+ All Categories
Home > Documents > 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use...

11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use...

Date post: 03-Jul-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
114
11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE PROPOSED MIXED-USE DEVELOPMENT TRANSPORTATION IMPACT STUDY ADDENDUM DECEMBER 13, 2018
Transcript
Page 1: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

11 YORKVILLE PARTNERS INC.

11-21 YORKVILLE PROPOSED MIXED-USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY ADDENDUM

DECEMBER 13, 2018

Page 2: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project
Page 3: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

11-21 YORKVILLE PROPOSED MIXED-USE DEVELOPMENT TRANSPORTATION IMPACT STUDY ADDENDUM

11 YORKVILLE PARTNERS INC.

PROJECT NO.: 17M-01494-00

DATE: DECEMBER 2018

WSP

100 COMMERCE VALLEY DRIVE WEST

THORNHILL, ON, CANADA L3T 0A1

WSP.COM

Page 4: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

December 13, 2018 Kristy Shortall, MCIP, RPP Vice President of Development and Planning 11 Yorkville Partners Inc. 2300 Yonge Street, Suite 807 Toronto, ON M4P 1E4 Dear Ms Shortall: Subject: Response to Comments from the City of Toronto

11-21 Yorkville, Toronto, ON

WSP Canada Group Ltd. (WSP) was retained by 11 Yorkville Partners Inc. to undertake a Traffic Impact Study (TIS) Addendum in support of your municipal application for a proposed mixed-use development between Yorkville Avenue and Cumberland Street west of Yonge Street. WSP prepared the original TIS dated March 23 2018. Since then, comments were received from Planning and Urban Design in September 2018, and Development Engineering at the City of Toronto in October 2018, and. This addendum addresses the transportation-related comments from both the City Divisions. The latest site plan has 670 residential units and 3293 m2 of retail Gross Floor Area (GFA), compared to the previous site plan with 716 units and 4,664 m2 of retail GFA.

PLANNING AND URBAN DESIGN COMMENTS – SEPTEMBER 18, 2018

Provide required bicycle parking for retail users (i.e. 17 spaces)

An updated bicycle parking review was conducted to ensure that the bicycle parking provided meets the City’s Zoning By-Law 569-2013 requirements. Bicycle parking is to be provided as per Bicycle Zone 1. Previously, no bicycle parking was provided for the retail portions of the site, which the updated site plan now does. Please see Table 1 for the bicycle parking requirement and the corresponding supply.

Although the Zoning By-Law standards require 20 retail spaces based on the latest GFA, the Planning and Urban Design comments asked for 17 retail bicycle parking spaces when the GFA for the retail was greater than that which is currently proposed. As well, the retail bicycle parking rates are based upon Interior Floor Area (IFA), but we are using GFA in our calculations. Thus, we believe that 17 bicycle parking spaces for both short and long-term retail users will be sufficient.

Table 1 Bicycle Parking Requirements and Supply with Updated Site Statistics

Building Component

Area (m2) or Units

Bicycle Parking Requirements

Bicycle Parking Spaces Required

Bicycle Parking Spaces Provided

Residential Long-term

670 units 0.9 spaces/unit 603 603

Residential Short-term Visitor

670 units 0.1space/unit 67 67

Retail Short-Term 3293 m2 Short-Term:

3 spaces plus 0.3 spaces/100 m2

13 17

Retail Long-Term 0.2/100 m2 7 SUM 690 687

Page 5: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Page 2

CITY OF TORONTO COMMENTS FROM OCTOBER 17, 2018

Part 1 Comments

1. Satisfy all outstanding issues/requirements with respect to the Transportation Impact Study, dated March 23, 2018, prepared by the applicant’s transportation consultant, WSP, in support of the proposed development, the details of which are provided further in the memorandum.

Noted. This response letter addresses all transportation related comments raised in the memorandum.

2. Site Plan

a. Comply with the parking allocation requirements identified in condition B(5), below, and as further discussed in this memorandum.

Noted. The parking allocated now exceeds the required parking. Please see Table 2 below.

b. Provide a pick-up/drop-off facility for the development on-site abutting the north-south public lane, as widened, and operate in a counter-clockwise fashion.

As per our discussions with the City’s Transportation Services staff, it was determined that a pick-up and drop-off facility with the capacity for four vehicles provided on the laneway is sufficient. Please see Figure 1 that demonstrates the maneuvers within the pick-up/drop-off facility.

3. Include provision in the Site Specific By-law for this project, which require parking to be provided in accordance with the following minimum standards:

a. Residential Units – 0.30 spaces per unit (215 spaces)

b. Residential Visitors – 0.028 spaces per unit (20 spaces)

The above rates were used to calculate the required parking based on the latest site statistics. The number of residential units has been reduced from 716 to 670, and the number of parking spaces required and supplied are shown in Table 2 below.

The current site plan provides 235 parking spaces, which exceeds the parking requirements, due to reduced units and retail GFA. Twenty spaces are designated as Residential Visitor spaces on the P1 level. There is a control gate on the ramp which separates the visitor parking from the residential parking which is located on P2 to P4.

Table 2 Parking Requirements and Supply with Updated Site Statistics

Building Component

Area (m2) or Units Parking

Requirements Parking Spaces

Required Parking Spaces

Provided Residential 670 units 0.3 spaces/unit 201 215 Residential

Visitor 670 units 0.028 space/unit 19 20

Retail 3293 m2 N/A 0 0 Pick-

Up/Drop-Off Spaces

4*

SUM 220 235

*Pick-Up/Drop-Off Spaces are excluded from the parking allocation

Page 6: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Page 3

4. Transportation Services

a. Provide an acceptable warning system near the top/bottom of the parking garage access ramp that warns motorists exiting the garage to watch for large vehicles and pedestrians travelling/maneuvering within the public lane, as widened;

A flashing beacon warning system has been added to the Site Plan to warn vehicles exiting the ramp that there may be a truck reversing out of the loading bays. Loop detectors will be installed just outside of the loading bays, which, when activated, will engage the flashing beacon. The beacon and warning sign will be placed on the ramp to alert exiting vehicles. The signage and loop detector locations are shown on Figure 2.

b. Submit documentation describing, in detail, the type of warning system used to satisfy Condition No. C(3) and how it will be activated;

See notes above and Figure 2.

5. Solid Waste Services

a. Current vehicle maneuvering diagram indicates the collection vehicle reversing into a public lane. Revised drawings must indicate and annotate a collection vehicle movement diagram with a minimum inside/outside turning radii of 9.5 m and 14 m respectively, when entering, exiting, and travelling throughout the site and entering/exiting the Type G loading space. The diagram must also indicate the ability of the collection vehicle to enter and exit the site in a forward motion with no more than a three-point turn without the need to reverse onto a public lane.

We have discussed this matter with City staff and determined that because the laneway will only serve the development and other units on the laneway, traffic volumes will be very low and thus relatively safe for garbage trucks to reverse on to the laneway. The flashing beacon warning system will also provide additional warning to any motor vehicles exiting the ramp.

The City of Toronto Front-Loading Garbage Truck that was used in our maneuvering analysis has a 10.3 m inner turning radius and 14 m outside turning radius. Therefore our garbage truck maneuver is more conservative than the 9.5 m inner radius, the turning template is provided in Figure 3, and the garbage truck maneuvering diagram is provided on Figure 4.

Part 2 Comments, Section E, Transportation Services

Despite the above-noted conclusion and recommendations by the consultant, additional analyses and documentation is required prior to accepting the traffic impacts of the proposal, which are as follows:

a. Submit a revised report, which includes ‘Access Location Analysis’ as required by Section 3.4.3 of the Guidelines for the preparation of Transportation Impact Studies, version 2013;

Please see the section below entitled Access Location Analysis. We believe that the current configuration of the laneway does not present any access issues.

b. Figure 3-2 illustrates all outbound site-generated trips assigned to eastbound right-turn movement only at the intersection of Yonge Street and Cumberland Street. Given that the left-turn movement is permissive at this intersection as illustrated in Figure 2-3, Figure 2-3 must illustrate the left turn movement despite the fact that ‘zero’ site trips are assigned to this movement;

Page 7: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Page 4

Noted, however, Figure 2-3 is a site-generated trips figure, which is meant to illustrate the distribution of site-generated trips, and not all the possible movements at each intersection. Please refer to Figure 2-1 in our initial TIS submission, which illustrates the lane configurations, of which an eastbound left turn is shown because that is a possible movement.

c. The foot note in the Capacity Analysis Worksheets for both Future Background and Future Total conditions provided at the bottom left, shows as existing AM/PM conditions. To help avoid confusion, the foot note in the worksheets must be corrected appropriately; and

Noted. Please see Appendix A for revised capacity analysis worksheets.

d. Replace the header in the capacity analysis worksheets for the intersection of site driveways with Cumberland Street and Yorkville Avenue to show as ‘Site Driveway and Cumberland Street’ and not just ‘Cumberland Street’. The same applies to the capacity analysis worksheet for the intersection of site driveway with Yorkville Avenue.

Noted. Please see Appendix A for revised capacity analysis worksheets.

ACCESS LOCATION ANALYSIS

An access location analysis as outlined in Section 3.4.3 of the Guidelines for the Preparation of Transportation Impact Studies, was conducted as per the City’s comments.

Turning sight distances were conducted using the Transportation Association of Canada’s Geometric Design Guide for Canadian Roads 2017 version. Turning sight distances for vehicles leaving the site driveway onto Yorkville Avenue or Cumberland Street were analyzed. Figure 5 demonstrates the turning sight lines of vehicles exiting the site onto Yorkville Avenue and Cumberland Street. Sightlines towards Yonge Street are truncated at Yonge Street rather than illustrating the full sight distance. Figure 5 shows that there are no obstructions within the turning sight lines.

There is a pedestrian pathway on the west side of the east laneway that provides a pedestrian connection between Yorkville Avenue and the Residential Lobby main entrance. Thus, pedestrians will be crossing the laneway on the south side of Yorkville Avenue, while vehicles will be required to stop behind the crosswalk and check for pedestrians before turning onto Yorkville Avenue. The peak hour volume of vehicles turning out of the site does not exceed 40 in the P.M. peak hour, so we do not expect any issues with this.

Pedestrians will also be accessing the site using the PATH network, as discussed in our initial TIS submission. These pedestrians will be even more sheltered from interaction with vehicles, because the PATH is an underground pedestrian network.

There are currently no bicycle lanes on Yorkville Avenue or on Cumberland Street. Cyclists accessing the site can enter through the rear door (facing south), go down the stairs to P1 and park their bicycles there. This applies to both residents or residential/retail visitors that want to park their bicycle.

