1 The Replanting of Lochaber Hydro Power Station by Andrew Thick
Transcript
Page 1: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

1

The Replanting of Lochaber Hydro Power Station

by Andrew Thick

Page 2: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

2

Topics to be covered today

• Scheme modelling;

• Operating capability of Lochaber;

• Turbine selection;

• Penstock works.

Page 3: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

3

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 4: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

4

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 5: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

5

Spey Dam

Page 6: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

6

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 7: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

7

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 8: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

8

Laggan Dam

Page 9: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

9

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 10: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

10

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 11: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

11

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 12: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

12

Loch Treig and Dam

Page 13: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

13

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 14: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

14

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 15: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

15

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 16: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

16

Penstocks, Powerhouse and Smelter

Page 17: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

17

Simplified Lochaber Scheme Model

QTspill

QP/H

QTin

Laggan

QTin

QTunnel

Treig

QLspill

QLin

QLin

QLin

Qintakes

Qintakes

Gravity Intake Flows are combined with Reservoir Inflows

Page 18: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

18

Energy Modelling Results

Trial 1 2 3 4 5 6 7

Installed Cap. (MW) 65 80 60 70 80 90 100

Overall Efficiency (%) 75 87 87 87 87 87 87

Headloss Coeff. (k) 0.021 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172

Operating rule Ext Ext Max E Max E Max E Max E Max E

Laggan Spill (mcm) 2,034 1,794 4,160 1,709 1,227 1,074 801

Treig Spill (mcm) 154 121 857 201 54 10 7

Ave. Energy (GWh/yr) 467 569 523 574 581 583 580

Page 19: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

19

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 20: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

20

Operating Capability in terms of Loch Treig Level

Note: 90.7% of water from Loch Treig9.3% of water from gravity intakes

Page 21: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

21

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 22: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

22

Operating Capability in terms of Surge Shaft Water Level

Penstock Limitation

Note: 90.7% of water from Loch Treig9.3% of water from gravity intakes

Page 23: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

23

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 24: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

24

Note: All water from Loch Treig

Operating Capability in terms of Surge Shaft Water Level

Page 25: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

25

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 26: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

26

Operating Capability in terms of Surge Shaft Water Level

Note: All water from gravity intakes

Page 27: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

27

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 28: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

28

Example Operation exceeding Penstock Pressure Rise Limit

Page 29: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

29

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 30: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

30

Scheme Operation Frequency Plot

Page 31: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

31

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 32: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

32

Page 33: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

33

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 34: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

34

Page 35: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

35

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 36: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

36

Page 37: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

37

Penstock works

Key aspects of the penstock works were:

• Need to undertake the works minimising shutdown of generation.

• Existing penstock system was very complex.

• In order to maintain double isolation, the penstocks needed to be dewatered sequentially.

• The works were complex with poor access.

• Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 38: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

38

Multiple buspipes

Numerous Valves

Bifurcations

Page 39: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

39

Penstock Area – difficult terrain!

Page 40: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

40

Penstock works

Key aspects of the penstock works were:

• Need to undertake the works minimising shutdown of generation.

• Existing penstock system was very complex.

• In order to maintain double isolation for the penstocks needed to be dewatered sequentially.

• The works were complex with poor access.

• Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 41: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

41

Survey Point Cloud Data

Page 42: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

42

AutoCAD 3-D Model

Page 43: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

43

Project Summary

• The generating plant has been replaced to give 25+ years life extension.

• The water to wire efficiency has been improved from 75% to 90+%.

• Energy production increased from 460 GWh/yr to 600+ GWh/yr.

• The scheme’s capability is better understood and limitations identified.

• The scheme was completed ahead of schedule and is operating successfully with minimal disruption to Smelter operations during construction

Page 44: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.

Contact Details

Andrew Thick BEng CEng MIMechE

URS Infrastructure and Environment UK Limited

International House, Dover Place

Ashford

Kent TN23 1HU

United Kingdom

Tel: +44 (0) 1233 658200

[email protected]