1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008
Transcript
Page 1: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

1

Working with Contractors for Indicator 14:

Tips and Strategies

Capacity Building Institute

Charlotte, NCMay 8, 2008

Page 2: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

2

Presenters

Jackie Burr, Oregon SEA

Pattie Johnson, Teaching Research Institute, Western Oregon University

Jacque Hyatt,Idaho SEA

David Test,Special Education Program, UNC Charlotte

States

Contractors

Page 3: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

3

Indicator 14: Census or Sample

Oregon

North Carolina

Idaho

Page 4: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

4

Oregon and Indicator 14

OR uses “census” and “sampling”

OR has no large LEAs (50,000+)

OR uses district personnel to make calls

Page 5: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

5

North Carolina and Indicator 14

NC is a ‘sampling’ state

NC has 5 large LEAs (50,000+)

NC uses a call center (PIAR @ SUNY Potsdam) will also send paper copies and have

on-line version if needed

Page 6: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

7

Idaho and Indicator 14

Idaho is a ‘census’ state Began survey with Class of 2000

Total school leavers per yr 1100-1200

Contract is with a private company

Two activities associated with data collection:

Exit Survey Follow-up Survey (1, 3, and 5 years out)

Page 7: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

8

Why (or when) should a contractor be used?

Provide missing content and context

Training partner

Different perspective (Academic)

Different skill set

Time lines too tight for state

Detailed data handling

Page 8: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

9

What are the roles of the partners in terms of…

Data collection?

Data analysis?

Data reporting?

Data-based decision-making?

Page 9: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

10

OR SEA Roles

State Representative

Set parameters

Develop budget

Finalize content

Liaison between data managers, IT, SEA teams

Obtain final approvals

Page 10: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

11

OR Contractor Roles

Contractor

Research alternatives

Recommend methodology

Develop application

Analysis

Reporting

Page 11: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

12

NC Department of Public Instruction’s Role

Have final say on all questions and procedures

Help with LEA contacts

Work with LEA directors

Report to all stakeholders

Page 12: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

13

NC Contractor’s Role

Help develop surveys

Coordinate/compile Exit data

Give it to PIAR (PAIR collects PS data)

Analyze PSO data

Write reports Exit survey summary PSO data summaries

Overall LEAs

Page 13: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

14

NC Contractor’s Role

Report to stakeholder group

Coordinate with NC DPI Email Phone Reports Presentations

Work with NPSO Participate in monthly calls Use website resources

Page 14: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

15

Idaho SDE Responsibilities

Develop scope of work for contractor

Manage the completion of the Exit Surveys

Generate student contact list for contractor

Provide contractor with survey cover letter

Communicate with contractor

Support a SDE ‘content’ specialist and a ‘data’ specialist to manage the project

Page 15: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

16

Examples of questions the SEA should ask of the contractor:

When will we be able to review progress and structure of data collection?

How long will we have to review and finalize?

When will reports be complete?

Page 16: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

17

Examples of questions the contractor should ask the SEA

What data format (SPSS, Excel, other) does the SEA need?

Who provides training and materials?

When are reports due?

Page 17: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

18

Tips and Strategies for working successfully with partners

Solid Contract

Relationships

Constant Communication

Page 18: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

19

Solid Contract

Choose a contractor that compliments the resources or skill set of the SEA

Write contract based on “big picture” result/outcomes

Clearly define deliverables

Specify time table

Write Tight—Work Loose

Page 19: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

20

Relationships

Good communication

Respect partners

Prioritize often

Anticipate barriers

Find solutions together

Maintain professionalism

Develop and maintain trust

Page 20: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

21

Issues Needing Constant Communication

Data collection

Methodology

Barriers

Measuring Results

Content and Context

Timelines

Page 21: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

22

Questions

Page 22: 1 Working with Contractors for Indicator 14: Tips and Strategies Capacity Building Institute Charlotte, NC May 8, 2008.

23

Contact Information

Jackie Burr 503-947-5639 Jackie.burr@state.

or.us

Pattie Johnson 503-838-8779 [email protected]

Jacque Hyatt 208-332-6951 [email protected].

gov

David Test 704-687-8853 [email protected]


Recommended