Strategic Plan 2015/16 – 2019/20
AND
Annual Performance Plan 2015/16
1
• Introduction• Strategic Overview
– Vision, Mission, Values
– Constitutional, Legislative and Policy Mandates
– Planned Policy Initiatives
• Situational Analysis– Performance and Organisational Environment
• Planned Initiatives over the MTSF and MTEF• Resource Considerations• Links to Long Term Infrastructure and Other Plans• Conditional Grants• Public Entities• Public-Private Partnerships
Presentation Outline
2
• DoT Strategic Plan 2015/16 – 2019/20 and Annual Performance Plan 2015/16 was guided by the National Development Plan (NDP) 2030, the New Growth Path (NGP) Framework, the Industrial Policy Action Plan (IPAP) and the National Infrastructure Plan (NIP)
• African Union Agenda 2063 vision of “an integrated, prosperous and peaceful Africa, driven by its own citizens and representing a dynamic force in the global arena” will also drive the DoT efforts of enhancing regional and continental integration
• DoT will also support the Back-to-Basics call made by Minister of CoGTA to strengthen and enhance performance of local government focusing on Public Transport, Rail Transport and Access Roads
Introduction
3
STRATEGIC OVERVIEW
4
VISION
“Transport, the Heartbeat of Economic Growth and Social Development”
MISSION
To lead the development of efficient integrated transport systems by creating a framework of sustainable policies and regulations; and implementable models to support government strategies for socio-economic development
DoT Vision & Mission
5
• Maintain fairness and equity in all our operations
• Strive for quality and affordable transport for all
• Stimulate innovation in the transport sector
• Ensure transparency, accountability and
monitoring of all operations
• Ensure sustainability, financial affordability,
accessibility as well as upholding of the Batho Pele principles
DoT Values
6
• Schedule 4 of the Constitution identifies functional areas of concurrent national and provincial legislative competence with regard to airports (other than internal and national airports), road traffic management, vehicle licensing and public transport
• The Minister of Transport is held accountable for all transport related functional areas of both national and concurrent legislative competence
• DoT is responsible for conducting research; formulating legislation and policies; assigning responsibilities to entities and other spheres; regulating through setting norms and standards; and monitoring and evaluation
Constitutional Mandate
7
The entire legislative mandate of the Department of Transport is derived from its constitutional mandate.
The DoT is thus primarily responsible for Acts related to:
•Railways and Harbours•Shipping•Roads•Motor Vehicles•Civil Aviation
Legislative Mandate
8
• National White Paper on Transport Policy, 1996
• White paper on National Policy on Airports and Airspace Management, 1997
• National Commercial Ports Policy, 2002
• Taxi Recapitalisation Policy, 2009
Policy Mandate
9
• Review of the White Paper on the National Transport Policy
• Finalisation of the White Paper on the National Railway Policy
• Development of the White Paper on the Roads Policy
• Finalisation of the National Civil Aviation Policy
• Finalisation of the White Paper on the National Maritime Policy
• Development of the Cabotage Policy for Coastal, Regional and Continental Waters
• Finalisation of the National Learner Transport Policy
Policy Initiatives over the MTSF
10
SITUATIONAL ANALYSIS
11
Background
•DoT exist to ensure provision of safe, reliable, effective, efficient, affordable and integrated transport services that best meet needs of passenger and freight users
•Major challenges facing transport sector in meeting its mandate
– infrastructure development
– maintenance
– strategic expansion of its network
– Non adherence to grant conditions
•Common problem
– rate of deterioration of existing infrastructure
– inadequate capital investment to meet required maintenance and expansion
Performance Environment
12
Background
• NDP 2030 – Radical Economic Transformation as a catalyst for accelerated economic growth and job creation
– Stimulate productivity
– Improve efficiencies
– Accelerate elimination of inequality
• NDP growth target – 5% by 2019. This will be achieved through:
– Private sector partnerships to unlock obstacles for investment
Performance Environment
13
Background
• Government investment (MTSF 2014 – 2019):
– R847 billion on infrastructure (manufacture of busses)
– R51 billion on New Rail Rolling Stock and R4 billion on new Hybrid Locomotives in the next 5-year period
A manufacturing factory to be established in Nigel to spearhead the manufacturing of rolling stock locally
This factory is anticipated to create direct and indirect jobs with skills like engineers, technicians, artisans and train drivers in the course of its contract.
