66
10.1.1 पूव मय रेलवे EAST CENTRAL RAILWAY 11 () New Lines (Construction) 248,00,00 .. .. .. 200,00,00 .. 448,00,00 14 Gauge Conversion 185,00,00 .. .. .. .. .. 185,00,00 15 Doubling 10,00,00 .. .. .. .. .. 10,00,00 16 - Traffic Facilities-Yard Remodelling & Others 16,46,33 .. .. 3,05,00 .. 8,82,18 28,33,51 17 Computerisation 2,01,00 .. 5,00,00 57,50 .. .. 7,58,50 21 Rolling Stock 16,80,00 .. .. 1,75,00 .. 13,20,00 31,75,00 22 - Leased Assets - Payment of Capital Component 511,32,64 202,97,36 .. .. .. .. 714,30,00 29 - Road Safety Works-Level Crossings. .. .. .. .. .. 59,28,48 59,28,48 30 -/ Road Safety Works-Road Over/Under Bridges. .. .. .. .. .. 144,62,00 144,62,00 31 Track Renewals .. .. .. .. .. 634,84,29 634,84,29 32 Bridge Works 4,35,00 .. .. .. .. 51,95,90 56,30,90 33 Signalling and Telecommunication 4,00 .. .. .. .. 132,40,02 132,44,02 36 - Other Electrical Works excl TRD 29,07,31 .. 2,03,84 1,97,81 .. 78,22 33,87,18 37 Traction Distribution Works 1,00,00 .. .. .. .. 84,69,86 85,69,86 41 Machinery & Plant 4,16,35 .. 1,32,07 4,06,82 .. 7,35,85 16,91,09 42 - ह Workshops including Production Units 97,27,50 .. 2,70,00 15,10,70 .. 18,69,41 133,77,61 51 Staff Quarters 8,12,00 .. 8,20,00 .. .. .. 16,32,00 52 Amenities for Staff 8,00,00 .. 5,34,03 4,24,02 .. .. 17,58,05 53 Passenger Amenities 93,91,30 .. 12,50,00 22,50,00 .. 100,00,00 228,91,30 64 Other Specified Works 52,32,00 .. 2,72,00 5,30,01 .. 24,53,00 84,87,01 65 / Training/HRD .. .. .. .. .. 60,00 60,00 71 Stores Suspense 1279,36,74 .. .. .. .. .. 1279,36,74 72 Manufacture Suspense 120,26,50 .. .. .. .. .. 120,26,50 73 Miscellaneous Advances 14,35,60 .. .. .. .. .. 14,35,60 Total Gross 2701,84,27 202,97,36 39,81,94 58,56,86 200,00,00 1281,79,21 4484,99,64 Credits or Recoveries (a) For Released Materials .. .. 20,00,00 .. .. 76,86,00 96,86,00 (b) Other Credits 2,00,00 .. .. .. .. .. 2,00,00 (c) Stores Suspense 1294,96,74 .. .. .. .. .. 1294,96,74 (d) Manufacture Suspense 114,46,38 .. .. .. .. .. 114,46,38 (e) Miscellaneous Advances 14,35,60 .. .. .. .. .. 14,35,60 Total - Credits or Recoveries 1425,78,72 .. 20,00,00 .. .. 76,86,00 1522,64,72 Plan Outlay (Net) 1276,05,55 202,97,36 19,81,94 58,56,86 200,00,00 1204,93,21 2962,34,92 Assets-Acquisition, Construction and Replacement for 2019-20
Transcript
  • 10.1.1

    पवू� म�य रेलवेEAST CENTRAL RAILWAYपंूजी पंूजी िनिध मूआिन िविन संिन रारेसंको जोड़िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL

    11 �� ����� (���) New Lines (Construction) 248,00,00 .. .. .. 200,00,00 .. 448,00,00 14 ��� ������ Gauge Conversion 185,00,00 .. .. .. .. .. 185,00,00 15 ��ह�� ���� ����� Doubling 10,00,00 .. .. .. .. .. 10,00,00 16 ������� ������� - ��!� "# $��%# �

    ������ �&� '(� "���

    Traffic Facilities-Yard

    Remodelling & Others

    16,46,33 .. .. 3,05,00 .. 8,82,18 28,33,51

    17 ��)�"�"�� Computerisation 2,01,00 .. 5,00,00 57,50 .. .. 7,58,50 21 %� *+�" Rolling Stock 16,80,00 .. .. 1,75,00 .. 13,20,00 31,75,00 22 �,�)� �����-��� - �.�/� 0�)

    "� 0�)���

    Leased Assets - Payment

    of Capital Component

    511,32,64 202,97,36 .. .. .. .. 714,30,00

    29 �1" ���2� "��� - ���� Road Safety Works-Level Crossings.

    .. .. .. .. .. 59,28,48 59,28,48

    30 �1" ���2� "��� -3���/�%�# �1" ���

    Road Safety Works-Road

    Over/Under Bridges.

    .. .. .. .. .. 144,62,00 144,62,00

    31 �#��& ���"�� Track Renewals .. .. .. .. .. 634,84,29 634,84,29 32 ��� ������ "��� Bridge Works 4,35,00 .. .. .. .. 51,95,90 56,30,90 33 �)�� 5� �.���%�� ������ "��� Signalling and

    Telecommunication

    4,00 .. .. .. .. 132,40,02 132,44,02

    36 �/�� ������ '(� "��� - "6�� ���� "# '��7�

    Other Electrical Works

    excl TRD

    29,07,31 .. 2,03,84 1,97,81 .. 78,22 33,87,18

    37 " 6�� ���� ������ "��� Traction Distribution Works

    1,00,00 .. .. .. .. 84,69,86 85,69,86

    41 8���� 5� ����9 Machinery & Plant 4,16,35 .. 1,32,07 4,06,82 .. 7,35,85 16,91,09 42 "��:��# - ;

  • 10.1.1

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    1 Sakri-Hasanpur (79 km) Cap. 325,00,00 304,08,81 25,00,00 1,00,00

    S.Fund 30,00,00 9,58,66 .. ..

    2 Munger - Rail cum road bridge on river Ganga (14 km) Cap. 1247,00,00 956,49,45 1,00,00 1,00,00

    S.Fund 75,00,00 42,35,18 .. ..

    EBR(P) 1116,00,00 1329,80,11 25,00,00 ..

    3 Patna - Ganga bridge with linking lines between Patna & Hajipur

    (rail cum road bridge) (19 km)

    Cap. 1681,00,00 1568,13,50 40,00,00 1,00,00

    S.Fund 100,00,00 152,12,59 .. ..

    EBR(P) 1240,00,00 1147,94,73 5,00,00 ..

    4 Ara-Sasaram (98 km) Cap. 323,84,00 320,79,77 50,00 50,00

    S.Fund 1,00,00 6,19 .. ..

    5 Giridih-Koderma (102.5 km) Cap. 326,67,00 350,33,73 15,00,00 15,00,00

    S.Fund 45,00,00 5,28,46 .. ..

    Deposit 442,20,60 .. .. 15,00,00

    6 Muzaffarpur-Sitamarhi (63 km) Cap. 560,11,00 521,34,41 10,00 1,00,00

    S.Fund 20,00 35,53 .. ..

    7 Khagaria-Kusheshwarsthan (44 km) Cap. 541,00,00 209,16,85 45,00,00 5,00,00

    S.Fund 30,00,00 23,63,87 .. ..

    8 Rajgir-Hisua-Tilaya (46 km) & Natesar-Islampur (21 km) Cap. 256,85,79 414,12,67 30,00,00 10,00,00

    S.Fund 75,00,00 22,82,41 .. ..

    9 Koderma-Ranchi (189 km) Cap. 1545,91,00 1156,13,67 100,00,00 25,00,00

    S.Fund 185,00,00 34,60,89 .. 100,00,00

    Deposit 1645,91,00 .. .. 100,00,00

    10 Fatuah-Islampur incl. material modification for extension of new line

    from Neora to Daniawan; Daniawan to Biharsharif; Biharsharif to

    Barbigha; Barbigha to Sheikhpura

    Cap. 516,41,00 552,27,01 50,00,00 50,00,00

    S.Fund 50,00,00 77,76,55 .. 25,00,00

    11 Kosi Bridge Cap. 560,00,00 332,22,91 46,00,00 20,00,00

    S.Fund 60,00,00 4,90,11 .. ..

    12 Koderma-Tilaiya (68 km) Cap. 338,17,00 271,09,91 35,00,00 50,00,00

    S.Fund 50,00,00 15,78,54 .. ..

    Deposit 60,00,00 .. .. 10,00,00

    EBR(IF) 10,00,00 .. .. ..

    13 Hajipur-Sagauli via Vaishali (148.3 km) Cap. 324,66,00 1180,54,27 10,00,00 40,00,00

    S.Fund 100,00,00 81,08,03 50,00,00 74,00,00

    14 Chhapra-Muzaffarpur (84.65 km) Cap. 378,56,00 354,92,46 17,00,00 1,00,00

    S.Fund 20,00,00 2,17,37 .. ..

    15 Darbhanga-Kusheshwar Asthan (70.14 km) Cap. 205,00,00 4,94,60 10,00 10,00

    S.Fund 1,00,00 .. .. ..

    16 Motihari-Sitamarhi (76.7 km) Cap. 926,09,00 24,16,36 1,00 10,00

    S.Fund 20,00,00 .. .. ..

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    NEW LINES (CONSTRUCTION)

    A - Works in Progress

  • 10.1.2

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    17 Bihta-Aurangabad via Anugrahanarayan Road (118.45 km) Cap. 326,20,00 1,73,66 1,00,00 25,00,00

    S.Fund 2,00,00 3,74 .. ..

    18 Sitamarhi-Jaynagar-Nirmali via Susand (188 km) Cap. 2393,23,00 16,86,29 1,00,00 10,00

    S.Fund 1,00,00 3,64 .. ..

    19 Muzaffarpur-Katra-Oral-Janakpur Road (66.55 km) Cap. 228,05,00 1,47,60 1,00 10,00

    S.Fund 1,00,00 .. .. ..

    20 Ara-Bhabhua Road (122 km) Cap. 49,08,00 39,61 10,00 10,00

    S.Fund 2,00,00 .. .. ..

    21 Araria-Supaul (92 km) Cap. 304,41,00 24,17 23,00,00 1,00,00

    S.Fund 2,00,00 .. .. ..

    22 Dehri on Sone-Banjari (36.4 km) Cap. 106,20,00 5,79,70 10,00 10,00

    S.Fund 5,00,00 11,29 .. ..

    23 Gaya-Daltonganj via Rafiganj (136.88 km) Cap. 445,25,00 1,14,12 1,00,00 10,00

    S.Fund 1,00,00 91 .. ..

    24 Gaya-Bodhgaya-Chatra, Gaya-Natesar (Nalanda) Cap. 549,75,00 14,81,48 1,47,70 10,00

    S.Fund 2,00,00 3,06 .. ..

    25 Nawada-Laxmipur (137 km) Cap. 620,57,00 16,79 10,00 10,00

    S.Fund 1,00,00 .. .. ..

    26 Kursela-Bihariganj (35 km) Cap. 192,56,00 40,32 10,00 10,00

    S.Fund 1,00,00 .. .. ..

    27 Muzaffarpur-Darbhanga (66.9 km) Cap. 281,30,00 57,35 10,00 10,00

    S.Fund 1,00,00 .. .. ..

    28# Vikramshila - Katareah (Pirpainthi-Naugachia) (18 km) Cap. 800,49,00 .. 82,20 10,00

    S.Fund 1,00 .. .. ..

    EBR(P) 800,50,00 .. .. ..

    29# Wazirganj-Natesar via Gehlaur (20 km) Cap. 300,00,00 .. 10,00 10,00

    30# Parasnath-Madhuban-Giridih (35 km) Cap. 364,50,00 .. 10,00 10,00

    EBR(P) 364,50,00 .. .. ..

    31# Dhanbad-Chandrapura - Alternative route via Tundu-Nichitpur

    (25.81 km) (umbrella work PB#23/2018-19/NR)

    Cap. 629,00,00 .. .. 10,00

    32 Estimated investment through EBR (Partnership) (for Tori-Sheopur) EBR(P) 2200,00,00 .. .. 2200,00,00

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 248,00,00

    S.Fund .. .. .. 199,00,00

    Deposit .. .. .. 125,00,00

    EBR(P) .. .. .. 2200,00,00

    33 Lumpsum Provision For New Works S.Fund .. .. .. 1,00,00

    TOTAL-NEW WORKS S.Fund .. .. .. 1,00,00

    TOTAL-New Lines (Construction) Cap. .. .. .. 248,00,00

    S.Fund .. .. .. 200,00,00

    Deposit .. .. .. 125,00,00

    EBR(P) .. .. .. 2200,00,00

    B - New Works

    NEW LINES (CONSTRUCTION)

  • 10.1.3

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    34 Mansi-Saharsa, incl. Saharsa-Dauram Madhepura-Purnea (143 km) Cap. 477,88,98 562,84,23 15,00,00 15,00,00

    S.Fund 40,00,00 53,07,31 .. ..

