1. VISUAL TEXTURAL CLASSIFICATION OF MINERAL SOILS
CLASSIFICATION APPARENT PARTICLE SIZE
Boulders Greater than 200 mm
Cobbles 75 mm to 200 mm
Gravel 5 mm to 75 mm
Sand Not Visible to 5 mm
Silt Non-Plastic particles, not visible to the naked eye
Clay Plastic particles, not visible to the naked eye
2. TERMS DESCRIBING CONSISTENCY (COHESIVE SOILS ONLY)
DESCRIPTIVE TERM APPROXIMATE UNDRAINED SHEAR STRENGTH
Very Soft Less than 10 kPa
Soft 10 - 25 kPa
Firm 25 - 50 kPa
Stiff 50 - 100 kPa
Very Stiff 100 - 200 kPa Modified from
Hard 200 - 300 kPa National Building
Very Hard Greater than 300 kPa Code
3. TERMS DESCRIBING DENSITY (COHESIONLESS SOILS ONLY)
DESCRIPTIVE TERM STANDARD PENETRATION TEST (SPT)
(Number of Blows per 300 mm)
Very Loose 0 - 4
Loose 4 - 10
Compact 10 - 30
Dense 30 - 50 Modified from
Very Dense Over 50 National Building
Code
4. LEGEND FOR TEST HOLE LOGS
SYMBOL FOR SAMPLE TYPE
Shelby Tube A- Casing
SPT Grab
No Recovery Core
MC - Moisture Content (% by weight) as determined by sample
___ Water Level
CPen - Shear Strength determined by pocket penetrometer
Cvane - Shear Strength determined by pocket vane
Cu - Undrained Shear Strength determined by unconfined compression test
SYMBOLS AND TERMS USED ON TEST HOLE LOGS
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
G-9
G-10
ST-11
CONC
CL-CI
SP
NR
GM
ML
Sonic drilling
Test hole hydrovacced to 3.0 m
Hydrometer AnalysisGravel = 60.9%Sand = 21.0%Silt = 14.2%Clay = 4.0%
Hydrometer AnalysisGravel = 0.0%Sand = 6.1%Silt = 90.7%Clay = 3.3%
CONC
CL-CI
SP
NR
GM
ML
CONCRETE
CLAY, sandy, trace gravel, low to medium plastic,brown, damp
SAND, trace gravel, trace silt, poorly graded, finegrained, brown, damp
- some gravel, occasional cobbles and boulders,fine to medium grained from 1.5 m to 2.3 m
- gravelly, fine to coarse grained below 2.3 m
NO RECOVERY
GRAVEL, sandy, some silt, trace clay, fine tocoarse grained, rounded, greyish brown, wet,frequent cobbles throughout
SILT, trace sand, non plastic, grey, moist
Shear Strength (kPa)
SPT (N) Blows/300 mm
10 20 30 40
PL LLW.C. (%)SA
MP
LE T
YP
E
DCP Count/300 mm
Cpen
SA
MP
LE ID
SP
T (
N)
10 20 30 40
UCS
50 100 150 200
Field Vane Peak CUP Triaxial
10 20 30 40
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
10
0
DE
PT
H (
m)
1
2
3
4
5
6
7
8
9
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-122
COMPLETION DATE: 22/11/2016DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: SL 250
DRILL METHOD: Sonic DrillPage 1 of 4
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
SAND BENTONITE
COMPLETION DEPTH: 34.1 m
ELEVATION: 1047.39 m3TM 114° NAD 83, Northing: 5656278.94 m, Easting: -4784.69 m
REVIEWED BY: DGA
ELE
VA
TIO
N (
m)
1047
1046
1045
1044
1043
1042
1041
1040
1039
1038
STAN
DPI
PE
G-12
G-13
G-14
G-15