The target of not less than 65% local content has been set
Performance Environment
14
• MTSF 2014 – 2019 approved July 2014 as comprehensive implementation plan of NDP and ruling party manifesto
• Minister’s delivery agreement to implement transport related issues in the MTSF
– Outcome 4: Decent Employment Through inclusive Growth
– Outcome 6: An Efficient, Competitive and Responsive Economic Infrastructure
– Outcome 7: Comprehensive Rural Development and Land Reform
– Outcome 10: Protect and Enhance Our Environmental Assets and natural Resources
Performance Environment
15
Outcome 4 – Decent employment through inclusive economic growth
Sub-Outcome 1: Productive investment is effectively crowded in through the infrastructure build programme
• Ensure monitoring of off-takes by end users on the infrastructure programme
Performance Environment
16
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 1: Regulation, funding and investment improved
• Establish a Single Transport Economic Regulator (STER) by December 2016
• Develop a Private Sector Participation Framework for ports and freight rail, removing barriers to entry for private investment and operations within the context of Cabinet-approved policy and with an analysis of the implication of tariffs
Performance Environment
17
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 3: Maintenance, strategic expansion, operational efficiency, capacity and competitiveness of our logistics and transport infrastructure ensured
• Improve and preserve national, provincial and local road infrastructure
• Strengthen road traffic management
• Improve public transport
• Strengthen institutional arrangements for public transport
Performance Environment
18
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 3: Maintenance, strategic expansion, operational efficiency, capacity and competitiveness of our logistics and transport infrastructure ensured
• Improve national transport planning to develop long-term plans for transport that synchronize with spatial planning and align infrastructure investment activities of provincial and local government and clearly communicate the state’s transport vision to the private sector
• Ensure development and approval of the Integrated Transport Plan by June 2016
• Develop and implement approved plan and improve market share of containers on rail vs road, to ensure that we move road freight to rail
Performance Environment
19
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 6: Coordination, planning, integration and monitoring implementation of strategic integrated projects in the National Infrastructure Plan
•SIP 1: Unlocking the Northern Mineral Belt
– N11 Ermelo to Hendrina Full Rehabilitation Project – SANRAL– Moloto Rail Corridor – PRASA
•SIP 2: Durban-Free State-Gauteng Logistics and Industrial Corridor projects
– N2 De Beers Pass (Harrismith Hub)
Performance Environment
20
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 6: Coordination, planning, integration and monitoring implementation of strategic integrated projects in the National Infrastructure Plan
•SIP 3: South Eastern Node and Corridor Development
– N2 Wildcoast – SANRAL– Mthatha Airport: upgrade of airport, landing aids, fencing and roads
•SIP 4: Unlocking economic opportunities in the North West Province
Performance Environment
21
Outcome 6 – An efficient, competitive and responsive economic infrastructure
Sub-Outcome 6: Coordination, planning, integration and monitoring implementation of strategic integrated projects in the National Infrastructure Plan
•SIP 7: Integrated Urban Space and Public Transport Programme
– Integrated Public Transport Networks in 13 cities (Cape Town, Tshwane, Johannesburg, eThekwini, Rustenburg, Nelson Mandela Bay, Ekurhuleni, Polokwane, Msunduzi, Mangaung, Mbombela, Buffalo City)
Performance Environment
22
Outcome 7 – Comprehensive Rural Development and Land Reform
Sub-Outcome 5: Increased access to quality infrastructure and functional services, particularly in education, healthcare and public transport in rural areas
•Improve transport infrastructure and public transport in rural areas
•Access Road Development Plan for improving rural road infrastructure implemented
•% of district municipalities implementing the Integrated Public Transport Network Strategy
Performance Environment
23
Outcome 10 – Protect and enhance our environmental assets and natural resources
Sub-Outcome 2: An effective climate change mitigation and adaptation response
•Develop strategic policy and regulatory frameworks and programmes to promote a low carbon economy
