+ All Categories
Home > Documents > 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure...

1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure...

Date post: 23-Jan-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
16
PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________ PFR-I 1.0 EXECUTIVE SUMMARY 1.1 Introduction The M/s. Nellore Mica Mine Association has formed a cluster of 14 mine sites in order to apply for Environmental Clearance. This is in compliance to the Office Memorandum dated 24th December 2013 by MoEF, New Delhi regarding the cluster formation. The projects proposed are within 500m for the periphery of each other. The total area of the cluster comes to around 63.00 Ha. The list of quarry owners, extent of lease along with their survey numbers is attached as Annexure 1. The cluster falls Perumallapadu, Utukur, Chaganam, Utukur, Chaganam, Chaganam, Perumallapadu, Utukur, Orupalli, Giddalur, Reddivaripalli, Utkur, Perumallapadu & Vellapalem Villages, Sydapuram, Chillakuru and Mandals, S.P.S.R. Nellore District. There are 14 existing leases in cluster The M/s. Nellore Mica Mine Association has formed a cluster of of 14 quarry sites in order to apply for Environmental Clearance. This is in compliance of the office Memorandam dated 63.00 Ha. mine lease area in Perumallapadu , Utukur,Chaganam, Utukur,Chaganam, Chaganam, Perumallapadu, Utukur, Orupalli, Giddalur, Reddivaripalli, Utkur, Perumallapadu & Vellapalem Villages, Sydapuram , Chillakuru and Nimmanapalli Mandals, S.P.S.R. Nellore District has been allotted to M/s. Sri Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD & UM)for a period of 20years byAssistant Director of Mines and Geology,Nellore. The proposed area is not fit for agriculture and the Department of Mines and Geology indicate that the subject area has mineral deposits for extraction. The salient features of the project are given Table 1.1. Table 1.1 The Salient Features of the Project Project Name M/s. Nellore Mica Mine Association Mining Lease Area 63.00 Ha. Location of Mines Perumallapadu , Utukur,Chaganam, Utukur,Chaganam, Chaganam, Perumallapadu, Utukur, Orupalli, Giddalur, Reddivaripalli, Utkur, Perumallapadu & Vellapalem Villages, Sydapuram,Chillakuru and Nimmanapalli Mandals, S.P.S.R. Nellore Di
Transcript
Page 1: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-I

1.0 EXECUTIVE SUMMARY

1.1 Introduction

The M/s. Nellore Mica Mine Association has formed a cluster of 14 mine sites in order

to apply for Environmental Clearance. This is in compliance to the Office Memorandum

dated 24th December 2013 by MoEF, New Delhi regarding the cluster formation. The

projects proposed are within 500m for the periphery of each other. The total area of

the cluster comes to around 63.00 Ha.

The list of quarry owners, extent of lease along with their survey numbers is attached

as Annexure 1. The cluster falls Perumallapadu, Utukur, Chaganam, Utukur,

Chaganam, Chaganam, Perumallapadu, Utukur, Orupalli, Giddalur, Reddivaripalli,

Utkur, Perumallapadu & Vellapalem Villages, Sydapuram, Chillakuru and Mandals,

S.P.S.R. Nellore District. There are 14 existing leases in cluster

The M/s. Nellore Mica Mine Association has formed a cluster of of 14 quarry sites in order

to apply for Environmental Clearance. This is in compliance of the office Memorandam

dated 63.00 Ha. mine lease area in Perumallapadu , Utukur,Chaganam,

Utukur,Chaganam, Chaganam, Perumallapadu, Utukur, Orupalli, Giddalur,

Reddivaripalli, Utkur, Perumallapadu & Vellapalem Villages, Sydapuram , Chillakuru

and Nimmanapalli Mandals, S.P.S.R. Nellore District has been allotted to M/s. Sri

Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD & UM)for a period of

20years byAssistant Director of Mines and Geology,Nellore.