    35 Jaynagar-Darbhanga-Narkatiaganj (268 km) Cap. 641,65,00 485,48,34 30,00,00 20,00,00

    C.Fund 401,90,02 361,90,02 .. ..

    S.Fund 60,00,00 76,25,86 .. ..

    36 Sakri - Laukaha Bazar - Nirmali & Saharsa - Forbesganj (206.06

    km)

    Cap. 255,81,00 351,57,32 89,00,00 150,00,00

    S.Fund 50,00,00 28,67,71 .. ..

    EBR(IF) 50,00,00 50,50,37 75,00,00 ..

    37 Jaynagar-Bijalpura, incl. extension between Bijalpura-Bardibas

    (Nepal) (69.08 km)

    Cap. 1 .. .. ..

    DRF 1 .. .. ..

    Deposit 200,00,00 .. .. 120,00,00

    EBR(P) 470,00,00 333,95,45 .. ..

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 185,00,00

    Deposit .. .. .. 120,00,00

    TOTAL-Gauge Conversion Cap. .. .. .. 185,00,00

    Deposit .. .. .. 120,00,00

    38 Maheshkhunt-Thana Bihpur (31.75 km) Cap. 8,00,00 50,64,95 .. ..

    C.Fund 92,41,20 92,41,20 .. ..

    Deposit 3,00,00 .. .. ..

    EBR(IF) 14,00,00 .. 7,00,00 1,10,00

    39 Thana Bihpur-Kursela (33.57 km) Cap. 27,73,59 15,79,16 .. ..

    C.Fund 39,86,41 39,86,41 .. ..

    Deposit 1,00 .. .. ..

    EBR(IF) 15,00,00 .. 1,20,00 1,00

    40 Katreah-Kursela - Patch doubling incl. bridge on river Koshi (7.24

    km)

    Cap. 79,81,00 .. 6,00,00 ..

    EBR(IF) 1,49,12 62,65,02 35,00,00 45,00,00

    41 Garhwa Road-Ramna Cap. 346,96,73 .. .. ..

    EBR(IF) 1,03,27 51,49,59 55,00,00 25,00,00

    42 Danea-Ranchi Road - Patch doubling Cap. 322,00,00 .. .. ..

    EBR(IF) 1,00,00 72,82,58 50,00,00 75,00,00

    43 Jarangdih-Danea - Patch doubling Cap. 330,96,21 3,29 .. ..

    EBR(IF) 1,03,79 51,01,99 60,44,00 75,00,00

    44 Hajipur-Ramdaualu Nagar (47.72 km) Cap. 322,17,00 12,10,00 .. ..

    EBR(IF) 46,00,00 227,55,66 78,00,00 50,00,00

    45 Renukut-Chopan (32 km) (Billi-Chopan 7.89 km) EBR(IF) 250,62,72 39,02,13 25,00,00 10,00,00

    DOUBLING

    A - Works in Progress

    GAUGE CONVERSION

    A - Works in Progress

  • 10.1.4

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    46 Karaila Road-Shaktinagar (32.15 km) EBR(IF) 266,47,92 58,84 2,00,00 5,00,00

    47 Ranchi Road-Patratu - Patch doubling (31 km) EBR(IF) 290,77,80 9,31,63 48,11,00 124,00,00

    48 Rampur Dumra-Tal-Rajendrapul - Addl bridge and doubling (14 km) Cap. 892,16,82 .. 9,00,00 10,00,00

    EBR(IF) 1,00,00 159,65,01 270,00,00 200,00,00

    49 Ramna-Singrauli (160 km) EBR(IF) 1600,00,00 166,13,49 165,00,00 250,00,00

    50 Dhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line (291 km) Cap. 25,00,00 .. .. ..

    EBR(IF) 4500,00,00 .. 250,00,00 100,00,00

    51 Hajipur-Bachwara (72 km) Cap. 20,00,00 11 .. ..

    EBR(IF) 720,00,00 203,68,93 250,00,00 100,00,00

    52 Samastipur-Darbhanga (38 km) EBR(IF) 380,00,00 66,04,69 50,00,00 90,00,00

    53 Kiul - Gaya (124 km) Cap. 5,00,00 .. .. ..

    EBR(IF) 1230,00,00 264,19,25 170,00,00 300,00,00

    54 Karota Patner-Mankatha - Surface triangle line (7.94 km) EBR(IF) 65,45,00 10,00,00 3,00,00 20,00,00

    55# Sagauli - Valmikinagar (109.7 km) Cap. 372,02,00 .. .. ..

    EBR(IF) 372,02,00 .. 20,00,00 100,00,00

    56 Gaya - Bypass line for Manpur (1.6 km) EBR(IF) 6,28,00 .. 1,00,00 3,00,00

    57# Muzaffarpur - Sagauli (100.6 km) Cap. 365,82,00 .. .. ..

    EBR(IF) 365,82,00 .. 27,00,00 200,00,00

    58 Garwa Road - Rail over rail (10 km) Cap. 24,36,50 .. .. ..

    EBR(IF) 24,36,50 .. 1,50,00 100,00,00

    59 Gomoh - Flyover for down trains (20 km) Cap. 47,28,00 .. .. ..

    EBR(IF) 47,28,00 .. 50,00 40,00,00

    60 Darbhanga - Bypass line connecting Shisho Halt & Kakarghati, excl

    Darbhanga Yard (7.64 km)

    Cap. 10,00,00 .. .. ..

    EBR(IF) 120,50,00 .. 10,00 19,00

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 10,00,00

    EBR(IF) .. .. .. 1913,30,00

    61 Lumpsum Provision For New Works EBR(IF) .. .. .. 1,00,00

    TOTAL-NEW WORKS EBR(IF) .. .. .. 1,00,00

    TOTAL-Doubling Cap. .. .. .. 10,00,00

    EBR(IF) .. .. .. 1914,30,00

    62 Patna Jn. - Addl platform & extension of platform Nos.4-7, incl

    material modification for reinforced concrete cement apron on

    platform No.8 & 9

    DF(3) 17,35,54 17,22,17 1,01 1,00

    63 Pawapuri Road-Silao - Crossing stations DF(3) 5,54,32 2,50,31 25,00 30,00

    RRSK 2,84,01 .. .. ..

    A - Works in Progress

    B - New Works

    TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

    DOUBLING

  • 10.1.5

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    64 Jhajha-Mughalsarai - Conversion of halt stations into intermediate

    block signal to split critical block section (3 stations)

    Cap. 2,19,49 1,46,75 5,00 5,83

    C.Fund 3,14,00 99,52 .. ..

    65 Bankaghat, Khusrupur, Karauta, Athmalgola & Mor - Loops & cross-

    overs on main line

    Cap. 7,22,27 7,24,65 20,00 23,33

    C.Fund 18,55,00 1,50,00 .. ..

    EBR 1,50,00 9,84,73 .. ..

    66 Patna - Addl. platform No.10 & circulating area on Karbigahia side Cap. 15,83,19 17,40,75 7,10 1,00

    67 Dhanbad Division - Sand hump for panel interlocking work (12

    places)

    DF(3) 2,68,29 2,54,46 5,45 1

    RRSK 12,83 18,83 .. ..

    68 Yadugram - Catch siding on top in down line DF(4) 3,03,47 2,26,03 .. ..

    RRSK 27,44 .. 1 2,00

    69 Pipra & Jibdhara - 3rd running line (686 m) with both end sand

    humps

    DF(3) 4,54,00 4,14,39 50,00 ..

    RRSK 80,63 .. .. 5,00

    70 Ghoshwar - Conversion of halt into 3-line crossing station Cap. 8,03,26 3,38,37 1,00 1,00

    EBR 1,00,00 .. .. ..

    71 Bakhtiyarpur - Fly-over, Bakhtiyarpur-Barh - 3rd line & surface

    triangle between Bakhtiyarpur-Rajgir line and Athmalgola-

    Bakhtiyarpur up line

    Cap. 18,73,20 22,46,93 1 1,00

    EBR(P) 233,64,80 71,51,91 .. 162,12,89

    72 Chamua - Conversion of halt into 3-line block / crossing station Cap. 4,65,21 3,92,51 6,00 1

    73 Mughalsarai Yard - Addl. 3rd line entry from grand chord with

    signalled movement in up receiving yard & engine line

    DF(3) 4,96,84 2,08,77 .. ..

    RRSK 2,83,07 .. .. 1

    74 Gaya-Mughalsarai - Emergeny cross over in grand chord section

    common loop (6 Nos)

    DF(3) 4,66,00 2,57,78 .. ..

    RRSK 3,30,25 43,82 .. 1

    75 Patna Jn - Stabling lines (2 Nos) Cap. 5,72,00 5,52,74 10,00 10,00

    76 Danapur - Connectivity of direct delivery lines at Delhi end Cap. 5,49,04 5,52,78 5,00 5,83

    77 Tekabigaha-Lemuabad - Crossing station Cap. 7,50,00 7,54,57 10,00 11,67

    EBR 1,50,00 1,50,00 .. ..

    78 Piprahan - Crossing station by splitting longer block section to

    increase line capacity

    DF(3) 5,48,11 3,34,73 40,00 ..

    RRSK 1,63,38 .. .. 1

    79 Narayanpur Anant - Basic facilities as freight terminal DF(3) 8,00,00 7,84,94 1,00 1,00

    80 Kishanpur, Rambhadrapur & Hayaghat - 3rd running line with both

    end sand hump (686 m)

    DF(3) 7,97,67 4,87,06 15,00 ..

    RRSK 2,27,53 .. .. 1,00

    81 New Muzaffarpur - Terminal station Cap. 18,00,00 .. 1,00 1,00

    EBR 4,00,00 .. .. ..

    TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

  • 10.1.6

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    82 Sadishopur (Neora-Bibata) - Pawanikamarpur (Buxar-Chausa) &

    Bahorachandil (Zamania-Dhina) - Intermediate block sections

    Cap. 3,89,00 1,79,67 1 1

    83 Kuchman - New down common loop Cap. 5,60,00 4,55,93 1,00,00 1,16,67

    84 Mughalsarai - 24-coach platforms on all lines, direct reception of

    goods in up departure line at speed of 75 kmph

    Cap. 11,71,00 5,62,70 65,00 10,00

    EBR 1,25,00 1,25,00 .. ..

    85 Gaya - Full length platform on line No.8 & 9 DF(3) 6,67,36 2,39,91 .. ..

    RRSK 5,54,28 19,62 .. 1

    86 Semra & Ramgarhwa - 3rd running line with both end sand humps

    (686 m)

    DF(3) 6,68,65 4,59,24 40,00 ..

    RRSK 1,56,55 .. .. 1

    87 Anugrahnarain Road - Down addl. loop cum direct delivery line DF(3) 6,17,47 1,91,98 .. ..

    RRSK 4,25,39 54,51 15,00 10

    88 Tori - Addl loop DF(3) 2,89,16 90,05 .. ..

    RRSK 9,18,11 .. 1 1

    89 Karjara & Karota Patner - Crossing stations Cap. 10,63,00 3,91,72 60,00 1,17

    90 Jhajha - Extention of 3rd loop and up line Nos.1 & 2 to full length Cap. 5,55,00 2,69,57 .. 70,00

    91 Bansipur - Down common loop Cap. 6,80,00 4,74,03 2,00,00 1,50,00

    92 Krishnashila - 2 addl loop lines Cap. 4,30,00 3,68,76 34,50 5,00

    93 Biharsharif - 3rd loop line Cap. 3,06,00 51,00 20,00 15,00

    94 Mahendia - Addl loop Cap. 2,99,00 1,80,65 50 10,00

    95 Darauli - Up loop line with sand hump at Mughalsarai end DF(3) 4,13,00 2,62,34 .. ..

    RRSK 64,70 .. 5,00 6,00

    96 Rampur Dumra - Operationalise of bridge line common loop Cap. 3,01,00 51,00 3,00 3,50

    97 Shaktinagar - 2 addl loops Cap. 5,60,00 3,38,61 75,00 10,00

    98 Mc Cluskieganj-Mahuamilan - Splitting of block section by restoring

    Nindra block hut

    DF(3) 2,72,42 52,05 1 1

    RRSK 2,19,37 .. 1,00 1

    99 Shekhpura - Addl. loop DF(4) 4,09,31 80,05 .. ..

    RRSK 2,21,20 17,79 50,00 1,00,00

    100 Pahleza - Development as B-class station DF(3) 6,02,66 34,55 .. ..

    RRSK 4,78,05 17,87 10,00 1

    101 Singrauli-Karela Road - 2 addl block stations with simultaneous

    reception / crossing facilities

    Cap. 10,75,02 5,24,17 80,00 1

    102 Richguta & Kechri - Provision of 59 BOXN, 2 electrical engines, 8

    wheeler MT capacity (730 m)

    Cap. 4,50,00 2,19,33 34,00 10,00

    103 Bhabhua Road - Development as passenger terminal DF(3) 4,57,16 1,16,77 .. ..

    RRSK 2,65,42 .. 10,00 10,00

    TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

  • 10.1.7

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    104 Electrification of Kathara siding Cap. 4,16,33 1,75,08 15,00 10,00

    105 Zamania - Yard remodelling in connection with extn. of platform

    incl. basic passenger amenities

    DF(1) 9,03,98 1,07,28 .. ..