•Green Transport Strategy and Implementation Plan formulated and completed by March 2018
Performance Environment
24
Key Areas of Service Delivery over the MTSF:
1.Efficient and integrated Infrastructure Network and Operations
•Private Sector Participation Framework - 2016/17
•National Transport Master Plan (NATMAP 2050) – 2016/17
•Single Transport Economic Regulator – 2016/17
•Mthatha Airport – Upgrade of terminal building, perimeter fence, perimeter road and carpark; and transfer of the upgrade asset to the Eastern Cape Province
•Transport Infrastructure Build Interventions
– Integrated Public Transport Networks (IPTNs)
– Provincial Road Maintenance Programme (PRMG)
– PRASA Capital Expenditure Programme
– Harrismith Hub
Performance Environment
25
Key Areas of Service Delivery over the MTSF:
1.Efficient and integrated Infrastructure Network and Operations
• Provincial Road Maintenance Programme (PRMG) – S’hamba Sonke• National Consolidated Targets:
– Rehabilitation of surfaced roads (1 150 km)
– Resealing of surfaced roads (3 150 km)
– Regravelling of gravel roads (3 308 km)
– Blacktop patching (850 500 m2)
– Blading of gravel roads (367 500 km)
– Gravel roads upgraded to surfaced roads (Province specific)
Performance Environment
26
Key Areas of Service Delivery over the MTSF:
1.Efficient and integrated Infrastructure Network and Operations
• Equitable Share and Conditional Grant Combined Targets per Province
Performance Environment
27
EC FS GP KZN MPU NW WC LIM NCSurfaced roads rehabilitated
27 400 sqm 479 lane km 633 884 sqm 3 504 000 sqm 700 040 sqm 850 000 sqm 350 000 sqm TBC TBC
Surfaced roads resealed
89 500 sqm 1 500 000 sqm
350 000 sqm 2 700 000 sqm 1 138 925 sqm 950 000 sqm 2 400 000 sqm TBC TBC
Gravel roads regravelled
592.1km 150km 102.32km 2700km 145km - 250km TBC TBC
Blacktop patching
68 839 sqm 380 000 sqm 125 000 sqm 240 000 sqm 97 810 sqm 81 782 sqm 50 000 sqm TBC TBC
Gravel roads bladed
32 629 km 44 000km 1388 km 120 000km 23 460 km 58 700km 45 000km TBC TBC
Gravel roads upgraded to surfaced roads
19.5km 16.3km - 74km 20km 67km - TBC TBC
Key Areas of Service Delivery over the MTSF:
2. A Transport Sector that is Safe and Secure
• Reduction of road fatalities by half based on 2010 figures – UN Decade of Action for Road Safety Resolution 64/255
• Adjudication of Administrative Road Traffic Offences Amendment Act – 2016/17
• National Railway Safety Regulator Amendment Act – 2017/18
• National Railway Safety Strategy – 2016/17
• Civil Aviation Amendment Act and Regulations – 2016/17
• Merchant Shipping Act – 2017/18
• Inland Waterway Strategy – 2016/17
Performance Environment
28
Key Areas of Service Delivery over the MTSF:
2. A Transport Sector that is Safe and Secure
• Safety and Compliance– Road Safety Awareness Programmes
– Schools involved in Road Safety Education Programmes
• Transport Administration and Licensing– Compliance inspections
• Law Enforcement– Speed operations
– Drunken driving operations
– Vehicles stopped and checked
– Vehicles weighed
Performance Environment
29
Key Areas of Service Delivery over the MTSF:
3. Improved Rural Access, Infrastructure and Mobility
•Access Road Development Plans to improve rural road infrastructure – 2017/18
•Integrated Public Transport Network plans in rural municipalities - MTSF
•Review of the Rural Transport Strategy to enhance access and mobility in rural space – 2015/16
•National Learner Transport Policy to provide norms and standards; and operational guidelines for learner transportation especially in rural areas – 2015/16
Performance Environment
30
Key Areas of Service Delivery over the MTSF:
3. Improved Rural Access, Infrastructure and Mobility
•Learners benefitting from learner transport schemes
•Distribution of bicycles in district municipalities
•Construction / upgrading / rehabilitation of non-motorised transport infrastructure
Performance Environment
31
Key Areas of Service Delivery over the MTSF:
4. Improved Public Transport Services
•Planning and construction of Bus Rapid Transit (BRT) systems in identified local and metropolitan municipalities - MTSF
•Review of the Taxi Recapitalisation Programme – 2015/16
•Integrated Public Transport Turnaround Plan to optimise public transport service offerings in rural and urban spaces – 2016/17
•Amendment of the National Land Transport Act and development of regulations to enhance public transport regulation – 2016/17
Performance Environment
32
Key Areas of Service Delivery over the MTSF:
4. Improved Public Transport Services
