    Site Engineer Training Course

    Radio Network Optimization

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    2/39

    Internal Only

    2011-5-19 2

    Learning Objective

    2011-5-19 2

    From this course, you will learn:

    Frequently used abbreviations about RNO

    Basic RNO flow and key actions

    Control point of each action

    Input and output documents

    Supporting documents for RNO.

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    3/39

    Internal Only

    Content

    Network Optimization - Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    4/39

    Internal Only

    Illustration

    CP

    KCP

    100% site inspection

    20% site inspection

    Document inspection

    No. Stage Action for NOE Illustration

    1Single Site

    VerificationReview the single site verification report..

    2

    RNO Plan

    Preparation

    s

    Confirm the optimization plan.

    3 Confirm the DT plan and Hand over theengineering details.

    4 Review resource preparations

    5 Review the detailed plan.

    6 RNO project kickoff meeting

    7 PerformRNO Test

    and confirmRNO

    Scheme

    Verify test preparations.

    8 Comprehensive RNO analysis

    9Review network evaluation report/RNOscheme.

    10 ImplementClusterOptimizatio

    n

    Monitor the (cluster) optimization effects.

    11 Review cluster optimization report.

    12 ImplementEntireNetworkOptimization

    Monitor the (entire network) optimizationeffects.

    13 Review the network optimization report.

    14

    NetworkAcceptance

    Submit RNO reports and documents.

    15 RNO project review meeting

    16 Archive the documents.

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    5/39

    Internal Only

    Frequently Used Abbreviations about RNO

    AbbreviationsNetwork Optimization Engineer

    SSVSUB

    DT

    CQT

    SubcontractorSingle Site Verification

    Drive Test

    Call Quality Test

    RNO

    CP

    KCP

    Control Point

    Key Control Point

    NOE

    NOM Network Optimization Manager

    Radio Network Optimization

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    6/39

    Internal Only

    Content

    Network Optimization - Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    7/39

    Internal Only

    Subcourse Content

    Single Site Verification

    Action 1: Review the Single Site Verification Report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    8/39

    Internal Only

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PATLevel 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixRNO Scheme

    ImplementClusterOptimization

    Implement EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    Plan testroutes

    Checkconfigurationparameters

    Check andhandlealarms

    Checktestingequipment

    Compilethe singlesiteverificationreport.

    1 day

    Reviewsingle siteverification

    From:

    Equipmentcommissioning

    0.25 day

    Site

    antennainspection

    Single Site Verification Flow

    Level 5

    The actions listed in the blue cells are the siteengineers' actions.

    The actions listed in the orange cells are the

    subcontractors' actions.

    Single Site Verification Flow

    NOEs

    Action 1

    1 day

    0.25 day 1 day0.25 day 0.25 day 0.25 day

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    9/39

    Internal Only

    Action 1: CP Review the single Site Verification

    Report

    After the NOEs finish reviewing of the single site verification report of the related products, they should submit the report to

    the NOM and the customer for reexamination.

    Key Actions Relevant Documents Action Points Work Day

    Review thesingle siteverification

    report

    1. Single Site VerificationReport

    2. Single Site Verification

    Work Guidebook

    When reviewing the Single Site Verification Report,the engineers should pay attention to the KPIs andfunctions of each site.

    1.Check whether the antenna installationparameters in the Single Site Verification Reportare consistent with those from the networkplanning data.

    2.For all sites included in the Single Site

    Verification Report, check whether each sector of

    the site can correctly launch the services, forexample, voice and data services, high-speeddata service and also check whether call quality,cell coverage, and handover with adjacent cells

    are normal.

    1 day

    Input - Single site verification report

    Output - Single site verification report

    http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30212680http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30212680http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30212680
  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    10/39

    Internal Only

    Content

    Network Optimization - Actions List for NOEs

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    11/39

    Internal Only

    Subcourse Content

    RNO Plan Preparations

    Action 1: Fix DT Plan and Hand over the

    Engineering details

    Action 2: Review Resource Preparations and

    Test Plan

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    12/39

    Internal Only

    Level 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixRNO Scheme

    ImplementClusterOptimization

    Implemen EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    2 days

    Fix the RNOplan

    0.5day

    Fix the DTplan/hand overthe engineeringmaterials

    1 day

    Fix the detailed testplanReview resourcepreparations

    1 day

    Review resourcepreparations.Review the test plan

    0.5day

    RNO projectkickoff meeting

    Test Plan Preparations

    Level 5

    The actions listed in the blue cells are

    the site engineers' actions.The actions listed in the orange cells

    are the subcontractors' actions.