    RRSK 8,43,26 1,21,83 3,00,00 1

    106 Electrification of Dugdha siding Cap. 10,15,58 5,77,49 10,00 10,00

    107 Barauni - Improvement of traffic facilities at bye pass station Cap. 21,25,26 .. 10,00 1,50,00

    108 Gamhar - Yard remodelling in connection with extn. of platform incl.

    basic passenger amenities

    DF(1) 4,50,70 1,19,82 .. ..

    RRSK 2,15,38 69,13 73,98 1,20,00

    109 Chakand - New frieght terminal Cap. 12,16,41 .. 35,00 40,83

    110 Ramgarwa - New freight terminal (Phase-I) Cap. 15,16,62 1,43,90 1,00,00 50,00

    111 Katreah - New freight terminal Cap. 13,19,51 1,37,54 2,00,00 1,00,00

    112 Kumarbagh - New freight terminal Cap. 11,88,00 3,17,23 4,20,00 50,00

    113 Dumraon - New freight terminal Cap. 4,10,08 .. 35,00 40,83

    114 Dhang - New freight terminal Cap. 14,35,60 1,65,45 4,02,88 1,00,00

    115 Tilrath - New freight terminal Cap. 10,16,51 5,09,33 4,00,00 19,63

    116 Dubaha - Addl. loop Cap. 7,30,00 .. .. 1

    117 Patna Saheb - Addl. platform DF(1) 3,00,00 .. .. 1

    118 East Central Railway - New works for development of goods

    terminal, IBP, bypass line, yard remodelling & platform, stabling

    lines, goods reception & departure lines

    Cap. 147,00,00 .. 35,00 3,03,00

    DF(3) 23,00,00 .. 70,00 75,00

    119 Estimated investment through EBR(Partnership) for private freight

    terminals

    EBR(P) 100,00,00 .. 100,00,00 40,00,00

    120 Works costing below Rs.2.5 crore each Cap. .. .. .. 3,00,00

    DF(1) .. .. .. 75,00

    DF(3) .. .. .. 75,00

    DF(4) .. .. .. 13,00

    RRSK .. .. .. 6,37,99

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 16,36,33

    DF(1) .. .. .. 75,01

    DF(3) .. .. .. 1,82,02

    DF(4) .. .. .. 13,00

    RRSK .. .. .. 8,82,18

    EBR(P) .. .. .. 202,12,89

    121 Lumpsum Provision For New Works Cap. .. .. .. 10,00

    DF(1) .. .. .. 13,99

    DF(3) .. .. .. 20,98

    TOTAL-NEW WORKS Cap. .. .. .. 10,00

    DF(1) .. .. .. 13,99

    DF(3) .. .. .. 20,98

    B - New Works

    TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

  • 10.1.8

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. .. .. .. 16,46,33

    DF(1) .. .. .. 89,00

    DF(3) .. .. .. 2,03,00

    DF(4) .. .. .. 13,00

    RRSK .. .. .. 8,82,18

    EBR(P) .. .. .. 202,12,89

    122 East Central Railway - Extension of RDBMS (Phase-II) DF(3) 3,78,07 56,93 2,00 2,00

    123 East Central Railway - Extension of unreserved ticketing system to

    E-category stations

    DF(1) 26,09,40 17,46,46 12,00 50,00

    124 East Central Railway - Extension of automatic ticket vending

    machines

    Cap. 18,40,00 1,78,30 1,50,00 2,00,00

    125 Works costing below Rs.2.5 crore each DRF .. .. .. 4,00,00

    DF(1) .. .. .. 2,50

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 2,00,00

    DRF .. .. .. 4,00,00

    DF(1) .. .. .. 52,50

    DF(3) .. .. .. 2,00

    126 Lumpsum Provision For New Works Cap. .. .. .. 1,00

    DRF .. .. .. 1,00,00

    DF(1) .. .. .. 2,00

    DF(3) .. .. .. 1,00

    TOTAL-NEW WORKS Cap. .. .. .. 1,00

    DRF .. .. .. 1,00,00

    DF(1) .. .. .. 2,00

    DF(3) .. .. .. 1,00

    TOTAL-Computerisation Cap. .. .. .. 2,01,00

    DRF .. .. .. 5,00,00

    DF(1) .. .. .. 54,50

    DF(3) .. .. .. 3,00

    127 Leased Assets - Payment of Capital component of lease charges to

    Indian Railway Finance Corporation

    Cap. 511,32,64 797,00,00 608,54,00 511,32,64

    C.Fund 202,97,36 196,68,00 .. 202,97,36

    TOTAL-WORKS IN PROGRESS Cap. .. .. .. 511,32,64

    C.Fund .. .. .. 202,97,36

    TOTAL-Leased Assets - Payment of Capital Component Cap. .. .. .. 511,32,64

    C.Fund .. .. .. 202,97,36

    128 Danapur Division - Upgradation of level crossings to A-class (7

    Nos) & B-class (5 Nos)

    S.Fund 3,27,53 2,23,31 .. ..

    RRSK 1,05,80 .. 40,00 41,72

    129 Danapur Division - Upgradation of level crossings to special-class

    (13 Nos)

    S.Fund 3,56,55 2,50,17 .. ..

    RRSK 68,20 .. 75,00 78,22

    130 East Central Railway - Manning of unmanned level crossings (150

    Nos)

    S.Fund 30,00,00 7,42,44 .. ..

    RRSK 19,02,71 .. 2,05,00 1,05,21

    A - Works in Progress

    ROAD SAFETY WORKS-LEVEL CROSSINGS.

    A - Works in Progress

    A - Works in Progress

    B - New Works

    LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

    COMPUTERISATION

  • 10.1.9

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    131 Samastipur Division - Interlocking of manned level crossing gates

    outside station limits (11 Nos)

    S.Fund 3,26,12 2,15,36 .. ..

    RRSK 40,76 .. 50,00 1

    132 East Central Railway - Manning of unmanned level crossing gates

    (120 Nos)

    S.Fund 24,00,00 15,28,06 .. ..

    RRSK 5,99,41 1,51,67 4,75,00 1,78,22

    133 Danapur Division - Upgradation of level crossings into A-class (7

    gates) & B-class (16 gates)

    S.Fund 8,91,00 2,29,41 .. ..

    RRSK 6,46,87 1,14,07 2,00,00 2,60,75

    134 Danapur Division - Upgradation of level crossings into special class

    (10 gates)

    S.Fund 5,74,63 4,37,46 .. ..

    RRSK 93,73 .. 10,00 10,43

    135 Dhanbad Division - Repl of manually operated interlocked lifting

    barriers by electrically operated barrier gates (85 Nos)

    S.Fund 11,29,23 6,22 .. ..

    RRSK 10,48,01 .. 3,10,00 1,00,00

    136 Muzaffarpur-Narkatiaganj - Selective calling at all manned level

    crossing gates

    S.Fund 3,31,46 1,42,33 .. ..

    RRSK 1,39,13 .. 1,76,00 1

    137 Mughalsarai Division - Upgradation (18 Nos) and interlocking (5

    Nos) of level crossing gates

    S.Fund 6,68,08 3,47,44 .. ..

    RRSK 4,12,08 .. 10,00 20,00

    138 Sonpur Division - Upgradation of level crossings to Spl & B2-class

    (21 Nos)

    S.Fund 10,24,33 2,83,67 .. ..

    RRSK 6,99,63 6,81,86 59,00 5,00

    139 Dhanbad Division - Upgradation of level crossing gates (10 Nos) S.Fund 5,51,29 2,07,85 .. ..

    RRSK 3,20,13 38,97 50,00 36,00

    140 Samastipur Division - Interlocking of level crossing gates outside

    station limits (tvu more than 20000) (18 Nos)

    S.Fund 6,82,90 2,57,42 .. ..

    RRSK 3,89,39 .. 2,00,00 1,00,00

    141 Danapur Division - Electrically operated lifting barrier at interlocked

    level crossings (87 gates)

    S.Fund 10,44,49 2,30,00 .. ..

    RRSK 6,14,49 .. 60,00 62,58

    142 East Central Railway - Interlocking of level crossing gates (tvu more

    than 20000) (11 Nos)

    S.Fund 5,60,00 .. .. ..

    RRSK 5,10,00 .. 80,00 1,00,43

    143 Sonpur Division - Electrical lifting barriers with datalogger &

    integrated power supply system at block section interlocked gates

    (41 Nos)

    S.Fund 15,37,66 .. .. ..

    RRSK 13,87,66 54,35 4,00,00 1,96,50

    144 Samastipur Division- Manning of unmanned level crossing (127

    Nos)

    S.Fund 3,80,49 .. .. ..

    RRSK 3,30,49 5,35,75 5,00,00 10,00,00

    145 Sonpur Division - Repl. of mechanical lifting barriers by electrical

    barriers at interlocked level crossing gates (32 Nos)

    S.Fund 6,58,85 .. .. ..

    RRSK 5,08,85 1,91,67 2,25,00 18,40

    ROAD SAFETY WORKS-LEVEL CROSSINGS.

  • 10.1.10

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    146 Sonpur Division - Manning of unmanned level crossings (27 Nos) S.Fund 5,80,70 3,00,06 .. ..

    RRSK 2,41,23 68,26 1,25,00 1,55,00

    147 Samastipur division- Upgradation of level crossing to B2 class (20

    Nos)

    S.Fund 6,99,99 .. .. ..

    RRSK 6,49,99 .. 1,50,00 5,00,00

    148 Samastipur division- Upgradation of level crossing to A class (30

    Nos)

    S.Fund 6,49,98 .. .. ..

    RRSK 5,99,98 .. 1,50,00 5,00,00

    149 Dhanbad Division - Interlocking of level crossing gates (3 Nos) S.Fund 2,95,75 43,13 .. ..

    RRSK 2,95,74 .. 50,00 60,00

    150 Samastipur - Upgradation of level crossings (30 Nos) & interlocking

    of level crossing gates (10 Nos)

    S.Fund 24,94,00 .. .. ..

    RRSK 24,84,00 74,68 1,50,00 2,00,00

    151 East Central Railway - Interlocking of level crossing gates (58 Nos) S.Fund 37,78,00 .. .. ..

    RRSK 37,67,00 .. 4,50,00 5,00,00

    152 Banmankhi-Purnea - Manning of unmanned level crossings (22

    Nos)

    RRSK 8,06,91 .. 1,00,00 1,00,00

    153 Mugalsarai Division - Toilet & drinking water facility at all manned

    level crossing (108 nos)

    RRSK 3,64,37 .. 70,00 1,00,00

    154 Danapur Division - Interlocking of level crossings gates (13 nos) RRSK 14,54,69 .. .. 1,00,00

    155 Dhanbad Division - Rubberized pad at level crossing gates of

    national highway/state highway road (21 nos)

    RRSK 4,39,78 .. 20,00 1,00,00

    156 Works costing below Rs.2.5 crore each RRSK .. .. .. 12,00,00

    TOTAL-WORKS IN PROGRESS RRSK .. .. .. 58,28,48

    157 Lumpsum Provision For New Works RRSK .. .. .. 1,00,00

    TOTAL-NEW WORKS RRSK .. .. .. 1,00,00

    TOTAL-Road Safety Works-Level Crossings. RRSK .. .. .. 59,28,48

    158 Patna-Gaya - Road over bridge in lieu of level crossing No 79-A on

    main line and level crossing No 1 near Mithapur

    S.Fund 16,77,85 32,69,43 .. ..