G-16
G-17
G-18
G-19
G-20
G-21
G-22
G-23
G-24
SM
ML
CL
Hydrometer AnalysisGravel = 0.0%Sand = 55.4%Silt = 40.5%Clay = 4.1%
Hydrometer AnalysisGravel = 0.0%Sand = 0.9%Silt = 96.5%Clay = 2.6%Atterberg test = non plastic
Hydrometer AnalysisGravel = 0.0%Sand = 0.1%Silt = 74.6%Clay = 25.3%SO4 = 207 mg/LChloride (Cl) =
G-25
G-26
ST-27
G-28
G-29
G-30
ST-31
G-32
G-33
G-34
G-35
CL-CI
CL-ML
CL
NR
Hydrometer AnalysisGravel = 0.1%Sand = 4.6%Silt = 70.9%Clay = 24.4%One dimensional consolidation testcompletedUCS = 217.7 kPaWet Density = 2124 kg/m3
Dry Density = 1762 kg/m3
Hydrometer AnalysisGravel = 0.0%Sand = 11.7%Silt = 69.5%Clay = 18.8%
Hydrometer AnalysisGravel = 10.7%Sand = 34.5%Silt = 44.2%Clay = 10.7%Hydrometer AnalysisGravel = 22.3%Sand = 7.3%Silt = 56.7%Clay = 13.7%No UCS test, poor sampleWet Density = 2300 kg/m3
Dry Density = 2090 kg/m3
Hydrometer AnalysisGravel = 1.5%Sand = 23.3%Silt = 55.8%Clay = 19.3%
Hydrometer AnalysisGravel = 0.6%Sand = 9.2%Silt = 69.8%Clay = 20.3%
CL-CI
CL-ML
CL
NR
CLAY (continued)
- trace sand, medium plastic below 21.0 m
- some sand, low plastic below 21.4 m
CLAY AND SILT, sandy, some gravel, low plastic,stiff to hard, grey, moist
- gravelly, trace sand below 24.4 m
- no recovery from 24.9 m to 25.3 m
- wet below 25.3 m
- sandy, trace gravel below 26.1 m
CLAY, trace gravel, trace sand, low plastic, stiff,grey, moist
NO RECOVERY
CLAY, trace gravel, trace sand, low plastic, stiff,grey, moist
Shear Strength (kPa)
SPT (N) Blows/300 mm
10 20 30 40
PL LLW.C. (%)SA
MP
LE T
YP
E
DCP Count/300 mm
Cpen
SA
MP
LE ID
SP
T (
N)
10 20 30 40
UCS
50 100 150 200
Field Vane Peak CUP Triaxial
10 20 30 40
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
30
20
DE
PT
H (
m)
21
22
23
24
25
26
27
28
29
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-122
COMPLETION DATE: 22/11/2016DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: SL 250
DRILL METHOD: Sonic DrillPage 3 of 4
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
SAND BENTONITE
COMPLETION DEPTH: 34.1 m
ELEVATION: 1047.39 m3TM 114° NAD 83, Northing: 5656278.94 m, Easting: -4784.69 m
REVIEWED BY: DGA
ELE
VA
TIO
N (
m)
1027
1026
1025
1024
1023
1022
1021
1020
1019
1018
STAN
DPI
PE
G-36
G-38
CL
NR
CLHydrometer AnalysisGravel = 2.7%Sand = 22.3%Silt = 46.4%Clay = 28.6%
CL
NR
CL
CLAY (continued)
NO RECOVERY
CLAY, sandy, trace gravel, low plastic, dark grey,damp
END OF HOLE at 34.1 m- backfilled with bentonite chips from 34.14 m to16.30 m- backfilled with bentonite pellets from 16.30 m to15.30 m- 51 mm diameter PVC monitoring well installed- machine slotted screen from 15.00 m to 12.00 m- backfilled with sand from 15.30 m to 11.70 m- backfilled with bentonite pellets from 11.70 m to10.70 m- backfilled with bentonite chips from 10.70 m to0.3 m- backfilled with sand from 0.30 m to 0.10 m- completed with a flush-mounted steel road cover- water level at 7.76 m on January 16, 2017- water level at 7.76 m on May 4, 2017- water level at 7.85 m on March 15, 2018- water level at 7.93 m on May 11, 2018