    RNO Plan Preparations

    NOEs

    Action 1NOEs

    Action 2

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PAT

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    13/39

    Internal Only

    Action 1: Fixing DT Plan and Hand over the

    Engineering Details

    After the handover, the NOEs should produce the meeting minutes. The minutes should be signed by all the three parties.

    Key Actions Relevant Documents Action Points Work Day

    Hand over

    theengineeringmaterials

    Collect information

    including but not limited to:

    1. OptimizationResponsibility Matrix

    2. Network OptimizationAcceptance Standard

    3. Main RNO Plan

    The NOEs should hand over the engineering detailstogether with the operator's NOM and the subcontractor.

    The NOEs, the customer, and the subcontractor shoulddiscuss the main RNO plan and define the RNO interface,

    RNO work flow, RNO acceptance criteria, and coordination

    requirements of the customer.

    0.5 day

    Fix the DT

    plan

    The NOEs should negotiate with the customer to fix the DTarea, site, parameters, calling mode and the CQT testspots.The NOEs should fix the RNO test plan, and provide the

    following information to the subcontractor: site information,main RNO plan, RNO document templates, and technicalguidelines.

    The subcontractor should fix the RNO test plan, test routes

    and accept the engineering details.

    Input - Main RNO plan

    Output - Meeting minutes

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    14/39

    Internal Only

    Action 2: CP Review Resource Preparations and Test

    Plan

    Area Network Optimization Test Plan

    Key Actions Relevant Documents Action Points Work Day

    Review the

    RNO test

    plan

    Area Network

    Optimization Test Plan

    Review contents:

    Check whether the test plan is feasible and

    that it can satisfy the requirements of the

    project and the customer.

    1 day

    Review

    resource

    preparations

    Review contents:

    The NOEs should check the preparations and

    qualifications of the test engineers, test

    vehicles, test equipment, test software, analytic

    software, test cell phone, portable computer,

    and GPS.

    Input - RNO test plan

    Output - Area Network Optimization Test Plan

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    15/39

    Internal Only

    Content

    Network Optimization- Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    16/39

    Internal Only

    Subcourse Content

    Perform RNO Test and Fixing RNO Scheme

    Action 1: Verify DT Preparations

    Action 2: Comprehensively Analyze RNO Problems

    Action 3: Review Evaluation Report/RNO Scheme

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    17/39

    Internal Only

    Level 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixiRNOScheme

    ImplementClusterOptimization

    Implement EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    2 days

    DTpreparations

    1 day

    Verify theengineers'preparations

    5 days

    CollectDT data

    2 days

    Analyze andevaluate thenetworkperformance

    1 day

    ComprehensiveRNOanalysis

    2 days

    Reviewnetworkevaluationreport/RNOscheme

    Perform RNO Test and Fix RNO Scheme

    Level 5

    The actions listed in the blue cells are the siteengineers' actions.The actions listed in the orange cells are thesubcontractors' actions.

    Perform RNO Test and Fix RNO Scheme

    NOEs' Action 1 NOEs'Action 2

    NOEs'Action 3

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PAT

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    18/39

    Internal Only

    Action 1: CP Verify DT Preparations

    1.Record the comments about the RNO test plan.

    2. If the test plan does not pass the review, the subcontractor has to rearrange the personnel, vehicle, and tools,

    and submit a more detailed test plan.

    Key ActionsRelevant

    DocumentsAction Points Work Day

    Verify DTpreparations

    Area NetworkOptimization Test

    Plan

    The NOEs should review the Area Network OptimizationTest Plan

    1.Review the feasibility of the test plan.

    2. Review the preparations of the test engineers and

    vehicles.

    3. Check whether the test devices, for example, test

    software, analytic software, test cell phone, portable

    computer, and GPS, satisfy the test requirements.

    4.Check whether the test routes are rational.

    5. Check whether the test procedures satisfy the

    customer's requirements.

    1 day

    Input - Area Network Optimization Test Plan

    Output - Null

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    19/39

    Internal Only

    Action 2: Comprehensively Analyze RNO Problems

    The NOEs should focus on the RNO problems and produce the network evaluation reportand RNO scheme.

    Key

    Actions

    Relevant

    DocumentsAction Points

    Work

    Day

    Comprehen

    sive RNO

    analysis

    1.Evaluation Report

    Template

    2. Network

    EvaluationGuidebook

    The subcontractor, NOEs and NOMshould analyze the key RNO issues of

    the network comprehensively, and draw

    up the final RNO scheme. For theproblems that cannot be solved, the

    NOEs and NOM should escalate the

    problems to a higher level to request

    further support.