    RRSK 10,00 3,76,79 7,00,00 1,00,00

    EBR(Dep) 41,98,00

    159 Chukati - Road over bridge in lieu of level crossing No 28/Spl S.Fund 4,25,28 4,24,28 .. ..

    RRSK 43,11 .. 1,00 1,00

    EBR(Dep) 3,75,24

    160 Gulzarbagh-Rajendranagar - Road over bridge in lieu of level

    crossing No.74

    S.Fund 15,26,43 15,25,43 .. ..

    RRSK 4,99,32 .. 4 10

    EBR(Dep) 9,48,75

    B - New Works

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

    A - Works in Progress

    ROAD SAFETY WORKS-LEVEL CROSSINGS.

  • 10.1.11

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    161 Sachivalaya-Phulwarisharif - Road over bridge in lieu of level

    crossing No 31

    S.Fund 13,25,92 13,25,42 .. ..

    RRSK 6,52,90 .. 4 1,00

    EBR(Dep) 9,48,75

    162 Patna Sahib-Gulzarbagh - Road over bridge in lieu of level crossing

    No 72

    S.Fund 14,92,84 14,87,84 .. ..

    RRSK 10,15,54 .. 10 10,00

    EBR(Dep) 33,63,85

    163 Kudra - Road over bridge in lieu of level crossing No 52/A/1 RRSK 21,01,60 .. 10 1,00

    EBR(Dep) 21,01,60

    164 Sasaram - Road over bridge in lieu of level crossing No 43 S.Fund 10,26 10,21 .. ..

    RRSK 12,63,76 .. 10 1,00

    EBR(Dep) 16,33,64

    165 Gaya-Kastha - Road over bridge in lieu of level crossing No 2 S.Fund 4,10,97 4,21,01 .. ..

    RRSK 4,57,58 .. 1 1,00

    EBR(Dep) 11,30,02

    166 Darbhanga Yard - Road over bridge in lieu level crossing No 27 S.Fund 4,93,32 4,92,82 .. ..

    RRSK 7,83,49 .. 10 1,00

    EBR(Dep) 15,51,66

    167 Bhabua - Road over bridge in liue of level crossing No 60/B RRSK 22,51,88 .. 10 1,00

    EBR(Dep) 22,51,88

    168 Jamui-Malaypur - Road over bridge (4-lane) in lieu of level crossing

    No 46-A

    S.Fund 4,55,90 4,54,90 .. ..

    RRSK 5,10,37 .. 10 1,00

    EBR(Dep) 16,45,59

    169 Narkatiaganj Yard - Road over bridge at level crossing No.22/Spl (2-

    lane)

    S.Fund 4,20,05 7,21,90 .. ..

    RRSK 2,06,95 1,04,05 2,00,00 50,00

    EBR(Dep) 6,39,00

    170 Jivdhara-Motihari - Road over bridge at level crossing No.159/A/Spl

    (2-lane)

    S.Fund 6,07,00 7,96,05 .. ..

    RRSK 10,00 1,44,11 10 1,00

    EBR(Dep) 6,06,00

    171 Narkatiaganj-Harinagar - Road over bridge at level crossing No.31

    (2-lane)

    S.Fund 9,06,16 9,75,31 .. ..

    RRSK 15,03,84 .. 5,00,00 1,00

    EBR(Dep) 41,97,80

    172 Khagaria - Road over bridge in lieu of level crossing No.23/B S.Fund 13,56,23 29,77,61 .. ..

    RRSK 9,44,77 24,67 2,00,00 50,00

    EBR(Dep) 75,26,00

    173 Hajipur-Muzaffarpur - Road over bridge (2-lane) in lieu of level

    crossing No 3/Spl

    S.Fund 10,28,67 11,58,10 .. ..

    RRSK 9,48,33 .. 10 1,00

    EBR(Dep) 50,17,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.12

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    174 Begusarai-Tilrath - Road over bridge (2-lane) in lieu of level

    crossing No 47-B

    S.Fund 19,68,07 20,58,64 .. ..

    RRSK 2,40,93 18,76 10 1,00

    EBR(Dep) 53,07,00

    175 Phulwari Sharif-Danapur - Road over bridge in lieu of level crossing

    No.35/B

    S.Fund 29,80,06 28,95,65 .. ..

    RRSK 7,84,94 .. 10 1,00

    EBR(Dep) 66,10,00

    176 Kauria Halt-Bihia - Road over bridge in lieu of level crossing No.53-

    /A

    S.Fund 6,11,14 8,72,83 .. ..

    RRSK 12,46,86 1,71,39 2,00,00 50,00

    EBR(Dep) 27,77,00

    177 Chhota Ambana-Pradhankhunta - Road over bridge in lieu of level

    crossing No.15/Spl./T

    S.Fund 59,69 9,69 .. ..

    RRSK 6,87,31 34 2,00,00 4,00,00

    EBR(Dep) 8,89,57

    178 Bhuli-Tetulmari - Road over bridgde in lieu of level crossing

    No.2/Spl

    S.Fund 52,13 2,13 .. ..

    RRSK 10,53,87 .. 7,00,00 2,00,00

    EBR(Dep) 11,30,00

    179 Katrasgarh-Nichitpur - Road over bridge in lieu of level crossing

    No.1/B/2/E

    S.Fund 1,11,63 2,20,40 .. ..

    RRSK 12,24,54 1,05,00 10 1,00

    EBR(Dep) 13,77,32

    180 Barauni-Tilrath - Road over bridge in lieu of level crossing

    No.61/Spl (2-lane)

    S.Fund 10,00 .. .. ..

    RRSK 10,75,82 .. 1,00 1,00

    EBR(Dep) 10,85,82

    181 Matri-Gomoh (LC No.9-B), Gomoh-Telo (LC No.9-B/CIC) & Gomoh-

    Khanudih (LC No.9-B) - Road over bridge

    S.Fund 24,85 24,45 .. ..

    RRSK 16,02,15 .. 7,00,00 5,00,00

    EBR(Dep) 23,07,00

    182 Hazaribagh Road-Keshwari - Road over bridge in lieu of level

    crossing No.20/B/T

    S.Fund 10,00 36,72 .. ..

    RRSK 7,82,00 .. 50,00 5,00,00

    EBR(Dep) 11,41,00

    183 Parsauni-Sitamarhi - Road over bridge in lieu of level crossing

    No.56

    S.Fund 1,96,65 96,65 .. ..

    RRSK 5,75,35 .. 5,00,00 4,00,00

    EBR(Dep) 11,44,00

    184 Laheriyasarai-Darbhanga - Road over bridge in lieu of level

    crossing No.25/Spl

    S.Fund 10,00 .. .. ..

    RRSK 7,62,00 .. 1,00 10,00

    EBR(Dep) 11,44,00

    185 Naugachhiya-Katareah - Road over bridge in lieu of level crossing

    No.11/Spl

    S.Fund 1,03,57 1,91,84 .. ..

    RRSK 6,43,43 32,53 1,00,00 10,00

    EBR(Dep) 10,76,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.13

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    186 Chakia Yard - Road over bridge on level crossing No.137 S.Fund 2,44 1,44 .. ..

    RRSK 7,46,56 .. 1,00 1,00

    EBR(Dep) 10,24,00

    187 Jeevdhara-Bapudham Motihari - Road over bridge on level

    crossing No.159

    S.Fund 1,00,00 .. .. ..

    RRSK 16,33,00 .. 1,00,00 10,00

    EBR(Dep) 90,38,00

    188 Samastipur-Karpurigram - Road over bridge in lieu of level crossing

    No.53-A

    S.Fund 10,00 .. .. ..

    RRSK 9,58,00 .. 10 1,00

    EBR(Dep) 13,27,00

    189 Danapur-Phulwarisharif - Road over bridge in lieu of level crossing

    No.33 (class-B)

    S.Fund 25,90 24,90 .. ..

    RRSK 7,89,10 .. 10 1,00

    EBR(Dep) 11,75,00

    190 Danapur-Neora - Road over bridge in lieu of level crossing No.36

    (class-B)

    S.Fund 2,00,00 1,86 .. ..

    RRSK 6,05,00 .. 10 1,00

    EBR(Dep) 11,61,00

    191 Danapur-Neora - Road over bridge in lieu of level crossing No.38

    (class-B)

    S.Fund 1,12,55 12,55 .. ..

    RRSK 7,26,45 .. 2,00,00 10,00

    EBR(Dep) 12,12,00

    192 Bihta-Neora - Road over bridge in lieu of level crossing No.42

    (class-B)

    S.Fund 1,50,00 .. .. ..

    RRSK 6,54,00 4,08,33 3,00,00 1,00,00

    EBR(Dep) 11,61,00

    193 Kulharia-Ara - Road over bridge in lieu of level crossing No.47

    (class-B)

    S.Fund 3,99,57 5,58,45 .. ..

    RRSK 4,27,43 .. 3,00,00 10,00

    EBR(Dep) 11,92,00

    194 Chausa-Gahmar - Road over bridge in lieu of level crossing No.78

    (class-A)

    S.Fund 2,36,42 7,64,74 .. ..

    RRSK 5,67,58 20,34 1,00,00 10,00

    EBR(Dep) 11,61,00

    195 Buxar-Baruna - Road over bridge in lieu of level crossing No.70

    (class-A)

    S.Fund 10,00 .. .. ..

    RRSK 7,94,00 .. 1,00 1,00

    EBR(Dep) 11,61,00

    196 Ismailpur-Rafiganj - Road over bridge in lieu of level crossing

    No.19/B

    S.Fund 2,32,34 82,34 .. ..

    RRSK 8,83,66 2,48 1,00,00 1,00,00

    EBR(Dep) 16,15,00

    197 Pusauli-Muthani - Road over bridge in lieu of level crossing No.56/C S.Fund 5,87 8,79 .. ..

    RRSK 7,74,13 .. 10,00 1,00,00

    EBR(Dep) 11,25,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.14

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    198 Guraru-Ismailpur - Road over bridge in lieu of level crossing

    No.11/B

    S.Fund 2,44,77 94,77 .. ..

    RRSK 5,66,23 7,43 10,00 1,00,00

    EBR(Dep) 11,71,00

    199 Gaya-Kastha - Road over bridge in lieu of level crossing No.4/A S.Fund 66,19 65,19 .. ..

    RRSK 12,89,81 .. 1,00 1,00

    EBR(Dep) 18,55,00

    200 Sonepur-Parmanandpur - Road over bridge in lieu of level crossing

    No.1-A

    S.Fund 1,49 1,45 .. ..

    RRSK 7,39,51 .. 4 10

    EBR(Dep) 10,69,00

    201 Dalsingh Sarai-Nazirganj - Road over bridge in lieu of level

    crossing No.32 (A-class)

    S.Fund 11,78 1,78 .. ..

    RRSK 14,88,22 .. 1,00 1,00

    EBR(Dep) 32,30,93

    202 Dhanbad Division - Elimination of level crossings by subways (7

    Nos)

    S.Fund 1,00 .. .. ..

    RRSK 28,91,17 .. 1,00 10,00

    203 Dugda-Chandrapura & West Bokaro Siding - Elimination of level

    crossings by subways (1 No each)

    S.Fund 1,00 .. .. ..

    RRSK 10,02,20 .. 5,00 5,00

    204 Wyndhamganj-Chopan & Karaila Road-Singrauli - Elimination of

    level crossings by subways (6 & 1 Nos respectively)

    S.Fund 1,00 .. .. ..

    RRSK 29,28,39 .. 2,00,00 1,00,00

    205 Sonenagar-Garhwa Road & Ara-Sasaram - Limited height subways

    at level crossings (8 & 60 Nos respectively)

    S.Fund 20,00 .. .. ..

    RRSK 73,58,88 .. 5,00,00 15,00,00

    206 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.39/C

    S.Fund 50,00 .. .. ..

    RRSK 23,77,28 .. 10,00 99,00

    EBR(Dep) 25,28,33

    207 Nagaruntari-Chopan & Chopan-Singrauli - Elimination of level

    crossings by subways (3 Nos each)

    S.Fund 1,00 .. .. ..

    RRSK 20,51,33 73,63 2,00,00 1,00,00

    208 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.55/C

    S.Fund 5,00 .. .. ..

    RRSK 23,38,18 .. 1,00 10,00

    EBR(Dep) 24,47,74

    209 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.41/C

    S.Fund 5,00 .. .. ..

