+ All Categories
Home > Documents > 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

Date post: 14-Jan-2016
Category:
Upload: lesley-robertson
View: 213 times
Download: 1 times
Share this document with a friend
Popular Tags:
15
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007
Transcript
Page 1: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

1

Systems Analysis and Design in a Changing World, Thursday, January 25, 2007

Page 2: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

2

Today’s Schedule

Project Management– Scoping & Planning– Risks & Feasibility

Thursday, Quiz #1 on Chapters 1 & 2 Assignment #3 Due Monday, January 29th Begin Reading Chapter 4, page 110 - 120

System Requirements

Page 3: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

3

Defining the Problem

Review business needs– Use strategic plan documents – Consult key users – Develop list of expected business benefits

Identify expected system capabilities– Define scope in terms of requirements

Create system scope document Build proof of concept prototype Create context diagram

Page 4: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

4

In Teams, Draw Context Diagram for Your Info System

Page 5: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

5

Producing the Project Schedule

Develop work breakdown structure (WBS)– List of tasks and duration required for project– Similar to outline for research paper– WBS is foundation for project schedule

Build a PERT/CPM chart– Assists in assigning tasks– Critical path method– Gantt chart and tracking GANTT chart

Page 6: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

6

Partial PERT/CPM Chart

Page 7: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

7

Gantt Chart for Entire Project (with overlapping phases)

Page 8: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

8

Gantt Chart for Iterative Project

Page 9: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

9

Confirming Project Feasibility

Risk management Economic feasibility

– Cost/benefit analysis– Sources of funds (cash flow, long-term capital)

Organizational and cultural feasibility Technological feasibility Schedule feasibility Resource feasibility

Page 10: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

10

Risk Management

Page 11: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

11

Economic Feasibility

Cost/benefit analysis – Estimate project development costs– Estimate operational costs after project– Estimate financial benefits based on annual savings

and increased revenues– Calculate using table of costs and benefits

Uses net present value (NPV), payback period, return on investment (ROI) techniques

Page 12: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

12

Sample Benefits for RMO

(Figure 3-19)

Page 13: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

13

RMO Cost Benefit Analysis

(Figure 3-20)

Page 14: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

14

Intangibles in Economic Feasibility

Intangible benefits cannot be measured in dollars– Increased levels of service

– Customer satisfaction

– Survival

– Need to develop in-house expertise

Intangible costs cannot be measured in dollars– Reduced employee morale

– Lost productivity

– Lost customers or sales

Page 15: 1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.

15

For Tuesday, January 30

Assignment #3 Due Monday, January 29th Begin Reading Chapter 4, page 110 - 120

System Requirements


Recommended