Shear Strength (kPa)
SPT (N) Blows/300 mm
10 20 30 40
PL LLW.C. (%)SA
MP
LE T
YP
E
DCP Count/300 mm
Cpen
SA
MP
LE ID
SP
T (
N)
10 20 30 40
UCS
50 100 150 200
Field Vane Peak CUP Triaxial
10 20 30 40
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
40
30
DE
PT
H (
m)
31
32
33
34
35
36
37
38
39
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-122
COMPLETION DATE: 22/11/2016DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: SL 250
DRILL METHOD: Sonic DrillPage 4 of 4
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
SAND BENTONITE
COMPLETION DEPTH: 34.1 m
ELEVATION: 1047.39 m3TM 114° NAD 83, Northing: 5656278.94 m, Easting: -4784.69 m
REVIEWED BY: DGA
ELE
VA
TIO
N (
m)
1017
1016
1015
1014
1013
1012
1011
1010
1009
1008
STAN
DPI
PE
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
G-9
G-10
G-11
G-12
G-13
ASPHCONC
SM
SW
GP-GM
GM
Becker hammer
Hydrometer AnalysisGravel = 6.0%Sand = 44.9%Silt = 39.0%Clay = 10.1%SO4 = 161 mg/LChloride (Cl) = 3950 mg/LpH = 8.08
Test hole hydrovacced to 3.0 m
Grain Size AnalysisGravel = 74.7%Sand = 16.6%Silt & Clay = 8.7%
Seepage
Hydrometer AnalysisGravel = 34.7%Sand = 19.2%Silt = 42.7%Clay = 3.4%Atterberg test = non plastic
Hydrometer Analysis at 9.1 mGravel = 0.0%Sand = 16.4%Silt = 76.8%Clay = 6.8%SO4 = 267 mg/LChloride (Cl) = 216 mg/LpH = 8.23
ASPHCONC
SM
SW
GP-GM
GM
ASPHALTCONCRETESAND AND SILT, trace gravel, trace clay, brown,damp, trace organics- no organics below 0.8 m
SAND, some gravel, trace silt, well graded, fine tomedium grained, brown, damp, occasional cobblesand boulders throughout
GRAVEL, some sand, trace silt and clay, poorlygraded, compact to very dense, rounded, brown,damp, occasional cobbles and boulders throughout
- possible boulder from 4.6 m to 5.2 m
GRAVEL AND SILT, some sand, trace clay,compact to dense, brown, wet
SILT, some sand, low to non plastic, brown, wet
PL LLW.C. (%)
10 20 30 40
SA
MP
LE ID
SA
MP
LE T
YP
E Becker Blow Count/300 mm
20 40 60 80
Cpen (kPa)
50 100 150 200
10
0
DE
PT
H (
m)
1
2
3
4
5
6
7
8
9
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-160
COMPLETION DATE: 24/03/2017DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Becker Hammer
DRILL METHOD: Becker HammerPage 1 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample
COMPILED BY: JLF
PROJECT: Green Line North LRT
BENTONITE SAND
COMPLETION DEPTH: 40.9 m
ELEVATION: 1047.22 m3TM 114° NAD 83, Northing: 5656251.89 m, Easting: -4750.94 m
REVIEWED BY: DGA
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