The proposed area is not fit for agriculture and the Department of Mines and Geology

indicate that the subject area has mineral deposits for extraction. The salient features

of the project are given Table 1.1.

Table 1.1

The Salient Features of the Project

Project Name M/s. Nellore Mica Mine Association

Mining Lease Area 63.00 Ha.

Location of Mines Perumallapadu , Utukur,Chaganam,

Utukur,Chaganam, Chaganam, Perumallapadu,

Utukur, Orupalli, Giddalur, Reddivaripalli, Utkur,

Perumallapadu & Vellapalem Villages,

Sydapuram,Chillakuru and Nimmanapalli Mandals,

S.P.S.R. Nellore Di

Page 2: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-II

Toposheet number 57 N/11

Minerals of mine Quartz, Feldspar, Mica

Method of mining Underground Manual mining

Drilling/Blasting Controlled Blasting and drilling is proposed.

No. of working days 300 days

Water demand 440 KLD

Sources of water Water will be supplied from bore wells of the nearby

area

Man power 500 No

Nearest railway station Gudur railway station is about 22 km - SE

Nearest airport Renigunta Airport is about 46 km - SSW

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent

Nellore, was granted the mining lease for Mica over an extent of 63.00 Hectares at

Perumallapadu Village, Sydapuram Mandal, Nellore District, Andhra Pradesh for a

period of 20 years, vide G.O. Ms. No. 407, Ind. & Comm. (M.II) Dept. dated 10-07-

1981.

The mining lease deed was executed on 27-11-1981, vide Asst. Director, Mines &

Geology, Nellore, Proceedings No. 700 / M1 / 1981 dated 27-11-1981 for a period of

20 years with effect from 28-11-1981 to 27-11-2001.

2.2 Brief Information about the Project

The mining lease area of 63.00 ha. is located in Pattaland. Underground manual

mining is followed and it has been proposed to produce Quartz - 222312

Tonnes/Annum, Feldspar – 1522260 Tonnes/Annum, Mica – 22250 Tonnes/Annum.

Tummalatalupur village is about 0.9 km due North.

2.3 Need for the Project and Its Importance to the Country or Region

Mica is having high insulation property. One mill thick Rubi Mica can stop 10,000

volts. The mica will not deform even at very high temperature. This is an important

requirement for space machinery. Most of the mica produced in India is exported to

developed countries. Scrap Mica is utilized in forming various products like Micanite

Page 3: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-III

Sheet, Mica Tapes & Mica powder. They are used in electronic machinery. Green

Mica is present in the mining lease area.

Feldspar containing 12%+ Allumina is used in Ceramic Industry and Sanitary Ware.

Electric Ceramic Insulators for over head lines are made from Feldspars. This is used

in India and export demand is available.

Quartz is used in Glass Industry. High quality quartz is used to make semiconductors

which are essential for electronic industry. The demand is available for Quartz in

India and outside.

As the separated state of Andhra Pradesh is now growing rapidly and many

industries are coming up. These minerals will be helpful as raw materials in industries

and the

As per National Green Tribunal Judgment pronounced on 13.01.2015, the proponent

has applied to State Level Environmental Appraisal Committee/State level

ImpactAssessment Authority of Andhra Pradesh to obtain Environment Clearance.

2.4 Demands-Supply Gap

There is huge demand since theseminerals are used extensively in industries and

many other sectors. This project will help in reducing the Demand-Supply gap in the

area.

2.5 Domestic/ Export Markets

The material is used in the domestic market and in there is no scope for exporting the

material.

2.6 Employment Generation

Mining will be undertaken by manual underground mining method and this project

operation will provide livelihood to the42 workers. It will provide employment to the

people residing in vicinity.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.

Page 4: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-IV

The proposed mine area is of2.33ha.area. No interlinked projects are associated with

this project.

