110:4,13depend (1) 134:11dependent (2) 130:16;137:11depending (2) 22:20;121:12depends (8) 31:8;48:19;52:10; 133:23;135:12,17; 136:14,17deployed (1) 76:14deposit (1) 136:11depth (1) 100:21DES (22) 24:9;25:3,12; 27:18;34:19,21; 36:19;48:21;75:4; 78:6;82:3,14;101:15,

19;103:17;106:19; 108:3;117:10,11,21; 131:19;132:4describe (3) 35:18;133:15,18described (2) 56:10;120:15design (7) 14:12;16:15;51:20; 79:8;131:14,15; 132:5designate (1) 121:11designated (3) 129:15,21;135:22designed (1) 131:11desktop (1) 129:11Despite (1) 25:19destroy (2) 38:16,18destroyed (4) 33:19;34:2,5,11destruction (2) 35:11;80:14destructive (1) 94:24deterioration (1) 21:9determination (1) 101:10determine (3) 36:22;37:3;50:7determined (1) 35:13detonating (1) 60:19devastating (1) 93:9devastation (2) 94:10,13developed (7) 14:24;15:1;17:4; 18:4;64:15;67:4,5developers (1) 64:15development (1) 135:7developmental (1) 6:1differ (1) 80:20difference (7) 99:23;101:1; 122:12,17;123:16; 124:14;127:14different (12) 10:7;21:17,18; 22:1,1;32:17;76:15; 79:19;108:18;109:2; 117:12;120:3

difficult (2) 87:1;127:17difficulty (1) 3:14dioxide (3) 86:22,23;89:10direct (5) 36:18;55:13;57:16; 69:2;113:12directional (3) 40:19;43:1,14directive (1) 69:3directly (4) 10:17;15:24;67:24; 74:16director (1) 31:6dirt (4) 111:23;112:2,3,6disagree (7) 37:15;71:9,10; 91:1,17;92:9,10discharge (1) 10:23discharged (1) 10:17discovery (2) 66:10,18discuss (1) 31:1discussed (4) 31:9;32:11;40:21; 97:16Discussion (3) 3:19;99:12;111:3discussions (3) 32:15;40:24;77:22dispersed (2) 47:20;49:14displace (1) 38:17displaced (2) 90:23;92:12displacement (2) 35:14;84:19distinguish (1) 134:20District (2) 111:18;112:20Districts (1) 114:23disturbance (1) 139:1disturbed (5) 51:18;78:20,22; 79:5;80:22DNA (1) 101:24docket (3) 103:5,9,13doctors (1) 94:17

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(5) cover - doctors

Page 147: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

document (6) 22:4;53:22;105:13, 17;115:18;116:3documenting (1) 115:16documents (1) 32:20DOE (2) 16:14;110:11done (34) 5:6;6:14;10:19; 18:18;21:13;23:19; 25:7,13,20;27:24; 41:5;47:23;48:3; 50:9;62:17;73:23,23; 96:18;103:13,17; 104:4,20,21;105:20; 106:17,23;107:20; 108:22;109:5;114:3; 115:20;124:14; 131:24;139:12dosage (3) 42:5;99:20;101:10DOT (21) 16:8,14;25:19; 50:3,7,19;51:1;52:4; 53:13,18;54:5;55:3, 6;63:4;75:4;76:3; 77:20,23;79:2;80:11; 122:8dots (2) 122:9;124:10doubt (1) 65:12down (21) 7:15;15:4;20:21; 27:4;28:18;39:3; 40:4;43:4;48:7;59:2; 60:24;73:18;93:8; 100:1;102:6;103:23; 112:23;115:7;119:3; 122:1,5downstream (1) 4:15Dr (1) 126:24draft (1) 89:15drain (6) 55:8;56:1,6,19,24; 63:7drained (1) 9:15drains (1) 59:11drastic (1) 65:16draw (2) 26:15;71:19drawn (1) 7:20drill (4) 7:23;100:16,20;

101:4drilling (9) 5:12;9:11;40:20; 42:15;43:1,2,14,15; 44:19drinking (2) 27:10;97:20drive (3) 95:12;120:24; 131:7driven (1) 9:17driveway (6) 113:7;120:11; 124:19;130:12,23; 136:3drop (1) 89:3drug (1) 42:9drugs (1) 42:8dry (7) 40:5;65:8;134:2, 24;135:11,13,14duct (2) 20:2;56:13due (4) 102:5;107:10; 110:6;131:12Dummer (3) 101:22;104:11,14dump (2) 10:13;11:5dumped (1) 5:11dunes (1) 120:17during (13) 27:21;32:5,8; 45:11;75:20;87:23; 89:3;118:16;122:1; 132:20;134:1; 135:20;137:6dwindle (1) 65:18

E

earlier (8) 18:24;58:17;75:9; 97:15;99:22;100:4; 103:21;133:16easement (4) 39:2,11,18,18easements (1) 39:21Easton (4) 4:1;12:11;30:17; 50:21eat (1) 134:9economic (1)

88:5economically (1) 73:22Economics (1) 83:16economy (1) 73:13ecosystems (1) 68:1edge (9) 16:9;18:11;59:4; 79:4,21;80:3,18,24; 121:22effect (2) 18:14;19:2effects (8) 18:6;26:15;42:6,7, 14;93:10;98:5,14effort (5) 16:13;34:17;79:9; 84:23;101:14efforts (1) 14:12eggs (2) 134:10;135:7EIS (2) 89:15;110:3either (15) 6:24;9:1;14:1; 15:24;38:9;43:12; 46:3,12;51:23;56:15; 69:5;80:17;115:8; 121:2;137:17elaborate (2) 34:3;83:13electricity (4) 64:12,21;71:6,8elements (1) 105:16elephant (1) 75:3elevated (1) 109:20else (9) 28:18;39:21;42:8; 46:13;50:14;51:4; 95:21;96:1;109:23emission (4) 67:19;83:19;89:12; 90:4emissions (16) 68:19;85:17,20; 86:8,11,13,18,21; 87:1,11,14,17;88:12, 21,23,23employee (1) 6:23employees (1) 9:13emulsion (3) 100:12,22;101:3enact (1) 105:4

encased (3) 19:19,24;63:9encasement (1) 55:17enclosed (1) 63:9encompass (1) 24:5encounter (1) 132:20encountered (1) 37:22encouraged (1) 68:16end (5) 11:11;75:8;124:6, 18;126:11endangered (3) 18:11;128:3; 131:21energy (6) 67:18;86:4;95:17; 109:2;110:4,14engaged (3) 29:22;32:9;95:8engineer (5) 56:3;120:8,9; 121:19;137:24engineering (11) 16:12;31:22;41:3, 4,6;42:12;57:17; 59:19;77:21;125:4; 130:20engineers (8) 31:11,23;50:12; 62:24;123:24; 125:12;126:2,20Engineers-reviewed (1) 122:16England (7) 63:20;71:19;84:7, 20;89:12;127:3; 128:6England's (1) 90:6enhancement (1) 68:22enough (5) 11:8;48:18;64:11; 109:14;112:13enter (1) 49:6entirely (2) 79:15;121:10entity (1) 105:7enumerate (1) 18:7environment (6) 33:5;43:20;73:13; 92:15,17;95:11environmental (51) 9:22;13:3;16:19;

17:13,23;31:1,7,15, 17;32:11,22;33:11, 16;38:19;40:16; 41:17,19;46:17;50:6, 9;56:14;59:21;64:19; 75:6;76:8,12;81:15; 95:13;96:10,11; 97:10;113:12,13,20; 114:3,16,17,21; 115:5,15;116:6,11, 16;118:11;119:9; 120:1;128:17,22,24; 129:8;132:9ephemeral (1) 121:6equipment (5) 49:9,12;115:23,24; 133:10equivalent (1) 10:6erosion (3) 20:22;115:7; 119:19escapees (1) 127:10especially (1) 10:15estimate (1) 89:24estimates (3) 84:11;89:11;94:6et (5) 38:18;50:17;60:11; 70:18;94:17evaluated (1) 80:17evaluating (4) 95:8;96:9,13,14evaluation (5) 18:17,18;81:17; 96:15;105:2even (18) 26:9;27:22;28:19; 34:16;38:11;59:6; 63:11,11;65:12; 70:11;74:2,9;78:17; 104:7;115:3;122:18; 130:2;134:19event (4) 47:12;101:6; 107:18;138:20events (1) 119:15Eversource (44) 8:24;30:24;31:5,7, 15,17,19;32:23;35:7; 37:12,19;39:10; 40:16;42:11;44:11; 45:11;46:2;48:15; 52:4;53:17,18;54:7; 55:3,23;63:4,24; 74:4;75:23;82:2,6; 108:13,15;109:4,6,

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(6) document - Eversource

Page 148: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

12;110:9,15;113:17; 114:5;116:24; 121:20;122:2; 132:22;133:13Eversource's (1) 76:20everybody (5) 16:17;28:18;68:5; 95:2;101:21everyone (2) 43:8;51:12everything's (1) 94:7everywhere (2) 51:17;63:19evidence (2) 53:6,12eviscerated (2) 90:24;92:13exact (4) 12:23;76:11;98:12; 116:10exactly (8) 19:13;30:8;33:1; 62:22;80:9;85:5; 98:13;100:15examination (1) 104:5example (16) 15:3;17:1,8;21:20; 22:11;79:1;103:20; 104:5,11;106:20; 114:20;115:21; 117:2,23;118:21; 132:22examples (1) 118:10excavate (1) 51:5excavated (1) 52:22excavating (1) 23:10excavation (1) 59:23exceedances (1) 22:11excuse (2) 85:24;130:6executive (2) 29:9;75:4exercise (1) 29:24exhaust (1) 23:12Exhibit (28) 42:21,22,24;43:23; 54:10,22;57:23,24; 58:4;68:11,12;72:12, 13,23,24;78:3,4,12; 81:7,9,12;85:11,12, 24;101:17,19,22,24existence (1)

56:12existing (11) 39:23;40:10;50:13; 59:5;69:15,20;71:18; 78:24;88:24;120:15; 135:4expand (1) 67:5expanded (1) 113:4expansion (3) 124:20,22;125:1expect (6) 8:17;16:19;47:21; 65:10;76:12;116:14expected (4) 51:21;103:19; 104:8;117:6expecting (2) 37:11;126:10experience (8) 81:22;82:21;83:22; 113:12,21;114:8,15; 118:17expert (1) 99:6expertise (1) 94:18experts (2) 85:18;90:14explain (5) 88:1;90:2;99:7; 100:5,11explore (1) 75:7explored (1) 39:1export (1) 71:8exposed (1) 19:18exposure (1) 27:8expressed (1) 78:1expressing (1) 28:13extend (1) 39:11extends (2) 109:9;112:20extensive (1) 48:5extensively (1) 57:9extent (4) 13:18;34:14;76:4; 100:18extreme (2) 29:24;92:19extremely (1) 26:2eyes (1)

86:2

F

face (1) 69:9face-to-face (2) 82:3,7facility (4) 14:9;106:10,15,18fact (9) 16:8;27:19,19; 38:10;39:10;59:15; 64:21;67:17;95:4factors (2) 14:18;60:20facts (1) 82:19fair (2) 20:8;110:13fairly (5) 32:18;131:24; 134:6;135:1,15fairy (1) 137:14fall (3) 107:8;135:12; 136:1familiar (4) 48:1;100:2;116:15; 126:22families (1) 27:9far (11) 6:13;29:14;36:16; 67:1;79:5;80:13; 86:6;94:21;128:1; 131:13;132:1Farm (1) 118:23farther (1) 16:20fast (1) 30:19fault (1) 72:10favor (1) 75:10fear (2) 64:10,16features (1) 14:15federal (2) 119:16;137:4fee (3) 52:13;117:16,20feedback (1) 16:14feel (3) 28:11;73:24;129:9feet (26) 6:2,3;12:20,21; 17:9;18:22,22,23,23;