    1 day

    Input - Network performance evaluation report

    Output - Network evaluation report and RNO scheme

    http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30315045http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30212683http://tsm.zte.com.cn/tsm/FileCenter/File.aspx?Mode=read&FileID=30315045
  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    20/39

    Internal Only

    Action 3: KCP Review the Evaluation Report/RNO

    Scheme

    Network Performance Evaluation Reportand RNO Scheme

    Key Actions Relevant Documents Action Points Work Day

    Review

    network

    evaluation

    report/RNO

    scheme

    1. Network

    Evaluation Report

    2. Network

    Optimization Work

    Guide

    Review contents:

    1.Check whether the test method is correct.

    2.Check whether the test data and KPIs are

    aligned.3.Check whether there are any problems

    with the network, and analyze and solve

    any problems.

    4.Check whether the scheme is feasible.

    5.Check whether the documents are

    correct .

    2 days

    Input - Network evaluation report and RNO scheme

    Output - Network evaluation report and final RNO scheme

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    21/39

    Internal Only

    Check whether the testmethod is standard.

    Check whether the testdata and KPIs areintegrated.

    Check whether there areany problem aboutnetwork, and analyze theproblem if any.

    Check whether theRNO scheme isreasonable.

    Check whether thedocuments arenormative.

    Example of the network evaluation report

    Illustration of Action 3: KCP Review Network

    Evaluation Report/RNO Scheme

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    22/39

    Internal Only

    Content

    Network Optimization- Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    23/39

    Internal Only

    Subcourse Content

    Implement Cluster Optimization

    Action 1: Monitor the Cluster Optimization Effects

    Action 2: Review Cluster Optimization Report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    24/39

    Internal Only

    Level 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixRNO Scheme

    ImplementClusterOptimization

    Implement EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    1 days

    Check thealarmsAdjust radionetworkparameters

    Adjustneighborcell relations

    3 days

    Check theradiocoverageAdjust theantenna

    feedersystem

    2 days

    Monitor theoptimizationeffects

    2 days

    Handlesubscriberscomplaints

    4 days

    Verify theclusteroptimizationClusteroptimization

    report

    2 days

    Reviewclusteroptimizationreport.

    Implement Cluster Optimization

    Level 5

    The actions listed in the blue cells are thesite engineers' actions.

    The actions listed in the orange cells arethe subcontractors' actions.

    Implement Cluster Optimization

    NOEs'Action 1

    NOEs'Action 2

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PAT

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    25/39

    Internal Only

    Action 1: CP Monitor the Cluster Optimization

    Effects

    The NOEs should monitor the execution status of the RNO adjustment work order and the RNO effects.

    Key Actions Relevant Documents Action Points Work Day

    Monitor the

    optimization

    effects

    1. Network Evaluation

    Guidebook

    The NOEs should monitor the execution status

    of the RNO adjustment work order and the

    RNO effects.

    Contents:

    1.Check whether the network indicators have

    improved after the radio parameter adjustment,

    for example, call drop rate, call setup success

    rate, and handover success rate.

    2.Check whether the indicators of the

    network/cell have improved after the

    optimization, for example, coverage, signal

    quality, call quality and handover.

    2 days

    Input - RNO adjustment work order

    Output - RNO adjustment work order

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    26/39

    Internal Only

    Action 2: KCP Review Cluster Optimization Report

    Submit the Cluster Optimization Reportto the NOM and the customer for review.

    Key Actions Relevant Documents Action Points Work Day

    Review

    cluster

    optimization

    report

    1. Cluster

    Optimization

    Report(Template)

    2. Remaining RNO

    Problems TracingTable

    Review contents:

    1.Check whether the test method is correct.

    2.Check whether the test data and KPIs are

    aligned.

    3.Confirm whether the KPIs meet the

    requirements.

    4.Check whether the network problems are

    solved, and whether the reports are clear.

    5.Check whether the documents are correct.

    2 days

    Input - Cluster optimization report

    Output - Cluster optimization report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    27/39

    Internal Only

    Check whether the testmethod is standard.

    Check whether the test dataand KPIs are integrated.

    Confirm whether the KPIsmeet the requirements.

    Check whether the networkproblems are solved, andwhether the description is

    clear.

    Check whether thedocuments are normative.

    Example of the cluster optimization report

    Illustration of Action 2: KCP Review Cluster

    Optimization Report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    28/39

    Internal Only

    Content

    Network Optimization- Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix the RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    29/39

    Internal Only

    Subcourse Content

    Implement Entire Network Optimization

    Action 1: Monitor the Network Optimization Effects

    Action 2: Review Network Optimization Report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    30/39

    Internal Only

    Level 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixRNO Scheme

    ImplementClusterOptimization

    Implement EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    1 day

    Check thealarms

    Adjust radionetworkparameters

    Adjustneighbor cell

    relations

    3 days

    Check theradiocoverage

    Adjust theantennafeeder system.