There are no potential interference conflicts with other driveways, because opposite the laneway access on Yorkville Avenue is the Town Hall Square park at 25 Yorkville Avenue. There are other driveways east and west of the laneway along Yorkville Avenue, but we do not think this will be an issue in terms of pedestrian safety due to the low volume of vehicle-pedestrian conflicts.

The intersection operations analysis from our initial TIS dated March 23, 2018 indicated that there is no need for any auxiliary turning lanes, and that the capacity of the laneway is sufficient to accommodate all vehicles.

Page 8: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Page 5

In addition, due to the location of the site, the site access laneway connects to Yorkville Avenue and Cumberland Street, both of which are collector roads. Therefore, site trips are first directed to the collector roads before connecting to arterial roads such as Yonge or Bay Streets.

PEDESTRIAN CONNECTION BETWEEN P.A.T.H. AND RETAIL LOBBY

Pedestrians accessing 11 Yorkville from the P.A.T.H. system will first enter P1 of 33 Yorkville Avenue (Toronto Parking Authority building) before entering the 11 Yorkville building via the southwest corner on P1 level. Pedestrians will then follow the marked pathway until they reach the stairs and elevator that lead to the retail lobby. The marked pedestrian pathway on P1 uses 1.2 m of the 6.0 m east-west drive aisle, and thus it must be shared with motorists circulating through the garage. It is expected that the pedestrian volumes will be quite low, and enhanced lighting and pavement markings will increase driver’s awareness to potential pedestrians walking along the pathway. Please see the P1 plan in Appendix B that illustrates the pedestrian connection.

This addendum letter should address all related comments. Should you have any questions or comments, please do not hesitate to contact me directly at your convenience.

Best regards,

WSP Canada Group Limited

David B. Richardson, P.Eng., PTOE

Manager - Transportation

Planning and Advisory Services

Kathy Hui, M.Sc., EIT

Designer – Transportation

Planning and Advisory Services

j:\01 projects\2017 jobs\17m-01494-00 - 11-19 yorkville\deliverable\december 2018 response\wsp (dec 10, 2018) 11 yorkville

response.docx

Page 9: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project
Page 10: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

FIGURES

Page 11: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

259.5 m²

2,794 SF

RESIDENTIAL

LOBBY

190 m²

2,045 SF

RETAIL

48 m²

516 SF

RETAIL

LOBBY

Modified:WSP - A106 - 20181210.dwg_PUDO

12/11/2018 9:47 AM

By:paulo.israel

J:\01 P

RO

JE

CT

S\2017 Jobs\17M

-01494-00 - 11-19 Y

orkville\C

AD

\2018-12-06\D

WG

Plot Date:

2018/12/11

Figure 1

Ground Floor Pick-Up/Drop-Off

11-21 Yorkville Avenue Response to Comments

Source: 181206 11 Yorkville-Sheet - A105 - Ground Floor Plan, from Sweeny & Co Architects, December 07, 2018

Scale: 1:250

AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
Page 12: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

259.5 m²

2,794 SF

LOBBY

258.2 m²

2,779 SF

RETAIL

LOOP DETECTOR WILL ACTIVATE

FLASHING BEACON FOR

VEHICLES EXITING RAMP

"CAUTION: TRUCKS REVERSING

WHEN FLASHING" SIGN AND

FLASHING BEACON

(CEILING-MOUNTED), WHERE

BEACON FLASHES WHEN LOOP

DETECTOR IS ACTIVATED.

CAUTION: TRUCKS REVERSING WHEN FLASHING

Modified:WSP - A106 - 20181210.dwg_Beacon

12/11/2018 9:47 AM

By:paulo.israel

J:\01 P

RO

JE

CT

S\2017 Jobs\17M

-01494-00 - 11-19 Y

orkville\C

AD

\2018-12-06\D

WG

Plot Date:

2018/12/11

Figure 2

Flashing Beacon Warning System

11-21 Yorkville Avenue Response to Comments

Source: 181206 11 Yorkville-Sheet - A105 - Ground Floor Plan, from Sweeny & Co Architects, December 07, 2018

Scale: 1:250

AutoCAD SHX Text
A TRAINED ON-SITE STAFF MEMBER WILL BE AVAILABLE TO MANEUVER BINS FOR THE COLLECTION DRIVER AND ALSO ACT AS FLAGMAN BY CONTROLLING THE TRUCK, CYCLING, PEDESTRIAN AND OTHER VEHICLE MOVEMENTS IN THE AREA. THE ON-SITE STAFF WILL MANEUVER THE BINS OUT OF THE WAY FOR THE COLLECTION VEHICLE TO EXIT FORWARD. THE ON-SITE STAFF MUST DO THIS FOR GARBAGE COLLECTION AT BOTH BUILDINGS. IN THE EVENT THE ON-SITE STAFF IS UNAVAILABLE AT THE TIME THE CITY COLLECTION VEHICLE ARRIVES AT THE SITE, THE COLLECTION VEHICLE WILL LEAVE THE SITE AND NOT RETURN UNTIL THE NEXT SCHEDULED COLLECTION DAY. FAILURE TO COMPLY WITH THIS ARRANGEMENT WILL RESULT IN CANCELLATION OF RESIDENTIAL COLLECTION AT THE SITE.
AutoCAD SHX Text
GARBAGE COLLECTION STAFF NOTE
Page 13: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Steering Angle

City of Toronto Garbage

Track

Lock to Lock Time

Width

0.80

6.0

: 25.9

:

2.40

2.40

:

:

5.49

meters

12.00

1

0

.

3

m

14

.0

m

Modified:WSP - A106 - 20181210.dwg_Profile

12/11/2018 9:47 AM

By:paulo.israel

J:\01 P

RO

JE

CT

S\2017 Jobs\17M

-01494-00 - 11-19 Y

orkville\C

AD

\2018-12-06\D

WG

Plot Date:

2018/12/11

Figure 3

Garbage Truck Profile

11-21 Yorkville Avenue Response to Comments

Source: 181206 11 Yorkville-Sheet - A105 - Ground Floor Plan, from Sweeny & Co Architects, December 07, 2018

Scale: 1:300

AutoCAD SHX Text
180
AutoCAD SHX Text
150
AutoCAD SHX Text
120
AutoCAD SHX Text
90
AutoCAD SHX Text
OUTSIDE SWEPT PATH
AutoCAD SHX Text
INSIDE SWEPT PATH
AutoCAD SHX Text
60
AutoCAD SHX Text
30
AutoCAD SHX Text
STEERING LOCK ANGLE = 25.9 deg.
AutoCAD SHX Text
ACHIEVED STEERING ANGLE:
AutoCAD SHX Text
30 deg. SWEEP ANGLE: 17.6 deg.
AutoCAD SHX Text
60 deg. SWEEP ANGLE: 23.2 deg.
AutoCAD SHX Text
90 deg. SWEEP ANGLE: 25.0 deg.
AutoCAD SHX Text
120 deg. SWEEP ANGLE: 25.6 deg.
AutoCAD SHX Text
150 deg. SWEEP ANGLE: 25.8 deg.
AutoCAD SHX Text
180 deg. SWEEP ANGLE: 25.9 deg.
AutoCAD SHX Text
City of Toronto Garbage
AutoCAD SHX Text
Imported
AutoCAD SHX Text
[m]
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
0m
AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
12.57 m
AutoCAD SHX Text
0.80 m
AutoCAD SHX Text
5.49 m
AutoCAD SHX Text
5.71 m
AutoCAD SHX Text
2.40 m
Page 14: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

UP

DN

259.5 m²

2,794 SF

RESIDENTIAL

LOBBY

90.5 m²

974 SF

RETAIL

190 m²

2,045 SF

RETAIL

48 m²

516 SF

RETAIL

LOBBY

INBOUND

OUTBOUND

Modified:WSP - A106 - 20181210.dwg_Truck

12/11/2018 9:47 AM

By:paulo.israel

J:\01 P

RO

JE

CT

S\2017 Jobs\17M

-01494-00 - 11-19 Y

orkville\C

AD

\2018-12-06\D

WG

Plot Date:

2018/12/11

Figure 4

Garbage Truck Entering and Leaving Site

11-21 Yorkville Avenue Response to Comments

Source: 181206 11 Yorkville-Sheet - A105 - Ground Floor Plan, from Sweeny & Co Architects, December 07, 2018

Scale: 1:300

AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
Page 15: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

UP

DN

46

2.6

m

²

4,9

80

S

F

RE

TA

IL

25

9.5

m

²

2,7

94

S

F

RE

SID

EN

TIA

L

LO

BB

Y

25

8.2

m

²

2,7

79

S

F

RE

TA

IL

90

.5

m

²

97

4 S

F

RE

TA

IL

19

0 m

²

2,0

45

S

F

RE

TA

IL

48

m

²

51

6 S

F

RE

TA

IL

LO

BB

Y

95000

54500

105000

55900

Modified:

WS

P - G

round F

loor P

lan S

ight D

istance A

nalysis.dw

g_

Sight D

istance

12/10/2018 3:03 P

M

By:

paulo.israel

J:\01 PROJECTS\2017 Jobs\17M-01494-00 - 11-19 Yorkville\CAD\2018-12-06\DWG

Plot D

ate:

2018/12/10

Fig

ure

5

Tu

rn

in

g S

ig

ht D

ista

nce

a

t S

ite

A

cce

sse

s

11

-2

1 Y

orkville

A

ve

nu

e R

esp

on

se

to

C

om

me

nts

So

urce: 181206 11 Y

orkville-S

heet - A

105 - G

round F

loor P

lan, from

S

weeny &

C

o A

rchitects, D

ecem

ber 07, 2018

Scale: 1:900

AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
AutoCAD SHX Text
(c) 2018 Transoft Solutions, Inc. All rights reserved.
Page 16: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

APPENDIX

A SYNCHRO

CAPACITY

WORKSHEETS

Page 17: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

599

20

688

50

235

41

534

4

Fut

ure

Vol

ume

(vph

)0

599

20

688

50

235

41

534

4

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r1.

001.

000.

991.

00

Frt

0.99

90.

998

0.99

9

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

033

910

034

180

032

420

034

500

Flt

Per

mitt

ed0.

955

Sat

d. F

low

(pe

rm)

033

910

034

180

032

420

032

930

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

12

1

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Adj

. Flo

w (

vph)

066

62

076

46

026

14

159

34

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

668

00

770

00

265

00

598

0

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Max

Max

Max

Max

Max

Max

Act

Effc

t Gre

en (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

v/c

Rat

io0.

680.

770.

300.