24:1;25:12;27:11; 39:5;46:1,4;59:24; 60:24;103:24; 111:21,22;121:18,20; 138:1,7;139:3,5fence (3) 5:5;7:3,8fertilizer (1) 98:2few (9) 24:1;40:13;60:24; 62:7,13;108:7; 135:14;137:18,18fewer (5) 13:1,6,15;14:4,22Fiddler's (4) 112:2;120:6,18; 130:23field (9) 85:18;90:14,17; 100:16;115:15; 117:6;124:1;127:15; 129:11fields (1) 94:18fighting (1) 30:7figure (3) 89:10,15,20fill (2) 20:2;53:11filled (1) 52:24FILLMORE (1) 3:13filters (2) 8:3;28:18final (5) 35:16;51:20;66:14, 15;89:9finally (1) 63:2financial (1) 29:12find (8) 14:8;23:1;34:20; 37:19;57:10;75:9; 121:12;128:9finding (1) 33:21finds (3) 28:15,15,16fine (1) 24:17fined (1) 77:7fingers (1) 140:2Finneran (1) 33:2firm (1) 119:13First (7)

12:16;27:18;52:22; 53:21;55:9;89:3; 100:14Fish (11) 36:21,24;42:2; 43:19;128:20,21; 129:3;132:3;134:8,9; 135:16fisheries (1) 108:21five-gallon (4) 7:1,14;8:18;9:13flip (2) 53:23;55:1flooded (1) 135:15flow (7) 7:15;57:3;64:8; 66:24;102:20,22; 103:6flowable (1) 63:14flowing (5) 56:15,16;60:16; 65:2;101:8flows (1) 56:20fluid (2) 43:24;63:14fluidized (10) 18:20;19:4,18,22; 20:5,15;22:23;55:3, 5;63:5fluids (5) 43:2,15;44:8,19,22fly (6) 21:15,17;22:15; 63:3,7;64:1focus (1) 12:14folks (11) 14:11;16:18;29:19; 30:7;31:17,20;41:3; 49:13;77:21;106:5; 127:18folks' (1) 97:20follow (4) 24:9;25:1;69:15; 80:12followed (3) 6:13;46:20;59:9following (9) 22:7;27:22;28:7; 43:1;69:22;72:20; 78:16;94:19;106:21follow-up (5) 24:22;47:13,16,24; 97:10food (1) 92:18foot (1) 16:5

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(7) Eversource's - foot

Page 149: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

footprint (1) 78:22forces (2) 70:19;80:12Forest (13) 5:13;9:18;10:23; 11:3;68:20;69:14,16, 20;70:1,7;74:9; 94:23;121:7forested (2) 70:3,4forests (2) 68:22;78:9forever (1) 20:20form (1) 86:8formula (2) 36:3;94:9forth (12) 32:3;37:13,22; 39:3;53:5,11;55:10, 21;63:3;82:15;85:2; 86:1forward (4) 9:2;42:10;59:19; 73:11fossil (2) 84:19;90:8found (9) 43:18;62:19;86:5; 117:2;119:1;127:2; 128:9;138:1;139:9foundation (4) 49:20,21,21; 104:15foundations (3) 79:11;104:13; 138:21four (5) 24:18;66:8;108:9, 10,11frack-out (5) 40:21;45:24;46:3, 9;47:22frack-outs (3) 45:20;46:18;49:5fraction (1) 70:9fracture (1) 102:12fractures (1) 102:18Franklin (1) 113:1frankly (1) 26:6Frayer (1) 87:19Frayer's (2) 83:15;94:6freeing (1) 23:17

French (7) 55:8,24;56:6,19, 24;59:11;63:7frequently (1) 119:10fresh (2) 48:14,17Friday (1) 139:16friend (1) 127:10frogs (1) 137:13front (4) 16:11;17:10;21:24; 22:22frost (1) 77:13frown (1) 69:9FTB (3) 55:5,21;63:5fuel (4) 46:19;84:19;90:8; 100:17fulfilled (1) 64:19full (2) 7:1;8:18fully (1) 29:23function (1) 135:17Fund (3) 36:1,2,10fundamental (1) 26:18funds (1) 35:10funnel (1) 7:3further (12) 14:14;17:9;18:4; 34:3;38:4;43:22; 44:20;59:2;70:22; 73:18;88:1;90:2furthermore (1) 28:2future (8) 8:17;64:8;65:17; 66:3;67:1;73:14; 76:2;132:7

G

Game (6) 36:21,24;128:20, 21;129:3;132:3Gas (4) 85:19;86:9;87:17; 90:21gases (3) 83:20;86:6,20

gas-fired (1) 90:16gathering (1) 86:24gauging (1) 87:17gave (2) 55:12;117:23general (4) 8:15;12:24;74:15; 108:5generalization (1) 16:23generally (4) 88:11;110:2;134:6, 8generating (1) 66:8generation (5) 66:11;73:15;84:20; 90:3,8gentleman (1) 7:12geologic (1) 60:5geophysical (1) 104:4George (1) 78:7geotechnical (5) 49:13;62:10; 104:19;106:7,17gets (1) 99:14giant (1) 103:23gist (1) 86:3given (4) 17:17;53:6,12; 131:19giving (1) 133:2glimpse (1) 127:16Global (2) 85:21;86:20goal (1) 64:20goals (1) 83:10goes (10) 8:4;19:22;21:24; 27:16;51:15;52:23; 82:16;86:9;87:5; 140:3good (15) 6:11;8:22;24:11; 27:24;32:18;41:22; 61:15;76:19;91:22; 92:4;99:22,24; 102:14;109:14; 119:21

government (4) 47:9;67:4,15; 109:12governments (1) 46:20Governor (4) 72:17;73:15,16; 74:3governors (2) 73:5,8Grafton (1) 139:20granite (2) 121:24;138:22gravels (1) 55:7great (2) 76:7;92:6greater (6) 16:24;51:21;52:12; 78:23;80:22;118:6green (4) 120:24;122:8,8,9greenhouse (4) 83:20;85:19;86:6; 87:17grid (2) 71:19,20Groton (1) 118:23ground (5) 10:9,14;20:23; 106:1;130:17groundbreaking (1) 85:16Grounds (2) 49:18;93:17groundwater (23) 19:3;20:19;25:23; 56:7;97:19;99:3,10, 15;102:3,5,16,18,23; 103:6,13;105:6,21; 107:3;111:18,20; 112:19;114:23;119:7group (6) 11:15;12:13; 109:23,24;116:6; 139:19groups (1) 32:17grow (1) 73:13growing (3) 65:4;72:18;134:5guaranty (1) 63:24guess (14) 4:18;6:20;11:15; 17:16,18;20:1;26:17; 28:14,23;30:20; 41:20;45:3;57:5;75:2guessing (1) 126:13

guidance (2) 24:11;101:15guidelines (2) 36:17;107:17guys (1) 77:21

H

habitat (13) 37:9,11;38:17,18; 94:23;129:10,20,23; 130:1,3,13,22,24habitats (2) 129:6;130:11half (2) 21:5;84:14half-inch (1) 119:17halfway (1) 120:23halt (2) 116:13;128:22Hampshire (28) 25:22;35:20;36:14, 19,20,24;60:7;68:24; 72:1,15,18;73:17; 76:1,3;78:9;81:14, 17;94:24;98:11; 113:14;116:17; 117:10,21;127:4,6; 131:19;132:4;137:4Hampshire's (1) 90:6hand (3) 32:2,3;35:15Hang (1) 43:6happen (8) 8:23;17:23;50:19; 54:15;72:4;80:15; 105:22;114:20happened (2) 10:4;54:12happening (2) 64:22;95:6happens (6) 7:4;23:3;29:10,12; 81:1;132:13happy (1) 93:6hard (9) 4:16;7:10;10:20; 26:14;47:15;60:3; 112:4;121:5;133:17harden (1) 63:15hardens (1) 63:15harm (1) 39:8harmful (5) 42:2,14,19;44:3,13

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(8) footprint - harmful

Page 150: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

harmony (1) 32:4hate (1) 49:20hay (2) 5:14;6:7HDD (5) 44:20;47:1;48:15; 49:5;77:12head (3) 4:21;12:22;75:3heads (1) 61:5health (2) 98:5,13hear (3) 26:20;94:2,3heard (11) 23:18,23;40:13; 52:20,20;55:20;65:7; 71:16;98:18;99:21; 131:12Hearing (6) 3:2;52:19;55:9; 61:24;124:21;140:6hearings (1) 82:8heat (1) 86:24heave (1) 77:14heavy (3) 19:5;20:17,18held (2) 53:15;116:4Hello (1) 30:16help (4) 50:6;97:13;103:11, 14herbicides (2) 75:21,24here's (3) 39:4;113:11; 121:14Heritage (1) 132:4hide (1) 29:8high (6) 21:19;23:2,6; 28:15;59:8;91:20higher (5) 36:7;57:13;86:14; 88:17;89:2high-level (4) 31:17,19,23;33:6Highly (4) 65:21,23;121:7; 122:3high-value (1) 37:8highway (4)

25:21;79:5,20,24highways (1) 79:2Hill (3) 111:22,24;112:1hillside (1) 103:23hired (2) 32:7;110:9hiring (1) 76:17history (2) 82:12,13Hmm (1) 61:6holds (2) 79:14;122:18hole (4) 4:2;5:3;100:23; 101:4holes (5) 100:16,20;102:8, 11;104:15homeowner (2) 21:8;23:4homeowners (2) 24:10;26:23homeowners' (1) 45:21homes (2) 24:2;29:2homogeneous (1) 21:16honest (3) 7:10;11:10;82:20honestly (1) 109:8HONIGBERG (44) 3:3,6,17,20;4:19; 5:15;11:13,18,24; 12:6;30:12;43:4,6; 49:18,23;53:20;54:9, 14,19;61:11,14,17, 20;62:3;70:23;74:23; 75:13;93:15,21; 96:19;110:24;111:4; 113:8,18,23;114:6, 12;122:21;123:1,6, 14,19;125:16;139:13hope (2) 47:7;136:12hopefully (3) 48:11;97:13; 132:14horizontal (3) 40:19;43:1,14hose (1) 11:7hosed (1) 10:10hoses (1) 7:9hosing (1)

10:14host (3) 53:16,16;60:20hourly (3) 109:15,16,17house (4) 21:24;95:12; 120:20;121:16housekeeping (1) 6:12HQ (1) 66:19human (2) 98:6,8humans (1) 44:3hundred (2) 64:12;87:11hundreds (2) 46:1;103:24hurt (1) 39:8hydrocarbons (1) 25:17hydroelectric (1) 67:6hydropower (3) 84:17;86:4;90:15Hydro-Quebec (3) 66:1;70:20;71:6hypothetical (5) 15:15,18;23:7; 33:22,24

I

I-93 (11) 15:4,7;29:3,15,16; 79:2,14,20;80:10,15; 100:1idea (1) 19:16ideal (1) 135:21ideally (1) 135:20ideas (1) 32:19identification (11) 42:23;54:23;58:1; 68:13;72:14;73:1; 78:5,13;81:10;85:13; 102:1identified (4) 117:3;124:9;129:7, 13identify (2) 35:21;48:8identifying (2) 132:1;137:7ignited (1) 100:18ignorance (1)