3.2 Location of the project

The mining lease area is located in Survey No. 216, PerumallapaduVillage,

SydapuramMandal, S.P.S.R. Nellore district,Andhra Pradesh. The mine lease area

falls in Survey of India Toposheet No.: 57N/11. The latitude and longitude of the mine

lease area are :

Google map is given in Figure - 1.Location of the mining lease in Nellore District is

shown in Figure 2.

Page 5: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-V

Figure 1

Google Map Showing the Mine Lease Area

Page 6: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-VI

Figure 2

Location Map

MINE SITE

Page 7: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-VII

3.3 Details of Alternate Sites

No alternate site was considered as the project is mineral specific and site specific.

3.4 Size or magnitude of operation

The proposed mine has lease over an area of 2.33ha. andthe production rate of Quartz is

312 Tonnes/Annum, Feldspar is 1560 Tonnes/Annum & Mica is 250 Tonnes/Annum. The

lease follows Underground manual mining.

3.5 Geology and Reserves

3.5.1 Topography

The mining lease area is part of Nellore Mica Belt (NMB). The NMB area is plain except for

some mounds or hillocks consisting of resisting rocks. The average elevation of land is 50 Mt

above Mean Sea Level. The rain water is drained through seasonal nallahs / gullies into

Pennar River which empties in Bay of Bengal. Some low lying land areas are storing water

and the water is used for agriculture. Some artificial ponds are constructed to store rain

water for use in agriculture. The mining lease area is having maximum relief of 3 Mt from

NW to SE. There is one open excavation measuring 20 / 30 Mt on surface and an

underground mines opening from the bottom of the open excavation. There is no cultivated

land in the mining lease area.

3.5.2 Geology

The Nellore Mica belt is about 110 Km long from Vinjamoor in the North to Ozili in the South.

The width of Mica belt varies from 10 Km to 30 Km. The Nellore Mica belt is located between

14o to 15o North Latitudes and 79o 35” to 80o Eastern Longitudes. The depth of Pegmatite

varies from 10 to 350 M. The dips of Pegmatite lances are 45o to 80o towards West. This

Nellore Mica belt is divided into 6 zones as detailed below.

N E L L O R E

M I C A

B E L T

1. Northern Pennar on the North most portion

2.

Tatipatri - Prabhugiripatnam

3.

Podalakur – Talupur

4. Kalichedu

5. Utukur - Sydapuram

6 Chennur – Kadivedu on the South most portion

Page 8: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-VIII

The mining lease area is in the 3rd zone, namely Podalakur – Talupur. The granites and

pegmatite have intruded into schists of KandraVolcanics, which contain Quartz, Biotite and

Hornblende Schists. Under favourable conditions, Muscovite books of commercial grades

have formed by intrusion of pegmatite into schists. Hundreds of Mica Mines were worked in

the Nellore Mica belt. The available information is Rubby Mica was found in 4th & 5th zones

and green mica was found in other zones.

REGIONAL STRUCTURAL FEATURES

The trend of rocks is NNW to SSE. Extensive disturbances took place due to repeated

intrusions of pegmatite and granite. This resulted in faults and metamorphism of strata mica

books formed were disturbed and parallel or en-echelon pattern of pegmatite lenses were

formed. Presently some of the pegmatite lenses are hidden below surface. Soil cover of 1 to

3 Mt thick is present.

LOCAL GEOLOGY

A pegmatite lense is outcropping in the mining lease area. The dimention of the pegmatite

on surface is 25 Mt wide and 50 Mt long. The country rocks is hornblende – biotite schist.

This was worked earlier upto a dearth of 48 Mt. Three levels at 30 Mt, 40 Mt and 48 Mt depth

were excavated. The pegmatite lense shows a slight north plunge at 48 Mt depth. The dip of

pegmatite is 60o towards west. The strike of pegmatite is NNW to SSE. There are adjacent

mines working under the same management.