    RRSK 23,65,79 .. 1,00 7,00

    EBR(Dep) 24,64,82

    210 Pradhankhanta-Manpur - Road over bridge in lieu of level crossing

    No.10/C/E

    S.Fund 5,00 .. .. ..

    RRSK 24,44,15 .. 10 3,00

    EBR(Dep) 25,46,68

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.15

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    211 Gomoh-Chandrapura & Bokaro Thermal-Gomia - Elimination of

    level crossings (4 & 3 Nos respectively) by subway

    S.Fund 50,00 .. .. ..

    RRSK 28,89,87 .. 50,00 1,00,00

    212 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.51/C

    S.Fund 50,00 .. .. ..

    RRSK 6,71,12 55,62 1,00,00 2,00,00

    213 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.52/C

    S.Fund 50,00 .. .. ..

    RRSK 6,78,08 .. 50,00 50,00

    214 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.49/C

    S.Fund 5,00 .. .. ..

    RRSK 25,03,83 .. 10 1,00

    EBR(Dep) 26,02,86

    215 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.52/II/C

    S.Fund 5,00 .. .. ..

    RRSK 24,02,60 .. 1,00 10,00

    EBR(Dep) 24,94,61

    216 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.64/C

    S.Fund 50,00 .. .. ..

    RRSK 6,79,39 .. 5,00 10,00

    217 Gomia-Barkakana & Barkakana-Hendigir - Elimination of level

    crossings by subways (4 & 3 Nos respectively)

    S.Fund 50,00 .. .. ..

    RRSK 28,74,59 .. 50,00 1,00,00

    218 Ray-Daltonganj - Elimination of level crossings by subways (5 Nos) S.Fund 50,00 .. .. ..

    RRSK 23,03,07 .. 50,00 1,00,00

    219 Khuldil Road-Mirchadhori - Elimination of level crossings by

    subways (2 Nos)

    S.Fund 3,54,00 63,80 .. ..

    RRSK 3,71,16 3,52,33 1,75,00 1,75,00

    220 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.44/C

    S.Fund 50,00 .. .. ..

    RRSK 6,79,39 1,87,72 2,00,00 2,00,00

    221 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.57/C

    S.Fund 50,00 .. .. ..

    RRSK 6,87,65 .. 5,00 1,00

    222 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.45/C

    S.Fund 5,00 .. .. ..

    RRSK 23,15,18 .. 1,00 1,00

    EBR(Dep) 24,24,73

    223 Dhanbad-Patherdih - Elimination of level crossings by subways (2

    Nos)

    S.Fund 1,00 .. .. ..

    RRSK 6,99,40 .. 1,00 10,00

    224 Gomoh-Patratu - Elimination of level crossings by subways (4 Nos) S.Fund 50,00 .. .. ..

    RRSK 13,76,99 .. 50,00 1,25,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.16

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    225 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.58/C

    S.Fund 50,00 .. .. ..

    RRSK 6,72,43 .. 1,00,00 2,00,00

    226 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.63/C

    S.Fund 5,00 .. .. ..

    RRSK 23,19,78 .. 10 1,00

    EBR(Dep) 24,25,82

    227 Dhanbad - Elimination of level crossing at Coalfield depot siding

    gate by subway (1 No)

    S.Fund 1,00 .. .. ..

    RRSK 3,49,20 .. 1,00 10,00

    228 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.39/I

    S.Fund 5,00 .. .. ..

    RRSK 23,10,58 .. 10 1,00

    EBR(Dep) 24,20,13

    229 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.38/C

    S.Fund 5,00 .. .. ..

    RRSK 24,02,60 .. 10 1,80

    EBR(Dep) 25,19,18

    230 Garhwa Road-Ramna - Elimination of level crossings by subways

    (6 Nos)

    S.Fund 3,50,00 1,41,46 .. ..

    RRSK 17,90,49 5,45,72 6,00,00 4,00,00

    231 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.48/C

    S.Fund 50,00 .. .. ..

    RRSK 6,91,56 .. 10 19,00

    232 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.40/C

    S.Fund 5,00 .. .. ..

    RRSK 23,63,49 .. 10 1,00

    EBR(Dep) 24,51,98

    233 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.46/C

    S.Fund 5,00 .. .. ..

    RRSK 23,42,79 .. 10 1,00

    EBR(Dep) 24,52,34

    234 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.47/C

    S.Fund 5,00 .. .. ..

    RRSK 23,38,18 .. 10 1,00

    EBR(Dep) 24,51,25

    235 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.50/C

    S.Fund 5,00 .. .. ..

    RRSK 23,51,99 .. 10 1,00

    EBR(Dep) 24,47,50

    236 Sonenagar-Durgauti - 2-lane road over bridge in lieu of level

    crossing No.53/C

    S.Fund 9,37 4,37 .. ..

    RRSK 23,33,81 .. 10 1,00

    EBR(Dep) 24,51,25

    237 Daltonganj-Garhwa Road - Elimination of level crossings by

    subways (6 Nos)

    S.Fund 50,00 .. .. ..

    RRSK 27,52,81 .. 50,00 1,25,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.17

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    238 Garhwa Road-Wyndhamganj - Elimination of level crossings by

    subways (6 Nos)

    S.Fund 1,00 .. .. ..

    RRSK 27,59,24 .. 1,25,00 1,25,00

    239 Naugachhia-Katareah & Karhagola Road-Semapur - Limited height

    subways in lieu of level crossings (1 & 4 Nos respectively)

    S.Fund 1,00,00 74,19 .. ..

    RRSK 10,34,44 82,36 2,00,00 5,00,00

    240 Gomoh-Karmahat - Elimination of level crossings by subways (7

    Nos)

    S.Fund 50,00 .. .. ..

    RRSK 15,55,87 .. 50,00 1,05,00

    241 Karwandia-Durgauti - Limited height subway with diversion in lieu of

    level crossing No.54/C

    S.Fund 50,00 .. .. ..

    RRSK 6,88,96 .. 10 1,00

    242 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.42/C

    S.Fund 5,00 .. .. ..

    RRSK 25,22,24 .. 10 1,00

    EBR(Dep) 26,21,26

    243 Sonenagar-Durgauati - 2-lane road over bridge in lieu of level

    crossing No.61/C

    S.Fund 5,00 .. .. ..

    RRSK 22,82,97 .. 10 1,00

    EBR(Dep) 23,96,03

    244 Pradhankhanta-Manpur - Road over bridge in lieu of level crossing

    No.27/B/T

    S.Fund 5,00 .. .. ..

    RRSK 24,44,15 .. 1,00 1,00

    EBR(Dep) 25,46,68

    245 Saidraja-Chandrauli Majhwar - Road over bridge in lieu of level

    crossing No.76/A

    S.Fund 20,00 .. .. ..

    RRSK 19,19,92 .. 1,00 5,00,00

    EBR(Dep) 21,25,20

    246 Pradhankhanta-Manpur - Road over bridge in lieu of level crossing

    No.40/C/T

    S.Fund 5,00 .. .. ..

    RRSK 24,44,15 .. 10 18,00

    EBR(Dep) 25,46,68

    247 Pradhankhanta-Manpur - Road over bridge in lieu of level crossing

    No.18/A/T

    S.Fund 5,00 .. .. ..

    RRSK 24,44,15 .. 5 1,00

    EBR(Dep) 25,46,68

    248 Pradhankhanta-Manpur - Subways in lieu of level crossings (6 Nos) S.Fund 50,00 .. .. ..

    RRSK 28,29,19 .. 1,00 1,00

    249 Pradhankhanta-Manpur - Subways in lieu of level crossings (5 Nos) S.Fund 50,00 .. .. ..

    RRSK 22,50,20 .. 1,00 1,00,00

    250 Pradhankhanta-Manpur - Subways in lieu of level crossings (2 Nos) S.Fund 50,00 .. .. ..

    RRSK 8,70,08 .. 75,00 75,00

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.18

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    251 Pradhankhanta-Manpur - Subways in lieu of level crossings (6 Nos) S.Fund 50,00 .. .. ..

    RRSK 27,10,25 .. 1,00 1,00

    252 Pradhankhanta-Manpur - Subways in lieu of level crossings (6 Nos) S.Fund 50,00 .. .. ..

    RRSK 27,73,68 .. 1,00 10,00

    253 Pradhankhanta-Manpur - Subways in lieu of level crossings (4 Nos) S.Fund 50,00 .. .. ..

    RRSK 18,50,58 .. 1,00 1,00

    254 Lakehri-Darbhanga - Road over bridge in lieu of level crossing

    No.21

    S.Fund 5,00 .. .. ..

    RRSK 17,45,00 .. 1,00 10,00

    EBR(Dep) 20,00,00

    255 Bettiah - Road over bridge in lieu of level crossing No.2 at Chhaoni

    Railway Crossing

    S.Fund 5,00 .. .. ..

    RRSK 17,45,00 .. 13,07,17 8,00,00

    EBR(Dep) 20,00,00

    256 Raxaul - Road over bridge in lieu of level crossing No.33 S.Fund 1,00 .. .. ..

    RRSK 17,49,00 .. 10 1,00

    EBR(Dep) 20,00,00

    257 Raxaul - Road over bridge in lieu of level crossing No.34 S.Fund 5,00 .. .. ..

    RRSK 17,45,00 .. 10 1,00

    EBR(Dep) 20,00,00

    258 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    28/B/T on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,63,04 .. 1,00 1,00

    EBR(P) 3,64,04 .. .. ..

    259 Manpur-Dahanu Road- subway in liue of level crossing No. 15/C/E

    on DFC route

    S.Fund 1,00 36,90 .. ..

    RRSK 3,37,90 .. 1,00 1,00

    EBR(P) 3,38,91 .. .. ..

    260 Manpur-Dahanu Road- subway in liue of level crossing No. 17/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,41,65 .. 1,00 1,00

    EBR(P) 3,42,65 .. .. ..

    261 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    23/C/T on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,42,36 .. 1,00 1,00

    EBR(P) 3,43,37 .. .. ..

    262 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    29/C/E on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,42,36 .. 1,00 1,00

    EBR(P) 3,43,37 .. .. ..

    263 Manpur-Dahanu Road- subway in liue of level crossing No. 8/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,42,52 .. 1,00 1,00

    EBR(P) 3,43,53 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.19

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    264 Manpur-Dahanu Road- subway in liue of level crossing No. 9/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,41,56 .. 1,00 1,00

    EBR(P) 3,42,57 .. .. ..

    265 Sone Nagar-Karwandiya- subway in liue of level crossing No. 37/C

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,63,70 .. 10 1,00

    EBR(P) 3,64,69 .. .. ..

    266 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 81/C on DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 23,75,99 .. 10 1,00

    EBR(P) 23,81,00 .. .. ..

    267 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 83 on DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 11,82,65 .. 10 1,00

    EBR(P) 35,62,95 .. .. ..

    268 Dahanu Road-Son Nagar - Subway in lieu of level crossing No.

    27/A/C/E on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,43,77 .. 1,00 1,00

    EBR(P) 3,44,77 .. .. ..

    269 Durgauti-Mughalsarai - Subway in liue of level crossing No. 80/C

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,22,48 .. 1,00 1,00

    EBR(P) 3,23,49 .. .. ..

    270 Durgauti-Mughalsarai- subway in liue of level crossing No. 67/C on

    DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,63,04 .. 10 1,00

    EBR(P) 3,64,04 .. .. ..

    271 Manpur-Dahanu Road- subway in liue of level crossing No. 21/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,37,90 .. 1,00 1,00

    EBR(P) 3,38,91 .. .. ..

    272 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 75/C on DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 23,85,19 .. 10 1,00

    EBR(P) 23,90,20 .. .. ..

    273 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 70/C on DFC route

    S.Fund 5,00 13,80 .. ..

    RRSK 23,83,01 .. 10 1,00

    EBR(P) 23,88,02 .. .. ..

    274 Dahanu Road-Son Nagar - Subway in lieu of level crossing No.

    31/C/T on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,47,71 .. 1,00 1,00

    EBR(P) 3,48,71 .. .. ..

    275 Durgauti-Mughalsarai- subway in liue of level crossing No. 77/C on

    DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,59,56 .. 10 1,00,00

    EBR(P) 3,60,56 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.20

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    276 Manpur-Dahanu Road- subway in liue of level crossing No. 14/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,42,82 .. 1,00 1,00

    EBR(P) 3,43,83 .. .. ..