42:18illustrated (1) 103:21imagine (1) 17:12immediately (1) 46:20impact (22) 13:13;16:20,24; 17:7,13,18;23:14; 28:18;35:1;36:5,11; 38:5;39:22;40:1; 52:11;79:8;86:20; 95:18,24;115:17; 117:13,15impacted (2) 34:13;89:9impactful (1) 29:15impacting (1) 118:2impacts (30) 14:10;17:23;35:22; 36:16,18,22;37:10; 38:1;51:20,22;52:13; 59:8;73:21;77:15; 78:18,22,24;79:10; 80:23;92:24;95:13, 20;96:11,11;115:3, 19;118:5,15;131:17, 24impervious (8) 20:21;55:15;58:5, 8,14,17,17,20impetus (1) 37:19implement (1) 68:16implications (2) 96:4,12import (1) 67:9important (1) 129:13improve (1) 49:16incentives (1) 68:18inches (1) 136:5incidents (1) 46:18include (3) 20:17;101:15; 137:16included (4) 50:16;87:14; 105:16;139:6includes (4) 25:4;37:6;50:12,14including (5) 16:17;25:17;60:1; 95:9;112:23

incomplete (1) 102:7inconclusive (1) 8:16incorporates (1) 126:1incorrect (1) 99:20increase (4) 17:21;39:22;71:14; 117:18increased (1) 71:5indeed (1) 19:4independent (3) 23:1;67:12;69:6in-depth (1) 73:21Indian (1) 92:11Indians (5) 90:24;92:21,22; 93:6,20indicated (5) 27:20;46:7;69:4; 94:12;106:20indicating (1) 63:12indicators (2) 137:15,18industry (1) 57:9infiltrate (1) 102:17infiltration (1) 99:2influence (2) 82:22;102:13influenced (1) 92:3information (20) 26:12;36:4;50:11, 18;54:8;55:4;60:6; 66:9;85:16;88:9; 90:15;103:2,4,10; 106:1,4;125:17; 126:19;131:20;133:3informed (1) 126:24infrastructure (1) 79:3initiative (2) 67:17;73:4injection (1) 102:10Innu (2) 90:24;93:9input (3) 33:10;124:5; 132:16insane (1) 43:12

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(9) harmony - insane

Page 151: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

insects (1) 137:16inside (2) 20:6;57:2inspector (1) 9:12install (1) 23:20installation (3) 24:3;59:7,14installed (1) 22:22instance (4) 24:20;64:9;114:17; 116:10instances (1) 116:15instead (1) 18:23instructions (1) 76:20integrity (2) 25:8;91:20intelligent (1) 106:2intended (1) 138:19intends (1) 25:1intentions (1) 76:19interest (5) 74:1;77:3,8;110:7, 19interested (3) 109:4;116:9; 118:10Intergovernmental (1) 87:16interjects (2) 72:6;106:12intermittent (3) 121:4,4,6internal (3) 32:15;40:15,21internally (1) 82:18interrupt (1) 80:5interrupted (1) 72:10interrupts (2) 43:3;89:23intersect (1) 102:11interstate (1) 79:2intervenor (1) 30:16intervenors (3) 78:1;99:8;100:6into (41) 7:3,15,24;8:5;9:14;

10:10,14,19,24;12:7; 14:18;16:11;17:10, 10,14;18:1,3;19:23; 20:18;27:4;29:2; 36:4,8;45:20;54:2; 65:5;89:21;94:7; 98:4;99:3,4,10,14,15, 17;100:13,22;101:3; 102:11;103:2;112:16introduce (3) 12:7;53:7,13introduced (1) 74:10introduction (2) 12:5,10invariably (1) 38:16inventory (3) 90:4,6,7invertebrate (1) 130:16invertebrates (3) 42:2;43:19;130:17investigate (1) 45:9invited (1) 124:2involve (2) 115:17;125:22involved (10) 31:23;33:3;41:14; 45:13;57:13;83:24; 96:9;105:10;117:17; 133:5involves (1) 137:6Island (1) 73:9ISO-New (1) 71:19issue (18) 7:11;9:6;23:18,24; 27:6;33:17;38:6,8,9; 51:9;52:15;61:8; 64:4;70:13;89:4; 106:22;110:19;118:1issues (25) 15:10;28:1,4; 29:19,23;31:1,8; 32:11;37:21;40:16; 48:8;56:8;64:21; 77:8,13,14,20,22; 84:1;93:4;97:11; 101:12,20;108:4; 116:7

J

Jake (5) 77:18;114:11; 126:4;138:11,15jeez (1) 39:4

Jefferson (1) 137:13job (6) 8:1;27:24;73:20; 82:12,13;132:1jobs (1) 30:1Join (2) 72:16,18joining (1) 74:18Julia (2) 83:15;94:5July (1) 135:21jump (1) 61:6June (2) 125:11;126:12justify (1) 94:11

K

keep (3) 28:11;115:18; 140:2keeping (1) 29:20keeps (1) 8:3Ken (1) 104:9Kevin (2) 96:24;97:1key (5) 84:17;121:2,6; 122:6;135:18kids (1) 27:5killing (1) 35:14kilovolt (1) 112:9kind (14) 9:17;10:7;20:23; 22:20;32:2;47:16; 55:11;95:17;103:1; 105:7;130:1;131:3; 136:9,16kinds (5) 28:10;30:8;48:8; 107:21;132:1knock (1) 7:4knocked (2) 10:9;122:1knocks (1) 122:4knowing (2) 10:1;60:4knowledge (6) 42:19;44:7,23;

76:1;93:24;103:8knowledgeable (1) 47:11known (2) 106:16;133:7knows (2) 32:2;46:13Kurtman's (1) 105:2

L

La (1) 66:7lab (2) 22:2;23:1Lakes (55) 11:15,18,23;30:12, 15,16;43:5,11,13; 44:4,6;49:23,24; 50:2;53:9,20,23; 54:11,17,24;55:2; 57:22;58:2;61:11,13, 16,19,22;62:3,5; 68:10;70:23;71:2,3; 72:11,22;73:2;74:23; 75:1,16,18;78:2,14; 81:6,11;85:10,14,23; 87:5,7;93:22;94:1,4; 96:17;127:12land (4) 36:11;40:6;130:4,7landowner (5) 38:23;39:11;129:1; 131:20;132:19landowners (11) 39:9;48:24;125:2, 6,14;131:13;132:11, 15,17,20,23language (1) 92:19laptops (1) 125:7large (4) 26:2;92:3;100:9; 134:14largely (1) 15:23larger (5) 22:13;99:23;100:8; 103:22;117:14largest (1) 26:8last (9) 3:24;55:12;73:4; 94:5,14;112:4;127:1; 135:9;140:3late (2) 132:17;135:11later (4) 9:4,10;67:21;134:3launched (1) 73:4

law (4) 22:8,9;35:19;60:7lay (2) 60:22;107:9leach (2) 19:6;20:18leaching (1) 20:24lead (3) 27:5,8;86:16leaders (1) 73:6leading (2) 7:9;87:13leaning (1) 75:12leanings (1) 75:6learned (3) 94:18;113:6;125:3least (7) 14:10;17:21;33:4; 59:13;94:24;118:2; 135:19leave (4) 4:11;5:2;7:13;8:18leaving (5) 6:6,13,15;7:1; 49:14ledge (1) 60:24Lee (25) 14:6;41:16;95:22; 96:2;110:24;111:5,6, 8,9;113:8,10,22; 114:1,14;122:24; 123:3,9,12,14,18,22; 126:7,9;138:18; 139:14left (5) 4:3,22;32:2; 135:24;136:3legal (2) 31:10;34:24Legasse (1) 97:1less (1) 78:19letter (3) 78:6,15;107:13level (4) 23:6;28:12,15;98:9levels (4) 23:2;44:16;98:7,23liberated (1) 98:4lie (1) 59:24life (2) 33:4;93:7light (1) 121:3likely (4)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(10) insects - likely

Page 152: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

17:6;59:7;65:22; 133:1limitations (1) 15:8limited (1) 79:20limits (1) 112:20line (37) 20:19,21;21:3,10, 12;26:17;28:19;29:8; 50:3,7,8,20,24;51:10; 56:6,16,17;57:4,14; 58:7;68:24;79:6,12; 84:5;111:14,19; 112:10,22,24;113:4; 120:12,14;121:3,17; 129:18,22;138:4linear (1) 79:6lined (5) 19:2,8,12,20;20:6lines (6) 38:22;55:17;57:11; 65:5;70:18;97:4lining (2) 19:14;28:21listed (1) 128:2listening (1) 55:22literally (1) 50:23little (11) 9:10;17:19;52:18, 21;73:18;79:7;84:4; 104:8;114:11;122:8; 124:9live (6) 12:11;80:9;90:11; 111:9,24;112:24load (1) 9:13loaded (1) 9:15locate (1) 29:14located (4) 10:21;59:4;79:4; 121:21location (14) 13:5;14:9,14; 15:18;25:14;29:18; 57:14,15;79:7;117:5; 123:11;136:22,23; 139:3locations (10) 15:19;26:13;49:5; 62:14;63:21;76:15; 80:20;104:7;125:21; 129:13lodge (2) 97:2,5

logical (1) 17:20London (1) 83:15long (12) 24:3,13,22;30:4,7; 77:16;89:1;103:24; 108:13,15;111:19; 135:9longitudinal (1) 56:6long-term (1) 66:5look (17) 14:13;25:7;34:6; 73:21;75:2;102:2,3, 6;116:13,20;119:19; 127:13,15;133:20,22; 136:9,13looked (4) 15:17;29:17;87:10; 124:5looking (8) 4:14;9:12;16:15; 27:7;28:1;59:2; 119:13;122:23looks (2) 4:6;73:11lose (1) 4:22lot (22) 14:17;24:11;26:24; 29:1;33:8;53:5,10; 83:22;91:19,22; 92:16;105:15;107:4, 7;108:3;111:13,14, 16;113:15;119:23; 120:24;136:20lots (2) 38:16;77:7low (3) 88:21,23;98:8lower (3) 22:14;57:15;88:12low-toxicity (1) 45:6lubrication (2) 42:1;43:16lucky (1) 92:7lynx (6) 127:1,13,19,21; 128:1,10

M

machines (1) 136:11Magee (3) 68:9;96:2,7magnitude (1) 86:10Maine (1)

127:2mainly (2) 97:6;127:6maintained (2) 112:15,17maintenance (1) 21:11major (1) 79:9makes (3) 65:11;93:23;99:23making (7) 29:9;40:7;79:14; 88:3;101:9;122:4; 126:20male (1) 5:24man (1) 68:1managed (3) 40:12;45:22;69:20Management (22) 5:2,7;6:10,16,19; 7:5,13;8:14;9:19,24; 10:12;11:4;25:19; 28:8;31:13;42:11; 44:16;60:13;61:2; 68:21;107:23;131:10man-made (1) 86:5Manual (2) 59:21;80:12many (22) 7:19;12:17;23:22; 32:15;33:8;34:10; 37:23;46:1;49:11; 53:3;55:21;76:8,16; 84:1;90:14;91:13; 92:4,6;108:24;109:5, 11,12map (23) 111:10,10;120:3,3, 4,5,14;121:23; 122:10,14,18,19; 123:4,10,13;124:23; 125:3,5,9,14;129:17; 130:19,20mapping (3) 122:17;125:1; 133:16maps (6) 120:8,9;122:22; 126:10;133:16; 134:15March (1) 135:21Mark (2) 97:1,1marked (14) 42:22;54:22;57:24; 68:12;72:13,24;78:4, 12;81:9;85:12; 101:23,24;120:7;