3.5.3 Exploration

As per the exploratory mining done, the lessee has proved the pegmatite upto a depth of 70

Mts and the width of the micaceous pegmatite varied from level to level. The micaceous

pegmatite delineated 3 dimensionally by means of exploratory mining is considered as G2 in

accordance with UNFC if explored within an interval of 10 – 48 Mts and is considered as G2

if exploration is done at an interval of 48 – 78 Mts. The mineral in the top cover of

underground excavation is considered exploratory mining zone.

The detailed exploration including geological survey, geophysical probing and underground

workings at 10 mt depth interval, complete meter wise chemical analysis and study of data

has indicated recoverable / saleable Feldspar, Quartz & Mica reserves of 89,687.50 Tons

and Pegmatite can be economically extracted upto 222 mt RL. The grade is also increasing

with depth.

Page 9: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-IX

3.5.4Reserves

Upto 48 M level, even though 48 M depth is proved, for the purpose of calculating

geological reserves, 48 M is considered, because pegmatite was already was

excavated. 48 M of insitu pegmatite is considered for calculation, allowing for old

excavation. The volume is 35,875.00 M3 The volume of pegmatite established by

existing workings is taken as geological reserves. The minerals are calculated basing

on the experience gained in workings of adjoining mines, taking a conservative

estimate to safeguard against local variations. The pegmatite upto 48 M is taken as

Proved Reserves.

Estimation of Minerals

Probable Geological Resources of Pegmatite is 35,875.00 M3. Taking 2.5 as Bulk

Density the Proved Reserve is 35,875.00 M3 x 2.5 = 89,687.50 MT.

Mica

The content of Mica in the pegmatite is taken as 8%. Total quantity of pegmatite is

89,687.50 MT Mica content is 8% = 7,175 MT

Feldspar

Basing on the experience of adjoining mines the contents of marketable feldspar is

taken as 50% of pegmatite. The feldspar content is 89,687.50 MT x 50 / 100 =

44,843.75 MT

Quartz

The content of marketable quartz is 10% of pegmatite 89,687.50 x 10 / 100 = 8,968.75

MT

Page 10: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-X

Mineable Reserves & Minerals The mineable reserves are taken as 60% of Geological Reserves. The allowance is for losses in underground mining. The minerals which can be recovered are therefore. Mica 4,305.00 MT Feldspar 26,906.25 MT Quartz 5,381.25 MT

A Total Geological Reserves 89,687.75

B Reserves Blocked under 7.5 M Buffer Zone Nil

C Reserves Blocked under Safety Slopes Nil

D Reserves Blocked under Power Line Safety

Barrier Nil

Reserves available for Mining 89,687.75

3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS

3.6.1 Method of Mining

The method of mining is underground mining method. There is an old working up to a depth

of 48 Mt. One vertical shift is available. The adjoining mine is being worked by the lessee.

The present workings have established the southern closure of pegmatite. The northern

extent is proposed to be explored by additional drives at footwall Contact and hanging wall

contact at 30 mt. Level, 40 Mt. Level 48 Mt. Level, 58 Mt. Level, and 66 Mt. Level., and upto

78 Mt Level, Several cross cuts which are proposed to confirm width of pegmatite and

content of minerals are planned. Thus by the end of five years, the pegmatite will be

explored up to 78 Mt depth and width will be established. Shaft will be explored upto 90 Mt

Extent of Mechanization

The machinery is planned for drilling work, underground transport, pumping, ventilation, and

lighting. The machinery required for the above are listed below.

Mining Machinery

Compressor : 310 cfm FAD capacity 8 to 10 Kgs / Cm.s pressure 1 No.