•Route subsidised•Kilometres subsidised•Trips subsidised•Provincial Regulatory Entity hearings
Performance Environment
33
Key Areas of Service Delivery over the MTSF:
5. Contribution to Job Creation
• Off-takes of the Provincial Road Maintenance Programme– 60% employment and empowerment in road infrastructure
– 40% of the grant allocated to pothole patching (Operation Tselantle)
– 6 000 000 work opportunities to be created – women, youth and people with disabilities
• Off-takes of the Rolling Stock Renewal Programme– A manufacturing factory to be established in Nigel to spearhead the
manufacturing of rolling stock locally
– 8 088 direct and 33 000 indirect jobs to be created over 10 years duration of contract to revamp ailing rail infrastructure
• Implementation of the African Maritime Charter – 2016/17
• Skills development and youth job readiness – 5 163 graduates currently in internship programmes in the transport sector
Performance Environment
34
Key Areas of Service Delivery over the MTSF:
6. Contribution to Environmental Protection
•Green Transport Strategy to reduce sector GHG emissions – 2016/17
•Regulations to phase out the Chapter 2 Aircraft to assist in reducing aviation noise – 2015/16
•Ratification and implementation of relevant maritime conventions to minimise pollution at sea
Performance Environment
35
DoT Strategic Outcome-Oriented Goals
36
DoT Programmes
37
Programme 2: Integrated Transport
Planning
Programme 4: Road Transport
Programme 3: Rail Transport
“Transport, the Heartbeat of
Economic Growth and Social
Development”
Programme 5: Civil Aviation
Programme 5: Civil Aviation
Programme 6: Maritime Transport
Programme 6: Maritime Transport
Programme 7: Public Transport
Programme 7: Public Transport
Programme 1: Administration
• Internal challenges of structural alignment and allocation of resources (human, financial, facilities and equipment) will be continually optimised to ensure economic, efficient and effective performance and improvement of service delivery
• Reduction of vacancy rate and strengthening of knowledge and information systems will be priorities for the medium term. The department will continue to strive towards reducing the vacancy rate from 23.34% to 10% in the 2015/16 financial year.
• Simplified organisation structure of the DoT puts emphasis on modes of transport and complementing this modal emphasis are two cross-cutting programmes that seek to provide strategic administrative and technical support – Administration and Integrated Transport Planning
Organisational Environment
38
PLANNED INITIATIVES OVER THE MTSF AND MTEF
39
Integrated Transport Planning
40
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Facilitate integrated Macro-transport systems planning to guide investments in the sector
Submit the final draft of the NATMAP 2050 to Parliament and monitor implementation
Final draft of the NATMAP 2050 submitted to Cabinet
Submit the White Paper on the National Transport Policy to Cabinet
Conduct stakeholder consultations on the reviewed White Paper on the National Transport Policy
Complete the Draft Transport Infrastructure Funding Framework (Roads and Ports) and submit to Minister for approval
Draft Transport Infrastructure Funding Framework (Roads and Ports) submitted to Minister for approval
Complete the Draft Transport Infrastructure Funding Framework(Aviation and Public Transport) and submit to Minister for approval
2017/18 Annual Target
Complete the Draft Transport Pricing Framework and submit to Minister for approval
Draft Transport Pricing Framework submitted to Minister for approval
Integrated Transport Planning
41
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Promote national, regional and continentalIntegration of transportInfrastructure and operations
Develop the Harrismith Hub Framework
Harrismith Hub Framework developed
Submit the Road Freight Strategy toCabinet
Draft Road Freight Strategy submitted to EXCO for approval
Enhance socio- economic transformationof the Transport Sector
Submit the Single Transport Economic Regulator (STER) Bill toParliament and establish the STER
STER Bill submitted to Cabinet
Submit the Private Sector Participation (PSP) Framework to Cabinet
PSP Framework developed
Reduce GHG emissions Submit the Green Transport Strategy to Cabinet
Draft Green Transport Strategy developed
Rail Transport
42
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Enhance performance, efficiency and reliability of the TransportSector
Submit the National Railway Bill to Parliament and develop the National Railway Strategy