122:4marker (1) 121:24marks (1) 127:15Mary (1) 111:9Massachusetts (3) 73:7,16;74:3Material (22) 6:3;7:16;20:4; 21:17;22:9;25:14; 55:18,24;60:19; 63:10,13,16,18,23; 98:1;99:16;100:17; 101:11;102:17; 119:2,5;136:17Materials (5) 6:8;43:18;46:10; 51:24;60:15mathematical (2) 94:6,9matter (1) 101:16matters (1) 100:7matting (1) 115:6mature (1) 18:9may (31) 3:6,21;8:18;12:2; 21:19;34:6,24;35:2, 24;37:18;40:3;45:24; 48:23;52:5,18;59:1, 13;62:4;79:19;80:5, 6;91:12;92:2;94:2,2; 111:5;121:11;134:4, 24;135:13,16maybe (6) 5:16;16:5;33:8; 55:20;62:18;75:19McDonnell (3) 41:3;44:21;125:11mean (18) 7:20;14:3,7;19:17; 27:14;29:11,16; 33:24;39:18;42:8; 47:14;60:20;102:19; 108:15;116:18; 122:11;129:16; 130:14meaning (2) 16:10;56:19means (1) 122:8meant (1) 54:1measure (2) 87:2,3measures (2) 6:12;119:20media (2)

74:15,15median (2) 15:4;29:3meet (5) 37:4;63:17;65:3; 137:5,17meeting (12) 32:16,17;41:20; 53:15;54:4,5,7;63:3, 5;116:4;132:14,19meetings (19) 30:24;31:5,14,24; 32:8,10;33:3,7,9,12; 40:15,22;41:9,10,16; 82:3,7;132:12,14megawatts (2) 66:13,15member (3) 12:12;74:17;81:16Memorandum (1) 48:9mention (1) 62:9mentioned (12) 28:3;29:16;45:4; 59:11;62:11;63:4,22; 83:14;100:3;101:13, 14;113:15mercury (12) 21:19,21;22:12; 23:2,6;28:15;90:22; 91:2;92:15,17,18,21merit (1) 74:4Merrimack (3) 108:22;112:21,23met (1) 124:17metabolism (1) 98:22metals (3) 19:5;20:17,18metamorphs (1) 135:8methane (12) 86:8,13,18,22;87:4, 19;88:11,21,23;89:8, 19;90:21methyl (2) 90:22;92:21metric (3) 84:6;90:1,9MEYER (7) 11:21,22;12:1,4,9, 11;30:10microphone (2) 4:20;12:8Middletown (1) 45:12might (13) 17:23;23:13;24:6; 26:16;34:7;36:6,23; 41:16;54:17;95:21,

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(11) limitations - might

Page 153: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

24;97:22;138:11mile (2) 112:12;120:19million (3) 35:10;89:24;90:9mind (4) 6:17;29:21;82:10, 17mine (1) 127:10minimization (1) 118:1minimize (6) 37:20;38:4;69:16; 79:8;131:17,23minimizes (1) 37:13minimizing (2) 38:1;115:2minus (3) 121:18;138:2,7minute (1) 23:5minutes (1) 10:11Miss (2) 113:8;139:21mistake (1) 19:10misunderstood (2) 55:20;59:1mitigate (2) 37:20;118:12mitigated (1) 57:7mitigation (23) 35:19,23;36:2,9, 18;37:2,5,6;38:9,10; 52:10,15;114:19; 116:9,22;117:18,22, 23;118:9,13,14,19; 131:12mix (1) 98:1mixed (1) 42:1mixing (1) 88:19mixtures (1) 42:15modeling (2) 83:18;84:23models (1) 84:24modifications (3) 115:14;125:21; 131:23monetary (2) 38:20;52:15money (5) 27:1;28:6;29:7; 65:11;91:23monitor (17)

9:22;72:12;114:17; 115:5,15,22;116:11, 16,19,24;118:11; 119:7,9;128:12,17, 22,24monitoring (11) 9:1;24:23;28:10; 46:23;77:11,17; 113:13,20;114:4,16, 21monitors (6) 76:8,12,18;116:3; 119:12,13monopoles (1) 104:13months (1) 29:21more (42) 13:1,7,15;14:5,22; 17:5;26:11;30:21; 31:22;32:9;38:10; 39:5;41:14;52:21; 55:19;62:7,10,13,19; 63:7,11;64:16;66:4, 22,23,24;67:20;71:7; 76:13;80:14;86:6,23; 87:10;88:17;91:5,10; 108:7;117:24;118:7; 128:1;132:6;137:8morning (1) 112:3most (10) 34:9;70:3;84:9; 86:7;114:24;123:4; 125:2;127:1;128:4; 135:3mostly (2) 62:14;96:24motor (1) 131:3Mountain (5) 5:12;9:18;10:22; 11:3;74:9Mountains (3) 127:7,8,20mouth (1) 4:21move (20) 4:20;16:20;17:24; 29:1;34:21;38:14; 42:10;43:23;45:19; 49:24;64:4;70:11,24; 72:8,22;75:16;81:3; 85:10;94:3,14movement (1) 20:23moving (7) 17:13;44:19;59:19; 66:22;75:19;82:24; 116:1MSDS (1) 6:13much (16)

9:6;21:20;47:13; 48:19;60:17;65:11, 12;80:14,21;88:17; 96:17;99:19;103:22; 106:3;129:24;135:18Municipalities (5) 23:20;48:7;105:4, 9;107:18must (3) 50:20;55:9;139:12

N

name (4) 44:13;98:20;111:9, 22name's (1) 96:23narrow (1) 69:19National (6) 5:12;9:18;10:23; 11:3;74:9;83:10natural (9) 15:5,14;17:6;18:6; 50:12;80:23;126:18; 132:4;136:19nature (5) 15:11;59:12;62:21; 101:6;105:24near (7) 10:15;24:23;26:1; 121:14,15;138:6,21nearby (1) 23:14necessarily (5) 20:1;32:7;40:2; 132:18;133:9necessary (6) 21:13;35:2;48:15; 100:21;115:17;116:2need (20) 10:22;12:7;16:16; 29:24;34:19;35:3; 48:19;49:11;51:23; 60:12,17;62:13,24; 69:17;79:21;91:5; 95:16;115:14,18; 116:7needed (8) 41:15;76:14; 116:19;117:3,4,11; 118:18;138:20needs (13) 13:16;22:10,10; 35:7;37:4;62:16,19; 65:3;67:8,10;91:15; 103:2;139:21negative (1) 44:14negatively (1) 43:20negotiated (1)

35:17neither (1) 130:20NEPA (2) 71:12;93:3Network (2) 3:15;102:12New (55) 25:21;35:20;36:14, 19,20,24;58:4,14; 60:7;61:7,18;62:6; 63:20;68:24;69:2,21; 70:15;71:24;72:15, 18;73:5,16;75:24; 76:3;78:9;81:14,17; 84:6,20;85:21;86:5; 87:2;89:2,12;90:5,6; 94:24;98:10;113:13; 116:17;117:10,13,21; 120:13,22;127:3,4,5; 128:5;129:18,19; 131:18,19;132:4; 137:3next (14) 5:11;43:23;44:5; 52:17;57:5;59:15; 61:7;65:8;71:1; 72:23;73:14;78:2; 87:6;130:10nice (1) 14:21night (1) 112:4nitrate (7) 25:23;98:2,7,9; 99:9,14;100:13nitrates (10) 25:17;28:16;97:19, 23;98:3,6,10,16;99:3, 4nitrous (1) 86:22no-action (2) 95:7,9nobody (1) 21:10noise (1) 131:3Non-abutters (1) 139:19none (1) 115:24nor (1) 103:17normal (1) 109:19Normally (2) 8:1;33:4Normandeau (12) 44:21;45:13;51:8; 81:24;82:2,6;108:8, 11;109:23,24;110:3; 114:3

north (5) 65:18;70:4;127:7, 8,20Northern (24) 5:11;8:17;9:11; 10:5;26:5;32:14; 38:12;67:13,13;69:7, 8;70:14;71:4;72:2,3; 74:7;76:17;83:7; 84:5;88:12,18; 107:15;109:17;129:7Northfield (4) 111:9,11,17;120:4Northumberland (2) 104:12,15Norwalk (1) 45:12Note (4) 68:15;105:2; 111:20;112:19noted (4) 4:7;8:15;55:19; 59:20notified (1) 139:9NPT's (1) 79:8number (13) 12:23;14:21;35:16; 54:12,15,20;65:4; 71:14;72:18;76:11; 78:11;94:8;98:12numbers (7) 12:21;70:8;81:8; 84:8;85:6;89:9;90:12

O

Oak (3) 111:22,24;112:1Objection (8) 49:17;70:21;74:21; 75:15;93:13,16,18,22obligate (2) 137:8,10obligation (1) 131:16observations (1) 129:9observe (1) 128:15observed (2) 128:19;129:2obtaining (2) 48:18;103:10obviously (5) 4:17;34:18;48:24; 70:4;92:23occur (2) 69:17;133:2occurred (2) 78:19;118:16occurring (3)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(12) mile - occurring

Page 154: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

14:1;21:9;40:24occurs (2) 76:15;90:3October (1) 53:14odd (1) 111:16off (16) 3:18,19;8:4;12:22; 27:18;50:20;62:18; 65:11;80:1;87:20; 89:3;99:12,18;111:2, 3,24official (1) 105:7officials (1) 82:22oftentimes (1) 134:2oil (1) 100:17oily (1) 136:9old (1) 69:1Oldenburg (1) 16:3once (7) 24:15;41:5;104:19; 115:4;129:18;131:2; 133:10one (34) 14:20;18:19;22:2; 28:14;38:18;43:7; 44:5;52:7;54:21; 56:8,20;61:5;66:13, 15;71:5;76:13;86:11; 97:21;107:6;108:24; 109:3;111:15; 116:17;119:11; 122:4;124:6;127:11; 131:18;135:22; 136:11;137:8,11; 140:3,3ones (3) 91:9;124:12;135:3OneTouch (1) 125:7ongoing (1) 48:4online (1) 36:3only (10) 37:7;39:5,22;51:1; 64:14;78:19;82:8; 106:16;112:12; 138:22onto (3) 10:9,13;112:1open (9) 4:2,11;5:2,3;7:13; 9:14;19:4;20:2;61:1operate (1)

119:22operation (3) 11:9;66:16;83:7opinion (2) 44:10;110:18opportunities (1) 132:6opportunity (1) 79:7opposed (1) 89:20opposition (1) 55:13optimal (1) 14:19option (1) 35:24options (1) 35:23orange (1) 9:12order (6) 22:9;106:2;112:5; 119:6;134:14;137:19ordinances (1) 105:4organizations (1) 87:15original (1) 84:11others (4) 14:6;41:16;63:20; 96:7out (36) 7:23;8:3;9:17; 10:9;18:1;19:6,24; 20:24;29:8;45:7; 51:6;58:19;62:19; 63:14;64:1;71:19,20; 72:21;75:9;79:11,21; 80:23;104:20;107:9, 12,14;118:3;119:14, 17;123:24;130:7; 132:23;133:12; 135:11,14,14outdated (1) 89:17outer (2) 16:9;80:3outlined (2) 29:6;85:19outlines (1) 48:11output (1) 64:18outreach (2) 48:4,4outside (6) 39:23;50:4;51:17; 78:21;79:5;80:18over (19) 7:5,15;39:6,12; 43:23;49:15;51:7;

52:23;53:24;55:1; 58:7,23;64:22;77:22; 80:13;106:22; 121:21,23;129:18overall (1) 70:9overdose (1) 42:9overdosing (1) 42:9overfilled (1) 119:4overhead (7) 50:15;62:15;78:23; 79:12;97:4,4;104:5overlap (1) 76:5overnight (3) 4:3,12;5:4oversight (4) 44:22;105:8; 107:19,22own (10) 12:19;24:2,2,17; 71:11,12,13;82:10; 91:15;119:13Owners (3) 12:13;126:11,16oxide (1) 86:22oxygen (1) 98:23oxygenation (1) 88:20

