+ All Categories
Home > Documents > 10-1_Gales

10-1_Gales

Date post: 07-Aug-2018
Category:
Upload: rigobertoguerra
View: 212 times
Download: 0 times
Share this document with a friend

of 10

Transcript
  • 8/21/2019 10-1_Gales

    1/21

    Fire 

    Engineering 

    Research: 

    Key 

    Issues 

    for 

    the 

    Future 

    Post ‐tensioned  Concrete Structures in Fire

    John Gales

    Supervision: Luke Bisby, 

    Co supervision: Martin Gillie‐ modelling, Phase 1 and  3

    Tim Stratford ‐ experimentation, Phase 2 and  3

  • 8/21/2019 10-1_Gales

    2/21

    What are post‐tensioned buildings?

    Conventional steel rebar  Prestressing (PS) steel 

    •   Advantages of  post‐tensioning concrete with PS steel for load balancing

    ‐   Thin floors (high ceilings)

    ‐   Increased span lengths 

    ‐   Reduces building materials 

    ‐   Rapid construction

    Highly 

    optimized

  • 8/21/2019 10-1_Gales

    3/21

    Typical post‐tensioned buildings

    Modern BPT 

    building, UK

    Modern UPT 

    building, USA

    Antiquated (1960s) 

    UPT building, USA

  • 8/21/2019 10-1_Gales

    4/21

    Novel building optimization

    “  Today’s  flat ‐slab  post ‐tensioned  buildings ,  for  example, with columns spaced  (12 m) on center  

    and  span

    ‐depth

     ratios

     of 

     40 

     are

     more

     complex 

     

    and  require more engineering attention thantypical   flat ‐slab buildings of  40  years ago , with columns spaced  at  (6 m) on center  and  span‐

    depth ratios

     of 

     20.

     ”   ‐Randall  Poston (chair   ACI 

    318)

    •   Current guidance is dated and has not 

    kept up with modern optimization trends

  • 8/21/2019 10-1_Gales

    5/21

    Real PT slab behaviour in fire is debatable

    •   PT optimization increases 

    susceptibility to fire:

    ‐  PS steel  more

     sensitive

     to

     strength

     loss

     in

     high

     

    temperature

    ‐   Spalling of  concrete cover  (HS concrete, 

     precompression of  slab)

    ‐  Unbonded  tendons run

     continuous , local  damage

     WILL

    effect  the entire  floor  (Key  Biscayne demolition)

    •   Code guidance is based on (often 

    dated) 

    standard 

    furnace 

    tests 

    of  

    simple 

    span slabs: 

    ‐  modern construction?, building materials?, real   fires? 

    PT  Standard   fire test  (Kelly  and  

    Purkiss, 2008)

  • 8/21/2019 10-1_Gales

    6/21

    The PhD

    •   Phase 1 Fire code assessment for unbonded PS steel rupture (spalling, and variable heating length) 

    •   Phase 2 High

     temperature

     

    mechanical behaviour of  modern PS steel (softening, strength and creep) 

    •   Phase 3 three large‐scale continuous PT slab tests under localised heating

    •   Side  projects while I wait   for  Phase 3 to begin (curing time delayed)

    Temperature compensated time (θ)

       C  r  e  e  p  s   t  r  a   i  n   (  e  c  r   )

     ∆θ

     ∆ecr  Secondary Creep rate=Z=  ∆ecr 

       ∆θ

    ecr,0

       P  r   i  m  a  r

       C  r  e  e  p

       S  e  c  o  n   d  a  r

       C  r  e  e  p

       T  e  r   t   i  a  r

       C  r  e  e  p

  • 8/21/2019 10-1_Gales

    7/21

    Phase 1: Localized fire damage to unbonded 

    PS 

    steel•   2009 Tests demonstrated unbonded PS steel rupture is more probable under localized heating ‐ influenced by creep 

    •   Localized fires may be due to spalling, travelling, ceiling  jets…

    Localized  heated  UPT  tendon tests 

    ( strong back  tests ) conducted  in my  

    masters

    Lower  ratio of  heating,  failed  tendons 

    at  equivalent  temperatures

  • 8/21/2019 10-1_Gales

    8/21

    Phase 1: Localized fire damage to unbonded 

    PS 

    steel•   IBC, and EC2 analyzed with simple tendon rupture 

    modelling with creep (time, temp, load dependent) 

    relation and

     heat

     transfer

     ( ASTM

     E119

     curve)