ELE
VA
TIO
N (
m)
1047
1046
1045
1044
1043
1042
1041
1040
1039
1038
STAN
DPI
PE
>>101
>>130
G-14
G-15
G-16
G-17
G-18
G-19
G-20
G-21
G-22
G-23
G-24
G-25
G-26
ML
Hydrometer AnalysisGravel = 0.0%Sand = 27.1%Silt = 65.4%Clay = 7.4%
Hydrometer AnalysisGravel = 0.0%Sand = 2.9%Silt = 88.5%Clay = 8.6%
Hydrometer AnalysisGravel = 0.0%Sand = 0.4%Silt = 65.8%Clay = 33.8%
Hydrometer AnalysisGravel = 0.0%Sand = 5.4%Silt = 69.8%Clay = 24.9%SO4 = 243 mg/LChloride (Cl) =
G-27
G-28
G-29
G-30
G-31
G-32
G-33
G-34
G-35
G-36
G-37
G-38
G-39
CL
Hydrometer AnalysisGravel = 0.0%Sand = 5.6%Silt = 69.4%Clay = 25.0%
Hydrometer AnalysisGravel = 0.0%Sand = 6.2%Silt = 66.4%Clay = 27.3%
Hydrometer AnalysisGravel = 0.0%Sand = 6.6%Silt = 69.9%Clay = 23.5%
Hydrometer Analysis at 28.2 mGravel = 16.4%Sand = 28.1%Silt = 42.3%Clay = 13.2%SO4 = 286 mg/LChloride (Cl) = 31 mg/LpH = 8.06
Hydrometer AnalysisGravel = 0.0%Sand = 10.6%Silt = 72.0%Clay = 17.4%
CL
CLAY (continued)
- sandy, some gravel below 26.7 m
- some sand, trace gravel below 29.0 m
PL LLW.C. (%)
10 20 30 40
SA
MP
LE ID
SA
MP
LE T
YP
E Becker Blow Count/300 mm
20 40 60 80
Cpen (kPa)
50 100 150 200
30
20
DE
PT
H (
m)
21
22
23
24
25
26
27
28
29
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-160
COMPLETION DATE: 24/03/2017DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Becker Hammer
DRILL METHOD: Becker HammerPage 3 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample
COMPILED BY: JLF
PROJECT: Green Line North LRT
BENTONITE SAND
COMPLETION DEPTH: 40.9 m
ELEVATION: 1047.22 m3TM 114° NAD 83, Northing: 5656251.89 m, Easting: -4750.94 m
REVIEWED BY: DGA
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
ELE
VA
TIO
N (
m)
1027
1026
1025
1024
1023
1022
1021
1020
1019
1018
STAN
DPI
PE
G-40
G-41
G-42
G-43
G-44
G-45
G-46
G-47
G-48
G-49
G-50
G-51
G-52
ML
CL
Hydrometer AnalysisGravel = 0.0%Sand = 18.3%Silt = 67.7%Clay = 14.0%
Hydrometer AnalysisGravel = 16.5%Sand = 10.2%Silt = 51.1%Clay = 22.3%
Hydrometer AnalysisGravel = 0.0%Sand = 8.8%Silt = 60.6%Clay = 30.7%
ML
CL
SILT, some sand, low to non plastic, grey, moist
CLAY, some gravel, some sand, low plastic, grey,moist
- trace sand, trace gravel below 37.4 m
PL LLW.C. (%)
10 20 30 40
SA
MP
LE ID
SA
MP
LE T
YP
E Becker Blow Count/300 mm
20 40 60 80
Cpen (kPa)
50 100 150 200
40
30
DE
PT
H (
m)
31
32
33
34
35
36
37
38
39
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-160
COMPLETION DATE: 24/03/2017DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Becker Hammer
DRILL METHOD: Becker HammerPage 4 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample
COMPILED BY: JLF
PROJECT: Green Line North LRT
BENTONITE SAND
COMPLETION DEPTH: 40.9 m
ELEVATION: 1047.22 m3TM 114° NAD 83, Northing: 5656251.89 m, Easting: -4750.94 m