P

package (1) 38:9pad (7) 34:16;52:23;58:7, 16;121:8,15;138:3pads (2) 113:5;126:21page (7) 20:9,12;53:21; 54:3;59:3;83:3;87:6paint (1) 56:23Palmer (2) 11:14,17Panel (38) 12:5,10;25:11; 28:2;42:18;45:10; 46:6,13,14,17;64:24; 67:23;74:17;75:9; 79:17;87:16;94:16; 95:2,14;97:8,10,17; 99:7;100:5;101:14; 103:18;111:12; 113:3,9,12,15,20; 114:7;120:5;125:4; 129:8;132:9;133:18

parallel (1) 59:23parameters (2) 24:12;97:21parcels (1) 37:7Paris (3) 68:14;72:19;75:10parked (2) 136:8,24parking (2) 135:23;136:4parsing (1) 90:12part (30) 6:11;11:9;13:20; 30:6;34:9;41:1;48:3; 66:10,18;67:15,16; 69:13;70:14,15;73:9; 78:15;84:3;87:20; 93:4;97:3,24;101:5, 14;111:18,19; 112:22;116:3,10; 126:14;137:12partially (1) 15:1participating (1) 32:7particular (13) 11:9;15:6;23:2; 48:20;56:10;61:3; 81:12;90:17;95:19, 20;117:5;124:3,8particularly (6) 42:12;57:10,11,12; 62:20;109:4parties (3) 44:12;68:15;71:5Pass (22) 5:11;8:18;9:11; 10:5;26:5;32:14; 38:12;67:13,13;69:7, 8;70:14;71:4,15; 72:2;74:8;76:17; 83:7;84:5;107:15; 109:17;129:7Passes (1) 72:3past (4) 81:22;82:21; 108:24;132:22Pastoriza (10) 3:4,5,9,11,21,22; 4:24;5:18,23;11:11path (4) 34:15;80:2;94:24; 115:24patterns (2) 61:10;64:8Pause (1) 53:8paved (2) 58:23;111:24

pavement (8) 15:22;16:1,11,21; 17:9,14,24;50:4pay (5) 35:7;38:23;39:11; 91:14;117:16payment (1) 36:10pays (1) 26:22peer-reviewed (2) 92:4,6pelt (1) 128:7Pemi (1) 139:19penalties (1) 29:13people (14) 6:9;27:6;29:9; 32:17;33:7;53:18; 54:4;76:19;91:7,19, 22;92:2;95:14;114:2people's (5) 15:12;28:6;81:1; 99:15;138:6per (4) 58:4;86:12;119:11; 134:8percent (4) 64:12;70:8;86:13, 19percentage (1) 70:1perception (1) 110:20perform (1) 44:12performed (1) 50:6Perhaps (4) 17:2;35:7;45:9; 66:3period (2) 81:18;135:20permanent (3) 52:11;57:7;68:23permanently (2) 38:18;135:15permeable (4) 55:19,24;63:6,11permission (1) 48:23permissions (1) 11:2permit (11) 10:22;27:23;35:3, 5;52:1;76:22;77:10; 107:12;117:9; 122:12;131:18permitted (3) 59:22;105:9; 137:24

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(13) occurs - permitted

Page 155: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

permitting (3) 71:13;110:8; 118:16persists (1) 64:17person (3) 28:14;31:7;41:19personal (1) 27:13personally (4) 24:17;41:13;45:8, 16Pessamit (3) 90:24;92:11;93:9pesticides (2) 75:21,24petroleum (4) 23:12,16,17;27:4PhDs (1) 94:17Photo (10) 3:23;4:16;5:9; 6:22;7:20;9:6,10; 10:5,21;121:7photograph (1) 3:24photographs (1) 115:20photos (2) 127:15;138:9physical (1) 25:5physically (2) 90:23;92:12pick (2) 11:16;12:19pickup (1) 9:14picture (1) 127:11piece (2) 40:5;66:16pinpoint (1) 47:15pipe (1) 57:9pipes (1) 23:21pit (1) 130:3Pittsburg (1) 127:6place (19) 9:2;20:20;25:2; 29:15;32:16;46:23; 48:2;51:1;52:23; 60:13;89:1;100:12, 14;108:14;115:1,3,7; 117:12;138:13placed (1) 59:15placement (1) 50:7

places (2) 50:21;124:2placing (1) 69:21plan (19) 18:21;26:14;37:3, 5;47:2;48:16;49:10; 106:21;107:6; 112:21;115:1; 124:11;125:23; 126:1,3,15,19,22; 131:11planned (2) 113:4;115:11planning (10) 30:23;32:5,8,19; 60:4;66:1;101:5,14; 105:15;107:5plans (11) 11:20,22;15:22; 18:20;46:23;64:10; 66:6;76:2;115:9; 117:7;131:14plant (1) 18:11plants (2) 50:17;90:16pleaded (1) 42:18please (12) 3:14;53:24;55:1; 57:23;68:10;72:11; 78:11;81:6;85:23,24; 95:3;96:5pledging (1) 72:19plugs (1) 57:8plus (4) 54:21;121:18; 138:2,7Plymouth (1) 12:13pm (4) 3:2;61:23,24;140:7point (9) 30:5;34:22;35:6; 40:7;65:18;70:12; 104:10;107:14; 112:16pointing (1) 58:19poisoning (1) 27:5police (1) 76:9policies (2) 71:11;83:12policy (1) 68:17polluted (1) 90:22polymer (2)

43:16;44:1polymers (5) 41:24;42:14;44:8; 45:7;49:14ponds (1) 48:17pool (15) 133:19,24;134:15, 20,22,24;135:18; 136:1,6,14,22,22; 137:2,3,20pooled (1) 133:20pooling (1) 77:14pools (5) 134:11,17;135:17; 136:12;137:11poor (2) 55:8;136:15poorly-staked (1) 7:2population (2) 92:11;93:10populations (1) 90:23porous (1) 20:4portion (6) 12:15;15:21;18:4; 40:5;50:15;138:14portions (1) 62:17position (3) 75:7;81:16;111:1positive (1) 68:18possibility (2) 34:8;35:1possible (15) 17:3;22:21;24:6; 29:15;30:19;40:20; 42:3,13;44:14;56:5, 9;57:6;65:15,22; 129:5possibly (2) 44:2;121:10post-Northern (1) 71:15potent (2) 86:8,23potential (8) 13:24;17:12,15,16, 21;18:5;59:8;110:6potentially (3) 20:17;21:9;33:18power (1) 90:16practicable (2) 50:4;78:18practice (3) 8:22;61:2;131:10Practices (17)

5:2,7;6:10,16,19; 7:6,13;8:14;9:19,24; 10:12;11:5;25:20; 28:8;60:14;105:3; 107:23pre- (1) 105:20pre-blast (4) 28:9;105:15; 106:23;107:1pre-blasting (1) 24:21precious (1) 127:22precipitation (1) 77:14predicted (1) 119:18preferable (2) 29:4;133:8preference (1) 133:11Prefiled (3) 58:3;82:24;83:14preliminary (2) 41:4,6premise (2) 84:2,16prepared (2) 46:24;101:19prescribed (1) 36:14presence (2) 119:9,24present (4) 53:19;62:1;81:23; 117:1presented (4) 55:3;85:7;96:16; 105:13presenting (4) 54:6,6,8;56:22presently (1) 25:10preservation (5) 35:24;37:7;94:22, 22,23President (5) 72:20;73:23;81:23; 82:1,5presumably (2) 4:15;100:8presume (2) 7:18;98:22pretty (4) 26:6;46:6;129:24; 135:2prevention/containment (1) 47:1previous (2) 120:3;124:21previously (5) 35:2;86:7,14;87:1;

101:23price (1) 26:22primarily (1) 69:15primary (1) 137:17prior (4) 44:15;83:22; 107:11;116:5pristine (6) 33:20;38:24;39:4; 40:3,11,13private (1) 48:24private-sector (1) 109:1prize (1) 74:4proactive (1) 77:11probably (10) 5:8;14:11;30:20; 41:15;52:3;66:21; 69:10;70:11;107:17; 134:23problem (4) 15:12;43:8,9;77:2procedure (1) 46:8proceed (4) 3:7,21;12:2;62:4proceeding (1) 87:24proceedings (1) 53:8proceedings] (1) 62:2process (10) 25:18;32:8;33:20; 48:2;71:12;93:2,3,4; 115:4;118:16processes (1) 71:13produce (1) 64:12produced (2) 87:20;90:13producing (1) 86:6product (5) 21:1,22;22:16,23; 53:2production (1) 67:6productive (2) 134:18,23products (3) 23:12;42:20;44:14professional (1) 44:10professionals (1) 94:17

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(14) permitting - professionals

Page 156: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

progress (1) 92:16Project (87) 9:2;13:13,16;14:7, 23;15:4;17:24;18:15; 23:4;24:1;25:1;26:5; 28:17,19,21;29:17; 30:3,23;31:6,12;32:6, 9;34:12,14,21;37:24; 38:2,15,21;41:4; 44:15;45:12;50:11; 64:18;65:19;66:6,7; 69:7,8,14,18;70:11; 71:23,24;74:8,15; 76:22;78:18;82:11; 83:8,21;84:9;90:10; 94:11,12;95:1,18,19, 21,23;96:3,8,13,14, 16;97:3,4;100:2,6; 103:12;104:2;105:9; 107:15;109:18; 118:12,17,19;119:20; 124:8;125:22; 128:18,18,23;129:1, 10;137:23;138:8projects (11) 48:1;63:19;67:12, 15;108:21,23;109:5; 114:4;116:17,24; 132:22Project's (1) 83:9prone (1) 63:7proper (4) 11:1;42:5;115:7; 138:2properly (4) 8:2;45:22;98:3; 99:16properties (2) 25:8;42:19Property (16) 12:12;28:22;29:7; 111:11;112:5,11,12, 22;121:14;126:2,11, 16;128:10,16;133:2; 137:24proposal (1) 120:11proposed (5) 36:22;107:23; 129:17,22;138:13proposing (1) 62:23protect (2) 73:13;105:5protected (6) 127:22,23;128:2, 14,15;129:14protection (6) 25:24;78:9;111:18, 20;112:20;114:23

protocol (2) 25:2;46:22protocols (2) 22:7;60:13proves (1) 22:5provide (7) 14:14;15:4,13; 47:17;67:7;83:6; 132:24provided (5) 16:14;37:2;50:10; 66:10;88:9Province (3) 65:11;67:8,19provinces (1) 67:9proximity (4) 12:18,20;13:2; 60:10prudent (3) 14:3;44:17;45:5public (4) 82:9;108:20; 126:14;140:1puddle (1) 137:21pulling (1) 10:2pump (1) 100:22pumping (1) 101:3purpose (3) 83:1,4,5purposes (2) 5:16,20purview (1) 75:5put (26) 3:11;7:24;36:3; 37:13;42:21;44:4; 51:1,6;52:23;54:2; 57:23;66:24;68:10; 72:11;78:3,11;79:21; 80:12;81:6;85:23; 89:21;94:10;100:17; 115:7,9;138:21putting (2) 6:8;35:13

Q

qualified (1) 134:15qualify (2) 40:11;137:21quality (13) 14:2;15:12;29:6; 59:8;83:9,11,11; 98:10;99:6;107:16; 120:9;124:15;134:13quantify (1)

117:13quantities (2) 22:13;100:8quantity (1) 21:19Quebec (7) 65:2,3,11;66:21; 67:5,10;69:2quick (1) 127:16quicker (1) 45:19quickly (3) 49:5;89:3;135:2quite (7) 26:6;75:7;99:1; 108:18;109:9;132:2; 136:21

