HERRIDGE NORTH RESERVOIR & MISCELLANEOUS IMPROVEMENT PROJECTS Regional Municipality of Peel Public Information Centre Construction Activities Summary June 10, 2010 BURNS1DE
Transcript

HERRIDGE NORTHRESERVOIR& MISCELLANEOUSIMPROVEMENT PROJECTSRegional Municipality of Peel

Public Information CentreConstruction Activities SummaryJune 10, 2010

BURNS1DE

Purpose of Today’s Meeting

• To present an update on constructionactivities for the project.

• Answer questions that you may have.

BuRNSIDE

Local Area Plan- ‘IS _SS

S

ANA’ARTh4DTS

CNANEA

VAcn

I—

z

GJ BURNS1DE

Temporary Construction Features(Slide from EA PlC — Aug 10, 2008)

-—-—ID

EXISTING ABANDONEDPUMPING STATION

EXISTINGSOUTH RESERVOIR(BELOW GROUND)

I II II I

TEMPORARYCONSTRUC11ON ROAD

2.4m (8 FT.) HIGH SOLID WOODTEMPORARY PRIVACY FENCE(TO BE REMOVED FOLLOWINGCOMPLETiON OF CONSTRUCTION)

I.

CONTRACTOR’S MATERIALLAY DOWN AREA

rI II II II I

EXISJ1NGNORTH RESERVOIR(BELOW GROUND)

flj BURNSIDE

—p0

PROPERTY LINE

EXISTiNG PUMPINGSTATION

EXISTING ELECTRICALSUBSTATION I

I II II I• I

WOOD POST

PROPOSED TEMPORARY I IPRIVACY FENCE

(PAINTED WHITE) . I

EXISTINGWALKWAY

Site Layout

(Slide from EA PlC — Aug 10, 2008)•0)

PROPERTY LINE

-

PROPOSED TREEPLANTING (TYP.)

PROPOSED ELECTRICALEASEMENT

-

-.

.0.

EXISTING PUMPINGSTATION

EXISTING ELECTRICALSUBSTATION

(10 BE REMOVED)

EXISTINGSOCCER FIELD

PROPOSED WATERMAIN

PROPOSED ELECTRICALSUBSTATION

EXISTING ABANDONEDPUMPING STATION(TO BE REMOVED)

EXI STINGSOUTH RESERVO(BELOW GROUND)

PROPOSED RESERVOIR VALVEDISTRIBUTION CENTER BUILDING

PROPOSED STORM WATERMANAGEMENT & RESERVOIR

OVERFLOW POND

I I

PROPOSED VENTHOUSE BUILDING

PROPOSEDNORTH RESERVOIR(BELOW GROUND)

4,...0

I.

I I

PROPOSEDNORTH RESERVOIR

FUTURE EXPANSION(BELOW GROUND)I—

I

I

PROPOSEDSTORM SEWER

___

VENT HOUSERELOCATED

TO WEST(MAY 2010)

BURNS1DE

Iijjjj

21 00mm Diameter Feedermain(Slide from EA PlC — Aug 10, 2008)

•0

2lOOmmø WATERMAINAPPROVED IN PREVIOUS E.A. AND

TO BE CONSTRUCTED UNDERSEPARATE CONTRACT

PROPERTY LINE

EXISTING PUMPINGSTATION

EXISTING ELECTRICALSUBSTATION

(TO BE REMOVED)

/

EXISTINGWALKWAY

PROPOSED WATERMAIN

PROPOSED TREEPLANTING (Th’P.)

PROPOSED ELECTRICALSUBSTATION

EXISTING ABANDONEDPUMPING STATION(TO BE REMOVED>

EXISTINGSOUTH RESERVOIR(BE OW GROUND)

PROPOSED RESERVOIR VALVEDISTRIBUTION CENTER BUILDING

PROPOSED STORM WATERMANAGEMENT & RESERVOIR

OVERFtOW POND

j

PROPOSED ELECTRICALEASEMENT

VENT HOUSERELOCATED TO

.0•PROPOSED VENTHOUSE BUILDING

PROPOSEDNORTH RESERVOIR(BELOW GROUND)

PROPOSED 1QNORTh RESERVOIR 0

I FUTURE EXPANSIONI (BELOW GROUND) •

J

_____

WEST (MAY—-. 2010)

I I

I —

0

____

BURNS1DE

LT

Current Site Plan(June 10,2010)

—,

a

1LJLI1L

rflT-s-.

/

— /0/

--------—---

—---1 1

Vu BURNSIDE

Artist Concept of Proposed Site workLooking from back of property toward Sheridan Park Drive

fJ BURNS1DE

Artist Concept of Finished ProjectLooking from back of property toward Sheridan Park Drive

I .4 —

I .,

Ij BURNS1DE

-‘

-I

c_I)

D cc —I’

c,Q

:,

.III

I—I

LI•

II—

.II

-‘

II

CD

CD

Q

iA

—I’

04

1’

CD —

,z

.•

“•;

.I

.;‘

-.

.4_4

,.

0 0 CQ —k

—‘

0 CD C,)

CD C•)

CD z 0 CD C,)

•CD

-‘

-I C-

)0 D C

)CD -I 0 - D ;5.

CD 0 -o -‘I 0 CD C)

-I

I;r!

’I :‘.

I

Construction Impacts andAssociated Mitigating ActionsUnderwayVisual Impact:• Install temporary privacy fence around facility during construction.

Construction Equipment Noise:• Restrict construction hours and use appropriate machinery/mufflers.

Dust Control:• Challenges to Dust Control at Site Are:

— Dry weather experienced this spring— Wind— Excavation equipment (little can be done to reduce dust if weather is dry or windy— Close proximity of Residences to Work Areas

• What is being Done?— Regular wetting - Limited success due to challenges— Regular placing calcium chloride - Limited success due to challenges— Paving of temporary construction road to reduce dust created by trucks.

f114 BURNS1DE

Construction Activities Schedule

Estimated Construction Schedule Construction Schedule(Slide from EA PlC — Aug 10, 2008)

Demolition: Spring 2009 Demolition: Completed May 2009

Construction: Fall 2009 Construction: Dec. 2009 - May2011

Landscaping: Fall 2010 Landscaping: May2011