Jack Hammers 25 to 30 Kgs weight to operate with 6 to 7 Kgs / Cm2 pressure of compressure air

5 No’s

Page 11: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XI

Drill Steels 3 ¼ Inch shank, 7/8 inch Hexagonal integral steel rod 33 mm to 38 mm T.C. bits Requirement for five years

150 No’s

Under Ground Transport Hoist one ton capacity ½ tubs to run on rails 20 Kgs / Mt rails lines & crossing 20 mm steel wire rope

1 No’s 12 No’s 5 Tons 120 Mt

Pumping 20 HP 70 Mt head electric pump 10 hp 30 mt head electric pump Compressed air roto pump

1 No. 1 No. 2 No’s

Ventilation 30,000 Cft / m ventilation fan 1 No.

Lighting 10 K.V.A step down transformer 440 v to 110 v 1 No.

Miscellaneous G.I. Sheets Structural, Head Gear & Others G.I. Pipes (3” Dia, 2” Dia, 1” Dia) Mining Tools (Spares, Crow Bars, Fans)

5 Tons 5 Tons 3 Tons 1 Ton

3.7 Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Product/S, Mode of Transport of Raw Material and

Finished Product

No raw material will be required in the proposed project. The operation involves the

extraction of material and dumping in stock yard.Mica is hand picked from the blasted

material in the mine and carried on head loads to the surface for dressing in Mica

Factory. The rest of the broken rock is loaded manually into half ton capacity level

tubs and trammied on rails to the shaft bottom from where, the material is lifted by

hoist to the surface and emptied into level tubs.

3.7.1 Use of Mineral

The Mica is used in space machinery.Feldspar containing 12%+ Allumina is used in

Ceramic Industry and Sanitary Ware. Electric Ceramic Insulators for over head lines

are made from Feldspars. Quartz is used in Glass Industry. High quality quartz is

used to make semi conductors which are essential for electronic industry. The

demand is available for Quartz in India and outside.

3.7.2 Processing

No processing at site is involved.

3.8 Resource Optimization/ Recycling and Reuse

Not envisaged.

Page 12: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XII

3.9 Availability of Water Its Source, Energy/ Power Requirement and Source

3.9.1 Water Requirement

Water is required only for drinking purposes and dust suppression. The number of

working people is around 42 so the total water requirement will be around 500 KLD.

About 200.0KLD will be required for dust suppression and greenbelt. This water will

be supplied from bore wells of nearby area.

3.10 Quantity of Wastes to be Generated (Liquid and Solid) And Scheme for their

Management/ Disposal

3.10.1 Solid Waste Generation& its Disposal

The material will be hoisted to surface. The material will be spread on the dump. The

marketable Feldspar & Quartz will be picked up manually and the rest of the material

will be leveled on the dump yard. The marketable feldspar and quartz will be taken by

head loads to the respective stock yards. The total waste estimated per annum to be

generated will be approximately 32% of pegmatite excavation, 3,031.9 MT of

pegmatite is estimated to be excavated during first five years. 32% of this is 970.2

MT. The 4,042.56 MT of total waste rock will be spread on 2,000 Sq. Meters. Thus

the additional height of dump will be 1.5 M. The existing height of old dump is 1.5 M.

The ultimate dump height will become 3 M from surface. Pack walls will be

constructed on the periphery of dump yard to prevent wash off of dump material. The

slopes and top will be seeded with grass to suppress air born dust.

3.10.2 Liquid Effluent

No liquid effluent will be generated at the mine site. The domestic wastewater

generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS

4.1 Connectivity

4.1.1 Nearest Railway Station

Gudur railway station is about 22 km from the mine area.

Page 13: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XIII

4.1.2 Nearest Airport

Renigunta Airport is about 46 km distance from mine site.

4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP

The mine lease area is located in Patta land. Land Use Pattern of the mine area

during the next 5 years will be as follows :

Area in

sq. m.

Area in

Ha.

1 Stock yard 1,721 0.1721

2 Waste Rock Dumps 1,995 0.1995

3 Buildings, Mill, Mines Office & Site Services

100 0.01

4 Ramp Area, Internal Road Ways Included Included

Reclamation Plan :

The mining lease area is devoid of top soil and overburden. M/s. Nellore Mica Mine

Association proposes to convert the mined out area into water pond under hydro

reclamation.