67

Con

trol

Del

ay34

.137

.228

.735

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

34.1

37.2

28.7

35.5

LOS

CD

CD

App

roac

h D

elay

34.1

37.2

28.7

35.5

App

roac

h LO

SC

DC

D

Que

ue L

engt

h 50

th (

m)

57.2

68.4

20.3

51.9

Que

ue L

engt

h 95

th (

m)

76.4

89.8

31.0

70.1

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)3.

03.

0

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Max

Max

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 18: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

997

879

892

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

680.

770.

300.

67

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.77

Inte

rsec

tion

Sig

nal D

elay

: 34.

9In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

44.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 19: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)66

877

026

559

8

v/c

Rat

io0.

680.

770.

300.

67

Con

trol

Del

ay34

.137

.228

.735

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

34.1

37.2

28.7

35.5

Que

ue L

engt

h 50

th (

m)

57.2

68.4

20.3

51.9

Que

ue L

engt

h 95

th (

m)

76.4

89.8

31.0

70.1

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

997

879

892

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

680.

770.

300.

67

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

599

20

688

50

235

41

534

4

Fut

ure

Vol

ume

(vph

)0

599

20

688

50

235

41

534

4

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

1.00

1.00

0.99

1.00

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

1.00

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3390

3418

3241

3448

Flt

Per

mitt

ed1.

001.

001.

000.

95

Sat

d. F

low

(pe

rm)

3390

3418

3241

3292

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

066

62

076

46

026

14

159

34

RT

OR

Red

uctio

n (v

ph)

00

00

10

01

00

10

Lane

Gro

up F

low

(vp

h)0

668

00

769

00

264

00

597

0

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)27

.027

.025

.025

.0

Effe

ctiv

e G

reen

, g (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)98

899

687

789

1

v/s

Rat

io P

rot

0.20

c0.2

30.

08

v/s

Rat

io P

erm

c0.1

8

v/c

Rat

io0.

680.

770.

300.

67

Uni

form

Del

ay, d

130

.031

.127

.831

.2

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

3.7

5.8

0.9

4.0

Del

ay (

s)33

.736

.928

.735

.2

Leve

l of S

ervi

ceC

DC

D

App

roac

h D

elay

(s)

33.7

36.9

28.7

35.2

App

roac

h LO

SC

DC

D

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay34

.6H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.47

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

44.3

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 20: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)65

519

106

8948

865

5237

58

2849

952

Fut

ure

Vol

ume

(vph

)65

519

106

8948

865

5237

58

2849

952

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

860.

950.

910.

960.

881.

000.

890.

97

Frt

0.97

50.

982

0.99

70.

986

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1574

3185

016

3632

620

1465

3322

016

3632

610

Flt

Per

mitt

ed0.

419

0.21

60.

365

0.49

0

Sat

d. F

low

(pe

rm)

599

3185

033

932

620

494

3322

075

032

610

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

3326

314

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Adj

. Flo

w (

vph)

7257

711

899

542

7258

417

931

554

58

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)72

695

099

614

058

426

031

612

0

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

38

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.06.

023

.022

.022

.023

.023

.0

Min

imum

Spl

it (s

)30

.030

.010

.030

.029

.029

.030

.030

.0

Tot

al S

plit

(s)

39.0

39.0

13.0

52.0

33.0

33.0

33.0

33.0

Tot

al S

plit

(%)

45.9

%45

.9%

15.3

%61

.2%

38.8

%38

.8%

38.8

%38

.8%

Yel

low

Tim

e (s

)3.

03.

03.

04.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

01.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lead

/Lag

Lag

Lag

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)26

.326

.338

.435

.436

.636

.636

.636

.6

Act

uate

d g/

C R

atio

0.31

0.31

0.45

0.42

0.43

0.43

0.43

0.43

v/c

Rat

io0.

390.

690.

360.

450.

270.

300.

100.

43

Con

trol

Del

ay28

.928

.015

.317

.223

.918

.119

.119

.4

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

28.9

28.0

15.3

17.2

23.9

18.1

19.1

19.8

LOS

CC

BB

CB

BB

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

28.1

16.9

18.8

19.7

App

roac

h LO

SC

BB

B

Que

ue L

engt

h 50

th (

m)

9.4

50.9

8.9

34.2

6.0

23.2

3.0

35.2

Que

ue L

engt

h 95

th (

m)

19.3

60.4

14.0

38.8

18.3

39.8

10.0

58.0

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

232

1256

290

1739

212

1433

323

1413

Sta

rvat

ion

Cap

Red

uctn

00

00

00

033

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

310.

550.

340.

350.

270.

300.

100.

57

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.69

Inte

rsec

tion

Sig

nal D

elay

: 21.

3In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.4

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 21: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)72

695

9961

458

426

3161

2

v/c

Rat

io0.

390.

690.

360.

450.

270.

300.

100.

43

Con

trol

Del

ay28

.928

.015

.317

.223

.918

.119

.119

.4

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

28.9

28.0

15.3

17.2

23.9

18.1

19.1

19.8

Que

ue L

engt

h 50

th (

m)

9.4

50.9

8.9

34.2

6.0

23.2

3.0

35.2

Que

ue L

engt

h 95

th (

m)

19.3

60.4

14.0

38.8

18.3

39.8

10.0

58.0

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

232

1256

290

1739

212

1433

323

1413

Sta

rvat

ion

Cap

Red

uctn

00

00

00

033

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

310.

550.

340.

350.

270.

300.

100.

57

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)65

519

106

8948

865

5237

58

2849

952

Fut

ure

Vol

ume

(vph

)65

519

106

8948

865

5237

58

2849

952

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.96

1.00

1.00

1.00

0.97

Flp

b, p

ed/b

ikes

0.86

1.00

0.99

1.00

0.87

1.00

0.89

1.00

Frt

1.00

0.97

1.00

0.98

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1359

3184

1612

3263

1277

3321

1448

3260

Flt

Per

mitt

ed0.

421.

000.

221.

000.

371.

000.

491.

00

Sat

d. F

low

(pe

rm)

600

3184

366

3263

491

3321

746

3260

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

7257

711

899

542

7258

417

931

554

58

RT

OR

Red

uctio

n (v

ph)

023

00

150

02

00

80

Lane

Gro

up F

low

(vp

h)72

672

099

599

058

424

031

604

0

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)26

.326

.336

.136

.135

.935

.935

.935

.9

Effe

ctiv

e G

reen

, g (

s)26

.326

.336

.136

.135

.935

.935

.935

.9

Act

uate

d g/

C R

atio

0.31

0.31

0.42

0.42

0.42

0.42

0.42

0.42

Cle

aran

ce T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)18

598

525

513

8520

714

0231

513

76

v/s

Rat

io P

rot

c0.2

10.

03c0

.18

0.13

c0.1

9

v/s

Rat

io P

erm

0.12

0.13

0.12

0.04

v/c

Rat

io0.

390.

680.

390.

430.

280.

300.

100.

44

Uni

form

Del

ay, d

123

.025

.716

.217

.216

.116

.314

.817

.4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.4

2.0

1.0

0.2

3.4

0.6

0.6

1.0

Del

ay (

s)24

.427

.717

.117

.419

.416

.815

.418

.4

Leve

l of S

ervi

ceC

CB

BB

BB

B

App

roac

h D

elay

(s)

27.4

17.4

17.1

18.3

App

roac

h LO

SC

BB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay20

.5H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.54

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.4

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 22: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

2616

7276

1948

324

9766

457

93

Fut

ure

Vol

ume

(vph

)13

2616

7276

1948

324

9766

457

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

910.

900.

950.

93

Frt

0.96

00.

985

0.96

90.

977

Flt

Pro

tect

ed0.

989

0.97

90.

995

0.99

5

Sat

d. F

low

(pr

ot)

015

170

016

460

030

800

031

670

Flt

Per

mitt

ed0.

923

0.84

30.

829

0.83

5

Sat

d. F

low

(pe

rm)

013

730

013

090

025

340

026

330

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

188

6540

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

152.

895

.511

5.7

Tra

vel T

ime

(s)

15.0

11.5

7.2

8.7

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Adj

. Flo

w (

vph)

1429

1880

8421

5336

010

873

508

103

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

610

018

50

052

10

068

40

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

31.0

31.0

31.0

31.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

36.5

%36

.5%

36.5

%36

.5%

63.5

%63

.5%

63.5

%63

.5%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)25

.025

.050

.050

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.59

0.59

v/c

Rat

io0.

150.

470.

340.

44

Con

trol

Del

ay18

.028

.48.

510

.1

Que

ue D

elay

0.0

0.0

0.5

0.0

Tot

al D

elay

18.0

28.4

9.0

10.1

LOS

BC

AB

App

roac

h D

elay

18.0

28.4

9.0

10.1

App

roac

h LO

SB

CA

B

Que

ue L

engt

h 50

th (

m)

5.1

23.4

18.0

27.6

Que

ue L

engt

h 95

th (

m)

14.1

42.7

27.0

39.4

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

432

405

1517

1565

Sta

rvat

ion

Cap

Red

uctn

00

560

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

140.

460.

540.

44

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.47

Inte

rsec

tion

Sig

nal D

elay

: 12.

4In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

65.6

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 23: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)61

185

521

684

v/c

Rat

io0.

150.

470.

340.

44

Con

trol

Del

ay18

.028

.48.

510

.1

Que

ue D

elay

0.0

0.0

0.5

0.0

Tot

al D

elay

18.0

28.4

9.0

10.1

Que

ue L

engt

h 50

th (

m)

5.1

23.4

18.0

27.6

Que

ue L

engt

h 95

th (

m)

14.1

42.7

27.0

39.4

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

432

405

1517

1565

Sta

rvat

ion

Cap

Red

uctn

00

560

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

140.

460.

540.

44

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

2616

7276

1948

324

9766

457

93

Fut

ure

Vol

ume

(vph

)13

2616

7276

1948

324

9766

457

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.94

0.98

0.96

0.94

Flp

b, p

ed/b

ikes

0.97

0.92

0.99

0.99

Frt

0.96

0.98

0.97

0.98

Flt

Pro

tect

ed0.

990.

980.

990.

99

Sat

d. F

low

(pr

ot)

1471

1519

3041

3138

Flt

Per

mitt

ed0.

920.

840.

830.

84

Sat

d. F

low

(pe

rm)

1374

1308

2534

2634

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

1429

1880

8421

5336

010

873

508

103

RT

OR

Red

uctio

n (v

ph)

013

00

60

027

00

160

Lane

Gro

up F

low

(vp

h)0

480

017

90

049

40

066

80

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)24

.024

.049

.049

.0

Effe

ctiv

e G

reen

, g (

s)25

.025

.050

.050

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.59

0.59

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)40

438

414

9015

49

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.04

c0.1

40.