White Paper on the National Railway Policy developed
Develop Migration Plan to migrate Interim Rail Economic Regulatory Capacity to STER
Guidelines for submission ofrail economic regulatory information submitted to the Ministerial Task Team for approval
Submit the Branchline Strategy to ESEID Cluster for approval and develop the framework for PSP
Branchline Strategy submitted to ESEID Cluster for approval
Regulate and enhance transport safety and security
Submit the draft National Railway Safety Regulator Amendment Bill to Parliament
Draft National Railway Safety Regulator Amendment Bill developed
Submit the National Railway Safety Strategy (NRSS)
NRSS developed
Road Transport
43
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Ensure a sustainable transport infrastructure network
Submit the White Paper on the Road Transport Policy to Cabinet
Draft Green Paper on the Road Transport Policy submitted to Cabinet
Oversee and monitor construction and maintenance of national and provincial roads in line with the budget
Construction and maintenance of national and provincial roads monitored in line with the budget
Submit the Draft Access Road Development Plan to Cabinet
Status quo analysis conducted on the municipal road network
Regulate and enhance transport safety and security
Submit AARTO Amendment Bill to Parliament and Roll out implementation
AARTO Amendment Bill submitted to Cabinet
Civil Aviation
44
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Enhance performance,efficiency and reliability of the Transport Sector
Submit the ACSA and ATNS Amendment Bills to Parliament and develop draft regulations
Stakeholder consultations conducted on the ACSA and ATNS Amendment Bills
Submit the National Civil Aviation Policy (NCAP) to Parliament and monitor its implementation
NCAP submitted to Cabinet
Submit the National Airport Development Plan (NADP) to Cabinet
NADP submitted to Cabinet
Air Service Agreements reviewed annually in line with the Yamoussoukro Decision (YD)
Air service arrangements with 6 states reviewed in line with the YD
Civil Aviation
45
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Regulate and enhance transport safety and security
Submit the Civil Aviation Amendment Bill to Parliament
Draft Civil Aviation Amendment Bill submitted to EXCO for approval
Corrective actions for audit findings and safety recommendations developed annually
Corrective actions for audit findings and safety recommendations developed
Upgrading of the Mthatha Airport monitored
Transfer of the upgrade of Mthatha Airport asset tothe Eastern Cape facilitated
Minimise aviation noise Submit the Regulations on the phasing out of the Chapter 2 Aircraft to the Minister for approval
Draft regulations for the phasing out of the Chapter 2 Aircraft submitted to the Minister for approval
Maritime Transport
46
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Enhance performance, efficiency and reliability of the Transport Sector
Submit the White Paper on the Maritime Transport Policy to Parliament
Green Paper on the National Maritime TransportPolicy submitted to Cabinet
Submit the Cabotage Policy for Coastal, Regional and Continental Waters to Cabinet
Cabotage Policy for coastal, regional and continental waters submitted to Cabinet
Submit the Cabotage Strategy to Cabinet
Final Draft Cabotage Strategy submitted to EXCO for approval
Submit the Cabotage Bill to Parliament and develop regulations
Final draft Cabotage Bill submitted to EXCO for approval
Maritime Transport
47
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Regulate and enhance transport safety and security
Submit the Draft Merchant Shipping Bill (2016) to Parliament
Discussion paper on the Merchant Shipping Bill (2016) submitted to EXCO for approval
Implement recommendations of mock audit findings and ensure readiness of mandatory audit
Recommendations of mock audit findings implemented
Submit the Draft Inland Waterway Strategy to Cabinet
Stakeholder consultation conducted and the draft Inland Waterway Strategy submitted to Minister for approval
Develop and implement relevant charters and legislation
Submit the African Maritime Charter to Parliament
African Maritime Charter submitted to Parliament
Public Transport
48
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Provide integrated rural transport infrastructureand services
Submit the Rural Transport Strategy to the Cabinet
Rural Transport Strategy submitted to Cabinet
ITPN plans developed in district municipalities annually
