OSP FIBER PROJECT IMPLEMENTATION
IT IS ALL ABOUT COMPLING WITH
PROCESS ..it has start and end
WHAT HAPPENS IN -BETWEEN
IS THE MANAGEMENT
STAGE I PROPOSED ROUTE SURVEY After studying the SOW from the client .
It is important to survey the project route and take note of the terrain.
The use of GPS and knowledge of it with other mapping
software is an hedge in this stage
It begins with SURVEY of the
PROPOSED ROUTE
STAGE II DRAFTING AND DRAWING
OF THE SURVEY IN AUTO-CAD
FORMATMH 1
MH 2 IN
MH 3 IN
MH 5 OUT
MH 4 OUT
MH 6 MH 7
STAGE III
TRENCHING
YOU CAN CALL IT DIGGING, REMOVAL
OF THE TERRAIN SUFARCE TO A GIVEN
DEPTH
ASPHALT CUTTING, CONCRETE BREAKING, THRUST BORING, PAVE STONES, SWAMP AREAS, BRIGDE CROSSING are some of the terrain to work with during
TRENCHING
STAGE IV : CONCRETE WORKcasting of MANHOLE and ROUTE MARKER
Manhole are the concrete junction box site at given interval on the project route
THIS CAN BE CONSTRUCTED ON SITE (IN-SITU)
OR
CAST IN THE PROJECT EQUIPMENT LOCATED (PRE-CAST)
Route marker are the short pillars erected along the fiber route to indicate the presence of underground telecom facilities
STAGE VDUCTING & COUPLING
Laying of
(PVC Polyvinyl chloride) (HDPE: High density polyethene) & GI Pipe
WHAT IS COUPLINGJOINING OF DUCTS TOGETHER FOR CONTINUITY
PVC COUPLINGPVC (Polyvinyl chloride)COUPLING INVOLVE SETTING
THE FEMALE SIDE OF THE PIPE AGAINST THE MALE SIDE
SUB-DUCT COUPLINGTHE SUB-DUCT KNOWN AS HDPE (High Density Polyethylene) VARY IN SIZES 33/40mm. It is uniform in size. Unlike PVC, it does not have male and female sides. joining requires a special coupler
and techniques
STAGE VIBACKFILLING
& REINSTATEMENT
This term refers to the returns of the excavated soil to the trench. Warning tape is required here before total backfilling. Reinstatement only takes place where major terrain such as asphalt cutting and concrete breaking take place
STAGE VII FIBER WORK
FIBER PULLING : HAND PULLING OR BLOWING
It involve inserting of the fiber optics cable into the sub-duct from manhole to manhole to the end of the cable drum or cassette.
Equipment such as the calibration rope, stager, hand and blowing machine can be deployed to achieve this stage
STAGE VIII FIBER CABLE TERMINATION
Connectorization and splicing
STAGE IX : TESTING
INSERTION LOSS TEST AND OTDR TEST
VISUAL FAULT LOCATOR
OLTSOTD
R
STAGE XDOCUMENTATION OF THE TEST RESULT, AS- BUILT DRAWING