REVIEWED BY: DGA
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
ELE
VA
TIO
N (
m)
1017
1016
1015
1014
1013
1012
1011
1010
1009
1008
STAN
DPI
PE
>>107
>>106
>>114
>>124
>>114
G-53
G-54 CSCS
CLAY (continued)
CLAYSTONE, highly weathered, extremely weak,bluish greyEND OF HOLE at 40.9 m- backfilled with bentonite chips from bottom to9.30 m- 51 mm diameter PVC monitoring well installed- machine slotted screen from 9.00 m to 5.95 m- backfilled with sand from 9.30 m to 5.70 m- backfilled with bentonite chips from 5.70 m to0.30 m- completed with a flush-mounted steel road cover- water level at 7.18 m on May 17, 2018
PL LLW.C. (%)
10 20 30 40
SA
MP
LE ID
SA
MP
LE T
YP
E Becker Blow Count/300 mm
20 40 60 80
Cpen (kPa)
50 100 150 200
50
40
DE
PT
H (
m)
41
42
43
44
45
46
47
48
49
CLIENT: Hatch Ltd. TEST HOLE NO: TH16-160
COMPLETION DATE: 24/03/2017DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Becker Hammer
DRILL METHOD: Becker HammerPage 5 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample
COMPILED BY: JLF
PROJECT: Green Line North LRT
BENTONITE SAND
COMPLETION DEPTH: 40.9 m
ELEVATION: 1047.22 m3TM 114° NAD 83, Northing: 5656251.89 m, Easting: -4750.94 m
REVIEWED BY: DGA
MU
SC
S /
ISR
M
SO
IL S
YM
BO
L
REMARKS
MU
SC
S /
ISR
M
DESCRIPTION
ELE
VA
TIO
N (
m)
1007
1006
1005
1004
1003
1002
1001
1000
999
998
STAN
DPI
PE
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
SPT-925-29-50/125
G-11
G-12
G-13
SPT-1415-17-19
(36)
FILL
SM
GM
ML
Sonic drilling
Test hole hydrovacced to3.0 m
Hydrometer AnalysisGravel = 66.7%Sand = 19.0%Silt = 10.7%Clay = 3.6%
Hydrometer Analysis at 6.2 mGravel = 59.5%Sand = 26.2%Silt = 10.4%Clay = 3.9%
Seepage at 8.6 m
Vibrating Wire Piezometer at8.60 m
Hydrometer Analysis at 8.8 mGravel = 0.0%Sand = 4.7%Silt = 88.8%Clay = 6.6%Atterberg Test = non-plastic
FILL
SM
GM
ML
FILL
SM
GM
ML
GRAVEL, some sand, trace silt, brown, damp,occasional pieces of garbage
SAND, silty, trace gravel, brown, damp
GRAVEL, sandy, some silt, trace clay, fine tocoarse grained, brown, damp, subrounded toangular
SILT, trace sand, non plastic, dense, grey, wet
- sandy below 9.3 m
10 20 30 40
LLW.C. (%)PLSA
MP
LE T
YP
E
SA
MP
LE ID
SPT/DCPT (N) Blows/300 mm
10 20 30 40
UCS (MPa)10 20 30 40
Cpen (kPa)50 100 150 200
CLIENT: Hatch Ltd. TEST HOLE NO: TH17-188
COMPLETION DATE: 15/02/2018DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Tracked Rig
DRILL METHOD: Sonic DrillPage 1 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Standard PenetrationTest Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
GROUT BENTONITE
COMPLETION DEPTH: 41.2 m
ELEVATION: 1047.69 m3TM 114° NAD 83, Northing: 5656312.20 m, Easting: -4751.90 m
REVIEWED BY: DGA
10
0
DE
PT
H (
m)
1
2
3
4
5
6
7
8
9
SO
IL/R
OC
K S
