54 888 w bROAdwAY, vANCOuvER
1936 VANCoUVErCITy HALL oPENS AT CAMBIE & 12TH
1959 VgH’SCENTENNIAL PAVILIoN BUILT
2003 VgH’S JIMMy PATTISoN PAVILIoN oPENS
1906 VgH’SHEATHEr PAVILIoN BUILT
2004 VgH’S gordoN ANd LESLIE dIAMoNd HEALTH CArE CENTrE oPENS
2008 BLUSSoN SPINAL Cord CENTrE oPENS(WorLdS LArgEST MoST
2011 roBErT H.N. Ho rESEArCH CENTrE oPENS
1909 NorMAL SCHooL BUILT (NoW CITy CENTrE SHoPPINg)
1905 ModEL SCHooL BUILT (NoW CITy CENTrE SHoPPINg)
2009 CANAdA LINErAPId TrANSIT oPENS
2017 NEW SUSTAINABLECoMPLEx ProPoSEd
2016 PHASE 1 BroAdWAy LINEExPANSIoN APProVEd
1965 PArK INN BUILT 117 gUESTrooMS, rESTAUrANT BAr & LoUNgE
1.1 HISTorIC ConTExT
1974 805 BroAdWAy CENTrE BUILT(85,000 SQ FT)
1960 FAIrMoNT MEdICAL BUILdINg (133.000 SQ FT)
76 888 w bROAdwAY, vANCOuvER
1.2 DEVELOPMENT CONTExT
MARINE DRIVE OAKRIDGE MALL BROADWAY/CITY HALL
CaMBIE CorrIdor TranSIT-orIEnTEd UrBan CEnTrES
BROADWAY/CIVIC CENTRETower height currently up to 90.01M
OAKRIDGE10 Towers up to 42 Storeys
MARINE DRIVETowers ranging up to 32 Storeys
1.3 SITE ConTExT
SITE
CD-1 (186) CD-1 (358)
CD-1 (494)
CD-1 (494)CD-1 (137)
CD-1 (187)CD-1 (59)
FM-1
CD-1 (137)
CD-1 (170)
CD-1 (295)
CD-1 (618)
RM-3A
RM-4
RT-6
CD-1 (46)
CD-1 (62) CD-1 (602)RM-4 RM-3
RM-3
CD-1 (196)
CD-1(274)
C-3A CD-1 (330)
RM-3
A
SITE
W BROADWAY
VANCOUVER GENERAL HOSPITAL
LAUREL ST
10TH AVE
CAMBIE ST
12TH AVE
2ND AVE
OAK ST
CD-1 (460)
M-2
CD-1 (405)
JIM PaTTISon PAViLLiON
CITy SqUarE SHoPPInG VANCOUVER CiTY HALL
CURRENT SiTE USE: SiNGLE-STOREY COMMERCiAL-RETAiL AND A 7-STOREY HOTEL:
805 Broadway CEnTrE
FAiRMONT MEDiCAL BUiLDiNG
BC CanCEr rESEarCH CEnTrE
988 w Broadway
HOLiDAY iNN
700 WEST EiGHTH
BROADWAY PLAZA BUiLDiNG
98 888 w bROAdwAY, vANCOuvER
STREET ELEVATiON - LAUREL ST
S I T E w 10TH aVELANEWAY
arTHrITIS SoCIETy805 Broadway CEnTrE
STREET ELEVATiON - WiLLOW ST
-S I T E (BEHiND WiLLOW MEDiCAL BUiLDiNG)w 10TH aVE LANEWAY w 8TH aVE LANEWAY W 7TH AVEw Broadway
w Broadwayw 8TH aVE LANEWAY
FAiRMOUNT MEDiCAL BUiLDiNG
805 Broadway CEnTrE
WiLLOW MEDiCAL BUiLDiNG
1.4 STrEETSCaPES
5352 888 w bROAdwAY, vANCOuvER
a.1 STaTISTICS A.2 CONTExT PLAN