20c0

.25

v/c

Rat

io0.

120.

470.

330.

43

Uni

form

Del

ay, d

121

.924

.59.

09.

7

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.1

0.9

0.6

0.9

Del

ay (

s)22

.125

.49.

610

.5

Leve

l of S

ervi

ceC

CA

B

App

roac

h D

elay

(s)

22.1

25.4

9.6

10.5

App

roac

h LO

SC

CA

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay12

.6H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.44

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

65.6

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 24: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

023

034

765

8

Fut

ure

Vol

ume

(vph

)0

023

034

765

8

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

1

Flt

Pro

tect

ed0.

999

Sat

d. F

low

(pr

ot)

00

3356

00

3464

Flt

Per

mitt

ed0.

999

Sat

d. F

low

(pe

rm)

00

3356

00

3464

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

712

712

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

5%0%

0%3%

Adj

. Flo

w (

vph)

00

256

388

731

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

029

40

073

9

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

26.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

230

347

658

Fut

ure

Vol

ume

(Veh

/h)

00

230

347

658

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

025

638

873

1

Ped

estr

ians

712

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.98

0.98

0.98

vC, c

onfli

ctin

g vo

lum

e13

6885

910

06

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

3281

296

2

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

099

cM c

apac

ity (

veh/

h)14

131

570

8

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al17

112

325

248

7

Vol

ume

Left

00

80

Vol

ume

Rig

ht0

380

0

cSH

1700

1700

708

1700

Vol

ume

to C

apac

ity0.

100.

070.

010.

29

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.3

0.0

Con

trol

Del

ay (

s)0.

00.

00.

50.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.2

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

26.4

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 25: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)11

1422

746

3048

7

Fut

ure

Vol

ume

(vph

)11

1422

746

3048

7

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.92

30.

975

Flt

Pro

tect

ed0.

979

0.99

7

Sat

d. F

low

(pr

ot)

1571

032

230

035

26

Flt

Per

mitt

ed0.

979

0.99

7

Sat

d. F

low

(pe

rm)

1571

032

230

035

26

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

805

805

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

7%13

%0%

1%

Adj

. Flo

w (

vph)

1216

252

5133

541

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)28

030

30

057

4

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.0

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1114

227

4630

487

Fut

ure

Vol

ume

(Veh

/h)

1114

227

4630

487

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)12

1625

251

3354

1

Ped

estr

ians

805

Lane

Wid

th (

m)

3.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e61

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.93

vC, c

onfli

ctin

g vo

lum

e14

1995

611

08

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

0395

611

08

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%75

8487

cM c

apac

ity (

veh/

h)48

101

249

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al28

168

135

213

361

Vol

ume

Left

120

033

0

Vol

ume

Rig

ht16

051

00

cSH

6817

0017

0024

917

00

Vol

ume

to C

apac

ity0.

410.

100.

080.

130.

21

Que

ue L

engt

h 95

th (

m)

12.0

0.0

0.0

3.4

0.0

Con

trol

Del

ay (

s)90

.10.

00.

06.

10.

0

Lane

LO

SF

A

App

roac

h D

elay

(s)

90.1

0.0

2.3

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

4.2

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.0

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 26: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)66

2731

197

502

156

Fut

ure

Vol

ume

(vph

)66

2731

197

502

156

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

790.

980.

88

Frt

0.96

10.

965

Flt

Pro

tect

ed0.

966

0.99

3

Sat

d. F

low

(pr

ot)

1489

00

3346

2951

0

Flt

Per

mitt

ed0.

966

0.82

6

Sat

d. F

low

(pe

rm)

1259

00

2723

2951

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

2395

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)74

.176

.122

.2

Tra

vel T

ime

(s)

5.6

5.7

1.7

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Adj

. Flo

w (

vph)

7330

3421

955

817

3

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)10

30

025

373

10

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

60.0

60.0

60.0

Tot

al S

plit

(%)

29.4

%70

.6%

70.6

%70

.6%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

v/c

Rat

io0.

280.

150.

38

Con

trol

Del

ay23

.26.

57.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

23.2

6.5

7.0

LOS

CA

A

App

roac

h D

elay

23.2

6.5

7.0

App

roac

h LO

SC

AA

Que

ue L

engt

h 50

th (

m)

10.5

7.7

22.5

Que

ue L

engt

h 95

th (

m)

23.7

12.3

32.2

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

367

1729

1909

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

280.

150.

38

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.38

Inte

rsec

tion

Sig

nal D

elay

: 8.4

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

54.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 27: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)10

325

373

1

v/c

Rat

io0.

280.

150.

38

Con

trol

Del

ay23

.26.

57.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

23.2

6.5

7.0

Que

ue L

engt

h 50

th (

m)

10.5

7.7

22.5

Que

ue L

engt

h 95

th (

m)

23.7

12.3

32.2

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

367

1729

1909

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

280.

150.

38

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)66

2731

197

502

156

Fut

ure

Vol

ume

(vph

)66

2731

197

502

156

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.93

1.00

0.88

Flp

b, p

ed/b

ikes

1.00

0.98

1.00

Frt

0.96

1.00

0.96

Flt

Pro

tect

ed0.

970.

991.

00

Sat

d. F

low

(pr

ot)

1488

3275

2950

Flt

Per

mitt

ed0.

970.

831.

00

Sat

d. F

low

(pe

rm)

1488

2722

2950

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

7330

3421

955

817

3

RT

OR

Red

uctio

n (v

ph)

180

00

350

Lane

Gro

up F

low

(vp

h)85

00

253

696

0

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.054

.054

.0

Effe

ctiv

e G

reen

, g (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)35

017

2918

74

v/s

Rat

io P

rot

c0.0

6c0

.24

v/s

Rat

io P

erm

0.09

v/c

Rat

io0.

240.

150.

37

Uni

form

Del

ay, d

126

.46.

27.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.7

0.2

0.6

Del

ay (

s)28

.06.

48.

0

Leve

l of S

ervi

ceC

AA

App

roac

h D

elay

(s)

28.0

6.4

8.0

App

roac

h LO

SC

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay9.

5H

CM

200

0 Le

vel o

f Ser

vice

A

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.34

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

54.4

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 28: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)30

028

00

00

245

00

497

0

Fut

ure

Vol

ume

(vph

)30

028

00

00

245

00

497

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

98

Frt

0.92

7

Flt

Pro

tect

ed0.

975

Sat

d. F

low

(pr

ot)

028

740

018

420

033

360

035

000

Flt

Per

mitt

ed0.

846

Sat

d. F

low

(pe

rm)

024

650

018

420

033

360

035

000

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

45

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

155.

610

2.4

95.5

Tra

vel T

ime

(s)

14.3

11.7

7.7

7.2

Con

fl. P

eds.

(#/

hr)

201

136

136

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Adj

. Flo

w (

vph)

330

310

00

027

20

055

20

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

640

00

00

272

00

552

0

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

46.0

46.0

Tot

al S

plit

(%)

36.1

%36

.1%

36.1

%36

.1%

63.9

%63

.9%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

v/c

Rat

io0.

090.

150.

28

Con

trol

Del

ay9.

68.

08.

9

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

9.6

8.0

8.9

LOS

AA

A

App

roac

h D

elay

9.6

8.0

8.9

App

roac

h LO

SA

AA

Que

ue L

engt

h 50

th (

m)

1.0

8.5

18.9

Que

ue L

engt

h 95

th (

m)

5.1

13.8

27.3

Inte

rnal

Lin

k D

ist (

m)

166.

213

1.6

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

717

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

090.

150.

28

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 7

2

Act

uate

d C

ycle

Len

gth:

72

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

T, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.28

Inte

rsec

tion

Sig

nal D

elay

: 8.7

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

7: B

ay S

t & C

umbe

rland

St

Page 29: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BT

NB

TS

BT

Lane

Gro

up F

low

(vp

h)64

272

552

v/c

Rat

io0.

090.

150.

28

Con

trol

Del

ay9.

68.

08.

9

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

9.6

8.0

8.9

Que

ue L

engt

h 50

th (

m)

1.0

8.5

18.9

Que

ue L

engt

h 95

th (

m)

5.1

13.8

27.3

Inte

rnal

Lin

k D

ist (

m)

166.

278

.471

.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

717

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

090.

150.

28

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)30

028

00

00

245

00

497

0

Fut

ure

Vol

ume

(vph

)30

028

00

00

245

00

497

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

1.00

Flp

b, p

ed/b

ikes

0.99

1.00

1.00

Frt

0.93

1.00

1.00

Flt

Pro

tect

ed0.

971.

001.

00

Sat

d. F

low

(pr

ot)

2841

3336

3500

Flt

Per

mitt

ed0.

851.

001.

00

Sat

d. F

low

(pe

rm)

2465

3336

3500

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

330

310

00

027

20

055

20

RT

OR

Red

uctio

n (v

ph)

033

00

00

00

00

00

Lane

Gro

up F

low

(vp

h)0

320

00

00

272

00

552

0

Con

fl. P

eds.

(#/

hr)

201

136

136

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Act

uate

d G

reen

, G (

s)20

.040

.040

.0

Effe

ctiv

e G

reen

, g (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)68

418

5319

44

v/s

Rat

io P

rot

0.08

c0.1

6

v/s

Rat

io P

erm

c0.0

1

v/c

Rat

io0.

050.

150.

28

Uni

form

Del

ay, d

119

.07.

78.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.1

0.2

0.4

Del

ay (

s)19

.17.

98.

8

Leve

l of S

ervi

ceB

AA

App

roac

h D

elay

(s)

19.1

0.0

7.9

8.8

App

roac

h LO

SB

AA

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay9.

3H

CM

200

0 Le

vel o

f Ser

vice

A

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.20

Act

uate

d C

ycle

Len

gth

(s)

72.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 30: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)27

670

433

527

0

Fut

ure

Vol

ume

(vph

)27

670

433

527

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

1.00

Ped

Bik

e F

acto

r

Frt

0.90

4

Flt

Pro

tect

ed0.

986

Sat

d. F

low

(pr

ot)

1556

00

3305

3400

0

Flt

Per

mitt

ed0.

986

Sat

d. F

low

(pe

rm)

1556

00

3305

3400

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)69

.810

3.3

15.7

Tra

vel T

ime

(s)

5.2

7.7

1.2

Con

fl. P

eds.