YM
BO
L
MU
SC
S /
ISR
M
REMARKS
MU
SC
S /
ISR
MM
US
CS
/ IS
RM
MU
SC
S /
ISR
M
DESCRIPTIONDESCRIPTION
ELE
VA
TIO
N (
m)
1047
1046
1045
1044
1043
1042
1041
1040
1039
1038
VIBR
ATIN
GW
IRE
VIBR
ATIN
GW
IRE
driven
G-16
G-17
G-18
ST-19
SPT-207-12-19
(31)
G-22
G-23
G-24
G-25
G-26
G-27
G-28
ST-29
SPT-305-9-15(24)
G-32
SM
ML
CL
ML
Hydrometer Analysis at 9.3 mGravel = 0.0%Sand = 22.3%Silt = 75.0%Clay = 2.7%Atterberg Test = non-plastic
Hydrometer Analysis at10.4 mGravel = 0.0%Sand = 33.3%Silt = 61.1%Clay = 5.6%
Hydrometer Analysis at12.3 mGravel = 0.0%Sand = 61.2%Silt = 34.2%Clay = 4.5%
Hydrometer AnalysisGravel = 0.0%Sand = 12.8%Silt = 85.0%Clay = 2.2%Atterberg Test = non-plastic
Hydrometer AnalysisGravel = 0.0%Sand = 5.4%Silt = 74.7%Clay = 19.9%
Hydrometer Analysis at18.8 mGravel = 0.0%Sand = 0.2%Silt = 76.7%Clay = 23.1%
Hydrometer Analysis at19.4 mGravel = 0.0%Sand = 21.1%Silt = 70.8%Clay = 8.1%
SM
ML
CL
ML
SM
ML
CL
ML
SILT (continued)
SAND, silty, trace clay, grey, wet to saturated, veryfine grained to fine grained
SILT, some sand, non plastic, grey, saturated
CLAY, trace sand, low plastic, grey, saturated
SILT, sandy, non to low plastic, grey, saturated
10 20 30 40
LLW.C. (%)PLSA
MP
LE T
YP
E
SA
MP
LE ID
SPT/DCPT (N) Blows/300 mm
10 20 30 40
UCS (MPa)10 20 30 40
Cpen (kPa)50 100 150 200
CLIENT: Hatch Ltd. TEST HOLE NO: TH17-188
COMPLETION DATE: 15/02/2018DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Tracked Rig
DRILL METHOD: Sonic DrillPage 2 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Standard PenetrationTest Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
GROUT BENTONITE
COMPLETION DEPTH: 41.2 m
ELEVATION: 1047.69 m3TM 114° NAD 83, Northing: 5656312.20 m, Easting: -4751.90 m
REVIEWED BY: DGA
20
10
DE
PT
H (
m)
11
12
13
14
15
16
17
18
19
SO
IL/R
OC
K S
YM
BO
L
MU
SC
S /
ISR
M
REMARKS
MU
SC
S /
ISR
MM
US
CS
/ IS
RM
MU
SC
S /
ISR
M
DESCRIPTIONDESCRIPTION
ELE
VA
TIO
N (
m)
1037
1036
1035
1034
1033
1032
1031
1030
1029
1028
VIBR
ATIN
GW
IRE
VIBR
ATIN
GW
IRE
G-33
G-34
G-35
G-36
G-37
G-38
G-39
G-40
SPT-417-9-12(21)
G-43
G-44
CL
NR
Vibrating Wire Piezometer at20.00 m
Hydrometer AnalysisGravel = 0.6%Sand = 5.3%Silt = 66.3%Clay = 27.7%
Hydrometer AnalysisGravel = 0.0%Sand = 5.6%Silt = 66.3%Clay = 28.0%
Hydrometer AnalysisGravel = 0.0%Sand = 5.8%Silt = 67.9%Clay = 26.3%
Hydrometer AnalysisGravel = 0.6%Sand = 4.6%Silt = 72.6%Clay = 22.2%
CL
NR
CL
NR
SILT (continued)
- trace gravel below 20.5 m
CLAY, trace gravel, trace sand, low plastic, grey,wet
NO RECOVERY
CLAY, trace sand, low plastic, dark grey, moist
10 20 30 40
LLW.C. (%)PLSA
MP
LE T
YP
E
SA
MP
LE ID
SPT/DCPT (N) Blows/300 mm
10 20 30 40
UCS (MPa)10 20 30 40
Cpen (kPa)50 100 150 200
CLIENT: Hatch Ltd. TEST HOLE NO: TH17-188
