    Spring 2010

    Engineering Options

    Report Appendices

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    2/44

    Please note:

    Further details are provided in the Final Report on SiteSelection Process (doc ref: 7.05) that can be found onthe Thames Tideway Tunnel section of the PlanningInspectorates web site.

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    3/44

    100-RG-ENG-00000-900009 | Spring 2010

    Engineering Options ReportA endices

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    4/44

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    5/44

    THAMES TUNNEL

    ENGINEERING OPTIONS REPORTAPPENDICES

    LIST OF CONTENTS

    Page Number

    APPENDIX A ASSUMPTIONS REGISTER 1APPENDIX B DRAWINGS 8APPENDIX C TIME CHAINAGE 21APPENDIX D GEOLOGY 35

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    6/44

    Appendix A

    APPENDIX A ASSUMPTIONS REGISTER

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    1 Main Tunnel Design General

    Main tunnel sizing (diameter) Beckton orAbbey Mills to Hammersmith

    7.2m internal diameter (ID)

    Excavated Diameter 8.8m

    Main tunnel primary lining Lining thickness 0.35m

    Main tunnel secondary lining (assumed it

    is required for this EOR)

    Lining thickness 0.3m with bar reinforcement

    Vertical alignment Alignment to give adequate clearance tothird-party infrastructure (including theproposed National Grid Kensall Green cableTunnel) with tie in to either Abbey Mills Shaft For Beckton overflow shaft.

    Not less than 2m clearance below existing BTOpenreach Tunnel

    Gradient as close as possible to 0.12%

    Horizontal alignment Minimum radius 600m

    2 CSO Connections

    List of CSOs to be connected 1, 4, 5, 6, 7A & 7B, 8A&B, 9, 10, 14West, 16,17, 19, 20, 23, 27, 28, 29, 30, 31, 32, 33, 34(CSO 34 not required if Abbey Mills route

    taken).Low Level Connections CSOs 14, 23, 27

    Minimum Tunnel internal diameters(assumptions for tunnel optiondevelopment only)

    CS01X Acton Storm - Dia = 2.2m

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    7/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    CS08B Jews Row - Opened (Wandle ValleySR & Falcon Brook PS) - Dia = 3m

    CS09X Falcon Brook PS - Dia = 2.5m

    CS10X Lots Road PS - direct connection totunnel shaft

    CS14X Ranelagh West & CS14W RanelaghLow Level 1 Wier - Dia = 4m

    CS16X Heathwall PS & CS17X South WestSR - Dia = 4.5m

    CS19X Clapham Storm Relief - Dia = 2.6m

    CS20X Brixton SR to Clapham SR - Dia =2.6m

    CS23X: Northumberland Street & CS23WNorthumberland Low Level No1 Wier - Dia =2.6m

    CS27X: Fleet Main & CS27W: Fleet Low LevelWier 1 - Dia = 3.5m (5.0m if not direct

    connection)

    CS28X: Shad Thames PS - Dia = 2m

    CS29X: North East SR to Holloway SR - Dia =3.6m

    CS30X: Holloway SR - Dia = 3.6m

    CS31X Earl PS - Dia = 4.5m

    CS32X Deptford SR to Earl PS - Dia = 4m

    CS33X Greenwich PS to Deptford SR - Dia =4.5m

    CS34X Charlton SR Pipe (Alternative Route 1

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    8/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    Connection tunnel to main tunnel Seventy degree angled connections arepreferred but allowing exceptions where theconstruction risk associated with a longerconnection in the Thanet sand and chalk

    becomes excessive.3 Connection with Lee tunnel

    Connection to Lee tunnel Connection to Lee tunnel to be either atBecton overflow shaft or Abbey Mills shaft F.

    4 Main tunnel TBM selection

    Geological factors in TBM selection TBMs and Drive Strategy to suit groundconditions

    Drives rates Drive rates to be consistent with "Base line rev3" programme plus EPBM in Chalk reduced to50m/week

    5 Tunnel const ruction and intervention st rategy

    Tunnel drive length Drive lengths to be dependent upon therequirements of meeting the overall contractprogramme dates.