    277 Manpur-Dahanu Road- subway in liue of level crossing No. 7/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,48,13 .. 1,00 1,00

    EBR(P) 3,49,14 .. .. ..

    278 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 74/C on DFC route

    S.Fund 5,00 2,87 .. ..

    RRSK 23,70,73 .. 10 1,00

    EBR(P) 23,75,73 .. .. ..

    279 Japla-Haidar Nagar- Road over bridge in lieu of level crossing No.

    42/B/Spl/T

    S.Fund 1,00 .. .. ..

    RRSK 23,89,20 .. 1,00 1,00

    EBR(P) 23,90,19 .. .. ..

    280 Durgauti-Mughalsarai - Subway in liue of level crossing No. 66/C in

    connection on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,69,78 .. 10 1,00

    EBR(P) 3,70,78 .. .. ..

    281 Durgauti-Mughalsarai - Subway in liue of level crossing No. 79/C in

    connection on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,10,30 .. 10 1,00,00

    EBR(P) 3,11,30 .. .. ..

    282 Manpur-Dahanu Road- subway in liue of level crossing No. 18/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,43,70 .. 1,00 1,00

    EBR(P) 3,44,70 .. .. ..

    283 Manpur-Dahanu Road- subway in liue of level crossing No. 20/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,48,13 .. 1,00 1,00

    EBR(P) 3,49,14 .. .. ..

    284 Sone Nagar-Karwandiya- subway in lieu of level crossing No. 35/C

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,63,04 .. 1,00 3,17,80

    EBR(P) 3,64,04 .. .. ..

    285 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    26/C/E on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,33,42 .. 1,00 1,00

    EBR(P) 3,34,42 .. .. ..

    286 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 76/C on DFC route

    S.Fund 5,00 3,89 .. ..

    RRSK 23,83,44 3,69 10 3,00,00

    EBR(P) 23,88,44 .. .. ..

    287 Deo Road Jakhim- subway in lieu of level crossing No. 22C on DFC

    route

    S.Fund 1,00 .. .. ..

    RRSK 3,43,77 .. 1,00 1,00

    EBR(P) 3,44,77 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.21

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    288 Manpur-Dahanu Road- subway in liue of level crossing No. 13/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,38,25 .. 1,00 1,00

    EBR(P) 3,39,26 .. .. ..

    289 Manpur-Dahanu Road- subway in liue of level crossing No. 16/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,40,14 .. 1,00 1,00

    EBR(P) 3,41,15 .. .. ..

    290 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    32/C/E on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,37,26 .. 1,00 1,00

    EBR(P) 3,38,26 .. .. ..

    291 Manpur-Son Nagar- subway in lieu of level crossing No. 6/C on

    DFC route

    S.Fund 1,00 22,61 .. ..

    RRSK 3,43,65 .. 1,00 1,00

    EBR(P) 3,44,65 .. .. ..

    292 Durgauti-Mughalsarai- subway in liue of level crossing No. 65/C on

    DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,60,21 .. 10 3,00,00

    EBR(P) 3,61,22 .. .. ..

    293 Durgawati-Mughalsarai -subway in lieu of level crossing No. 73/C

    on DFC Route

    S.Fund 5,00 .. .. ..

    RRSK 3,67,52 .. 5,00 5,00

    EBR(P) 3,72,52 .. .. ..

    294 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 78/C on DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 11,83,00 .. 10 1,00

    EBR(P) 35,63,00 .. .. ..

    295 Manpur-Dahanu Road- subway in liue of level crossing No. 12/C/E

    on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,42,37 .. 1,00 1,00

    EBR(P) 3,43,36 .. .. ..

    296 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    24/C/E on DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,33,11 .. 1,00 1,00

    EBR(P) 3,34,12 .. .. ..

    297 Dahanu Road-Son Nagar-subway in lieu of level crossing No.

    27/C/T on DFC route

    S.Fund 1,00 11,43 .. ..

    RRSK 3,42,69 .. 1,00 1,00

    EBR(P) 3,43,69 .. .. ..

    298 Durgauti-Mughalsarai- subway in liue of level crossing No. 69/C on

    DFC route

    S.Fund 1,00 .. .. ..

    RRSK 3,63,70 .. 10 3,00,00

    EBR(P) 3,64,69 .. .. ..

    299 Son Nagar-Durgauti- Road over bridge in lieu of level crossing No.

    36/C on DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 23,65,03 .. 10 10

    EBR(P) 23,70,04 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.22

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    300 Durgauti-Mughal Sarai- Road over bridge in lieu of level crossing

    No. 71/C on DFC route

    S.Fund 5,00 .. .. ..

    RRSK 11,90,00 .. 10 1,00

    EBR(P) 35,85,00 14 .. ..

    301 Kiul-Gaya - Road over bridge in lieu of level crossing No.33/B1 S.Fund 1,00 .. .. ..

    RRSK 14,44,00 .. 1,00 1,00

    EBR(P) 14,45,00 .. .. ..

    302 Darbhanga-Kakarghatti - Road over bridge in lieu of level crossing

    No.28

    S.Fund 5,00 .. .. ..

    RRSK 14,78,73 .. 10 10,00

    EBR(P) 14,83,74 .. .. ..

    303 Darbhanga Yard-Road over bridge in lieu of level crossing No. 26 S.Fund 20,00 .. .. ..

    RRSK 43,96,04 .. 10 10,00

    EBR(P) 44,16,04 .. .. ..

    304 Bapudham Motihari Yard- Road over bridge in lieu of level crossing

    No. 160 in Muzaffarpur-Sugauli.

    S.Fund 1,00 .. .. ..

    RRSK 43,75,84 .. 10 1,00

    EBR(P) 43,76,84 .. .. ..

    305 Saidraja- Road over bridge in lieu of level crossing No. 72/B/T on

    DFC route

    S.Fund 5,00 2,70 .. ..

    RRSK 10,03,56 .. 10 1,00

    EBR(P) 30,25,70 .. .. ..

    306 Manpur-Gaya- Road over bridge in lieu of level crossing No. 71/A S.Fund 20,00 5,44 .. ..

    RRSK 9,96,28 .. 1,00 1,00,00

    EBR(P) 30,48,84 5,06,20 .. ..

    307 Umeshnagar-Khagaria - Road over bridge in lieu of level crossing

    No.24

    S.Fund 1,00 .. .. ..

    RRSK 14,44,00 .. 1,00 10,00

    EBR(P) 14,45,00 .. .. ..

    308 Barauni-Teghra -Road over bridge in lieu of level crossing No.7-B S.Fund 8,77 3,77 .. ..

    RRSK 14,36,23 .. 1,00 1,00

    EBR(P) 14,45,00 .. .. ..

    309 Ramdayalu Nagar-Muzaffarpur - Road over bridge in lieu of level

    crossing No.4-A

    S.Fund 5,00 .. .. ..

    RRSK 14,40,00 .. 1,00,00 1,00

    EBR(P) 14,45,00 .. .. ..

    310 Ramdayalu Nagar-Turki - Road over bridge in lieu of level crossing

    No.7-Spl

    S.Fund 5,00 .. .. ..

    RRSK 12,50,00 .. 1,00 1,00

    EBR(P) 12,55,00 .. .. ..

    311 Muzaffarpur-Narayanpur Anant - Road over bridge in lieu of level

    crossing No.100-Spl

    S.Fund 5,00 .. .. ..

    RRSK 14,40,00 .. 1,00 1,00

    EBR(P) 14,45,00 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.23

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    312 Barauni-Teghra - Road over bridge in lieu of level crossing No.9-Spl S.Fund 8,77 3,77 .. ..

    RRSK 14,36,23 .. 1,00 1,00

    EBR(P) 14,45,00 .. .. ..

    313 Patna-Sachivalaya Halt - Road over bridge in lieu of level crossing

    No.30

    S.Fund 1,00 .. .. ..

    RRSK 29,36,00 38,70 1,00 1,00

    EBR(P) 29,38,00 .. .. ..

    314 Dumraon-Baruna - Road over bridge in lieu of level crossing No. 67 S.Fund 1,00 .. .. ..

    RRSK 14,44,00 37,46 5,00 1,00

    EBR(P) 14,45,00 .. .. ..

    315 Kanti Yard - Road over bridge in lieu of level crossing No.112 S.Fund 1,00 .. .. ..

    RRSK 14,83,00 .. 1,00 1,00

    EBR(P) 14,84,00 .. .. ..

    316 Motipur Yard - Road over bridge in lieu of level crossing No.121 S.Fund 1,00 .. .. ..

    RRSK 15,10,89 .. 1,00 1,00

    EBR(P) 15,11,90 .. .. ..

    317 Muktarpur-Kishanpur - Road over bridge in lieu of level crossing

    No.2

    S.Fund 5,00 .. .. ..

    RRSK 14,78,73 .. 1,00 1,00

    EBR(P) 14,83,74 .. .. ..

    318 Thalwara-Laheriasarai - Road over bridge in lieu of level crossing

    No.18

    S.Fund 5,00 .. .. ..

    RRSK 14,78,73 .. 1,00 1,00

    EBR(P) 14,83,74 .. .. ..

    319 Motipur-Mahwal - Road over bridge in lieu of level crossing No.124 S.Fund 1,00 .. .. ..

    RRSK 14,82,73 .. 1,00 1,00

    EBR(P) 14,83,74 .. .. ..

    320 Muhamadpur-Kamtaul - Road over bridge in lieu of level crossing

    No.10

    S.Fund 5,00 .. .. ..

    RRSK 14,78,73 .. 1,00 10,00

    EBR(P) 14,83,74 .. .. ..

    321 Parsauni-Sitamarhi - Road over bridge in lieu of level crossing

    No.54

    S.Fund 2,00 .. .. ..

    RRSK 14,81,73 .. 1,00 1,00

    EBR(P) 14,83,74 .. .. ..

    322 Darbhanga-Muhamadpur - Road over bridge in lieu of level

    crossing No. 1

    S.Fund 50 .. .. ..

    RRSK 14,83,23 .. 1,00 10,00

    EBR(P) 14,83,74 .. .. ..

    323 Darbhanga-Muhamadpur - Road over bridge in lieu of level

    crossing No.2

    S.Fund 50 .. .. ..

    RRSK 14,83,23 .. 1,00 10,00

    EBR(P) 14,83,74 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.24

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    324 Kakarghatti-Tarsarai - Road over bridge in lieu of level crossing

    No.32

    S.Fund 50 .. .. ..

    RRSK 14,83,24 .. 1,00 10,00

    EBR(P) 14,83,73 .. .. ..

    325 Kharpokhra-Bagha - Road over bridge in lieu of level crossing

    No.49

    S.Fund 1,00 .. .. ..

    RRSK 14,82,73 .. 1,00 1,00

    EBR(P) 14,83,74 .. .. ..

    326 Nabinagar Yard- Road over bridge in lieu of level crossing No. 29 S.Fund 5,00 .. .. ..

    RRSK 12,42,50 .. 10 1,00

    EBR(Dep) 12,47,51

    327 Tall-Mokama- Road over bridge in lieu of level crossing No. 50 S.Fund 5,00 .. .. ..

    RRSK 19,49,33 .. 10 1,00

    EBR(Dep) 19,54,33

    328 Raghunathpur-Twinninganj- Road over bridge in lieu of level

    crossing No. 59 in Raghunathpur Yard

    S.Fund 5,00 .. .. ..

    RRSK 19,48,09 .. 10 1,00

    EBR(Dep) 19,53,09

    329 Danapur-Neora- Road over bridge in lieu of level crossing No. 39 S.Fund 5,00 .. .. ..

    RRSK 19,49,33 .. 10 1,00

    EBR(Dep) 19,54,33

    330 Dhanbad-kusunda-Road over bridge in lieu of level crossing No.

    2/B/3T

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 20,00 18,00

    EBR(Dep) 18,85,25

    331 Demu-Latehar-Road over bridge in lieu of level crossing No.35/B/T S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 1,00 10,00

    EBR(Dep) 18,85,25

    332 Chainpur-Karmahat- Road over bridge in lieu of level crossing No

    26/Spl/T

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 20,00 18,00

    EBR(Dep) 18,85,25

    333 Bhandaridah-Phusro-Road over bridge in lieu of level crossing

    No.10/Spl/E

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 20,00 18,00

    EBR(Dep) 18,85,25

    334 Singrauli-Mahadaiya- Road over bridge in lieu of level crossing No

    16/C/T

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 10 18,00

    EBR(Dep) 18,85,25

    335 Barh-Athmalgola- Road over bridge in lieu of level crossing No. 54

    (RH Yard)

    S.Fund 5,00 .. .. ..