    Parametric  analysis: Heated  length ratio, spalling, specified  concrete cover 

  • 8/21/2019 10-1_Gales

    9/21

    Phase 1 results

     Performance based

     guidance

     not

     

    clearly specified in codes with respect to losing unbonded PS steel in a fire

     Considerations

     

    to 

    made; 

    restraint, 

    bonded  reinforcing, spalling mitigation

     American IBC code was unconservative

     Real unbonded PS steel behaviour more 

    severe than

     Phase

     1 modelling,

     new

     

    modelling parameters needed (Phase 2)

     Results have tied  in directly  or  inspired  

    related  PhD

      projects

     at 

     Edinburgh

    (spalling, concrete cover  influence using FEM)

    0.00

    100.00

    200.00

    300.00

    400.00

    500.00

    600.00

    700.00

    800.00

    900.00

    1000.00

    0 0.2 0.4 0.6 0.8 1

    Time (hr)

       T  e  m

      p  e  r  a   t  u  r  e   (   °   C   )

    Cover (0mm)

    Cover (1mm)

    Cover (2mm)

    Cover (3mm)

    Cover (4mm)

    Cover (5mm)

    Cover (6mm)

    Cover (7mm)

    Cover (8mm)

    Cover (9mm)Cover (10mm)

    Cover (11mm)

    Cover (12mm)

    Cover (13mm)

    Cover (14mm)

    F|IR|E

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    0 0.2 0.4 0.6 0.8 1

    Time (hr)

       T  e  m  p  e  r  a   t  u  r  e   (   °   C   )

    Cover (0mm)

    Cover (1mm)

    Cover (2mm)

    Cover (3mm)

    Cover (4mm)

    Cover (5mm)

    Cover (6mm)

    Cover (7mm)

    Cover (8mm)

    Cover (9mm)

    Cover (10mm)

    Cover (11mm)

    Cover (12mm)

    Cover (13mm)

    Cover (14mm)

    F|IR|E

    Example heat  transfer  compensated   for  spalling input  (200mm slab)

  • 8/21/2019 10-1_Gales

    10/21

    Phase 2: Modern PS steel behaviour in high 

    temperature

    Used Digital Image Correlation (DIC) in uniaxial tensile tests to 

    measure deformation and cross section reduction

  • 8/21/2019 10-1_Gales

    11/21

    Phase 2: Modern PS steel behaviour in high 

    temperature•   DIC patch correlations based on HT paint speckle pattern   atch A 750Px gauge length = 37.5mm  Patch B

    Pixel (y)

    Pixel (x)

    Stress = 0 MPa 

    Stress = 1950 MPa

     

     Patch A Patch B 

    Method  needed  validation  for  current  use……………….

  • 8/21/2019 10-1_Gales

    12/21

    Phase 2: Modern PS steel behaviour in high 

    temperature•   DIC to bonded foil strain gauges and extensometer 

    •   DIC cross section to Poisson constant  volume theory 

    •   DIC to theoretical

     thermal

     expansion

     calculation

     (EC2)

  • 8/21/2019 10-1_Gales

    13/21

    Phase 2: Modern PS steel behaviour in high 

    temperature•   Creep behaviour using temperature compensated time.

    •   PS steel types considered; ASTM 421‐1970, ASTM 416‐

    2008, and

     BS

     5896

    ‐2011 (all 

     of 

     different 

     composition,

     but 

     

    considered  structurally  equivalent)

  • 8/21/2019 10-1_Gales

    14/21

    Phase 2 results

    •   Uniaxial creep tests at Steady  state and Transient 

    investigating equivalency

    Results appeared  similar  (creep  parameters were 

    identical  magnitudes; at  

    690MPa and 

     1000MPa

     

    stress levels)

    Change in transient  test  

    heating rate had  same magnitudes

  • 8/21/2019 10-1_Gales

    15/21

    Phase 2 results

    •   Tertiary creep as manifestation of  localized yielding

     

    0.00

    0.02

    0.04

    0.06

    0.08

    0.10

    0.12

    0 1E-19 2E-19 3E-19 4E-19 5E-19 6E-19

           ε  c  r

    Virtual creepstrain (steady

    state)

    Harmathy

    equation

    w/ASTM 416

     params and area

    reduction

    690 MPa

    12

    13

    14

    15

    16

    0 1E-19 2E-19 3E-19 4E-19 5E-19 6E-19

    Temperature compensated time, θ (x 10-19

     hrs)

        A  r  e  a   (  m  m

       2   )

     Necking region

    3300Px distance

      1 2 3 4 5 6

    Creep curve initiates runaway  (tertiary)  failure 

    when a local  necking 

    region develops

    Result  appears in 

    transient  test 

    Possible to model, but  relations  produce error 

  • 8/21/2019 10-1_Gales

    16/21

    Phase 2 results

    •   Strength tests with true stress in steady state; Implicit 

    creep strength tests comparison underway (post peak 

    softening).