    TBM Intervention Strategy It is assumed that there will be no need forintermediate shafts to carry out planned TBMinterventions

    Intermediate shaft requirements Intermediate shafts may be required forconstruction of the secondary lining.

    6 Shaft requirements

    Distance between Main tunnel shafts forpermanent access

    9km maximum distance, but to be minimisedwhere possible. Equipment and methodologywill be developed to inspect and maintain thetunnel.

    Permanent installation - General All main and intermediate access shaftlocations are to provide for the followingpermanent structures:1) Ventilation building

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    9/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    Drop Shafts (assumptions for tunneloption development only). All drop shaftsare Vortex type unless less than 10m thenStraight Drop - Diameters are minimum.

    CS01X Acton Storm Relief

    Vortex - Shaft Dia =7m Tube Dia = 1.5m

    CS04X Hammersmith Pumping Station:

    Straight Drop - Shaft Dia =12m

    CS05X West Putney Storm Relief

    Vortex - Shaft Dia =20m Tube Dia = 1.5m

    CS06X Putney Bridge

    Vortex - Shaft Dia =6m Tube Dia = 1.5m

    CS07A Frogmore Storm Relief: Bell LaneCreek

    Vortex - Shaft Dia =6m Tube Dia = 1.5m

    CS07B Frogmore Storm Relief: BuckholdRoad

    Vortex - Shaft Dia =7.5m Tube Dia = 2m

    CS08A Jews Row - Wandle Valley StormRelief

    Vortex X2 - Shaft Dia =7.5m Tube 1 Dia =1.5m

    CS08B Jews Row - Falcon Brook PumpingStation

    Tube 2 Dia = 2m

    CS09X Falcon Brook Pumping StationVortex - Shaft Dia =8m Tube Dia = 2m

    CS10X Lots Road Pumping Station

    Vortex - Shaft Dia =20m Tube Dia = 2m

    CS14X Ranelagh West

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    10/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    CS19X Clapham Storm Relief

    Vortex - Shaft Dia =5m Tube Dia = 1m

    CS20X Brixton Storm Relief

    Vortex - Shaft Dia =10m Tube Dia = 2m

    CS23X: Northumberland Street ForeshoreInterception and side Spill Wiers toNorthumberland LL1 Wier Vortex X2 - ShaftDia =9m Tube 1 Dia = 1.5m

    CS23W: Northumberland LL1 Wier

    Tube 2 Dia =1.5m

    CS27X: Fleet Main

    Vortex X2 - Shaft Dia =17m Tube 1 Dia = 3.5m

    CS27W: Fleet Low Level Wier 1

    Tube 2 Dia = 2m

    CS28X: Shad Thames pumping station

    Vortex - Shaft Dia =20m Tube Dia = 1.5m

    CS29X: North East Storm Relief

    Vortex - Shaft Dia =13m Tube Dia = 3m

    CS30X: Holloway Storm Relief

    Vortex - Shaft Dia =7m Tube Dia = 2m

    CS31X Earl Pumping Station

    Vortex - Shaft Dia =8m Tube Dia = 2m

    CS32X Deptford Storm Relief

    Vortex - Shaft Dia =12m Tube Dia = 3m

    CS33X Greenwich Pumping Station

    Vortex - Shaft Dia =12m Tube Dia = 3m

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    11/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    Marine transport Marine transport is to be favoured over landtransport. The policy is for all excavatedmaterial to be transported by marine facility atmain tunnel shaft sites.

    Land transport Land transport should be minimised in favourof marine transport. It is likely that specificcontaminated materials will need to betransported to special disposal sites via roadtransport.

    Segment supply main tunnels No specific limitations have been placed onthe supply of tunnel segments, which dependupon the location of the manufacturing facility.