R

rain (3) 112:4;119:15,17rainfall (2) 61:10;64:7raise (1) 23:9raised (1) 77:20raising (2) 48:9;110:19ramming (1) 74:8ramping (1) 61:18ramps (1) 80:1range (1) 102:22rare (4) 18:10;50:17; 115:21;131:20rate (9) 86:12;109:15,15, 16,17,20,20,21;110:1rates (1) 103:6rather (6) 13:1,14;14:5,22; 16:9;39:7ratio (1) 36:7reach (2) 120:20;132:23reached (1) 35:16reaching (1) 84:17reach-out (1) 39:9read (2) 74:14;98:24reading (1)

73:19ready (6) 3:4,5;7:3,18;43:10; 111:5real (4) 29:7;67:24;121:19; 138:2realize (1) 14:17really (12) 13:9;16:4;26:19; 29:10;55:11;70:16; 98:15;112:17; 133:17;134:17; 136:6;138:7reason (2) 30:6;38:3reasonable (2) 52:8;84:18reasons (1) 38:7recall (4) 19:13;98:12; 109:19,22recent (2) 84:9;125:3recently (4) 32:10;54:2;124:19; 127:11Recess (1) 61:23recognize (1) 91:7recommendation (2) 38:13;41:22recommendations (2) 25:3;37:24recommended (1) 110:10recommending (1) 91:10record (8) 3:18,19;89:5; 99:12;103:13;111:2, 3;126:14recycling (1) 8:2red (2) 120:12,14redirecting (1) 56:7reduce (1) 79:9reduces (1) 67:18reducing (2) 68:19;92:17reduction (5) 69:24,24;90:7,9; 96:10reductions (3) 83:19;88:6;89:12redundant (1)

52:19re-evaluate (1) 131:10reference (1) 26:4referred (2) 95:5;124:19referring (1) 36:1refilled (1) 9:16reflect (1) 16:8reflects (1) 79:8regard (10) 14:13,20;18:20; 20:15;21:15;23:10; 35:11;75:12;81:22; 94:5regarding (1) 19:14Region (1) 127:12regional (1) 83:10regular (1) 30:24regularly (1) 64:22regulated (1) 102:4regulations (3) 24:9;76:23;137:4regulatory (1) 105:8related (3) 69:13;71:17;89:13relates (1) 93:1relating (1) 68:19relation (1) 81:22relationship (3) 108:13,14;110:15relatively (3) 67:18;69:19;70:6release (3) 23:12;102:4,12released (2) 25:18;63:8releasing (1) 23:16Relevance (1) 74:22relevant (2) 74:24;75:14relocate (2) 116:2;117:12relocated (2) 129:22;138:4remainder (1)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(15) progress - remainder

Page 157: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

62:1remaining (2) 77:15;86:21remains (1) 89:14remediate (1) 138:10remediation (1) 77:12remember (3) 27:5;57:1;124:12remote (2) 113:2;131:2remove (1) 119:4removed (1) 25:14René (1) 93:8Rennie (1) 78:6repair (1) 23:21replace (3) 21:7,10;23:21replacement (2) 36:7,13report (7) 8:20;46:21;53:14; 85:22;86:3;128:13; 129:2reported (3) 46:19;47:4;127:4Reporter (4) 43:3;72:6;89:23; 106:12reporting (2) 46:22;47:3reports (3) 85:8;127:5,19represent (4) 3:23;5:9;51:8; 96:24representations (1) 4:4representing (1) 41:21reproductive (2) 6:1;137:12Republican (3) 72:17;73:6;74:3request (1) 51:24requested (2) 117:7,10require (6) 47:13,15;79:3; 80:1;100:9;104:16required (10) 21:12;22:8;26:9; 36:24;38:11;48:23; 52:10,16;107:6; 119:15

requirement (4) 22:8;107:12; 117:19;134:16requirements (4) 35:19;47:3;48:21; 77:4requires (2) 35:21;117:15rerouting (1) 34:15research (1) 87:2researcher (1) 86:16Researchers (1) 87:8reservoir (4) 71:21;85:20;87:13; 88:15reservoirs (12) 69:2,4;70:16; 71:15;86:5,21;87:12, 20;88:21,24;90:21; 91:3residents (2) 16:2;47:8resource (5) 18:6;36:2,9;37:1; 126:18resources (8) 10:20;14:11;33:11; 40:10;50:12;51:12; 80:19,23response (2) 78:8;88:10response] (1) 64:3responsibility (1) 27:14responsible (4) 103:10;115:6,12, 16rest (2) 70:17;95:14restore (1) 119:5restricted (1) 64:9restrictions (1) 79:3result (7) 28:17;52:6;66:2; 97:19;101:20; 117:18,19resulted (3) 25:22;114:19; 116:21resulting (3) 51:20;102:4,12results (2) 87:10,13resume (2) 81:4;139:16

resumed (2) 3:2;61:24retired (1) 96:24retort (1) 75:1return (1) 11:14returned (1) 33:19reusing (1) 23:10reverse (1) 118:8review (4) 44:21;93:3;117:20; 122:13revise (1) 51:24rhetorical (1) 26:19Rhode (1) 73:9rid (1) 8:7right (48) 3:3,17,20;4:21; 11:13,17;12:2;14:17; 16:1,2,17;17:10; 32:3;46:8;50:22; 53:7;54:20;55:16; 56:2;61:20;65:22; 67:20;72:8;97:5; 101:10;105:1;111:4, 14,19;112:3;114:12; 116:21;118:22; 121:15,16,21;123:1, 9,17,18,19;126:23; 129:4;130:19;137:2, 22;138:23;139:13right-of-way (24) 16:10;18:5,12; 26:13;38:2;39:24; 40:10;50:13;51:19; 69:19;76:5;79:22; 80:4,19,24;104:21; 112:7,8;114:4; 115:22;116:1; 121:22;135:4;138:14rights-of-way (2) 69:15,21rise (1) 28:12rising (3) 61:9;64:6,7risk (7) 21:8;25:24;27:3,3, 9;28:20;106:16risks (3) 27:1;29:4,5River (4) 108:22;112:21,23; 139:19

Riverine (1) 120:9rivers (9) 48:17;64:13,16; 65:2,8,18;66:23; 67:1;71:7road (34) 4:3,12;5:13;11:7; 14:9;16:1,4;18:5; 23:13;49:15;50:13, 21,23;51:16,18;52:8; 56:20;62:18,18; 78:22;80:2;111:22, 23,23,24;112:1,2,6, 14,17;120:7,18; 130:14,22roadbed (5) 17:4;51:18;78:20; 79:6;80:22roads (5) 13:11;77:23;80:7, 8;130:12roadside (1) 23:11roadsides (1) 23:20roadway (1) 130:22roadways (1) 59:5rock (6) 100:9;101:7; 102:18,21;119:3; 138:22rocks (2) 60:19;139:10role (5) 68:21;76:21;82:11; 110:7,12Romaine (1) 66:7room (2) 31:20;75:3Route (38) 4:1;12:15,18;13:2, 7,8;14:4,16,19;15:6, 7,18,21;26:10,24; 30:17,18;34:6;35:12; 39:1;46:5;49:14; 50:10,16;53:3;62:11, 15;75:22;76:9;79:15, 16;104:6;117:4,8; 118:2;119:21; 120:15;125:22ROWs (1) 78:24rules (6) 36:14,17;38:11; 77:10;80:8,9run (3) 57:13;81:1;97:5running (1) 54:7

rusty-colored (1) 136:10rut (1) 134:22rutted (1) 112:5

S

safe (1) 21:23Safety (3) 6:4,8;38:6sagging (1) 7:2salamanders (2) 137:13,14salmon (1) 90:23Same (19) 9:11;20:9,12;43:8; 49:12;57:3;66:21; 71:18;78:15;79:13; 80:8,9,11;81:18; 83:3;90:11;120:6; 124:14;136:24sample (2) 22:23;23:3sand (2) 120:17;130:3sandy (2) 120:7,10satisfy (2) 91:15;119:6savings (1) 84:18saw (2) 66:20;133:15saying (13) 5:18,19;10:4; 20:16;32:21;33:12, 13,13;55:14,14; 56:19;65:14;92:14scenario (4) 56:10,21,23;61:3scenery (1) 93:12schedule (3) 21:13;66:17;133:1scheduled (2) 21:3;140:1science (1) 82:20scientists (4) 91:9,13;92:4,7scope (1) 30:23scraped (1) 10:9screen (1) 46:2se (1) 134:8

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(16) remaining - se

Page 158: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

season (4) 127:24;128:4,6; 137:7SEC (5) 75:4;82:7,14;83:6; 85:7second (6) 3:18;43:7;56:5; 70:2;112:19;140:1secondary (3) 80:7;137:15,18sector (1) 109:3sediment (1) 136:16sedimentation (1) 115:8seeing (2) 10:1;85:15seek (1) 35:3seem (4) 15:13;17:20;52:3; 123:15seems (5) 44:17;52:4;55:12; 56:2;94:8sees (1) 74:4select (1) 26:13selected (1) 110:11sense (5) 28:24;29:1,14; 30:1;124:8sensible (1) 60:2sensitive (1) 49:7sent (2) 78:7;127:11September (2) 53:15;134:3seriously (1) 33:6served (2) 81:13,16service (2) 21:4;108:20services (2) 32:22;81:15SESSION (2) 3:1;140:1set (4) 35:10;125:23; 126:1,3settling (1) 77:13several (6) 10:11;103:24; 108:22;114:2; 116:23;119:11

shallow (3) 134:6,22;135:5shared (1) 112:7sheen (1) 136:18Sheet (4) 6:9,13;47:19;110:2Sheets (1) 6:4shifting (1) 79:10shoulder (4) 16:1,4;17:5;78:20shovel (1) 7:23shoveling (1) 8:5show (8) 21:20;33:9;53:21; 101:18;111:12; 120:2;124:11;125:14shown (5) 111:10;112:20; 115:9,9;121:23shows (2) 4:1;120:6shrimp (1) 137:14shrub (1) 136:5side (16) 4:3,12,16;5:13; 6:24;11:6;27:13; 39:6,12;41:17;50:22; 52:7;56:20;80:13; 82:16;110:8sides (1) 49:15signal (1) 3:15signed (1) 73:7significant (5) 77:2;83:18,19; 100:1;103:20sign-off (1) 115:13silt (3) 5:5;7:2,8similar (3) 48:2;55:6;127:14Simon (1) 93:8simpler (1) 75:19simply (4) 92:14;128:3,19; 129:1sit (1) 48:7site (20) 5:12;6:2,9,14,15;

8:4;9:11;49:4;66:19; 81:17;102:24;103:1; 106:9,15,18;116:19; 119:10,24;130:13; 133:11sites (5) 24:24;50:18;66:2; 77:12;79:23siting (3) 14:7;15:3;93:4sitting (1) 82:15situation (1) 29:2situations (1) 39:10size (6) 38:15;100:6;101:2; 103:11;134:16,20skip (1) 45:18slight (1) 17:20slimy (1) 136:9slope (1) 119:3slopes (1) 57:12Slow (1) 43:4slurry (23) 4:2,7,11;5:2,10; 6:6,15,24;7:2,3,14, 22;8:2,5,8,19;9:16; 10:7,8,8,13,24;11:5small (8) 26:6;28:20;70:1,6, 9;112:13;134:18,19smoothly (1) 140:3smother (1) 38:17snakes (1) 115:21so-called (2) 120:12;136:4social (4) 87:22;88:4;89:14, 20Society (1) 78:8soil (4) 19:19;20:7;27:5; 120:10soils (2) 23:11;55:8solid (5) 55:14;57:1;63:8, 12;120:12solids (1) 7:23solution (2)