4.3 Topography

The NMB area is plain except for some mounds or hillocks consisting of resisting

rocks. The average elevation of land is 50 Mt above Mean Sea Level.

4.4 Climatic data from secondary sources

The average rainfall is about 650 mm/annum. The observed maximum temperature

is 370Cin summer season and minimum temperature is 170C in winter seasons. The

rainfall does not disturb the mining activities. Moderate wind velocities, prevailed in

north east to south west direction.

IMD station Nellore : 22 km (NE)

Maximum Temperature : 46.70C

Minimum Temperature : 14.40C

Annual rainfall in mm : 1975 mm

Mean Wind Speed : 8.3 km/hr

Page 14: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XIV

5.0 PLANNING BRIEF

5.1 Planning Concept

The method of mining is underground mining method. There is an old working up to a depth of 48 Mt. One vertical shift is available. The adjoining mine is being worked by the lessee. The present workings have established the southern closure of pegmatite. The northern extent is proposed to be explored by additional drives at footwall Contact and hanging wall contact at 30 mt. Level, 40 Mt. Level 48 Mt. Level, 58 Mt. Level, and 66 Mt. Level., and upto 78 Mt Level, Several cross cuts which are proposed to confirm width of pegmatite and content of minerals are planned. Thus by the end of five years, the pegmatite will be explored up to 78 Mt depth and width will be established. Shaft will be explored upto 90 Mt. 5.2 Population projection

The project will employ mostly workers from nearby villages. There will not be any

increase in population due to the project.

5.3 Land use planning

The project site is Pattaland. There will not be any change in landuse as the mine is

an operating mine.

5.4 Assessment of Infrastructure Demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the villages was

assessed on the basis of need and priority. The existing infrastructure is satisfactory

but the approach road has to be maintained regularly.

5.5 Amenities/Facilities

The Mica factory of the lessee company, situated within the Mine area from the Sulochana Mine, is harbinger of all the modern facilities for stay in this interior place – residential accommodation, protected water supply, power, telephone facilities and recreational activities in the form of the well laid out township of the company. 1) First aid station

2) Canteen cum rest shelter 3) Water Facilities : Bore water supply by workers to requirement for workshop, mines office and canteen. 4) Lighting Arrangement : Working is proposed in the day light hours only. However tower mounted halogen lighting arrangement would be provided within the mine area for security purposes.

Page 15: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XV

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area)

No infrastructure is proposed.

6.2 Residential Area (Non Processing Area)

As the local persons will be given employment, no residential area/ housing is

proposed within the mining lease area.

6.3 Green Belt

There is an orchard, Mango garden having 160 Mango trees and 48 No’s other trees in the mining lease area. The space occupied by the Mine lease area Around 4.12 Acres and space occupied by dumps is not having any vegetation. So, therefore afforestation is planned with in mine lease area.

6.4 Sewerage System

The domestic wastewater generated will be sent to septic tanks followed by soak

pits.

6.5 Industrial Waste Management

Not applicable.

6.6 Solid Waste management

The waste generated will be dumped in the eastern boundary of the mining lease area

over an area of 1,995 m2.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

Not Applicable.

8.0 PROJECT SCHEDULE & COST ESTIMATES

The Total cost of project would be around Rs. 450 lakhs.

Page 16: 1.0 EXECUTIVE SUMMARY 1.1 Introduction Annexure 1.environmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 4. 13. · Venkata Kanaka Durga & Uma Maheswara Mica Mines (SVKD

PROJECT: M/s. Nellore Mica Mine Association PRE-FEASIBILITY __________________________________________________________________________________________

PFR-XVI

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the Local

People Including Tribal Population, If Any, In the Area.

The extraction of the material will be done in manual underground manner so local

labour will be used. Supporting ancillary facilities will help the local people once the

project commences.

***********