    Power is available for TBM drives at all main drive sites

    8 Excavated material handling anddisposal

    No assumption has been made regardingdisposal sites

    Waste management strategy document todefine disposal. This document is to beproduced

    10 Third-party inf rastructure impact

    The tunnel and shafts shall not endangerthird-party structures

    Thames Tunnel shall be designed to minimisethe impact to third-party infrastructure as far asreasonably practicable

    11 Programme Constraints

    Pre-construction mobilisation periodduration

    6 months

    Civils construction duration Maximum 4.5 years

    M&E (MEICA) works duration Period 6 months

    Testing and commissioning duration Period 6 months

    Overall Duration 6 years (ie. 2014 start to meet 202 completion)

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    12/44

    Appendix A

    Engineering Options Report Revision: 1

    Appendix A - AssumptionsRegister

    Item Criteria/constraints Requirements and Assumpt ions

    13 M&E Requirements

    No major M&E Plant required in thetunnels

    No specific impact to cost and schedule

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    13/44

    Appendix B

    APPENDIX B DRAWINGS

    Page number

    Figure B1 100-DA-GEN-00000-007300 Thames Tunnel alignment and drive options key plans . 9Figure B2 100-DA-GEN-00000-007301 Thames Tunnel main tunnel shaft sites plan sheet 1 of4 ........................................................................................................................................................ 10Figure B3 100-DA-GEN-00000-007302 Thames Tunnel main tunnel shaft sites plan sheet 2 of4 ........................................................................................................................................................ 11Figure B4 100-DA-GEN-00000-007303 Thames Tunnel main tunnel shaft sites plan sheet 3 of4 ........................................................................................................................................................ 12Figure B5 100-DA-GEN-00000-007304 Thames Tunnel main tunnel shaft sites plan sheet 4 of4 ........................................................................................................................................................ 13Figure B6 100-DA-GEN-00000-007305 Thames Tunnel River Thames route east end driveoptions plan sheet 1 of 2 ............................................................................................................... 14Figure B7 100-DA-GEN-00000-007306 Thames Tunnel River Thames route east end driveoptions plan sheet 2 of 2 ............................................................................................................... 15Figure B8 100-DA-GEN-00000-007307 Thames Tunnel Rotherhithe route east end driveoptions plan sheet 1 of 2 ............................................................................................................... 16Figure B9 100-DA-GEN-00000-007308 Thames Tunnel Rotherhithe route east end driveoptions plan sheet 2 of 2 ............................................................................................................... 17Figure B10 100-DA-GEN-00000-007309 Thames Tunnel Abbey Mills route east end driveoptions plan ...................................................................................................................................... 18Figure B11 100-DA-GEN-00000-007310 Thames Tunnel west end drive options plan sheet 1of 2 .................................................................................................................................................... 19Figure B12 100-DA-GEN-00000-007311 Thames Tunnel west end drive options plan sheet 2of 2 .................................................................................................................................................... 20

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    14/44

    Appendix B

    Page 9100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figur e B1 100-DA-GEN-00000-007300 Thames Tunnel alignment and drive opt ions key plans

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    15/44

    Appendix B

    Page 10100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figur e B2 100-DA-GEN-00000-007301 Thames Tunnel main tunnel shaft s ites pl an sheet 1 of 4

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    16/44

    Appendix B

    Page 11100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figur e B3 100-DA-GEN-00000-007302 Thames Tunnel main tunnel shaft s ites pl an sheet 2 of 4

    A di B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    17/44

    Appendix B

    Page 12100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figur e B4 100-DA-GEN-00000-007303 Thames Tunnel main tunnel shaft s ites pl an sheet 3 of 4

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    18/44

    Appendix B

    Page 13100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figur e B5 100-DA-GEN-00000-007304 Thames Tunnel main tunnel shaft s ites pl an sheet 4 of 4

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    19/44

    Appendix B

    Page 14100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B6 100-DA-GEN-00000-007305 Thames Tunnel River Thames route east end driv e option s plan sheet 1 of 2

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    20/44

    pp

    Page 15100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B7 100-DA-GEN-00000-007306 Thames Tunnel River Thames route east end driv e option s plan sheet 2 of 2

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    21/44

    Page 16100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B8 100-DA-GEN-00000-007307 Thames Tunnel Rotherhithe route east end drive opti ons pl an sheet 1 of 2

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    22/44

    Page 17100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B9 100-DA-GEN-00000-007308 Thames Tunnel Rotherhithe route east end drive opti ons pl an sheet 2 of 2

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    23/44

    Page 18100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B10 100-DA-GEN-00000-007309 Thames Tunnel Abbey Mills ro ute east end drive options plan