COMPLETION DATE: 15/02/2018DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Tracked Rig
DRILL METHOD: Sonic DrillPage 3 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Standard PenetrationTest Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
GROUT BENTONITE
COMPLETION DEPTH: 41.2 m
ELEVATION: 1047.69 m3TM 114° NAD 83, Northing: 5656312.20 m, Easting: -4751.90 m
REVIEWED BY: DGA
30
20
DE
PT
H (
m)
21
22
23
24
25
26
27
28
29
SO
IL/R
OC
K S
YM
BO
L
MU
SC
S /
ISR
M
REMARKS
MU
SC
S /
ISR
MM
US
CS
/ IS
RM
MU
SC
S /
ISR
M
DESCRIPTIONDESCRIPTION
ELE
VA
TIO
N (
m)
1027
1026
1025
1024
1023
1022
1021
1020
1019
1018
VIBR
ATIN
GW
IRE
VIBR
ATIN
GW
IRE
G-45
G-46
G-47
G-48
G-49
G-50
G-51
G-52
G-53
G-54
G-55
G-56
G-57
G-58
CL
Hydrometer AnalysisGravel = 0.0%Sand = 5.6%Silt = 68.0%Clay = 26.3%
Hydrometer AnalysisGravel = 0.0%Sand = 10.5%Silt = 73.4%Clay = 16.1%
Hydrometer AnalysisGravel = 0.0%Sand = 0.0%Silt = 87.5%Clay = 12.5%
Hydrometer AnalysisGravel = 0.0%Sand = 16.9%Silt = 69.8%Clay = 13.3%
Hydrometer AnalysisGravel = 0.0%Sand = 10.1%Silt = 60.3%Clay = 29.6%
CLCL
CLAY (continued)
- some sand at 33.1 m
- silt at 36.3 m, low to non plastic
- clay and silt at 38.3 m, low to non plastic, somesand, occasional cobbles
10 20 30 40
LLW.C. (%)PLSA
MP
LE T
YP
E
SA
MP
LE ID
SPT/DCPT (N) Blows/300 mm
10 20 30 40
UCS (MPa)10 20 30 40
Cpen (kPa)50 100 150 200
CLIENT: Hatch Ltd. TEST HOLE NO: TH17-188
COMPLETION DATE: 15/02/2018DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Tracked Rig
DRILL METHOD: Sonic DrillPage 4 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Standard PenetrationTest Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
GROUT BENTONITE
COMPLETION DEPTH: 41.2 m
ELEVATION: 1047.69 m3TM 114° NAD 83, Northing: 5656312.20 m, Easting: -4751.90 m
REVIEWED BY: DGA
40
30
DE
PT
H (
m)
31
32
33
34
35
36
37
38
39
SO
IL/R
OC
K S
YM
BO
L
MU
SC
S /
ISR
M
REMARKS
MU
SC
S /
ISR
MM
US
CS
/ IS
RM
MU
SC
S /
ISR
M
DESCRIPTIONDESCRIPTION
ELE
VA
TIO
N (
m)
1017
1016
1015
1014
1013
1012
1011
1010
1009
1008
VIBR
ATIN
GW
IRE
VIBR
ATIN
GW
IRE
G-59CSCSCS
CLAY (continued)
CLAYSTONE, fresh, very weak to weak, dark grey
END OF HOLE at 41.2 m- Vibrating Wire Piezometers installed at depths of8.60 m (VW 40329) and 20.00 m (VW 48370) belowgrade- backfilled with bentonite chips from 41.15 m to28.65 m- backfilled with grout from 28.65 m to surface- completed with a flush mounted steel road cover- piezometer (VW 40329) dry on June 11, 2018- piezometric water level (VW 48370) at 8.6 m onJune 11, 2018
10 20 30 40
LLW.C. (%)PLSA
MP
LE T
YP
E
SA
MP
LE ID
SPT/DCPT (N) Blows/300 mm
10 20 30 40
UCS (MPa)10 20 30 40
Cpen (kPa)50 100 150 200
CLIENT: Hatch Ltd. TEST HOLE NO: TH17-188
COMPLETION DATE: 15/02/2018DRILLING CO.: Earth Drilling Co. Ltd.