    2 days

    Monitor theoptimizationeffects

    2 days

    Handlesubscriberscomplaints

    4 days

    Networkoptimizationacceptance

    Networkoptimizationreport

    2 days

    Review thenetworkoptimizationreport

    Implement Entire Network Optimization

    Level 5

    The actions listed in the blue cells are the siteengineers' actions.The actions listed in the orange cells are the

    subcontractors' actions.

    Implement Entire Network Optimization

    NOEs

    Action 1NOEs

    Action 2

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PAT

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    31/39

    Internal Only

    Action 1: CP Monitor the Network Optimization

    Effects

    The NOEs should monitor the execution status of the RNO adjustment work order and theRNO effects.

    Key

    Actions

    Relevant

    DocumentsAction Points

    Work

    Day

    Monitor the

    optimization

    effects

    1. Network

    Evaluation

    Guidebook

    The NOEs should monitor the execution

    status of the RNO adjustment work order

    and the RNO effects.

    Contents:Check whether the network indicators have

    improved after the radio parameter

    adjustment, for example, call drop rate, call

    setup success rate, and handover success

    rate.

    2 days

    Input - RNO adjustment work order

    Output - RNO adjustment work order

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    32/39

    Internal Only

    Action 2: KCP Review Network Optimization Report

    Submit the Network Optimization Reportto the NOM and the customer for review.

    Key Actions Relevant Documents Action Points Work Day

    Review the

    network

    optimization

    report

    1. Network

    Optimization

    Report(Template)

    2. Remaining RNOProblems Tracing

    Table

    Review contents:

    1. Check whether the test method is

    standard.

    2. Check whether the test data and KPIs

    are aligned.3. Confirm whether the KPIs meet the

    requirements.

    4. Check whether the network problems are

    solved, and whether the description is clear.

    5. Check whether the documents are

    correct.

    2 days

    Input - Network optimization report

    Output - Network optimization report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    33/39

    Internal Only

    Check whether the testmethod is standard.

    Check whether the test dataand KPIs are integrated.

    Confirm whether the KPIsmeet the requirements.

    Check whether the networkproblems are solved, andwhether the description is

    clear.

    Check whether thedocuments are normative.

    Example of the network optimization report

    Explanation of Action 2: KCP Review Network

    Optimization Report

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    34/39

    Internal Only

    Content

    Actions List for NOE

    Single Site Verification

    RNO Plan Preparations

    Perform RNO Test and Fix RNO Scheme

    Implement Cluster Optimization

    Implement Entire Network Optimization

    Network Optimization Acceptance

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    35/39

    Internal Only

    Subcourse Content

    Network Optimization Acceptance

    Action 1: Archive the Documents

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    36/39

    Internal Only

    Level 4

    Single SiteVerification

    RNO PlanPreparations

    Perform RNOTest and FixRNO Scheme

    ImplementClusterOptimization

    Implement EntireNetworkOptimization

    NetworkOptimization

    Acceptance

    1 day

    Classify and

    submit the RNOdocuments

    1 day

    Review the RNOdocuments

    1 day

    RNO projectreviewingmeeting

    1 day

    Archive the

    documents

    Network Optimization Acceptance

    Level 5

    The actions listed in the blue cells are thesite engineers' actions.

    The actions listed in the orange cells are the

    subcontractors' actions.

    Network Optimization Acceptance

    NOEss

    Action 1

    NetworkPlanning

    SiteSurvey

    SiteAcquisition

    SiteDesign

    MaterialDelivery

    CivilWork

    TEInstallation

    SiteIntegration

    NetworkOptimization PAT

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    37/39

    Internal Only

    Action 1: Archive the Documents

    Ensure the timeliness, accuracy, integrity, and validity of all documents.

    Key Actions Relevant Documents Action Points Work Day

    Archive thedocuments

    Relevant documents

    1.Base station information table

    2.Single site verification report

    3.Network evaluation report

    4.Cluster optimization report

    5.Network optimization report

    6.Remaining RNO problems tracing table

    7.RNO adjustment work order

    8.Backup of the test data

    1 day

    Input - All documents involved in the RNO process

    Output - RNO documents

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    38/39

    Internal Only

    Review

    Control Point

    of Each Action

    CPs/KCPs

  • 7/29/2019 10 Site Engineer Training Course_Radio Network Optimization

    39/39

    Proprietary Confidential


Recommended