(#/

hr)

148

341

313

313

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%1%

2%8%

5%0%

Adj

. Flo

w (

vph)

3074

048

158

60

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)10

40

048

158

60

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.6

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

2767

043

352

70

Fut

ure

Vol

ume

(Veh

/h)

2767

043

352

70

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)30

740

481

586

0

Ped

estr

ians

313

341

148

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e24

3013

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.97

0.97

0.97

vC, c

onfli

ctin

g vo

lum

e12

8894

789

9

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol10

7687

982

9

tC, s

ingl

e (s

)6.

96.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%78

5110

0

cM c

apac

ity (

veh/

h)13

615

158

9

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al10

424

024

029

329

3

Vol

ume

Left

300

00

0

Vol

ume

Rig

ht74

00

00

cSH

146

1700

1700

1700

1700

Vol

ume

to C

apac

ity0.

710.

140.

140.

170.

17

Que

ue L

engt

h 95

th (

m)

31.4

0.0

0.0

0.0

0.0

Con

trol

Del

ay (

s)74

.50.

00.

00.

00.

0

Lane

LO

SF

App

roac

h D

elay

(s)

74.5

0.0

0.0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

6.6

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.6

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 31: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

1842

00

1842

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

1842

00

1842

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

2.8

74.1

91.9

Tra

vel T

ime

(s)

11.5

5.6

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

374

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 32: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

676

90

606

50

539

101

430

17

Fut

ure

Vol

ume

(vph

)1

676

90

606

50

539

101

430

17

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

991.

000.

990.

98

Frt

0.99

80.

999

0.99

70.

994

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

035

040

035

110

034

550

034

360

Flt

Per

mitt

ed0.

955

0.95

4

Sat

d. F

low

(pe

rm)

033

460

035

110

034

550

032

760

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

11

24

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Adj

. Flo

w (

vph)

171

29

063

85

056

711

145

318

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

722

00

643

00

578

00

472

0

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Non

eN

one

Non

eN

one

Non

eN

one

Act

Effc

t Gre

en (

s)62

.262

.223

.823

.8

Act

uate

d g/

C R

atio

0.65

0.65

0.25

0.25

v/c

Rat

io0.

330.

280.

670.

58

Con

trol

Del

ay8.

58.

036

.434

.1

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.5

8.0

36.4

34.1

LOS

AA

DC

App

roac

h D

elay

8.5

8.0

36.4

34.1

App

roac

h LO

SA

AD

C

Que

ue L

engt

h 50

th (

m)

27.5

23.5

51.5

40.7

Que

ue L

engt

h 95

th (

m)

43.8

37.6

64.1

52.2

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)2.

03.

5

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Non

eN

one

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 33: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2168

2275

954

906

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

330.

280.

610.

52

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.67

Inte

rsec

tion

Sig

nal D

elay

: 20.

1In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

44.8

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 34: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)72

264

357

847

2

v/c

Rat

io0.

330.

280.

670.

58

Con

trol

Del

ay8.

58.

036

.434

.1

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.5

8.0

36.4

34.1

Que

ue L

engt

h 50

th (

m)

27.5

23.5

51.5

40.7

Que

ue L

engt

h 95

th (

m)

43.8

37.6

64.1

52.2

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2168

2275

954

906

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

330.

280.

610.

52

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

676

90

606

50

539

101

430

17

Fut

ure

Vol

ume

(vph

)1

676

90

606

50

539

101

430

17

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

0.99

0.98

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3503

3510

3455

3435

Flt

Per

mitt

ed0.

951.

001.

000.

95

Sat

d. F

low

(pe

rm)

3345

3510

3455

3277

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

171

29

063

85

056

711

145

318

RT

OR

Red

uctio

n (v

ph)

00

00

00

02

00

30

Lane

Gro

up F

low

(vp

h)0

722

00

643

00

576

00

469

0

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)61

.261

.222

.822

.8

Effe

ctiv

e G

reen

, g (

s)62

.262

.223

.823

.8

Act

uate

d g/

C R

atio

0.65

0.65

0.25

0.25

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)21

6722

7485

681

2

v/s

Rat

io P

rot

0.18

c0.1

7

v/s

Rat

io P

erm

c0.2

20.

14

v/c

Rat

io0.

330.

280.

670.

58

Uni

form

Del

ay, d

17.

67.

332

.631

.7

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.4

0.1

2.1

1.0

Del

ay (

s)8.

07.

434

.732

.7

Leve

l of S

ervi

ceA

AC

C

App

roac

h D

elay

(s)

8.0

7.4

34.7

32.7

App

roac

h LO

SA

AC

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay19

.0H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.45

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

44.8

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 35: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)56

489

6960

448

6513

277

79

7240

086

Fut

ure

Vol

ume

(vph

)56

489

6960

448

6513

277

79

7240

086

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

820.

950.

850.

940.

831.

000.

880.

92

Frt

0.98

10.

981

0.99

80.

973

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1685

3296

016

3632

750

1685

3514

016

6831

360

Flt

Per

mitt

ed0.

382

0.35

70.

313

0.34

0

Sat

d. F

low

(pe

rm)

553

3296

052

032

750

460

3514

052

731

360

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

205

131

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Adj

. Flo

w (

vph)

5951

573

6347

268

139

818

976

421

91

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)59

588

063

540

013

982

70

7651

20

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

52

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.023

.023

.06.

023

.022

.022

.0

Min

imum

Spl

it (s

)29

.029

.029

.029

.010

.029

.029

.029

.0

Tot

al S

plit

(s)

40.0

40.0

40.0

40.0

15.0

50.0

35.0

35.0

Tot

al S

plit

(%)

44.4

%44

.4%

44.4

%44

.4%

16.7

%55

.6%

38.9

%38

.9%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

01.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-4.0

-1.0

2.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lead

/Lag

Lead

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Max

Max

Max

Max

Non

eC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)35

.035

.038

.035

.044

.045

.031

.731

.7

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.49

0.50

0.35

0.35

v/c

Rat

io0.

270.

450.

290.

420.

430.

470.

410.

46

Con

trol

Del

ay23

.221

.121

.721

.217

.215

.831

.423

.0

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Tot

al D

elay

23.2

21.1

21.7

21.2

17.2

15.8

31.4

23.0

LOS

CC

CC

BB

CC

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

21.3

21.2

16.0

24.1

App

roac

h LO

SC

CB

C

Que

ue L

engt

h 50

th (

m)

6.8

37.4

7.0

34.8

12.8

46.8

9.9

33.3

Que

ue L

engt

h 95

th (

m)

16.7

51.8

17.0

48.4

23.1

61.6

23.9

48.7

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

215

1294

219

1276

347

1757

185

1124

Sta

rvat

ion

Cap

Red

uctn

00

00

00

00

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

270.

450.

290.

420.

400.

470.

410.

46

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.47

Inte

rsec

tion

Sig

nal D

elay

: 20.

0In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.2

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 36: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)59

588

6354

013

982

776

512

v/c

Rat

io0.

270.

450.

290.

420.

430.

470.

410.

46

Con

trol

Del

ay23

.221

.121

.721

.217

.215

.831

.423

.0

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Tot

al D

elay

23.2

21.1

21.7

21.2

17.2

15.8

31.4

23.0

Que

ue L

engt

h 50

th (

m)

6.8

37.4

7.0

34.8

12.8

46.8

9.9

33.3

Que

ue L

engt

h 95

th (

m)

16.7

51.8

17.0

48.4

23.1

61.6

23.9

48.7

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

215

1294

219

1276

347

1757

185

1124

Sta

rvat

ion

Cap

Red

uctn

00

00

00

00

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

270.

450.

290.

420.

400.

470.

410.

46

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)56

489

6960

448

6513

277

79

7240

086

Fut

ure

Vol

ume

(vph

)56

489

6960

448

6513

277

79

7240

086

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.94

1.00

1.00

1.00

0.92

Flp

b, p

ed/b

ikes

0.82

1.00

0.85

1.00

0.95

1.00

0.88

1.00

Frt

1.00

0.98

1.00

0.98

1.00

1.00

1.00

0.97

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1376

3297

1385

3275

1604

3515

1473

3137

Flt

Per

mitt

ed0.

381.

000.

361.

000.

311.

000.

341.

00

Sat

d. F

low

(pe

rm)

554

3297

521

3275

528

3515

528

3137

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

5951

573

6347

268

139

818

976

421

91

RT

OR

Red

uctio

n (v

ph)

012

00

30

01

00

200

Lane

Gro

up F

low

(vp

h)59

576

063

537

013

982

70

7649

20

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)34

.034

.034

.034

.044

.044

.030

.730

.7

Effe

ctiv

e G

reen

, g (

s)35

.035

.038

.035

.042

.045

.031

.731

.7

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.47

0.50

0.35

0.35

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

4.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)21

512

8221

912

7333

317

5718

511

04

v/s

Rat

io P

rot

c0.1

70.

160.

03c0

.24

0.16

v/s

Rat

io P

erm

0.11

0.12

0.16

0.14

v/c

Rat

io0.

270.

450.

290.

420.

420.

470.

410.

45

Uni

form

Del

ay, d

118

.820

.417

.120

.114

.914

.722

.122

.4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

3.1

1.1

3.3

1.0

0.8

0.9

6.6

1.3

Del

ay (

s)21

.921

.520

.421

.115

.715

.628

.723

.7

Leve

l of S

ervi

ceC

CC

CB

BC

C

App

roac

h D

elay

(s)

21.5

21.1

15.6

24.3

App

roac

h LO

SC

CB

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay20

.0H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.50

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.2

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 37: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

6020

8312

451

7673

811

032

350

82

Fut

ure

Vol

ume

(vph

)33

6020

8312

451

7673

811

032

350

82

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

900.

860.

970.

95

Frt

0.97

60.

973

0.98

20.

974

Flt

Pro

tect

ed0.

986

0.98

40.

996

0.99

7

Sat

d. F

low

(pr

ot)

016

890

016

420

033

890

032

380

Flt

Per

mitt

ed0.

864

0.86

80.

856

0.84

4

Sat

d. F

low

(pe

rm)

014

080

013

290

028

800

027

360

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

1315

2644

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

161.

795

.511

5.7

Tra

vel T

ime

(s)

15.0

12.1

7.2

8.7

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Adj

. Flo

w (

vph)

3563

2187

131

5480

777

116

3436

886

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

119

00

272

00

973

00

488

0

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

36.0

36.0

36.0

36.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

40.0

%40

.0%

40.0

%40

.0%

60.0

%60

.0%

60.0

%60

.0%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)26

.726

.753

.353

.3

Act

uate

d g/

C R

atio

0.30

0.30

0.59

0.59

v/c

Rat

io0.

