1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design
Transcript
Page 1: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

1

Week 5 & 6 -Major Components of Systems Development

IT2005 System Analysis

& Design

Page 2: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

2

Major components of system development

1. Methodology2. Modeling Methods or Techniques3. Tools

Page 3: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

3

Methodology

• A very formal and accurate system development process that defines a set of – Activities – Methods – Best practices – Deliverables – Automated tools

Methodology

Methods Or Techniques

Tools

Page 4: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

4

Methodology..

Provides the framework1. Has a predefined set of steps2. Ensures that systems are built in the most effective

wayEg: SSADM (structured methodologies)STRADIS (Structured Analysis, Design and

Implementation of Information Systems) YSM (Yourdon Systems Method)

Page 5: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

5

Methodology

Modeling Methods Or Techniques

Eg: Class diagram, usecase diagram

ToolsEg: Rational rose

Page 6: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

6

Modeling method• A set of techniques used to implement a Methodology.• Data Flow Diagrams

– A process model – Depict the flow of data through a system and the work performed

by the system • Entity Relationship Diagrams

– A data model – Depict data in terms of entities and relationships described by the

data – Consists of several notations

• Structure Charts etc.

Page 7: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

7

ToolsTools are Software systems and they assist analysts

and designers to build information systems. General Aim :– Decrease the human effort required to develop

the software – Increase the quality of software – Tools will support methodologies but will not

replace system analysts.e.g. Easy Case, Rational Rose

Page 8: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

8

Underlying Principles for SystemDevelopment methodology

P1: Get the system users involvedP2: Use a problem-solving approachP3: Establish phases and activities.P4 : Document through out DevelopmentP5: Establish standardsP6 :Manage the process and ProjectsP7:Justify systems as Capital Investments.P8:Don’t be afraid to cancel or revise scope.P9:Divide and conquerP10: Design systems for growth and change.

Page 9: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

9

What is a Software Process?

• A set of ordered tasks involving activities , constraints and resources that produce a software system.

Page 10: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

10

Software process models• Waterfall model• Prototyping models• Evolutionary models• The spiral model• Formal development• Incremental development• Rapid Application Development• Unified Process• Agile Process• Extreme Programming (XP)

Page 11: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

11

The Waterfall model• Separate and distinct phases of specification

and development

• A linear sequential model

requirements analysis & spec

softwaredesign

coding

testing

Maintenance

Page 12: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

12

Software Life Cycle Models

• Waterfall lifecycle

Page 13: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

13

Waterfall Strengths

Easy to understand, easy to useProvides structure to inexperienced staffMilestones are well understoodSets requirements stabilityGood for management control (plan, staff,

track)Works well when quality is more important

than cost or schedule

Page 14: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

14

Problems with Waterfall Development Approach

Page 15: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

15

Problems with Waterfall Development Approach……

There are several problems with this approach. 1. It has a rigid design 2. Inflexible 3. It has a top-down procedure 4. One phase must be completed before the next phase

starts 5. No phase can be repeated 6. Time consuming

There are several criticisms of the Waterfall development approach

Page 16: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

16

Modified Waterfall Development Approach

• Uses the same phases as the pure waterfall development approach.

• Allow some of the stages to overlap, such as the requirements stage and the design stage.

• Another common modification is to incorporate prototyping into the requirements phases.

• Overlapping stages make it possible to integrate feedback from the design phase into the requirements.

• Progress is more difficult to track.

Page 17: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

When to use the Waterfall Model

The linear cycles are usually best suited to problems which are well understood and highly structured. Attractive for large problems. Projects which have clear and stable requirements.

Page 18: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

PrototypingIt is very difficult for end-users to anticipate how they will use new software systems to support their work. If the system is large and complex, it is probably impossible to make this assessment before the system is built and put into use.

A prototype ( a small version of the system) can be used to clear the vague requirements. A prototype should be evaluated with the user participation.

There are two types of Prototyping techniques

* Throw-away Prototyping

* Evolutionary Prototyping

Page 19: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Throw-away and Evolutionary Prototyping

Outline

Requirements

Throw-away

prototyping

Evolutionary

prototyping

Executable prototype +

System specification

Delivered system

Page 20: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Throw-away Prototypingspecify system

establish outline

specification

components

evaluate prototype

develop prototype

validate system

design and implement

system

Delivered

software

system

Page 21: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Throw-away Prototyping

The objective is to understand the system requirements clearly. Starts with poorly understood requirements. Once the requirements are cleared, the system will be developed from the beginning.