    RRSK 19,53,15 .. 10 1,00

    EBR(Dep) 19,58,16

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.25

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    336 Phusro-Amlo- Road over bridge in lieu of level crossing No.

    13/Spl/T

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 20,00 1,00

    EBR(Dep) 18,85,25

    337 Patna-Gaya- Road over bridge in lieu of level crossing No. 21/A in

    Taregna yard

    S.Fund 5,00 .. .. ..

    RRSK 19,48,09 .. 1,00,00 15,00

    EBR(Dep) 19,53,09

    338 Punarakh-Barh- Road over bridge in lieu of level crossing No. 53/1 S.Fund 5,00 .. .. ..

    RRSK 19,48,74 .. 10 1,00

    EBR(Dep) 19,53,75

    339 Amlo-Bermo- Road over bridge in lieu of level crossing No. 14/Spl/E S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 20,00 1,00

    EBR(Dep) 18,85,25

    340 Bansipur-Kiul- Road over bridge in lieu of level crossing No. 55 S.Fund 5,00 .. .. ..

    RRSK 19,50,17 .. 10 15,00

    EBR(Dep) 19,55,18

    341 Bhadaura-Dildarnagar- Road over bridge in lieu of level crossing

    No. 85/A

    S.Fund 5,00 .. .. ..

    RRSK 19,49,22 .. 10 1,00

    EBR(Dep) 19,54,22

    342 Bhurkunda-Patratu- Road over bridge in lieu of level crossing No.

    39/Spl/T

    S.Fund 5,00 .. .. ..

    RRSK 18,80,25 .. 10 1,00

    EBR(Dep) 18,85,25

    343 Mokama-Mor- Road over bridge in lieu of level crossing No. 51 S.Fund 5,00 .. .. ..

    RRSK 19,49,33 .. 10 10

    EBR(Dep) 19,54,33

    344 Majhaulia-Bettiah -Road over bridge in lieu of level crossing No.188 S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    345 Parsauni-Sitamarhi- Road over bridge in lieu of level crossing No.

    55

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    346 Saharsa-Paniara- Road over bridge in lieu of level crossing No. 90

    in Dauram Madhepura Yard

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    347 Muzaffarpur-Sagauli - Road over bridge in lieu of level crossing No.

    145 in Pipra Yard

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.26

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    348 Saharsa-Baijnathpur- Road over bridge in lieu of level crossing No.

    104

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    349 Darbhanga-Sakri- Road over bridge in lieu of level crossing No. 39

    in Sakri Yard

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    350 Jivdhara-Bapu Dham Motihari- Road over bridge in lieu of level

    crossing No. 158

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    351 Bugha-Valmikinagar- Road over bridge in lieu of level crossing No.

    59

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    352 Majhaulia-Bettiah- Road over bridge in lieu of level crossing No. 184 S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    353 Sagauli-Majhaulia- Road over bridge in lieu of level crossing No.

    178

    S.Fund 5,00 .. .. ..

    RRSK 23,18,77 .. 10 10

    EBR(Dep) 23,23,77

    354 Kurhani-Goraul - Road over bridge in lieu of level crossing No.23/B RRSK 39,12,00 3,31 10,00 10,00

    EBR(Dep) 39,12,00

    355 Goldenganj Yard - Road over bridge in lieu of level crossing

    No.32/C

    RRSK 38,52,44 2,06 5,00,00 5,00,00

    EBR(Dep) 38,52,45

    356 Daniyawan-Biharsharif - Elimination of unmanned level crossing by

    subways (level crossing No.1, 2, 3, 4, 5, 6, 7, 8, 9 & 10)

    RRSK 11,91,00 .. 2,00,00 2,00,00

    357 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.52 (PB#367/2018-19/ECR)

    RRSK 13,20,04 .. .. 1,00

    EBR(P) 39,60,12 .. .. ..

    358 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.54 (PB#367/2018-19/ECR)

    RRSK 13,14,70 .. .. 1,00

    EBR(P) 39,44,08 .. .. ..

    359 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.64 (PB#367/2018-19/ECR)

    RRSK 26,42,79 .. .. 1,00

    EBR(P) 26,42,79 .. .. ..

    360 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.57 (PB#367/2018-19/ECR)

    RRSK 26,36,08 .. .. 1,00

    EBR(P) 26,36,09 .. .. ..

    361 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.35/C (PB#367/2018-19/ECR)

    RRSK 13,14,70 .. .. 1,00

    EBR(P) 39,44,08 .. .. ..

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.27

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    362 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.48 (PB#367/2018-19/ECR)

    RRSK 26,29,39 .. .. 1,00

    EBR(P) 26,29,39 .. .. ..

    363 Son Nagar-Karwandia - Road over bridge in lieu of level crossing

    No.37 (PB#367/2018-19/ECR)

    RRSK 13,14,70 .. .. 1,00

    EBR(P) 39,44,08 .. .. ..

    364 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.66 (PB#367/2018-19/ECR)

    RRSK 26,42,80 .. .. 1,00

    EBR(P) 26,42,80 .. .. ..

    365 Manpur-Mughalsarai - Road over bridge in lieu of level crossing

    No.67 (PB#367/2018-19/ECR)

    RRSK 26,49,49 .. .. 1,00

    EBR(P) 26,49,50 .. .. ..

    366 Estimated investment through EBR(Partnership) for works on

    Indian Railways on cost share basis incl deposit from State

    Government etc

    EBR(P) 130,00,00 .. 130,00,00 65,00,00

    367 Works costing below Rs.2.5 crore each RRSK .. .. .. 25,00,00

    TOTAL-WORKS IN PROGRESS RRSK .. .. .. 136,62,00

    EBR(P) .. .. .. 65,00,00

    368 Lumpsum Provision For New Works RRSK .. .. .. 8,00,00

    TOTAL-NEW WORKS RRSK .. .. .. 8,00,00

    TOTAL-Road Safety Works-Road Over/Under Bridges. RRSK .. .. .. 144,62,00

    EBR(P) .. .. .. 65,00,00

    369 Mccluskieganj - Tori - Through sleeper renewal (Primary) of rails

    between km 168 - 174 (6 km)

    DRF 2,78,00 2,26,81 .. ..

    RRSK 1,51,22 .. 5,00 25,00

    370 Garhwa Road-Sonenagar - TFR- 113.69 km & TBR-11 km DRF 10,15,05 13,15,71 .. ..

    RRSK 1,73,45 1,92,84 35,00 2,50,00

    371 Samastipur - Darbhanga - TRR(P) - 5.07 km, CTR(S)- 3.811 km &

    TRR(S) -0.71 km

    DRF 7,69,41 1,59,33 .. ..

    RRSK 6,67,12 5,70,08 85,00 35,00

    372 Patratu-Garwa Road :- (I) TBR-56.40Km(II) TTR (CS CMSC)-33

    Sets(III) TRDS- 01 Sets,(IV) TFR - 86.388 Km(V) renewal of SEJ-

    30 sets & Glued Joint -100 sets

    DRF 24,82,17 2,00,00 .. ..

    S.Fund 3,00,00 3,50,00 .. ..

    RRSK 24,72,17 2,75,10 6,00,00 6,00,00

    373 Muzaffarpur- Sagauli :- TTR(CS CMSC)- 45 sets. DRF 4,71,01 .. .. ..

    S.Fund 50,00 .. .. ..

    RRSK 4,61,01 .. 1,71,50 4,65,15

    374 Mansi-Saharsa:- (I) TBR- 40.00 km. (II) TFR- 40.00 Km DRF 11,61,74 .. .. ..

    S.Fund 2,00,00 .. .. ..

    RRSK 11,51,74 .. 3,05,15 11,56,00

    B - New Works

    TRACK RENEWALS

    A - Works in Progress

    ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

  • 10.1.28

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    375 Manpur-Mughalsarai:- (I) SEJ - 26 sets. (II) Glued Joint- 150 Nos.

    (III) TBR- 24.00 KM.

    DRF 7,02,49 .. .. ..

    S.Fund 1,00,00 .. .. ..

    RRSK 6,92,49 5,30,17 4,50,00 3,00,00

    376 Manpur-Mughalsarai:- TRR(P)-10.70 Km. DRF 8,23,79 .. .. ..

    S.Fund 2,00,00 .. .. ..

    RRSK 8,13,79 6,34,34 6,00,00 6,00,00

    377 Samastipur - Khagaria - TTR - 32 Sets, TBR - 40.42 km RRSK 13,85,27 .. 3,70,00 7,25,00

    378 Pradhankhunta - Manpur - TRR(P) - 43.457 km, CTR(S), TSR (P)

    & TRR(S) - 8.202 km

    RRSK 57,06,50 1,35,00 10,00,00 2,50,00

    379 Samastipur - Darbhanga - TTR - 22 set RRSK 2,68,66 .. 1,75,00 1,95,00

    380 Patna - Gaya - TBR-7.95 km, Kiul-Gaya - TBR - 06 km, Kiul-

    Dhanauri - 1.60 km, Fatuha-Islampur - TBR-43.35 km & TFR-43.35

    km

    RRSK 17,75,18 .. 3,95,01 4,00,00

    381 Pradhankhunt -Manpur - TRR (P) - 32.103 km, TSR (P) - 4.50 km

    & CTR(S) (TSR/P & TRR/S) -12.319 km.

    RRSK 53,39,51 .. 7,00,00 5,00,00

    382 Gomoh-Patratu - CTR (P) - 8.90 km & CTR(S) (TSR/P & TRR/S) -

    1.622 km.

    RRSK 17,35,96 .. 1,60,00 3,60,00

    383 Manpur-Mughalsarai - TRR(P) - 28.62 km & CTR(S) - 5.00 km RRSK 36,54,52 .. 6,00,00 5,00,00

    384 Pradhankhunta-Manpur - TBR - 14.212 km, TTR(CS CMSC) - 5

    sets, TTR(TWS) - 1 set, SEJ - 48 sets & Glued Joints - 283 Nos.

    RRSK 7,89,02 .. 1,00,00 1,00,00

    385 Garhwa Road-Mahadiya(SL) -TBR - 5.283 km, TTR(FS CS CMSC)

    - 18 sets, TTR(CS CMSC) - 26 sets, TTR(CS) -19 sets, TTR(DS) -

    4 sets, TFR - 7.813 km & SEJ - 26 sets.

    RRSK 11,09,00 .. 1,50,00 2,00,00

    386 Patratu-Garhwa Road - TRR (P) -1.175 km (UP) & TSR (P) - 6.00

    km (DN).

    RRSK 6,04,28 .. 90,00 1,00,00

    387 Patratu-Garhwa Road - TBR - 2.502 km, TT (CS CMSC) - 2 sets,

    TTR (TWS) - 4 sets, TFR - 6.04 km, SEJ - 56 sets & Glued Joints -

    54 Nos.

    RRSK 4,06,55 .. 2,00,00 2,00,00

    388 Garhwa Road-Mahadiya(SL) - CTR (P) - 2.36 km,) TRR(P) - 2.077

    km & TSR(P) - 9.876 km.

    RRSK 14,13,75 .. 2,00,00 2,00,00

    Complete Track Renewal

    389 Garhwa Road - Sonenagar - CTR -16.16 km, TRR - 29.11 km &

    TSR - 1.21 km (P)

    DRF 40,15,52 40,37,60 .. ..

    RRSK 72,05 52,27 5,00 1,00

    R. 4,16,88

    390 Sindri Block Hut - Patherdih - CTR - 13.854 km (S) DRF 7,96,60 6,56,00 .. ..

    RRSK 1,14,76 2,25 40,00 40,00

    R. 15,52

    391 Jhajha-Patna - CTR - 8.9 km (P), TRR - 4 km (P) & Fatuah Yard -

    CTR - 5 km (S)

    DRF 16,03,13 16,91,55 .. ..

    RRSK 10,00 .. 40,00 20,00

    R. 27,49

    TRACK RENEWALS

  • 10.1.29

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    392 Barkakana - Garhwa Road - CTR - 0.87 km, TRR - 0.64 km & TSR -

    17.3 km (P)

    DRF 9,84,16 8,71,66 .. ..