280.

670.

570.

30

Con

trol

Del

ay22

.834

.913

.09.

1

Que

ue D

elay

0.0

0.0

3.3

0.0

Tot

al D

elay

22.8

34.9

16.3

9.1

LOS

CC

BA

App

roac

h D

elay

22.8

34.9

16.3

9.1

App

roac

h LO

SC

CB

A

Que

ue L

engt

h 50

th (

m)

14.3

40.1

45.8

17.1

Que

ue L

engt

h 95

th (

m)

25.6

61.3

74.5

30.3

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

493

467

1715

1637

Sta

rvat

ion

Cap

Red

uctn

00

621

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

240.

580.

890.

30

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 6

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.67

Inte

rsec

tion

Sig

nal D

elay

: 17.

5In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

74.6

%IC

U L

evel

of S

ervi

ce D

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 38: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)11

927

297

348

8

v/c

Rat

io0.

280.

670.

570.

30

Con

trol

Del

ay22

.834

.913

.09.

1

Que

ue D

elay

0.0

0.0

3.3

0.0

Tot

al D

elay

22.8

34.9

16.3

9.1

Que

ue L

engt

h 50

th (

m)

14.3

40.1

45.8

17.1

Que

ue L

engt

h 95

th (

m)

25.6

61.3

74.5

30.3

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

493

467

1715

1637

Sta

rvat

ion

Cap

Red

uctn

00

621

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

240.

580.

890.

30

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

6020

8312

451

7673

811

032

350

82

Fut

ure

Vol

ume

(vph

)33

6020

8312

451

7673

811

032

350

82

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.94

0.94

0.98

0.95

Flp

b, p

ed/b

ikes

0.95

0.92

0.99

1.00

Frt

0.98

0.97

0.98

0.97

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

1608

1509

3350

3228

Flt

Per

mitt

ed0.

860.

870.

860.

84

Sat

d. F

low

(pe

rm)

1410

1331

2881

2734

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

3563

2187

131

5480

777

116

3436

886

RT

OR

Red

uctio

n (v

ph)

09

00

110

011

00

180

Lane

Gro

up F

low

(vp

h)0

110

00

261

00

962

00

470

0

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)25

.725

.752

.352

.3

Effe

ctiv

e G

reen

, g (

s)26

.726

.753

.353

.3

Act

uate

d g/

C R

atio

0.30

0.30

0.59

0.59

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)41

839

417

0616

19

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.08

c0.2

0c0

.33

0.17

v/c

Rat

io0.

260.

660.

560.

29

Uni

form

Del

ay, d

124

.127

.711

.29.

0

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.3

4.2

1.4

0.5

Del

ay (

s)24

.531

.912

.69.

5

Leve

l of S

ervi

ceC

CB

A

App

roac

h D

elay

(s)

24.5

31.9

12.6

9.5

App

roac

h LO

SC

CB

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay15

.4H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.60

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

74.6

%IC

U L

evel

of S

ervi

ceD

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 39: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

066

094

1644

4

Fut

ure

Vol

ume

(vph

)0

066

094

1644

4

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

1

Flt

Pro

tect

ed0.

998

Sat

d. F

low

(pr

ot)

00

3472

00

3529

Flt

Per

mitt

ed0.

998

Sat

d. F

low

(pe

rm)

00

3472

00

3529

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

496

496

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

2%2%

1%0%

0%1%

Adj

. Flo

w (

vph)

00

695

9917

467

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

079

40

048

4

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

660

9416

444

Fut

ure

Vol

ume

(Veh

/h)

00

660

9416

444

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

069

599

1746

7

Ped

estr

ians

496

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.92

0.92

0.92

vC, c

onfli

ctin

g vo

lum

e15

0889

312

90

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

7470

311

36

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

097

cM c

apac

ity (

veh/

h)12

234

857

1

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al46

333

117

331

1

Vol

ume

Left

00

170

Vol

ume

Rig

ht0

990

0

cSH

1700

1700

571

1700

Vol

ume

to C

apac

ity0.

270.

190.

030.

18

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.7

0.0

Con

trol

Del

ay (

s)0.

00.

01.

50.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.5

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.2

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.3

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 40: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)15

6659

745

1035

5

Fut

ure

Vol

ume

(vph

)15

6659

745

1035

5

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.89

00.

990

Flt

Pro

tect

ed0.

991

0.99

9

Sat

d. F

low

(pr

ot)

1491

034

600

035

32

Flt

Per

mitt

ed0.

991

0.99

9

Sat

d. F

low

(pe

rm)

1491

034

600

035

32

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

670

670

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%6%

2%4%

0%1%

Adj

. Flo

w (

vph)

1669

628

4711

374

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)85

067

50

038

5

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

30.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1566

597

4510

355

Fut

ure

Vol

ume

(Veh

/h)

1566

597

4510

355

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)16

6962

847

1137

4

Ped

estr

ians

670

Lane

Wid

th (

m)

3.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e51

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.86

0.86

0.86

vC, c

onfli

ctin

g vo

lum

e15

3010

0813

45

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol12

8867

810

71

tC, s

ingl

e (s

)6.

87.

04.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

42.

2

p0 q

ueue

free

%75

5896

cM c

apac

ity (

veh/

h)64

163

278

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al85

419

256

136

249

Vol

ume

Left

160

011

0

Vol

ume

Rig

ht69

047

00

cSH

126

1700

1700

278

1700

Vol

ume

to C

apac

ity0.

670.

250.

150.

040.

15

Que

ue L

engt

h 95

th (

m)

27.5

0.0

0.0

0.9

0.0

Con

trol

Del

ay (

s)78

.30.

00.

02.

20.

0

Lane

LO

SF

A

App

roac

h D

elay

(s)

78.3

0.0

0.8

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

6.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

30.3

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 41: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)16

846

8758

532

212

1

Fut

ure

Vol

ume

(vph

)16

846

8758

532

212

1

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

750.

960.

84

Frt

0.97

10.

959

Flt

Pro

tect

ed0.

962

0.99

4

Sat

d. F

low

(pr

ot)

1536

00

3500

2862

0

Flt

Per

mitt

ed0.

962

0.81

3

Sat

d. F

low

(pe

rm)

1239

00

2753

2862

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

1412

5

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)65

.276

.122

.2

Tra

vel T

ime

(s)

4.9

5.7

1.7

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Adj

. Flo

w (

vph)

177

4892

616

339

127

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)22

50

070

846

60

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

65.0

65.0

65.0

Tot

al S

plit

(%)

27.8

%72

.2%

72.2

%72

.2%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

v/c

Rat

io0.

640.

390.

24

Con

trol

Del

ay39

.18.

04.

9

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

39.1

8.0

4.9

LOS

DA

A

App

roac

h D

elay

39.1

8.0

4.9

App

roac

h LO

SD

AA

Que

ue L

engt

h 50

th (

m)

33.2

26.5

10.7

Que

ue L

engt

h 95

th (

m)

57.1

36.4

16.6

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

352

1804

1919

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

640.

390.

24

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.64

Inte

rsec

tion

Sig

nal D

elay

: 11.

9In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

63.8

%IC

U L

evel

of S

ervi

ce B

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 42: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)22

570

846

6

v/c

Rat

io0.

640.

390.

24

Con

trol

Del

ay39

.18.

04.

9

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

39.1

8.0

4.9

Que

ue L

engt

h 50

th (

m)

33.2

26.5

10.7

Que

ue L

engt

h 95

th (

m)

57.1

36.4

16.6

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

352

1804

1919

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

640.

390.

24

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)16

846

8758

532

212

1

Fut

ure

Vol

ume

(vph

)16

846

8758

532

212

1

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.93

1.00

0.84

Flp

b, p

ed/b

ikes

1.00

0.96

1.00

Frt

0.97

1.00

0.96

Flt

Pro

tect

ed0.

960.

991.

00

Sat

d. F

low

(pr

ot)

1536

3364

2862

Flt

Per

mitt

ed0.

960.

811.

00

Sat

d. F

low

(pe

rm)

1536

2754

2862

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

177

4892

616

339

127

RT

OR

Red

uctio

n (v

ph)

110

00

430

Lane

Gro

up F

low

(vp

h)21

40

070

842

30

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.059

.059

.0

Effe

ctiv

e G

reen

, g (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)34

118

0518

76

v/s

Rat

io P

rot

c0.1

40.

15

v/s

Rat

io P

erm

c0.2

6

v/c

Rat

io0.

630.

390.

23

Uni

form

Del

ay, d

131

.67.

26.

3

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

8.5

0.6

0.3

Del

ay (

s)40

.17.

86.

5

Leve

l of S

ervi

ceD

AA

App

roac

h D

elay

(s)

40.1

7.8

6.5

App

roac

h LO

SD

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay12

.6H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.45

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

63.8

%IC

U L

evel

of S

ervi

ceB

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 43: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)11

670

052

836

50

Fut

ure

Vol

ume

(vph

)11

670

052

836

50

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

1.00

Ped

Bik

e F

acto

r

Frt

0.94

9

Flt

Pro

tect

ed0.

970

Sat

d. F

low

(pr

ot)

1610

00

3500

3535

0

Flt

Per

mitt

ed0.

970

Sat

d. F

low

(pe

rm)

1610

00

3500

3535

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)64

.710

3.3

15.7

Tra

vel T

ime

(s)

4.9

7.7

1.2

Con

fl. P

eds.

(#/

hr)

384

466

466

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

1%2%

2%2%

1%2%

Adj

. Flo

w (

vph)

122

740

556

384

0

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)19

60

055

638

40

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

32.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

116

700

528

365

0

Fut

ure

Vol

ume

(Veh

/h)

116

700

528

365

0

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)12

274

055

638

40

Ped

estr

ians

466

438

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e35

03

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.86

vC, c

onfli

ctin

g vo

lum

e11

6666

285

0

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol85

966

285

0

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%23

7210

0

cM c

apac

ity (

veh/

h)15

926

150

7

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al19

627

827

819

219

2

Vol

ume

Left

122

00

00

Vol

ume

Rig

ht74

00

00

cSH

187

1700

1700

1700

1700

Vol

ume

to C

apac

ity1.

050.

160.

160.

110.

11

Que

ue L

engt

h 95

th (

m)

69.7

0.0

0.0

0.0

0.0

Con

trol

Del

ay (

s)13

1.6

0.0

0.0

0.0

0.0

Lane

LO

SF

App

roac

h D

elay

(s)

131.

60.

00.

0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

22.7

Inte

rsec

tion

Cap

acity

Util

izat

ion

32.4

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 44: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5679

430

660

799

108

2343

10

Fut

ure

Vol

ume

(vph

)47

5679

430

660

799

108

2343

10

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

770.