This model is suitable if the requirements are vague but stable.

Page 22: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Some problems with Throw-away Prototyping1. Important features may have been left out of the prototype to

simplify rapid implementation. In fact, it may not be possible to prototype some of the most important parts of the system such as safety-critical functions.

2. An implementation has no legal standing as a contract between customer and contractor.

3. Non-functional requirements such as those concerning reliability, robustness and safety cannot be adequately tested in a prototype implementation.

Page 23: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Evolutionary Prototyping

Develop abstractspecification

Build prototypesystem

Evaluate prototypesystem

SystemAdequate?

Deliversystem

NO

YES

Page 24: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

24

Structured Evolutionary Prototyping Strengths

1. Customers can “see” the system requirements as they are being gathered

2. Developers learn from customers 3. A more accurate end product4. Unexpected requirements accommodated5. Allows for flexible design and development6. Interaction with the prototype stimulates awareness of

additional needed functionality

Page 25: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

25

Prototyping Weaknesses• Prototyping can lead to false expectations. • Prototyping can lead to poorly designed systems. • Overall maintainability may be overlooked• The customer may want the prototype delivered.• Process may continue forever (scope creep)

• Continual change tends to corrupt the structure of the prototype system. Maintenance is therefore likely to be difficult and costly.

Page 26: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Evolutionary Prototyping (continued)Disadvantages

* Prototype usually evolve so quickly that it is not cost- effective to

produce greater deal of documentation

* Continual change tends to corrupt the structure of the prototype

system. Maintenance is therefore likely to be difficult and costly.

* It is not clear how the range of skills which is normal in software

engineering teams can be used effectively for this mode of

development.

* Languages which are good for prototyping not always best for final

product.

Page 27: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

The RAD Model

Business

modeling

Data

modeling

Process

modeling

Application

generation

Testing &

turnover

Business

modeling

Data

modeling

Process

modeling

Application

generation

Testing &

turnover

Business

modeling

Data

modeling

Process

modeling

Application

generation

Testing &

turnover

Team 1Team 2

Team 3

60 –90 days

Page 28: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Processes in the RAD model

Business modelling - The information flow in a business system considering its functionality.

Data Modelling - The information flow defined as part of the business modelling phase is refined into a set of data objects that are needed to support the business

Process Modelling - The data objects defined in the data modelling phase are transformed to achieve the information flow necessary to implement business functions.

Application generation - RAD assumes the use of 4GL or visual tools to generate the system using reusable components.

Testing and turnover

New components must be tested and all interfaces must be fully exercised

Page 29: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Cont. RAD lifecycle

29

RequirementDefinition/ Refinement

Contract

Feedback

Design

Prototype Development

Cutomer Prototype Review

Deployment

Page 30: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

The RAD model

• Rapid Application Development (RAD) is an incremental software development process model that emphasizes an extremely short development cycle.

• If requirements are well understood and project scope is constrained, the RAD process enables a development team to create a ‘fully functional system’ within very short time periods (eg. 60 to 90 days)

Page 31: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Some problems with the RAD model

1. RAD requires sufficient human resources to create right number of RAD teams

2. RAD requires developers and customers who are committed to the rapid-fire activities necessary to get a system completed in a much abbreviated time frame.

3. If a system cannot be properly modularized, building the components necessary for RAD will be problematic.

4. RAD is not applicable when technical risks are high.

Page 32: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Incremental Model

conception

architecture

deliver 1st Increment

analysis design code test

deliver 2nd Increment

analysis design code test

deliver 3rd Increment

analysis design code test

structure

feedback

feedback

Page 33: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Incremental Development

• The Incremental development model involves developing the system in an incremental fashion.

• The most important part of the system is fist delivered and the other parts of the system are then delivered according to their importance.

• Incremental development is more manageable than evolutionary prototyping as the normal software process standards are followed.

• Plans and documentation must be produced

Page 34: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

34

Iterative Development Approach

Page 35: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

35

Iterative Development Approach

• Iterative development approach completes the entire IS in successive iterations.