33:21;64:15solutions (1) 48:12somebody (2) 45:9;125:11somebody's (2) 47:23;97:16somehow (1) 98:21someone (8) 7:4;100:3;113:15; 116:15;133:5,15,18, 18sometime (1) 125:10sometimes (7) 30:20;31:6,11,23; 136:15,16,18somewhere (2) 39:21;117:1sonar (1) 87:3soon (1) 134:24sorry (11) 15:17;19:10;23:8; 33:16;40:2;43:5; 47:18;72:10;83:11; 99:11;139:17sort (4) 24:21;35:8;60:18; 83:23sound (3) 26:18;52:8;60:2Sounds (2) 61:17;139:5source (3) 22:19;48:17;63:16sources (1) 67:7southern (1) 88:13speak (3) 76:3;96:5;133:4speaking (2) 88:11;93:2species (9) 42:3;128:2;129:14; 130:4,15;131:21; 134:10;137:9,10specific (6) 14:20;36:17;47:14, 17;125:24;127:15specifically (7) 45:1,2;46:11; 48:10;104:14;107:9; 124:10specified (1) 49:9specifies (1) 44:19speculate (2) 18:16;72:7

speculating (1) 72:5speculation (1) 93:20Spencer (1) 96:24spent (1) 10:11spill (1) 47:1spilled (3) 5:11;6:6;7:3spills (3) 46:18,19;49:6spoils (1) 49:6spoke (1) 122:20spoken (1) 74:16spot (2) 60:21;133:21spot-checked (1) 124:1spotted (1) 137:13spring (4) 134:2;135:2,9; 137:7stand (2) 74:2;92:5standard (1) 98:10standards (4) 22:7;63:17;79:19; 108:2standing (5) 6:24;7:12;134:1; 135:19;137:1standpoint (3) 13:3,4;120:1Stark (5) 97:2,3;101:22; 104:11,15start (4) 20:24;44:15;95:4; 111:5started (2) 69:10;71:23startling (1) 87:12starts (4) 48:5;63:14;115:5; 131:3state (20) 15:9;48:24;59:21; 63:20;67:3;70:2,3; 71:24;76:14;83:10; 85:17;86:15;87:8; 90:18;107:19,21; 119:15;124:7; 127:24;130:1stated (4)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(17) season - stated

Page 159: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

14:7;102:19;126:7; 138:18statement (5) 22:15;58:9;70:13; 91:1;102:8States (10) 54:4;67:10;70:19; 72:19;73:9,12;74:1; 88:18;128:5,6stating (1) 9:7stations (1) 26:7staunch (2) 74:7,12stenographers (1) 43:9step (2) 65:5;110:14stepped (3) 110:8,16,20Stick (2) 82:19,19Sticking (1) 126:23still (10) 14:12;18:13;64:17; 90:13;122:18; 126:10;128:1; 135:16;139:17,21stir (1) 23:11stiring (1) 23:15stirring (2) 27:3,4stocks (1) 68:22stop (10) 23:4;61:12;77:1; 113:19,19;116:13; 117:11;123:7,7; 133:9stopped (1) 77:7stops (1) 128:13storm (1) 119:18straddling (1) 6:23strategy (3) 67:4,5,16straw (2) 4:8,14stream (8) 7:4,15;8:19;10:16, 18;59:24;60:1;134:7streams (8) 18:9;48:16;49:7; 50:17;59:15;60:10; 62:20;81:2stretch (1)

118:24strongly (1) 91:17structural (1) 25:7structure (5) 14:2;25:5;34:16; 78:23;79:10structures (2) 39:20;126:21studied (5) 15:8;21:2;56:9,11; 59:17studies (8) 87:11;90:17,17; 91:4,4,5,10,11study (8) 37:13;50:6;84:24; 85:17;86:5,17;88:11, 14studying (1) 59:13stuff (2) 8:3;55:11subject (3) 35:15;67:22;106:6submit (2) 51:22;122:12submitted (4) 66:18;69:11;78:8; 89:5subparagraphs (1) 102:6subsequent (1) 5:17substance (3) 97:24;102:5,13substances (1) 102:10substantial (2) 77:6;104:1substrate (1) 136:17suggest (1) 65:7suggesting (1) 95:7suggestion (2) 44:18;110:17suggests (3) 95:6;98:20;105:3summer (4) 3:24;107:8;134:3; 135:12Sununu (7) 72:15,17;73:19; 74:7,18,20;75:2Sununu's (1) 75:12super-surprised (1) 86:10supplement (1) 64:14

supply (5) 10:15,18;64:22; 88:20;99:17supplying (1) 64:20support (2) 68:17;74:14supporter (2) 74:7,12suppose (2) 17:19;45:23supposedly (1) 125:10Sure (30) 4:23;5:19;9:22; 14:24;24:7,14;33:1, 14,23;34:23;35:5; 36:21;45:24;46:6; 55:22;56:2;61:16; 66:23;76:21;77:3,9; 80:19;91:18;93:11; 104:3;115:6,23; 119:21;122:3,4surface (5) 58:12,18,20,23; 63:8surfaces (3) 58:5,14;85:20surprised (1) 86:12surrounding (1) 128:5survey (4) 105:15,20;121:19; 138:2surveyed (1) 50:15surveying (1) 124:18surveys (2) 28:9;106:23sustain (1) 75:14sustainable (1) 68:21SUV (1) 112:14SW (2) 6:23;9:12swamp (1) 53:4swamps (1) 51:10Synthesis (1) 85:21system (2) 71:18,21systems (1) 49:4

T

table (2)

82:16;101:8tadpoles (2) 134:10;135:8tailgate (4) 116:4;132:12,13, 19tailings (2) 10:8,13talk (5) 52:17;61:7;64:5; 67:20;93:9talked (1) 44:24talking (12) 27:17;28:1,11; 45:2;52:21;58:11,20; 90:10;101:12;107:2; 118:14;123:7talks (1) 91:23tank (1) 8:2tankful (1) 4:7tannins (1) 136:20tax (2) 111:10;120:4team (6) 16:12;32:14;38:12; 50:11;57:17;73:23technical (1) 3:14technique (1) 115:11technological (1) 38:5telling (2) 51:12,13temperatures (2) 61:9;64:6temporary (1) 52:11ten (1) 89:3tend (1) 89:1tends (1) 88:16ten-minute (1) 61:21Tennessee (2) 57:12;59:20tenths (2) 112:11;120:19term (2) 34:12,24terms (12) 13:5;14:1;15:9; 17:7;20:9;48:18,21; 60:10;70:8;82:17; 105:23;107:8terrain (3)

38:6;58:22;117:5test (11) 24:5,7,13,15,18; 25:15;46:2;138:5,8, 19,24tested (7) 22:2,5,10;23:1; 25:16;63:16;97:22testified (4) 25:11;87:23; 103:18;104:9testifying (2) 49:19;100:4testimony (10) 18:24;19:7;58:4; 83:1,2,4,5,14;85:8; 97:15testing (7) 22:18;24:4,10,21; 25:4,8;138:12tests (1) 21:22thankful (1) 139:12Thanks (2) 111:6;123:9there'd (2) 96:10,12there'll (2) 69:18;96:3thermal (7) 18:20;20:5;53:1; 55:4,5;63:5;64:1third (1) 44:12third-party (1) 44:22Thompson (1) 139:21thorough (2) 129:12;131:24though (6) 4:6;41:13;63:11; 98:8;105:12;122:18thought (6) 19:1,16;54:2; 86:14;93:20;136:10thousands (1) 103:24threat (1) 68:1threatened (3) 18:10;128:3; 131:21three (2) 24:18;108:8thresholds (1) 22:14Thursday (1) 139:24thus (1) 131:13times (4)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(18) statement - times

Page 160: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

33:9;34:19;55:21; 86:23timing (1) 107:10Tinnus (1) 40:17Tinus (146) 3:10,23;4:6,13,19, 23;5:6,16,22;6:5,11, 17,20;7:7,16;8:10,12, 15,22;9:5,20;10:1,17; 11:1,8;12:22;13:5,9, 16;14:6,24;15:7,15, 24;16:12,22;17:2; 19:3;20:10,14,16; 21:2,11;22:3,18;23:7, 18;24:9,15;25:16; 26:2;27:17;29:16; 40:17,18,18,23;41:2, 8,11,22;42:5,16; 44:11,17,24;45:4,8, 15,16,20,22;46:6,11, 22;47:5,14;48:1,18; 49:8;55:11,16;56:2, 10,18;57:16,20;58:3, 10,18;59:18;60:3,9, 12;61:4;62:9,13,22; 63:10;68:8;77:19; 96:13;97:11,13,21, 24;98:7,12,15,18,20, 24;99:4,16;100:3,8, 15,24;101:5;102:2,9, 19,24;103:6,8,16; 104:7,18,24;105:11, 22;106:7,13,19,24; 107:4;114:9,13; 118:21,23;126:6; 138:17,23;139:2,8,11tip (1) 7:15title (3) 33:2;85:19,21titled (1) 72:15titles (1) 33:14today (10) 40:14;52:20;53:5; 55:10;64:24;65:15; 93:7;97:6;133:16; 139:16together (3) 48:6,10;61:5told (4) 97:18;121:9; 122:18;124:24tons (3) 84:6;90:1,9took (3) 8:11;22:22,24tools (1) 87:2top (5)

12:22;51:7;52:23; 58:23;83:3topic (2) 23:9;61:18topsoil (2) 23:16;51:6total (3) 54:2;70:6;86:19totally (2) 65:19;91:21touted (1) 86:4towards (1) 16:9tower (1) 118:24town (7) 36:12;46:20;47:9, 9;111:11;112:15,18towns (3) 47:4,5;127:7toxic (2) 22:13;43:19toxicologist (1) 98:8toxin (2) 6:1,1track (1) 115:19tracking (1) 87:3tracks (1) 136:2trail (1) 22:5transition (1) 26:7transmission (14) 50:3,20,24;51:10; 56:13,16;57:11,14; 65:4;68:24;70:17; 78:24;79:10;83:8transmission-related (1) 108:23transportation (2) 69:23;78:21trapping (1) 128:6travel (1) 46:1tree (3) 122:1;135:3,5trees (5) 18:9;38:16;39:3; 40:5;129:20tremendous (1) 69:1trench (16) 19:4,15,20,23;20:6, 10;21:12;51:5,5,14; 52:22;57:7,8;60:23; 77:13;80:3trenched (1)

56:12trenches (5) 18:22;19:1,8,11; 59:23trenching (2) 52:18;77:12tries (1) 132:24triggered (2) 69:8;71:22trim (1) 135:23trim-cut (1) 122:2tropical (1) 88:15trouble (1) 56:4truck (2) 9:15;10:2trucking (1) 49:2true (9) 5:18,21;66:1; 79:15;94:20;105:22; 124:23;127:3;130:9Trump's (1) 72:21truth (1) 91:6try (6) 3:13;29:14;30:18; 32:4;125:18;131:23trying (6) 14:8;48:6;56:21, 23;71:14;84:12tub (9) 4:2,11;5:3;6:24; 7:24;8:5;10:7,8,13turbine (1) 119:1turn (2) 4:21;36:8turned (1) 94:7turns (2) 19:24;112:16turtle (1) 117:2turtles (1) 115:21TV (1) 3:12tweaking (1) 16:16two (5) 66:11;112:11; 120:19;121:13; 127:16type (4) 4:9;53:2;94:9,10types (3) 32:16;37:10;109:2

typical (4) 4:9,11,14;25:16typically (11) 31:21;103:9,17; 118:13;119:10; 133:13;134:1,7,9; 135:6,11

