OSP FIBER PROJECT IMPLEMENTATION
Transcript
Page 1: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

OSP FIBER PROJECT IMPLEMENTATION

Page 2: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

IT IS ALL ABOUT COMPLING WITH

PROCESS ..it has start and end

Page 3: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

WHAT HAPPENS IN -BETWEEN

IS THE MANAGEMENT

Page 4: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE I PROPOSED ROUTE SURVEY After studying the SOW from the client .

It is important to survey the project route and take note of the terrain.

The use of GPS and knowledge of it with other mapping

software is an hedge in this stage

Page 5: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

It begins with SURVEY of the

PROPOSED ROUTE

Page 6: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE II DRAFTING AND DRAWING

OF THE SURVEY IN AUTO-CAD

FORMATMH 1

MH 2 IN

MH 3 IN

MH 5 OUT

MH 4 OUT

MH 6 MH 7

Page 7: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE III

TRENCHING

Page 8: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

YOU CAN CALL IT DIGGING, REMOVAL

OF THE TERRAIN SUFARCE TO A GIVEN

DEPTH

Page 9: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

ASPHALT CUTTING, CONCRETE BREAKING, THRUST BORING, PAVE STONES, SWAMP AREAS, BRIGDE CROSSING are some of the terrain to work with during

TRENCHING

Page 10: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE IV : CONCRETE WORKcasting of MANHOLE and ROUTE MARKER

Manhole are the concrete junction box site at given interval on the project route

THIS CAN BE CONSTRUCTED ON SITE (IN-SITU)

OR

CAST IN THE PROJECT EQUIPMENT LOCATED (PRE-CAST)

Route marker are the short pillars erected along the fiber route to indicate the presence of underground telecom facilities

Page 11: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE VDUCTING & COUPLING

Laying of

(PVC Polyvinyl chloride) (HDPE: High density polyethene) & GI Pipe

Page 12: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

WHAT IS COUPLINGJOINING OF DUCTS TOGETHER FOR CONTINUITY

Page 13: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

PVC COUPLINGPVC (Polyvinyl chloride)COUPLING INVOLVE SETTING

THE FEMALE SIDE OF THE PIPE AGAINST THE MALE SIDE

Page 14: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

SUB-DUCT COUPLINGTHE SUB-DUCT KNOWN AS HDPE (High Density Polyethylene) VARY IN SIZES 33/40mm. It is uniform in size. Unlike PVC, it does not have male and female sides. joining requires a special coupler

and techniques

Page 15: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE VIBACKFILLING

& REINSTATEMENT

This term refers to the returns of the excavated soil to the trench. Warning tape is required here before total backfilling. Reinstatement only takes place where major terrain such as asphalt cutting and concrete breaking take place

Page 16: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE VII FIBER WORK

FIBER PULLING : HAND PULLING OR BLOWING

Page 17: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

It involve inserting of the fiber optics cable into the sub-duct from manhole to manhole to the end of the cable drum or cassette.

Page 18: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

Equipment such as the calibration rope, stager, hand and blowing machine can be deployed to achieve this stage

Page 19: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE VIII FIBER CABLE TERMINATION

Connectorization and splicing

Page 20: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE IX : TESTING

INSERTION LOSS TEST AND OTDR TEST

VISUAL FAULT LOCATOR

OLTSOTD

R

Page 21: 10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION

STAGE XDOCUMENTATION OF THE TEST RESULT, AS- BUILT DRAWING