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    24/44

    Page 19100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B11 100-DA-GEN-00000-007310 Thames Tunnel west end d rive opt ions p lan sheet 1 of 2

    Appendix B

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    25/44

    Page 20100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure B12 100-DA-GEN-00000-007311 Thames Tunnel west end d rive opt ions p lan sheet 2 of 2

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    26/44

    Appendix C

    APPENDIX C TIME CHAINAGE

    Page numberFigure C1 Time chainage plot River Thames route Option Ba1 4-4 (4) ................................... 22Figure C2 Time chainage plot River Thames route Option Ba2 4-4(4) .................................... 23Figure C3 Time chainage plot River Thames route Option Bb1 4-3(9) .................................... 24Figure C4 Time chainage plot River Thames route Option Bb2 4-3(9) .................................... 25Figure C5 Time chainage plot Rotherhithe route Option A1a 4-4(4) ........................................ 26Figure C6 Time chainage plot Rotherhithe route Option A1b 4-3(9) ........................................ 27Figure C7 Time chainage plot Abbey Mills route Option A2a 3-3(4) ........................................ 28Figure C8 Time chainage plot Abbey Mills route Option A2b 3-2(1) ........................................ 29Figure C9 Time chainage plot Abbey Mills route Option A2c 2-2(2)......................................... 30Figure C10 Time chainage plot Abbey Mills route Option A2e 2-2(2) ...................................... 31Figure C11 Time chainage plot west end Option Wa 2-2 ......................................................... 32Figure C12 Time chainage plot west end Option Wb 2-1 ......................................................... 33Figure C13 Time chainage plot west end Option Wc 1-1 ......................................................... 34

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    27/44

    Page 22100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C1 Time chainage plo t River Thames route Option Ba1 4-4 (4)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    28/44

    Page 23100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C2 Time chainage plot River Thames route Option Ba2 4-4(4)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    29/44

    Page 24100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C3 Time chainage plot River Thames route Option Bb1 4-3(9)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    30/44

    Page 25100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C4 Time chainage plot River Thames route Option Bb2 4-3(9)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    31/44

    Page 26100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C5 Time chainage plot Rotherhithe route Option A1a 4-4(4)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    32/44

    Page 27100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C6 Time chainage plot Rotherhithe route Option A1b 4-3(9)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    33/44

    Page 28100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C7 Time chainage plot Abbey Mills rout e Option A2a 3-3(4)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    34/44

    Page 29100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C8 Time chainage plot Abbey Mills route Option A 2b 3-2(1)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    35/44

    Page 30100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C9 Time chainage plot Abbey Mills rout e Option A2c 2-2(2)

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    36/44

    Page 31100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C10 Time chainage plot Abbey Mills rout e Option A2e 2-2(2)

    Appendix C

    Fi C11 Ti h i l t t d O ti W 2 2

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    37/44

    Page 32100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C11 Time chainage plot west end Option Wa 2-2

    Appendix C

    Figure C12 Time chainage plot west end Option Wb 2 1

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    38/44

    Page 33100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C12 Time chainage plot west end Option Wb 2-1

    Appendix C

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    39/44

    Page 34100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure C13 Time chainage plot west end Option Wc 1-1

    Appendix D

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    40/44

    APPENDIX D GEOLOGY

    Page number

    Figure D1 EA groundwater levels Jan 2008 ................................................................................ 36Figure D2 Geological section for River Thames route .................................................................... 37Figure D3 Geological section for Rotherhithe route ........................................................................ 38Figure D4 Geological section for Abbey Mills route ........................................................................ 39

    Appendix D

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    41/44

    Page 36100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Figure D1 EA groundwater levels Jan 2008

    Appendix D

    Figure D2 Geological section for River Thames route

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    42/44

    Page 37100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Appendix D

    Figure D3 Geological section for Rotherhithe route

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    43/44

    Page 38100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010

    Appendix D

    Figure D4 Geological section for Abbey Mills route

  • 7/27/2019 100-RG-ENG-00000-900009-EOR-Apps_Spring 2010

    44/44

    Page 39100-RG-ENG-00000-900009-Engineering-Options-Report-Appendices.doc Printed 04/11/2010