U

ubiquitous (1) 63:22Unable (1) 3:15unbalanced (1) 56:14uncovered (1) 4:1under (11) 15:22,24;35:19; 38:11;66:7;69:5; 75:5;89:13;105:24; 135:3;137:3underground (21) 12:14,18;14:14; 15:20;26:10;30:17; 45:11;50:8,10,24; 51:14;55:18;59:3,6, 14;62:11,17;74:10; 75:22;76:9;79:15undergrounding (2) 58:6,15undergrowth (2) 10:10,15underlying (1) 60:15Understood (1) 5:22undertaken (2) 67:14;107:8undertaking (1) 67:12unduly (1) 82:22unfortunate (1) 91:6unfortunately (1) 91:12uniform (2) 22:16,17United (3) 67:10;70:19;74:1units (2) 66:8,12University (4) 85:18;86:15;87:9; 90:19unless (2) 138:13,20Unlike (1) 79:6unlikely (2) 65:21,23

unposted (1) 6:3unreasonable (1) 18:14unregulated (1) 102:5unusual (1) 131:4unusually (1) 23:6up (51) 6:7,8,11,18;9:13, 15;11:16,20;23:11, 15,17,23;27:18; 29:20;33:9;38:3; 42:21;43:2,15;46:20; 49:5;50:22;51:11; 54:1;57:23;61:18; 62:7;65:6,8;68:10; 70:16;72:11;78:3,11; 81:6,7;84:3;91:14; 96:5;106:8;112:6,6; 118:2,18;131:13; 133:16,20;134:2,24; 135:1;136:3update (2) 84:10;126:3updated (2) 16:7;126:10upgrade (1) 23:22uphold (1) 72:19upland (3) 10:19,24;37:8upon (1) 137:11upper (2) 31:13;42:11urges (1) 37:12USA (1) 65:5USACE (3) 120:8;122:15; 123:16usage (1) 71:5use (14) 4:10;22:9;34:12; 49:20;70:15;75:24; 87:19;92:19;101:10; 106:3;107:18;117:8; 121:11;125:8used (20) 8:9;42:5,14;44:1,8, 20;57:8,10;63:19; 64:2;75:21;83:17; 89:7;99:19;102:10; 112:8;115:11; 116:16;117:22; 121:10useless (1)

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(19) timing - useless

Page 161: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

65:20uses (3) 43:2,15;63:21using (5) 7:16;25:19;87:2; 113:6;120:13usually (5) 33:6;86:4;91:4; 135:1;137:5utilities (2) 13:18;23:21

V

vacuum (1) 49:4valuable (1) 37:9value (3) 35:14;38:20;130:3values (3) 28:22;29:7;36:11variance (4) 34:20,20,23;52:3Variances (2) 52:3,5varies (5) 102:24;135:10,10; 136:21,22variety (2) 108:20;124:6various (4) 14:15;23:21;31:1; 92:15Varney (57) 65:7,21,23;66:3,5; 67:3;68:4;69:4;71:9, 11;72:5,7,9;74:6,11, 14;81:3,5,20;82:4,8, 13,19,23,24;83:17, 24;84:8,13,19,23; 85:6;87:18,22;88:2; 89:11;90:2,20;91:1,9, 17,19;92:1,14,23; 93:23;94:12;95:4; 108:10;109:8,11,19, 22;110:1,5,16,18vary (1) 22:19vegetated (2) 129:24;130:3vegetation (3) 16:24;17:6;134:5vehicle (2) 112:13;136:24vehicles (2) 131:6;136:7verbal (1) 64:3verified (1) 127:19verify (1) 77:13

verifying (1) 115:12Vermont (1) 73:7vernal (16) 133:19,24;134:11, 15,17,20,22,24; 135:17,18;136:12,14; 137:2,3,11,20versus (5) 38:20,20;42:9; 76:19;122:14vice-president (3) 32:22;33:1,11vice-presidents (1) 33:15video (1) 10:2violation (1) 69:3Virtually (1) 43:8virtue (3) 27:19;81:15;97:15visiting (1) 137:6voluntarily (2) 110:16,21VP (2) 31:14,14VPs (1) 33:8

W

waddle (1) 4:15waddles (1) 4:8wait (9) 23:5;62:23;117:11; 122:21,21,22,22; 123:6,6waiting (1) 125:9WALERS (1) 74:21walk (2) 112:11;120:23walked (1) 137:24WALKER (5) 49:17,19;70:21; 93:13,19walks (1) 41:6warm (3) 88:16;135:1,7warming (2) 86:9,20warms (1) 135:1Washington (5)

73:6;85:17;86:15; 87:8;90:18water (58) 10:15,18;14:2; 15:12;23:15;24:3; 25:4,16;27:10,16; 28:6;29:6;48:14,17, 19,22;49:1,3;55:7; 56:7,24;57:2,13; 59:8;60:16;64:8,11, 22;66:24;77:14; 85:20;88:20;97:20; 98:4,10;99:5,6,17; 100:13;101:8,8; 102:20,22;107:16; 133:19,21;134:1,4, 13;135:1,19;136:6, 15,20;137:1,21; 138:5,8water-based (1) 45:7water-permeable (1) 55:6water-quality (4) 13:3,12;28:9;108:2way (18) 10:2;12:5,10; 38:10;39:8,8;48:14; 62:1;63:10;71:18; 74:13;93:6;117:14; 118:5;120:18;122:4; 124:14;138:19ways (2) 37:19;96:4weak (1) 3:16web (2) 66:19;92:18week (4) 73:4;119:11;127:1; 140:4wells (29) 12:17;13:1,6,7,15, 17;14:5,21,22;15:2,5, 11,13;16:18;17:7; 24:2,10,23;25:11; 26:1;27:10;29:3; 45:21;46:2,4;97:20; 99:15;138:6;139:4weren't (2) 24:14;86:10west (2) 111:21,22wet (2) 133:19;135:13wetland (21) 10:18;33:18;34:2; 35:21;36:13;38:1,24; 39:4,12;50:24;51:15, 17,20,21;52:13; 59:24;60:23;115:6; 118:14;119:4;124:20wetlands (41)

18:8;34:10,13; 35:20;36:7,15;37:8, 22;40:14;49:7;50:16, 22;51:9;52:7;53:4; 56:13;59:16,16; 60:11;62:20;79:11; 81:2;94:21;111:13; 114:22;120:24; 121:2;122:7,8,10,14, 16;123:16,16,23; 124:6,9,18,24; 130:11;133:17wetlands-associated (1) 131:8wetlands-delineated (1) 121:1what's (9) 12:19;35:22;36:9; 50:19;65:15;93:17; 105:24;122:16; 134:13wheel (1) 134:22Whereupon (1) 140:6White (8) 5:12;9:18;10:22; 11:2;74:9;127:7,8,20whole (9) 39:1;45:18;53:16; 60:20;73:20;79:15; 80:2;109:1;124:6who's (1) 116:16wide (1) 112:13wildlife (18) 35:15;36:16,19; 37:9,11;38:17;94:22; 129:6,10,23;130:2,5, 8,11,14,18,21;131:7willing (1) 21:10wind (3) 67:7;118:23,24Windham (3) 25:21;100:1; 101:21withdrawal (1) 48:22withdrawals (1) 48:22withdrawn (1) 49:1within (22) 25:11;26:12;38:1, 2;46:4,12;50:13; 57:10;59:4,24;65:8; 67:19;69:19;70:2; 80:20;82:11;93:5; 130:1;138:1,3;139:3, 4without (6)

5:4;9:17;20:2; 47:14;121:18;138:2WITNESS (12) 4:23;5:22;12:1; 70:24;71:1;72:9; 114:9,10;126:4,6; 138:15,17woman (1) 124:17wonder (1) 38:19wondering (4) 82:16;125:1;136:8, 12Wood (1) 137:12word (4) 49:20;50:5;55:12; 96:6words (2) 39:2;99:18work (40) 11:2,19;16:17; 32:4;34:15;41:2; 44:13;50:9;59:3,7; 76:14,24;77:1,6; 83:23;92:5,6;102:16; 105:18;107:20,22; 108:8,11,21;110:3; 114:24;115:19; 117:11;118:4; 119:14;126:21; 128:13,22;131:17; 132:16;133:9,11; 137:23;138:3,3worked (6) 45:10,17;96:8; 108:19;116:23;125:6working (13) 12:21;16:13;30:2, 3;31:11;34:18;37:18; 110:8;114:21; 119:21;126:3;132:2, 10works (2) 22:4;99:9worksheet (1) 36:3world (9) 64:23;68:2;87:10, 12;90:11;91:20,22; 92:2,7worldwide (3) 61:9;64:6;88:14worried (1) 99:8worse (2) 16:20;39:24worth (5) 34:17;35:16;40:4; 59:13;128:7written (3) 46:21;47:19;63:24

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(20) uses - written

Page 162: 1 STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE 7 … · 6/20/2017  · 18 APOBP 48 4/21/16 Letter to DES 79 from Mr. Bisbee 19 APOBP 49 4/21/16 Letter to DES 79 20 from Mr. Bisbee

SEC DOCKET NO. 2015-06 NORTHERN PASS TRANSMISSION, LLC ADJUDICATORY HEARING

DAY 18 - AFTERNOON SESSION ONLYJune 20, 2017

wrong (8) 13:24;21:5;26:23; 27:12,16;29:10,11,12wrote (1) 56:3

Y

yard (2) 17:11;127:11yards (7) 16:11;17:14;18:1, 3;22:22;25:13;81:1year (4) 66:14;110:1; 133:24;135:13years (13) 20:21,22,22;21:4; 23:22;24:19;65:1,9; 81:18;84:1;89:3; 109:9;135:14yellow (2) 122:9;124:10York (1) 73:6Yup (2) 56:4;90:11

Z

zero (1) 49:21zone (1) 111:21zoned (1) 111:16zones (1) 88:19zooming (1) 6:22

0

0022 (1) 70:8

1

1 (2) 3:23;102:31:48 (1) 3:210 (1) 65:1112 (1) 79:16115 (1) 129:18115-kilovolt (1) 129:22116 (9) 4:1;12:11;16:4; 30:17;49:14;53:3;

60:23;79:16;80:1112 (3) 49:14;81:18;136:515 (1) 65:118 (1) 79:161989 (1) 81:13

2

2 (1) 5:92.9 (1) 89:182/19/2016 (1) 122:1920 (2) 65:1,9200 (1) 12:202001 (1) 81:132009 (1) 25:222013 (1) 25:222015 (1) 89:182016 (2) 53:14;78:102020 (1) 66:1721st (1) 78:10245 (1) 66:1525 (1) 86:13250 (1) 87:1127th (1) 53:15

3

3 (2) 6:22;79:163.2 (4) 84:6;89:15,24;90:93:08 (1) 61:233:25 (1) 61:2430 (7) 27:11;39:5;65:1; 121:18,20;138:1,7302 (1) 79:1630th (1) 125:11320 (2)

104:12,1434 (1) 86:23345 (1) 112:9

4

4 (5) 6:2;9:10;18:22,23, 23401 (1) 107:1642 (2) 42:21,2243 (1) 54:2244 (2) 57:23,2445 (2) 68:11,1246 (2) 72:12,1347 (1) 72:2448 (2) 78:3,449 (2) 78:11,12

5

5 (1) 6:25,000 (1) 25:135:10 (1) 140:750 (5) 12:21;17:9;59:24; 81:7,9500 (6) 25:12;46:4;111:21, 22;139:3,451 (2) 85:11,1252 (1) 68:145th (1) 53:14

6

6 (1) 10:560 (2) 101:22,2461 (1) 85:2462 (1) 87:6

7

7 (1) 18:227405 (1) 111:14

8

80 (3) 20:20;21:4;86:19

9

90 (1) 107:10900-pound (1) 75:3910 (1) 66:1393 (1) 15:13

Min-U-Script® SUSAN J. ROBIDAS, N.H. LCR(603) 540-2083 [email protected]

(21) wrong - 93


Recommended