710.

930.

99

Frt

0.93

50.

918

0.98

2

Flt

Pro

tect

ed0.

987

0.98

10.

997

Sat

d. F

low

(pr

ot)

026

860

013

720

032

270

034

930

Flt

Per

mitt

ed0.

859

0.80

50.

883

Sat

d. F

low

(pe

rm)

021

900

098

90

032

270

030

730

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

4537

1

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

160.

710

2.4

95.5

Tra

vel T

ime

(s)

14.3

12.1

7.7

7.2

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Adj

. Flo

w (

vph)

4959

8345

069

084

111

424

454

0

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

191

00

114

00

955

00

478

0

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

62.0

62.0

62.0

Tot

al S

plit

(%)

29.5

%29

.5%

29.5

%29

.5%

70.5

%70

.5%

70.5

%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

v/c

Rat

io0.

360.

450.

470.

24

Con

trol

Del

ay23

.926

.69.

27.

3

Que

ue D

elay

0.0

0.0

1.4

0.5

Tot

al D

elay

23.9

26.6

10.5

7.8

LOS

CC

BA

App

roac

h D

elay

23.9

26.6

10.5

7.8

App

roac

h LO

SC

CB

A

Que

ue L

engt

h 50

th (

m)

10.7

11.0

39.1

16.3

Que

ue L

engt

h 95

th (

m)

20.2

26.8

51.7

23.2

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

532

253

2053

1955

Sta

rvat

ion

Cap

Red

uctn

00

838

1005

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

360.

450.

790.

50

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

8

Act

uate

d C

ycle

Len

gth:

88

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.47

Inte

rsec

tion

Sig

nal D

elay

: 12.

3In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

75.7

%IC

U L

evel

of S

ervi

ce D

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

8: B

ay S

t & C

umbe

rland

St

Page 45: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Exis

ting P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)19

111

495

547

8

v/c

Rat

io0.

360.

450.

470.

24

Con

trol

Del

ay23

.926

.69.

27.

3

Que

ue D

elay

0.0

0.0

1.4

0.5

Tot

al D

elay

23.9

26.6

10.5

7.8

Que

ue L

engt

h 50

th (

m)

10.7

11.0

39.1

16.3

Que

ue L

engt

h 95

th (

m)

20.2

26.8

51.7

23.2

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

532

253

2053

1955

Sta

rvat

ion

Cap

Red

uctn

00

838

1005

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

360.

450.

790.

50

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5679

430

660

799

108

2343

10

Fut

ure

Vol

ume

(vph

)47

5679

430

660

799

108

2343

10

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.82

0.81

0.93

1.00

Flp

b, p

ed/b

ikes

0.94

0.88

1.00

0.99

Frt

0.93

0.92

0.98

1.00

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

2517

1205

3227

3471

Flt

Per

mitt

ed0.

860.

811.

000.

88

Sat

d. F

low

(pe

rm)

2189

990

3227

3073

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

4959

8345

069

084

111

424

454

0

RT

OR

Red

uctio

n (v

ph)

035

00

290

00

00

00

Lane

Gro

up F

low

(vp

h)0

156

00

850

095

50

047

80

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Act

uate

d G

reen

, G (

s)20

.020

.056

.056

.0

Effe

ctiv

e G

reen

, g (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)49

722

520

5319

55

v/s

Rat

io P

rot

c0.3

0

v/s

Rat

io P

erm

0.07

c0.0

90.

16

v/c

Rat

io0.

310.

380.

460.

24

Uni

form

Del

ay, d

128

.328

.88.

36.

9

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.7

4.8

0.8

0.3

Del

ay (

s)29

.933

.69.

07.

2

Leve

l of S

ervi

ceC

CA

A

App

roac

h D

elay

(s)

29.9

33.6

9.0

7.2

App

roac

h LO

SC

CA

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay12

.4H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.44

Act

uate

d C

ycle

Len

gth

(s)

88.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

75.7

%IC

U L

evel

of S

ervi

ceD

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 46: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

1842

00

1842

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

1842

00

1842

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

1.7

65.2

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

265

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 47: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

018

4218

420

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

018

4218

420

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

0.7

64.7

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

1

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 48: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

634

20

719

50

243

41

591

4

Fut

ure

Vol

ume

(vph

)0

634

20

719

50

243

41

591

4

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r1.

001.

000.

991.

00

Frt

0.99

90.

998

0.99

9

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

033

920

034

190

032

430

034

510

Flt

Per

mitt

ed0.

955

Sat

d. F

low

(pe

rm)

033

920

034

190

032

430

032

950

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

11

1

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Adj

. Flo

w (

vph)

070

42

079

96

027

04

165

74

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

706

00

805

00

274

00

662

0

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Max

Max

Max

Max

Max

Max

Act

Effc

t Gre

en (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

v/c

Rat

io0.

710.

810.

310.

74

Con

trol

Del

ay35

.239

.029

.037

.8

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

35.2

39.0

29.0

37.8

LOS

DD

CD

App

roac

h D

elay

35.2

39.0

29.0

37.8

App

roac

h LO

SD

DC

D

Que

ue L

engt

h 50

th (

m)

61.3

72.5

21.2

58.7

Que

ue L

engt

h 95

th (

m)

81.5

94.7

32.1

78.7

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)3.

03.

0

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Max

Max

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 49: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

997

879

893

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

710.

810.

310.

74

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.81

Inte

rsec

tion

Sig

nal D

elay

: 36.

5In

ters

ectio

n LO

S: D

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.7

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 50: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)70

680

527

466

2

v/c

Rat

io0.

710.

810.

310.

74

Con

trol

Del

ay35

.239

.029

.037

.8

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

35.2

39.0

29.0

37.8

Que

ue L

engt

h 50

th (

m)

61.3

72.5

21.2

58.7

Que

ue L

engt

h 95

th (

m)

81.5

94.7

32.1

78.7

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

997

879

893

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

710.

810.

310.

74

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

634

20

719

50

243

41

591

4

Fut

ure

Vol

ume

(vph

)0

634

20

719

50

243

41

591

4

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

1.00

1.00

0.99

1.00

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

1.00

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3390

3418

3242

3450

Flt

Per

mitt

ed1.

001.

001.

000.

95

Sat

d. F

low

(pe

rm)

3390

3418

3242

3294

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

070

42

079

96

027

04

165

74

RT

OR

Red

uctio

n (v

ph)

00

00

10

01

00

10

Lane

Gro

up F

low

(vp

h)0

706

00

804

00

273

00

661

0

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)27

.027

.025

.025

.0

Effe

ctiv

e G

reen

, g (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)98

899

687

889

2

v/s

Rat

io P

rot

0.21

c0.2

40.

08

v/s

Rat

io P

erm

c0.2

0

v/c

Rat

io0.

710.

810.

310.

74

Uni

form

Del

ay, d

130

.431

.527

.931

.9

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

4.4

7.0

0.9

5.5

Del

ay (

s)34

.838

.528

.837

.5

Leve

l of S

ervi

ceC

DC

D

App

roac

h D

elay

(s)

34.8

38.5

28.8

37.5

App

roac

h LO

SC

DC

D

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay36

.1H

CM

200

0 Le

vel o

f Ser

vice

D

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.50

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.7

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 51: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)70

532

106

102

498

8157

426

854

518

58

Fut

ure

Vol

ume

(vph

)70

532

106

102

498

8157

426

854

518

58

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

870.

950.

910.

950.

881.

000.

900.

97

Frt

0.97

50.

979

0.99

70.

985

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1574

3189

016

3632

250

1465

3326

016

3632

500

Flt

Per

mitt

ed0.

408

0.21

30.

345

0.44

7

Sat

d. F

low

(pe

rm)

587

3189

033

532

250

470

3326

069

332

500

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

3229

215

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Adj

. Flo

w (

vph)

7859

111

811

355

390

6347

39

6057

664

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)78

709

011

364

30

6348

20

6064

00

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

38

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.06.

023

.022

.022

.023

.023

.0

Min

imum

Spl

it (s

)30

.030

.010

.030

.029

.029

.030

.030

.0

Tot

al S

plit

(s)

39.0

39.0

13.0

52.0

33.0

33.0

33.0

33.0

Tot

al S

plit

(%)

45.9

%45

.9%

15.3

%61

.2%

38.8

%38

.8%

38.8

%38

.8%

Yel

low

Tim

e (s

)3.

03.

03.

04.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

01.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lead

/Lag

Lag

Lag

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)26

.926

.939

.136

.135

.935

.935

.935

.9

Act

uate

d g/

C R

atio

0.32

0.32

0.46

0.42

0.42

0.42

0.42

0.42

v/c

Rat

io0.

420.

690.

410.

460.

320.

340.

200.

46

Con

trol

Del

ay29

.727

.615

.817

.026

.119

.121

.620

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

29.7

27.6

15.8

17.0

26.1

19.1

21.6

20.6

LOS

CC

BB

CB

CC

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

27.9

16.8

19.9

20.7

App

roac

h LO

SC

BB

C

Que

ue L

engt

h 50

th (

m)

10.1

51.0

9.8

34.6

6.9

28.1

6.2

38.7

Que

ue L

engt

h 95

th (

m)

20.9

61.7

15.5

40.6

20.2

45.6

17.2

61.5

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

227

1257

291

1721

198

1407

293

1382

Sta

rvat

ion

Cap

Red

uctn

00

00

00

029

1

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

340.

560.

390.

370.

320.

340.

200.

59

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.69

Inte

rsec

tion

Sig

nal D

elay

: 21.

5In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.5

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 52: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)78

709

113

643

6348

260

640

v/c

Rat

io0.

420.

690.

410.

460.

320.

340.

200.

46

Con

trol

Del

ay29

.727

.615

.817

.026

.119

.121

.620

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

29.7

27.6

15.8

17.0

26.1

19.1

21.6

20.6

Que

ue L

engt

h 50

th (

m)

10.1

51.0

9.8

34.6

6.9

28.1

6.2

38.7

Que

ue L

engt

h 95

th (

m)

20.9

61.7

15.5

40.6

20.2

45.6

17.2

61.5

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

227

1257

291

1721

198

1407

293

1382

Sta

rvat

ion

Cap

Red

uctn

00

00

00

029

1

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

340.

560.

390.

370.

320.

340.

200.