    Reduction ratios matched  well  

    to Eurocode

    Loading

     rate

     decrease,

     

    decreased  yield   point 

    True strength retention at  

    elevated  temperature

     better 

     

    than EC2 until   post   peak  

    softening occurs 

    0

    500

    1000

    1500

    2000

    2500

    0 0.05 0.1 0.15 0.2 0.25 0.3

       S   t  r  e  s  s   (   M   P  a

       )

    Strain

    100ºC (true)

    300ºC (true)

    400ºC (true)

    500ºC

    (true)

    100

    500ºC

    400ºC

    300ºC

  • 8/21/2019 10-1_Gales

    17/21

    Phase 2 results

    •   Creep models were compared with the results of  the 

    locally heated strong back tests (varied  transient  and  

    steady  state heating with cooling) 

    60 0

    65 0

    70 0

    75 0

    80 0

    85 0

    90 0

    95 0

    1000

    1050

    0 1 2 3 4 5 6

    Test duration (hrs)

       U  n   b  o  n   d  e   d   P   S  s   t  r  e  s  s   l  e  v  e   l   (   M   P  a

    ASTM 416 (2008)

    actual stress

    ASTM 416 (2008)

    model

    ASTM 421 (1970)

    modelBS 5896 (2011)

    Transient heating (2°C/min) Steady

    heating

    (400°C)

    Cooling (natural)

    Creep model  accuracy  

     function of  heating rate 

    and  metallurgy 

    Error  at  2%  for2⁰ C/min 

    growing to 7% error  at  

    30⁰ C/min

    Third  creep  phase not  

    considered  yet 

  • 8/21/2019 10-1_Gales

    18/21

    Phase 3: Continuous post‐tensioned 

    concrete slabs under localized fire•   Two UPT and One BPT , 1‐hour rated EC2 slabs

      Tests  planned   for  this summer  (6+ months, low  MC%)

      Restraining  forces measured   from steel  columns (stiffness based  on 

    representative concrete columns 

      Applied  loading 

      Realistic

     span

     to

     depth

     ratio

     (>40)

      Bonded  steel   provided 

      Thermocouples (x24), Linear  Potentiometers (x8), Load  cells (x2)

      Radiant   panel  heating (locally  heated)

  • 8/21/2019 10-1_Gales

    19/21

    Phase 3: Continuous post‐tensioned 

    concrete slabs under localized fire

    Issues and problems with Phase 3:

    •   What do we want to do with the results…..

    ‐ Apriori  and   Aposteriori  round  robin modelling? 

    ‐ In house modelling (FEM  packages)? 

    •   Instrumentation

    ‐ What  should  we be measuring and  what  does it  mean? 

    ‐ Motion imaging?  (2D DIC, 3D tracking?)

    •   Pretesting‐ Ambient  tests before heating? 

    •   Intangibles;  prestressing the slabs? 

  • 8/21/2019 10-1_Gales

    20/21

    Current collaborative side projects

    •   Project 1: The History of  Fire Safety Engineering (The full story is not recorded)

     Traditional  and  non traditional  construction

     Large scale testing (Modern and  antiquated)ICEM15 conference this  July  in Porto

     Fire behaviour, dynamics and  design  philosophy 

    •   Project 2: Axis

     distance

     vs.

     clear

     cover of 

     

    miniature PS slabs exposed to ISO 834. Should this design rule change? 

    •   Project 3: Open

     access

     repositories for

     

    historical fire engineering photographs and articles

  • 8/21/2019 10-1_Gales

    21/21

    Thank you

    For additional information

    Email:  [email protected]

    Further reading:

    •http://www.eng.ed.ac.uk/fire/2009‐ phd ‐ john.html 

    •Results of  Phase 1 can be consulted  in the  Journal  of  Structural  Fire Engineering and  

    Fire Safety   Journal  (see web link   for  references)

    •Some  preliminary  results of  Phase 2 will  be  presented  at  SIF  2012 conference in  Zurich

    •Phase 3 is currently  in  progress targeting 2013  for  completion.


Recommended