+ All Categories
Home > Documents > 100 m OPEN - Cartier Resources Inc. · The analytical results, derived from Cartier’s drilling,...

100 m OPEN - Cartier Resources Inc. · The analytical results, derived from Cartier’s drilling,...

Date post: 23-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
LONGITUDINAL SECTION SOUTH GOLD CORRIDOR LOOKING NORTH LONGITUDINAL SECTION NORTH GOLD CORRIDOR LOOKING NORTH LONGITUDINAL SECTION CENTRAL GOLD CORRIDOR LOOKING NORTH CROSS SECTION LOOKING WEST PLAN VIEW OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 650 m NORTH SURFACE SURFACE SURFACE SURFACE CENTRAL SOUTH NORTH CENTRAL CENTRAL SOUTH 1 600 m 1 400 m 650 m 0.5 km 0.5 km 1.0 km 1.5 km 0.5 km 1.0 km 1.5 km 0.5 km W E W E W E S N N The scientific and technical information of the company have been prepared and reviewed by MM. Gaétan Lavallière, P. Geo., Ph.D., Vice President and Ronan Déroff, P. Geo, M.Sc., Senior Geologist, Project Manager and Geomatician, Qualified Persons as defined by NI 43-101. Mr. Lavallière approved the information. The analytical results, derived from Cartier’s drilling, were obtained from samples measured along the drill core. The estimated true thickness averages about 65-85 % of the measured length. 1: NI 43-101 Technical Report and Mineral Resource Estimate, Chimo Mine Project, Central Gold Corridor, Val-d’Or, Québec, Canada. GéoPointCom Inc., December 17 , 2019. 2: Cartier increases gold resources of the Chimo Mine property. InnovExplo Inc., May 5 , 2020. 100 m 100 m 100 m 100 m 100 m Metric Ton (t) Grade (g/t Au) Troy Ounce (oz) Metric Ton (t) Grade (g/t Au) Troy Ounce (oz) InnovExplo Inc. (2020) North 2.5 505 300 5.35 86 850 715 700 4.59 105 710 GéoPointCom Inc. (2019) Central 2.5 3 263 300 4.40 461 280 3 681 600 3.53 417 250 InnovExplo Inc. (2020) South 2.5 249 000 4.63 37 060 480 600 4.84 74 840 Total 2.5 4 017 600 4.53 585 190 4 877 900 3.82 597 800 Inferred Resource Source Gold Corridor Cut-OGrade (g/t Au) Indicated Resource INDICATED RESOURCE INFERRED RESOURCE 1 2 2 th th Previous Results / CH19-55 incl. in 12.7 g/t Au / 4.0 m 22.0 g/t Au / 2.0 m incl. in 7.1 g/t Au / 11.5 m Previous Results / CH19-54 incl. in 2.6 g/t Au / 16.1 m 7.0 g/t Au / 2.0 m Previous Results / CH19-54E incl. in 2.0 g/t Au / 15.8 m 9.5 g/t Au / 2.0 m Previous Results / CH19-54B incl. in 2.5 g/t Au / 26.1 m 5.0 g/t Au / 10.9 m New Results / CH19-55B incl. in 9.4 g/t Au / 11.0 m 20.8 g/t Au / 4.0 m incl. in 6.7 g/t Au / 16.0 m
Transcript
Page 1: 100 m OPEN - Cartier Resources Inc. · The analytical results, derived from Cartier’s drilling, were obtained from samples measured along the drill core. The estimated true thickness

LONGITUDINAL SECTIONSOUTH GOLD CORRIDOR

LOOKING NORTH

LONGITUDINAL SECTIONNORTH GOLD CORRIDOR

LOOKING NORTH

LONGITUDINAL SECTIONCENTRAL GOLD CORRIDOR

LOOKING NORTHCROSS SECTION

LOOKING WEST

PLAN VIEW

OPEN

OPEN

OPEN

OPENOPEN

OPENOPEN

OPEN

650 mNORTH SURFACESURFACESURFACE

SURFACE

CENTRALSOUTH

NORTH

CENTRAL

CENTRAL

SOUTH

1 60

0 m

1 400 m

650

m

0.5 km 0.5 km

1.0 km

1.5 km

0.5 km

1.0 km

1.5 km

0.5 km

W E

W E

W E S N

N

The scienti�c and technical information of the company have been prepared and reviewed by MM. Gaétan Lavallière, P. Geo., Ph.D., Vice President and Ronan Déro�, P. Geo, M.Sc., Senior Geologist, Project Manager and Geomatician, Quali�ed Persons as de�nedby NI 43-101. Mr. Lavallière approved the information. The analytical results, derived from Cartier’s drilling, were obtained from samples measured along the drill core. The estimated true thickness averages about 65-85 % of the measured length. 1: NI 43-101 Technical Report and Mineral Resource Estimate, Chimo Mine Project, Central Gold Corridor, Val-d’Or, Québec, Canada. GéoPointCom Inc., December 17 , 2019.2: Cartier increases gold resources of the Chimo Mine property. InnovExplo Inc., May 5 , 2020.

100 m

100 m

100 m 100 m

100 m

Metric Ton(t)

Grade(g/t Au)

Troy Ounce(oz)

Metric Ton(t)

Grade(g/t Au)

Troy Ounce(oz)

InnovExplo Inc. (2020) North 2.5 505 300 5.35 86 850 715 700 4.59 105 710GéoPointCom Inc. (2019) Central 2.5 3 263 300 4.40 461 280 3 681 600 3.53 417 250

InnovExplo Inc. (2020) South 2.5 249 000 4.63 37 060 480 600 4.84 74 840Total 2.5 4 017 600 4.53 585 190 4 877 900 3.82 597 800

Inferred ResourceSource

GoldCorridor

Cut-Off Grade

(g/t Au)

Indicated Resource

INDICATEDRESOURCEINFERREDRESOURCE

1

2

2

thth

Previous Results / CH19-55

incl. in 12.7 g/t Au / 4.0 m22.0 g/t Au / 2.0 m

incl. in 7.1 g/t Au / 11.5 m

Previous Results / CH19-54

incl. in 2.6 g/t Au / 16.1 m7.0 g/t Au / 2.0 m

Previous Results / CH19-54E

incl. in 2.0 g/t Au / 15.8 m9.5 g/t Au / 2.0 m

Previous Results / CH19-54B

incl. in 2.5 g/t Au / 26.1 m5.0 g/t Au / 10.9 m

New Results / CH19-55B

incl. in 9.4 g/t Au / 11.0 m20.8 g/t Au / 4.0 m

incl. in 6.7 g/t Au / 16.0 m

Recommended