10 May 2015 Planning for BRT in Giza and New Cairo
Transcript
Page 1: 10 May 2015 Planning for BRT in Giza and New Cairo.

10 May 2015

Planning for BRT in Giza and New Cairo

Page 2: 10 May 2015 Planning for BRT in Giza and New Cairo.

Metro network

78 km existing76 km planned

Page 3: 10 May 2015 Planning for BRT in Giza and New Cairo.

After finishing metro lines 3, 4, 5

Paris London Mexico City

Beijing Cairo

10.4 13.6 8.6 13.6 19 Population (million)

807 466 283 466 154 Rapid transit (km)

0

20

40

60

80 76

55

3321

8

Rapid Transit Ratio (RTR) – km of rapid transit per million urban residents

Page 4: 10 May 2015 Planning for BRT in Giza and New Cairo.
Page 5: 10 May 2015 Planning for BRT in Giza and New Cairo.

Frequency-occupancy survey form

Stephanie Lotshaw

02/03/2015

Chris KostJinja Road & Yusuf Lule Road

7 30

7 2515

24

Page 6: 10 May 2015 Planning for BRT in Giza and New Cairo.

Frequency-occupancy survey locations

Page 7: 10 May 2015 Planning for BRT in Giza and New Cairo.

Corridor demand

Faisal: 4,600 pphpd

26 July: 8,700 pphpd

Mourad Street/El Nile3,700 pphpd

Al Ahram: 4,300 pphpd

Rabiye El GezySalah Salem: 6,900 pphpd

26 July: 7,400 pphpd

Gameat Al Dewal: 6,400 pphpd

Sudan St: 3,800 pphpd

Page 8: 10 May 2015 Planning for BRT in Giza and New Cairo.

Corridor right-of-way (ROW)

Page 9: 10 May 2015 Planning for BRT in Giza and New Cairo.

Potential BRT corridor

16.1 km Faisal-Oraby corridor1 minute between busesFleet of 81 buses (articulated)USD 80m capital cost

Page 10: 10 May 2015 Planning for BRT in Giza and New Cairo.

Service typology

Direct services to reduce passenger transfers

Page 11: 10 May 2015 Planning for BRT in Giza and New Cairo.

30 m cross section

At stations

Between stations

Page 12: 10 May 2015 Planning for BRT in Giza and New Cairo.

What is Bus Rapid Transit (BRT)?

Enclosed and secure

stations

New, clean, high-capacity

buses

Pre-board payment

with smart cards

Pedestrian and cycle access

Dedicated bus lanes

Page 13: 10 May 2015 Planning for BRT in Giza and New Cairo.

Ensuring Quality

Page 14: 10 May 2015 Planning for BRT in Giza and New Cairo.

Institutional arrangement

• Lean, focused special purpose unit as regulator

• Contract private firms to procure & operate buses through transparent bidding process

• Payment made based on kilometers operated

• Separate contract(s) for electronic fare collection and IT systems

Page 15: 10 May 2015 Planning for BRT in Giza and New Cairo.

SPV structure

Board of Directors

Managing Director

Planning &

design

Operations

Admin &

finance

Communications and

marketing

• Route planning

• Infrastructure design

• Business model

• Financial analysis

• Long-term vision

• Scheduling• Fleet

monitoring• Fare collection• Quality control

• Financial management

• Contracting & payments

• Human resources

• Physical resources

• Legal

• Public information strategy

• User surveys• Corporate

identity• Marketing• Media relations

Page 16: 10 May 2015 Planning for BRT in Giza and New Cairo.

Managing the transition to competitive professional private modern companies

Single public monopoly

Thousands of informal

operators

Mixed system(competitive market with

public oversight)

Single public monopoly

Thousands of informal

operators

Mixed system(competitive market with

public oversight)

Page 17: 10 May 2015 Planning for BRT in Giza and New Cairo.

Existing projects

• Metro Line 4 on Al Ahram

• BRT in Cairo:– Airport to Giza border

– Mostafa El Nahaas

• 6th of October Monorail

• CTA purchase of 500 buses: BRT compatible?

• Giza tunnels

Page 18: 10 May 2015 Planning for BRT in Giza and New Cairo.

Integration with metro

Page 19: 10 May 2015 Planning for BRT in Giza and New Cairo.

Integration of bridges and tunnels with BRT

Page 20: 10 May 2015 Planning for BRT in Giza and New Cairo.

BRT planning process

1. Preliminary Assessment

2. Service Plan

3. Infrastructure Plan

4. Financial Plan

5. Social, Environmental, and Economic Evaluation

Page 21: 10 May 2015 Planning for BRT in Giza and New Cairo.

Implementation timeline

SPV formation

Design consultants

Infrastructure contract

Marketing

Testing

year 1 year 2 year 3

Bus operations contract

Bus procurement

IT contract

IT procurement

Page 22: 10 May 2015 Planning for BRT in Giza and New Cairo.

Coordination with stakeholders

• Steering committee with– Three governors

– Minister of Housing/NUCA

– Minister of Transport

• Institutional partnerships:– Cairo Metro

– CTA

– Minibus operators

Page 23: 10 May 2015 Planning for BRT in Giza and New Cairo.