10/12/2004 SC-RP-SL EDMS n 543722 Survey PS complex SPS ring PS
complex: dose rate measurements in 40 cm distance of the vacuum
chamber en amont et en aval of the magnets Hot spot measurements
SPS: RP technicians bikes around the ring with gamma scintillation
counter mounted on the bike -> distance from the beam elements ~
1 m Hot spot measurements in 10 cm distance
Page 3
10/12/2004 SC-RP-SL EDMS n 543722
Page 4
10/12/2004 SC-RP-SL EDMS n 543722
Page 5
10/12/2004 SC-RP-SL EDMS n 543722 Pour 2003, les mesures nont
pu tre faites quaprs larrt du faisceau avec les ions.
Page 6
10/12/2004 SC-RP-SL EDMS n 543722
Page 7
10/12/2004 SC-RP-SL EDMS n 543722
Page 8
10/12/2004 SC-RP-SL EDMS n 543722 Pour 2003, les mesures nont
pu tre faites quaprs larrt du faisceau avec les ions.
Page 9
10/12/2004 SC-RP-SL EDMS n 543722 1998, dernire anne du
neutrino
Page 10
10/12/2004 SC-RP-SL EDMS n 543722
Page 11
10/12/2004 SC-RP-SL EDMS n 543722
Page 12
10/12/2004 SC-RP-SL EDMS n 543722
Page 13
10/12/2004 SC-RP-SL EDMS n 543722
Page 14
10/12/2004 SC-RP-SL EDMS n 543722 Pour 2003, les mesures nont
pu tre faites quaprs larrt du faisceau avec les ions.
Page 15
10/12/2004 SC-RP-SL EDMS n 543722 1998, dernire anne du
neutrino
Page 16
10/12/2004 SC-RP-SL EDMS n 543722 Conclusion The dose rates in
the SPS ring in 2004 are two times higher when compared to those of
2003 Main reason: no heavy ion run Machine maintenance has to be
planned carefully to avoid unnecessary high doses to