• Each iteration does some – analysis – design – construction

• Allows versions of usable information to be delivered in regular and shorter time frames.

• The iteration process helps to develop a part of the new system and place it into operation as quickly as possible.

Page 36: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

36

Spiral model• The spiral model (Boehm, 1988) aims at risk reduction by any

means in any phase.• quadrant 1

– determine objectives of that phase– alternatives and constraints.

• quadrant 2– analyzed form the viewpoint of risk– solutions to minimize these risks are investigated, often using

prototyping. • quadrant 3

– where the traditional waterfall model phases are put into practice.• Quadrant4

– the results of the risk-reduction strategies

Page 37: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

37

Spiral model

Page 38: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

38

Spiral Quadrant

Determine objectives, alternatives and constraints

• Objectives: functionality, performance, hardware/software interface, critical success factors, etc.

• Alternatives: build, reuse, buy, sub-contract, etc.

• Constraints: cost, schedule, interface, etc.

Page 39: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

39

Spiral QuadrantEvaluate alternatives, identify and resolve risks

• Study alternatives relative to objectives and constraints

• Identify risks (lack of experience, new technology, tight schedules, poor process, etc.

• Resolve risks (evaluate if money could be lost by continuing system development)

Page 40: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

40

Spiral QuadrantDevelop next-level product

• Typical activates:– Create a design– Review design– Develop code– Inspect code– Test product

Page 41: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

41

Spiral QuadrantPlan next phase

• Typical activities– Develop project plan– Develop configuration management plan– Develop a test plan– Develop an installation plan

Page 42: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

42

Spiral Model Strengths• Provides early indication of insurmountable

risks, without much cost• Users see the system early because of rapid

prototyping tools• Critical high-risk functions are developed first• The design does not have to be perfect • Users can be closely tied to all lifecycle steps• Early and frequent feedback from users

Page 43: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

43

Spiral Model Weaknesses

• Time spent for evaluating risks too large for small or low-risk projects

• The model is complex • Risk assessment expertise is required• May be hard to define objective, verifiable

milestones that indicate readiness to proceed through the next iteration

Page 44: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

44

When to use Spiral Model• When creation of a prototype is appropriate• When costs and risk evaluation is important• For medium to high-risk projects• Long-term project commitment unwise because of potential

changes to economic priorities• Users are unsure of their needs• Requirements are complex• New product line • Significant changes are expected (research and exploration)•

Page 45: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

V-Shaped SDLC Model

45

Testing of the product is planned in parallel with a corresponding phase of development

Page 46: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

46

Page 47: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

47

V-Shaped Strengths

• Emphasize planning for verification and validation of the product in early stages of product development

• Each deliverable must be testable• Project management can track progress by

milestones• Easy to use

Page 48: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

48

V-Shaped Weaknesses

• Does not easily handle concurrent events• Does not handle iterations or phases• Does not easily handle dynamic changes in

requirements• Does not contain risk analysis activities

Page 49: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

49

Waterfall vs AgileTimeboxing

Page 50: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

RAD: Definition?

50

• Many Definitions : same philosophy• Definition 1:– A software development process that allows

usable systems to be built within a short period (as little as 2-3 months), often with compromises.

– It is a generic term with the meaning “speedy development” or “Shorter schedule”

Page 51: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

RAD

51

• Rapid Application Development (RAD) refers to a type of software development which uses “optimal” planning in favor of rapid prototyping.

• The "planning" of software developed using RAD is interleaved with writing the software itself.

• The lack of extensive pre-planning generally allows software to be written much faster, and makes it easier to change requirements.

Page 52: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

RAD lifecycle

52

• RAD compresses the step-by-step development process into an iterative process.– User requirements are refined.– A system is designed.– A prototype is developed.– The prototype is reviewed by end-user.– User provide feedback.– The process is repeated.

Page 53: 1 Week 5 & 6 -Major Components of Systems Development IT2005 System Analysis & Design.

Review Questions

1. The following are initial requirements specified by some customers. Identify the most suitable process models for these software projects.

(a) “ I need to develop a simple library system for my school. I know the requirements very well”

(b) “I need to develop a management information system for my organization,. I may use it for all the branches in several location in Sri Lanka. I might use it on the Internet”.

(c ) “ I need to develop a software system to control a space shuttle”