INSPECTOR: BRM
RIG TYPE: Tracked Rig
DRILL METHOD: Sonic DrillPage 5 of 5
PROJECT NO: 11474
SAMPLE TYPE:
BACKFILL TYPE:
Grab Sample Standard PenetrationTest Shelby Tube
COMPILED BY: JLF
PROJECT: Green Line North LRT
GROUT BENTONITE
COMPLETION DEPTH: 41.2 m
ELEVATION: 1047.69 m3TM 114° NAD 83, Northing: 5656312.20 m, Easting: -4751.90 m
REVIEWED BY: DGA
50
40
DE
PT
H (
m)
41
42
43
44
45
46
47
48
49
SO
IL/R
OC
K S
YM
BO
L
MU
SC
S /
ISR
M
REMARKS
MU
SC
S /
ISR
MM
US
CS
/ IS
RM
MU
SC
S /
ISR
M
DESCRIPTIONDESCRIPTION
ELE
VA
TIO
N (
m)
1007
1006
1005
1004
1003
1002
1001
1000
999
998
VIBR
ATIN
GW
IRE
VIBR
ATIN
GW
IRE
0 100 200 300
0
5
10
15
20
25
30
35
40
qt (bar)
De
pth
(m
ete
rs)
0.0 2.0 4.0 6.0 8.0
fs (bar)
0 2 4 6 8
Rf (%)
0 100 200 3003000
u (m)
0 3 6 99
SBT Qtn
Thurber EngineeringJob No: 17-03030
Date: 2017-10-29 11:21
Site: Calgary, AB
Sounding: SCPT17-187
Cone: 347:T1500F15U500
Max Depth: 41.200 m / 135.17 ftDepth Inc: 0.025 m / 0.082 ftAvg Int: Every Point
File: 17-03030_SP187B.CORUnit Wt: SBTQtn (PKR2009)
SBT: Robertson, 2009 and 2010Coords: Local N: 5656251.76m E: -4748.87m Elev: 1047.21mPage No: 1 of 2
Undefined
Sands
Sand Mixtures
Sands
Sand MixturesSandsSand MixturesSand MixturesSilt Mixtures
Sand MixturesSilt MixturesSilt Mixtures
Silt Mixtures
Clays
Silt MixturesClaysClays
Clays
Silt MixturesSilt Mixtures
ClaysClaysClaysSilt MixturesClaysClaysClays
Silt Mixtures
Clays
Silt MixturesSilt MixturesSilt MixturesSilt MixturesClaysSand MixturesSand Mixtures
Clays
DRILLED OUT DRILLED OUT DRILLED OUT DRILLED OUT
Overplot Item: Assumed UeqUeq Dissipation, equilibrium not achieved
Dissipation, equilibrium achieved Hydrostatic Line
0 100 200 300
40
45
50
55
60
65
70
75
8080
qt (bar)
De
pth
(m
ete
rs)
0.0 2.0 4.0 6.0 8.0
fs (bar)
0 2 4 6 8
Rf (%)
0 100 200 3003000
u (m)
0 3 6 99
SBT Qtn
Thurber EngineeringJob No: 17-03030
Date: 2017-10-29 11:21
Site: Calgary, AB
Sounding: SCPT17-187
Cone: 347:T1500F15U500
Max Depth: 41.200 m / 135.17 ftDepth Inc: 0.025 m / 0.082 ftAvg Int: Every Point
File: 17-03030_SP187B.CORUnit Wt: SBTQtn (PKR2009)
SBT: Robertson, 2009 and 2010Coords: Local N: 5656251.76m E: -4748.87m Elev: 1047.21mPage No: 2 of 2
ClaysClays
Refusal Refusal Refusal Refusal
Overplot Item: Assumed UeqUeq Dissipation, equilibrium not achieved
Dissipation, equilibrium achieved Hydrostatic Line
0 100 200 300
0
5
10
15
20
25
30
35
4040
qt (bar)
De
pth
(m
ete
rs)
0.0 2.0 4.0 6.0 8.0
fs (bar)
0 2 4 6 8
Rf (%)
0 100 200 3003000
u (m)
0 3 6 99
SBT Qtn
Thurber EngineeringJob No: 17-03030
Date: 2017-10-25 14:33
Site: Calgary, AB
Sounding: SCPT17-188
Cone: 347:T1500F15U500
Max Depth: 39.200 m / 128.61 ftDepth Inc: 0.025 m / 0.082 ftAvg Int: Every Point
File: 17-03030_SP188B.CORUnit Wt: SBTQtn (PKR2009)
SBT: Robertson, 2009 and 2010Coords: Local N: 5656311.45m E: -4752.10m Elev: 1047.74mPage No: 1 of 1
Undefined
Sands
Sands
Sand Mixtures
Sands
Sand Mixtures
SandsSand Mixtures
Sand MixturesSilt Mixtures
Sand MixturesSilt MixturesSilt Mixtures
Clays
Silt Mixtures
Silt MixturesSilt Mixtures
Clays
Silt Mixtures
ClaysSilt Mixtures
Clays
Silt MixturesUndefined
Refusal Refusal Refusal Refusal
DRILLED OUT DRILLED OUT DRILLED OUT DRILLED OUT
Overplot Item: Assumed UeqUeq Dissipation, equilibrium not achieved
Dissipation, equilibrium achieved Hydrostatic Line