ITPN plan developed in 1 district municipality
Submit the National Learner Transport Policy to Cabinet
National Learner Transport Policy submitted to Cabinet
Promote sustainable public transport
Scrap 3 300 old taxi vehicles 1 100 old taxi vehicles scrapped
Submit the Taxi Recapitalisation Programme Review Report to Cabinet
Taxi Recapitalisation Programme Review Report submitted to Cabinet
Submit the Integrated Public Transport Turnaround Plan to Cabinet
Draft Integrated Public Transport Turnaround Plan submitted to EXCO for approval
Public Transport
49
Strategic Objective MTSF Planned Initiatives 2015/16 Annual Target
Improve public transport access and reliability
ITPNs funded and monitored in selected cities
Funding and implementation of the following cities monitored:A Re Yeng (Tshwane) Inception Phase,Go George (George) Pilot Phase,Rea Vaya (Johannesburg) Phase 1a and Phase 1b,My CiTi (Cape Town) Phase 1 andpartial Phase 2 (N2 Express)
Regulate public transport
Submit the Land Transport Amendment Bill to Parliament
Land Transport Amendment Bill submitted to Parliament
RESOURCES CONSIDERATIONS
50
• In the medium term, key resource considerations will towards:
– Maintenance of road infrastructure
– Upgrading of rail infrastructure and services
– Enhancing public transport
– Establishment of the Single Transport Economic Regulator (STER)
• Transfers and subsidies to public entities, provinces and municipalities remains the largest expenditure item in the DoT’s budget. In 2014/15, at R47.8 billion, transfers and subsidies constituted 96.7% of adjusted appropriation allocation and they are projected to increase at an average annual rate of 6.8% to reach R51.1 billion in 2017/18.
• Cabinet-approved reductions will also be effected over the medium term (Page 60 of the DoT Strategic Plan 2015/16 – 2019/20).
Resource Considerations
51
LINKS TO LONG-TERM INFRASTRUCTURE AND
OTHER PLANS
52
Moloto Rail Development Corridor
Project Description:
•Planning, designing and construction of a rapid rail project for the Moloto Development Corridor is underway. A feasibility study has been completed into a transport solution to problems experienced along the Moloto Corridor.
•Rapid rail service between Mthambothini (Siyabuswa) in Mpumalanga and Tshwane with feeder services to and from stations.
•Interim measures of upgrading the R573 have been handed over to SANRAL. These measures include intersection capacity and safety improvement, improvement of bus bays (position and capacity), widening of structures (bridges), storm water and drainage structures, pedestrian and non-motorised transport facilities, weigh bridges and vehicle testing centres.
Estimated Project Cost
•R18.9 billion capital expenditure
•R1.6 billion land acquisition
Long-Term Infrastructure and Other Plans
53
Durban Dug-Out Port Development
Project Description:
Expansion of the container-handling capacity at the Durban Port to enhance logistics of doing business in SA by improving rail and port connections. Project linked to SIP 2: Durban-Free State-Gauteng Logistics and Industrial Corridor
Estimated Project Cost
• R75 – R100 billion
Long-Term Infrastructure and Other Plans
54
CONDITIONAL GRANTS
55
• Public Transport Operations Grant – R4 939 448 000
• Public Transport Network Grant – R5 953 090 000
• Provincial Road Maintenance Grant – R9 850 655 000
• Rural Road Asset Management System – R96 842 000
Conditional Grants
56
PUBLIC ENTITIES
57
• Passenger Rail Agency of South Africa – R18 222 047 000• Rail Safety Regulator – R53 379 000• Road Traffic Management Corporation – R184 104 000• Road Traffic Infringement Agency – R11 497 000• Road Accident Fund – Funded through fuel levy
• South African National Roads Agency Limited – R12 542 488 000• Cross-Border Road Transport Agency – Collect permit fees from operators
• South African Civil Aviation Authority – R20 124 000• Air Traffic Navigation Services – No transfer from DoT
• Airports Company South Africa - No transfer from DoT
• South African Maritime Safety Authority – No transfer from DoT
• Ports Regulator of South Africa – R17 627 000
Public Entities
58
PUBLIC-PRIVATE PARTNERSHIPS
59
Moloto Rail Development Corridor
Purpose: Provide transport solution to problems experienced by commuters along the Moloto Corridor
Outputs: Reduced travel times, improved safety, reduction of traffic congestions, road accidents, injuries and fatalities
Value of Agreement: PPP registered and process currently at Phase 1 of Treasury Approval processes
Public-Private Partnerships
60
Thank You!