+ All Categories
Home > Documents >  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided...

 · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided...

Date post: 05-Apr-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
26
Transcript
Page 1:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 2:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 3:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 4:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 5:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 6:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 7:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 8:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 9:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 10:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 11:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 12:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 13:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 14:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 15:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 16:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 17:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 18:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 19:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 20:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 21:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 22:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 23:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 24:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 25:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,
Page 26:  · 1.05 For earthwork excavation and embankment upto 10000 Cum. The manual rate shall be provided and if the quantity exceeds 10000 Cum. the machinery rates shall be adopted. However,

Recommended