    RRSK 10,00 95,00 1,00,00 50,00

    R. 52,87

    393 Samastipur - Muzaffarpur - TRR - 3.51 km & CTR - 5.065 km (P) DRF 9,95,31 9,78,11 .. ..

    RRSK 17,10 .. 17,31 1

    394 Barkakana-Garhwa Road - CTR(P) - 6.4 km & TRR(P) - 8.96 km DRF 16,18,77 13,10,89 .. ..

    RRSK 2,44,11 .. 1,00,00 1,00,00

    R. 19,71

    395 Samastipur-Muzaffarpur - CTR(P) - 8.8 km DRF 11,31,48 11,19,60 .. ..

    RRSK 19,93 12,00 52,08 1

    R. 27,10

    396 Hajipur-Muzaffarpur - TRR(S) - 4.966 km DRF 2,66,80 2,30,16 .. ..

    RRSK 24,64 80,00 97,16 1

    397 Dhanbad-Pathardih - CTR(P) - 2.28 km DRF 2,90,47 1,66,51 .. ..

    RRSK 1,18,96 9,64 5,00,00 3,00,00

    R. 7,75

    398 Jhajha-Patna - CTR(P) - 37.33 km, TRR(P) - 0.8 km & TRR(S) -

    3.4 km

    DRF 50,73,60 27,79,46 .. ..

    S.Fund 8,00,00 9,56,99 .. ..

    RRSK 32,78,97 10,99,71 10,50,00 3,00,00

    R. 1,26,92

    399 Samastipur-Muzaffarpur - CTR(P) - 24.305 km & TRR(P) - 3.95 km DRF 35,15,43 35,88,64 .. ..

    RRSK 10,00 .. 1,00,00 1

    R. 82,64

    400 Hajipur-Muzaffarpur - CTR(P) - 12.438 km DRF 16,07,90 16,57,27 .. ..

    RRSK 10,00 .. 2,82,90 1

    R. 42,29

    401 Barkakana-Ramgarh - CTR(P) - 2.5 km DRF 3,18,50 2,08,58 .. ..

    RRSK 1,03,50 .. 50,00 50,00

    R. 8,50

    402 Dhanbad-Patherdih - CTR(S) - 9.06 km DRF 7,04,05 2,09,45 .. ..

    RRSK 3,49,60 75,09 1,00,00 10,00,00

    R. 11,56

    403 Karaila Road-Shaktinagar - CTR(P) - 0.8 km, TRR(P) - 1.04 km &

    TSR(P) - 2.35 km

    DRF 3,22,05 1,25,52 .. ..

    RRSK 1,38,53 68,60 70,00 75,00

    R. 11,14

    404 Jhajha-Patna - CTR(P) - 8.84 km, TRR(P) - 4.9 km, TSR(S) - 3 km

    & TRR(S) - 6 km

    DRF 20,33,17 17,51,47 .. ..

    RRSK 7,09,90 1,28,87 3,00,00 1,50,00

    R. 34,80

    TRACK RENEWALS

  • 10.1.30

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    405 Garhwa Road-Chopan - CTR(P) - 1.905 km & CTR(S) - 0.9 km DRF 3,25,90 2,17,52 .. ..

    RRSK 1,07,90 57,83 1,00,00 25,00

    R. 7,91

    406 Sindri Bloack Halt-Patherdih - CTR(P) - 3.1 km DRF 4,16,52 1,20,60 .. ..

    RRSK 1,80,92 75,70 50,00 50,00

    R. 11,01

    407 Salai Banwa-Mahadiya - CTR(P) - 1.5 km & CTR(S) - 2.94 km DRF 4,30,01 1,79,66 .. ..

    RRSK 1,55,01 13,81 .. 75,00

    R. 9,08

    408 Hajipur-Muzaffarpur - CTR(P) - 14.32 km & TRR(P) - 25.08 km DRF 41,93,21 40,14,66 .. ..

    RRSK 1,79,55 .. 1,15,00 1

    R. 50,84

    409 Patna-Mughalsarai - CTR(P) - 1.1 km, TRR(S) - 3.6 km DRF 3,58,53 3,77,91 .. ..

    RRSK 10,00 1,30,17 1,80,00 50,00

    R. 3,91

    410 Samastipur-Muzaffarpur - CTR(P) - 8.61 km DRF 11,56,84 11,02,92 .. ..

    RRSK 49,35 .. 26,77 1

    R. 30,57

    411 Jhaja-Patna - CTR(P) - 22.82 km, TRR(P) - 3.1 km, CTR(S) - 0.6

    km & TRR(S) - 5.4 km

    DRF 37,75,28 15,88,17 .. ..

    S.Fund 1,00,00 2,50,16 .. ..

    RRSK 15,07,89 6,38,56 5,00,00 2,00,00

    R. 81,68

    412 Pradhankhanta-Manpur - CTR(P) - 0.73 km, TRR(P) - 2.25 km,

    TSR(P) -2.5 km, CTR(S) - 3.4 km & TRR(S) -1.73 km

    DRF 9,25,80 2,59,03 .. ..

    RRSK 6,80,89 71,62 1,00,00 1,50,00

    R. 19,59

    413 Patratu - Garhwa Road - TRR(P) -0.75 km ,TSR(P) -0.5 km &

    CTR(S) (TRR/S &TSR/P) - 5.806 km

    DRF 8,10,52 3,19,92 .. ..

    RRSK 5,88,02 49,37 1,00,00 1,50,00

    414 Gomoh - Patratu- CTR(P)- 2.63 km ,TRR(P) - 0.49 km ,CTR(S)

    (TRR/S & TSR/P) - 6.27 km & TRR(S) - 9.33 km

    DRF 18,10,62 4,02,08 .. ..

    RRSK 13,31,09 1,49,52 1,50,00 1,00,00

    415 Dhanbad - Jamuniatanr- TSR(P) -18.26 km, CTR(S) (TRR/S &

    TSR/P) - 4.221 km

    DRF 17,86,93 4,58,63 .. ..

    RRSK 12,35,19 1,36,02 1,00,00 1,00,00

    416 Samastipur - Muzaffarpur - CTR(P) -3 km, TRR(P)- 0.16 km &

    TRR(S) -1.5 km

    DRF 5,65,34 6,10,00 .. ..

    RRSK 10,00 .. 1,20,00 29,18

    R. 34,80

    417 Jhajha - Patna - CTR(P) 6.4 km, TSR(P)- 1 km, CTR(S)-2.8 km &

    TRR(S) 8.008 km

    DRF 17,81,67 4,16,97 .. ..

    RRSK 13,34,67 1,38,52 3,00,00 2,00,00

    TRACK RENEWALS

  • 10.1.31

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    418 Pradhankhunta - Manpur - TRR(P)- 7.21 km, CTR(S) (TRR/S &

    TSR/P)-0.8 km & TRR(S)-8.703 km

    DRF 13,32,46 4,11,48 .. ..

    RRSK 8,50,48 1,25,00 1,50,00 1,50,00

    419 Garhwaroad - Chopan - CTR(S) (TRR/S & TSR/P) - 3.121 km DRF 3,79,64 2,02,32 .. ..

    RRSK 1,29,64 34,32 1,00,00 1,00,00

    420 Barauni-Rajendrapul - CTR(S)- 3.1 km & TRR(S)-3 km DRF 4,40,36 2,50,00 .. ..

    RRSK 2,43,36 18,99 60,00 39,81

    421 Patna-Mugalsarai -TSR(P) - 9.2 km, TRR(P) - 6 km, & CTR(S) -

    4.71 km

    DRF 15,32,11 2,53,98 .. ..

    RRSK 12,24,31 93,64 3,50,00 2,50,00

    422 Patratu-Garhwa Road:-(I) CTR(P)-3.00 Km, (II) TRR(P) -12.419

    Km. (III) TRR(S)-6.763 Km.(IV) CTR(S)-1.00 Km.

    DRF 16,94,40 2,00,00 .. ..

    S.Fund 5,00,00 4,50,00 .. ..

    RRSK 16,84,40 4,03,18 4,00,00 2,00,00

    423 Sonpur-Chhapra Kachhari (UP) :- (I) CTR(P)-36.232 Km (II)TRR(P)-

    10.558 Km.

    DRF 54,19,74 7,30,00 .. ..

    S.Fund 15,00,00 10,00,00 .. ..

    RRSK 54,09,74 15,02,00 30,00,00 15,50,00

    424 Patna - Mugalsarai :- (I) CTR(P) - 9.30 km, (II) TRR(P) - 1.62 Km,

    (III) CTR(S) - 0.245 km & (IV) TRR(S) - 5.99 Km.

    DRF 15,73,68 .. .. ..

    S.Fund 5,00,00 1,50,00 .. ..

    RRSK 15,63,68 8,82,92 6,00,00 2,00,00

    425 Muzaffarpur-Sagauli - CTR(P)- 94.95 km DRF 114,77,12 .. .. ..

    S.Fund 40,00,00 14,59,73 .. ..

    RRSK 114,67,12 103,97,64 56,95,00 12,50,00

    426 Garhwaroad-Mahadiya-Shaktinagar:- (I) TRR(P)-2.945 Km, (II)

    CTR(S) - 4.458 Km.

    DRF 5,57,54 25,00 .. ..

    S.Fund 1,00,00 90,00 .. ..

    RRSK 5,47,54 1,52,11 1,50,00 1,50,00

    427 N.S.C.B. Gomoh-Patratu:-(I) CTR(P) -2.90 Km, (II) TRR(P)-5.55

    Km, (III) CTR(S) - 2.92 Km, & (IV) TRR(S)-1.08 Km.

    DRF 11,37,54 31,33 .. ..

    S.Fund 1,90,00 2,50,00 .. ..

    RRSK 11,27,54 3,87,09 3,90,00 2,50,00

    428 Barauni- Katihar (UP,DN& SL) :- (I) CTR(P)-4.94Km (II) TRR(P) -

    9.825 Km.

    DRF 11,44,32 5,24,00 .. ..

    S.Fund 6,00,00 6,00,00 .. ..

    RRSK 11,34,32 6,30,00 3,60,00 4,00,00

    429 Jhajha-Patna -(I) CTR(P)- 6.25 Km, (II) TRR(P)-12.80Km,

    Rampurdumra-Baruni (SL) - TRR(P)-3.4 km

    DRF 20,69,42 11,26 .. ..

    S.Fund 5,00,00 1,50,00 .. ..

    RRSK 20,59,42 11,69,29 7,50,00 2,00,00

    430 Pradhankhunta- Manpur - (I)TRR(P)-20.688 Km. (II) CTR(S) -

    4.071 Km.

    DRF 18,34,85 25,00 .. ..

    S.Fund 5,00,00 4,10,01 .. ..

    RRSK 18,24,85 4,20,96 5,00,00 3,00,00

    TRACK RENEWALS

  • 10.1.32

    EAST CENTRAL RAILWAY

    ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2019-20

    ( INTERIM BUDGET )

    Item

    No.

    Sanctioned

    Cost

    Exp. at the

    end of

    March 2018

    Revised

    Outlay 2018-

    19

    Outlay

    Proposed for

    2019-20

    Alloca-

    -tion

    Particulars

    (Figures in thousand of Rupees)

    431 Bachhwara -Hajipur (SL)- CTR(P) -70 Km DRF 74,17,20 9,57,72 .. ..

    S.Fund 40,00,00 6,09,84 .. ..

    RRSK 74,07,20 51,64,10 50,00,00 40,00,00

    432 Patratu - Garhwaroad - CTR(P) - 19.95 km, TRR(P) - 29.775 km,

    CTR(S), TSR(P) & TRR(S)) - 7.464 km, TRR(S) - 2.25 km

    RRSK 77,02,23 2,26,45 1,00,00 1,25,00

    433 Gomoh - Patratu -TRR(P) - 6.82 km CTR(S), TSR(P) & TRR(S) -

    5.879 km

    RRSK 15,45,41 50,00 50,00 1,25,00

    434 Garhwaroad - Mahadiya - Shaktinagar - CTR(P) - 8.92 km, TRR(P)

    - 4.687 km, TSR(P) - 1.52 km, CTR(S), TSR(P) & TRR(S) - 4.171

    km

    RRSK 27,09,17 77,21 50,00 2,00,00

    435 Patna - Mughalsarai - CTR(P) -19.30 km, TRR(P) - 22.94 km RRSK 56,44,55 21,26,22 23,00,00 18,00,00

    436 Dhanbad - Chandrapura - CTR(P) -1.576 km, TSR(P) - 3.70 km,

    CTR(S) (TSR(P) & TRR(S) -2.618 km

    RRSK 9,32,44 55,00 50,00 2,00,00

    437 Barauni - Katihar UP/DN/SL- CTR(P) - 6.42 Km, TRR(P) -10.485

    Km,TSR(P) -19.78 km

    RRSK 37,61,57 7,40,87 10,00,00 15,00,00

    438 Jhajha-Patna - CTR(P) - 3 km,TRR(P) -3.28 km


Recommended