59

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)70

532

106

102

498

8157

426

854

518

58

Fut

ure

Vol

ume

(vph

)70

532

106

102

498

8157

426

854

518

58

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.95

1.00

1.00

1.00

0.97

Flp

b, p

ed/b

ikes

0.87

1.00

0.99

1.00

0.88

1.00

0.90

1.00

Frt

1.00

0.98

1.00

0.98

1.00

1.00

1.00

0.98

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1368

3189

1613

3225

1287

3326

1467

3250

Flt

Per

mitt

ed0.

411.

000.

211.

000.

341.

000.

451.

00

Sat

d. F

low

(pe

rm)

587

3189

362

3225

467

3326

690

3250

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

7859

111

811

355

390

6347

39

6057

664

RT

OR

Red

uctio

n (v

ph)

022

00

160

01

00

90

Lane

Gro

up F

low

(vp

h)78

687

011

362

70

6348

10

6063

10

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)26

.926

.936

.936

.935

.135

.135

.135

.1

Effe

ctiv

e G

reen

, g (

s)26

.926

.936

.936

.935

.135

.135

.135

.1

Act

uate

d g/

C R

atio

0.32

0.32

0.43

0.43

0.41

0.41

0.41

0.41

Cle

aran

ce T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)18

510

0926

014

0019

213

7328

413

42

v/s

Rat

io P

rot

c0.2

20.

04c0

.19

0.14

c0.1

9

v/s

Rat

io P

erm

0.13

0.15

0.13

0.09

v/c

Rat

io0.

420.

680.

430.

450.

330.

350.

210.

47

Uni

form

Del

ay, d

122

.925

.315

.916

.916

.917

.116

.018

.2

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.6

1.9

1.2

0.2

4.5

0.7

1.7

1.2

Del

ay (

s)24

.527

.217

.017

.121

.517

.817

.719

.4

Leve

l of S

ervi

ceC

CB

BC

BB

B

App

roac

h D

elay

(s)

26.9

17.1

18.2

19.2

App

roac

h LO

SC

BB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay20

.6H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.56

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.5

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 53: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

2616

106

7645

4835

711

972

524

93

Fut

ure

Vol

ume

(vph

)13

2616

106

7645

4835

711

972

524

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

920.

880.

940.

94

Frt

0.96

00.

973

0.96

60.

980

Flt

Pro

tect

ed0.

989

0.97

70.

995

0.99

5

Sat

d. F

low

(pr

ot)

015

170

015

850

030

620

031

960

Flt

Per

mitt

ed0.

912

0.82

00.

826

0.82

1

Sat

d. F

low

(pe

rm)

013

630

012

190

025

180

026

150

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

1815

7634

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

152.

895

.511

5.7

Tra

vel T

ime

(s)

15.0

11.5

7.2

8.7

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Adj

. Flo

w (

vph)

1429

1811

884

5053

397

132

8058

210

3

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

610

025

20

058

20

076

50

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

31.0

31.0

31.0

31.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

36.5

%36

.5%

36.5

%36

.5%

63.5

%63

.5%

63.5

%63

.5%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)25

.425

.449

.649

.6

Act

uate

d g/

C R

atio

0.30

0.30

0.58

0.58

v/c

Rat

io0.

150.

670.

390.

50

Con

trol

Del

ay17

.534

.79.

111

.3

Que

ue D

elay

0.0

0.0

0.6

0.0

Tot

al D

elay

17.5

34.7

9.7

11.3

LOS

BC

AB

App

roac

h D

elay

17.5

34.7

9.7

11.3

App

roac

h LO

SB

CA

B

Que

ue L

engt

h 50

th (

m)

5.1

33.8

20.5

33.0

Que

ue L

engt

h 95

th (

m)

13.8

59.1

31.6

48.0

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

429

383

1500

1540

Sta

rvat

ion

Cap

Red

uctn

00

528

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

140.

660.

600.

50

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.67

Inte

rsec

tion

Sig

nal D

elay

: 14.

5In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

70.0

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 54: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)61

252

582

765

v/c

Rat

io0.

150.

670.

390.

50

Con

trol

Del

ay17

.534

.79.

111

.3

Que

ue D

elay

0.0

0.0

0.6

0.0

Tot

al D

elay

17.5

34.7

9.7

11.3

Que

ue L

engt

h 50

th (

m)

5.1

33.8

20.5

33.0

Que

ue L

engt

h 95

th (

m)

13.8

59.1

31.6

48.0

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

429

383

1500

1540

Sta

rvat

ion

Cap

Red

uctn

00

528

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

140.

660.

600.

50

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

2616

106

7645

4835

711

972

524

93

Fut

ure

Vol

ume

(vph

)13

2616

106

7645

4835

711

972

524

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.94

0.96

0.95

0.95

Flp

b, p

ed/b

ikes

0.97

0.92

0.99

0.99

Frt

0.96

0.97

0.97

0.98

Flt

Pro

tect

ed0.

990.

981.

000.

99

Sat

d. F

low

(pr

ot)

1478

1453

3034

3168

Flt

Per

mitt

ed0.

910.

820.

830.

82

Sat

d. F

low

(pe

rm)

1363

1220

2517

2614

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

1429

1811

884

5053

397

132

8058

210

3

RT

OR

Red

uctio

n (v

ph)

013

00

110

032

00

140

Lane

Gro

up F

low

(vp

h)0

480

024

10

055

00

075

10

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)24

.424

.448

.648

.6

Effe

ctiv

e G

reen

, g (

s)25

.425

.449

.649

.6

Act

uate

d g/

C R

atio

0.30

0.30

0.58

0.58

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)40

736

414

6815

25

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.04

c0.2

00.

22c0

.29

v/c

Rat

io0.

120.

660.

370.

49

Uni

form

Del

ay, d

121

.726

.19.

410

.3

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.1

4.5

0.7

1.1

Del

ay (

s)21

.830

.610

.211

.5

Leve

l of S

ervi

ceC

CB

B

App

roac

h D

elay

(s)

21.8

30.6

10.2

11.5

App

roac

h LO

SC

CB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay14

.3H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.55

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

70.0

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 55: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

026

036

769

2

Fut

ure

Vol

ume

(vph

)0

026

036

769

2

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

2

Flt

Pro

tect

ed0.

999

Sat

d. F

low

(pr

ot)

00

3358

00

3463

Flt

Per

mitt

ed0.

999

Sat

d. F

low

(pe

rm)

00

3358

00

3463

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

712

712

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

5%0%

0%3%

Adj

. Flo

w (

vph)

00

289

408

769

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

032

90

077

7

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

260

367

692

Fut

ure

Vol

ume

(Veh

/h)

00

260

367

692

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

028

940

876

9

Ped

estr

ians

712

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.97

0.97

0.97

vC, c

onfli

ctin

g vo

lum

e14

2287

610

41

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

8082

098

9

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

099

cM c

apac

ity (

veh/

h)13

031

068

9

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al19

313

626

451

3

Vol

ume

Left

00

80

Vol

ume

Rig

ht0

400

0

cSH

1700

1700

689

1700

Vol

ume

to C

apac

ity0.

110.

080.

010.

30

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.3

0.0

Con

trol

Del

ay (

s)0.

00.

00.

40.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.2

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.4

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 56: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

2425

563

3450

5

Fut

ure

Vol

ume

(vph

)13

2425

563

3450

5

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.91

10.

970

Flt

Pro

tect

ed0.

983

0.99

7

Sat

d. F

low

(pr

ot)

1557

032

010

035

26

Flt

Per

mitt

ed0.

983

0.99

7

Sat

d. F

low

(pe

rm)

1557

032

010

035

26

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

805

805

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

7%13

%0%

1%

Adj

. Flo

w (

vph)

1427

283

7038

561

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)41

035

30

059

9

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.6

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1324

255

6334

505

Fut

ure

Vol

ume

(Veh

/h)

1324

255

6334

505

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)14

2728

370

3856

1

Ped

estr

ians

805

Lane

Wid

th (

m)

3.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e61

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.93

vC, c

onfli

ctin

g vo

lum

e14

8098

211

58

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

6798

211

58

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%67

7284

cM c

apac

ity (

veh/

h)42

9723

8

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al41

189

164

225

374

Vol

ume

Left

140

038

0

Vol

ume

Rig

ht27

070

00

cSH

6717

0017

0023

817

00

Vol

ume

to C

apac

ity0.

610.

110.

100.

160.

22

Que

ue L

engt

h 95

th (

m)

19.9

0.0

0.0

4.2

0.0

Con

trol

Del

ay (

s)12

0.7

0.0

0.0

7.3

0.0

Lane

LO

SF

A

App

roac

h D

elay

(s)

120.

70.

02.

7

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

6.6

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.6

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 57: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)66

3541

220

516

175

Fut

ure

Vol

ume

(vph

)66

3541

220

516

175

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

790.

980.

88

Frt

0.95

30.

962

Flt

Pro

tect

ed0.

968

0.99

2

Sat

d. F

low

(pr

ot)

1458

00

3337

2915

0

Flt

Per

mitt

ed0.

968

0.78

5

Sat

d. F

low

(pe

rm)

1251

00

2578

2915

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

3010

7

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)74

.176

.122

.2

Tra

vel T

ime

(s)

5.6

5.7

1.7

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Adj

. Flo

w (

vph)

7339

4624

457

319

4

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)11

20

029

076

70

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

60.0

60.0

60.0

Tot

al S

plit

(%)

29.4

%70

.6%

70.6

%70

.6%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

v/c

Rat

io0.

310.

180.

41

Con

trol

Del

ay22

.46.

77.

2

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

22.4

6.7

7.2

LOS

CA

A

App

roac

h D

elay

22.4

6.7

7.2

App

roac

h LO

SC

AA

Que

ue L

engt

h 50

th (

m)

10.8

9.0

23.9

Que

ue L

engt

h 95

th (

m)

24.6

14.1

34.1

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

366

1637

1890

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

310.

180.

41

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.41

Inte

rsec

tion

Sig

nal D

elay

: 8.5

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

61.1

%IC

U L

evel

of S

ervi

ce B

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 58: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)11

229

076

7

v/c

Rat

io0.

310.

180.

41

Con

trol

Del

ay22

.46.

77.

2

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

22.4

6.7

7.2

Que

ue L

engt

h 50

th (

m)

10.8

9.0

23.9

Que

ue L

engt

h 95

th (

m)

24.6

14.1

34.1

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

366

1637

1890

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

310.

180.

41

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)66

3541

220

516

175

Fut

ure

Vol

ume

(vph

)66

3541

220

516

175

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.92

1.00

0.88

Flp

b, p

ed/b

ikes

1.00

0.98

1.00

Frt

0.95

1.00

0.96

Flt

Pro

tect

ed0.

970.

991.

00

Sat

d. F

low

(pr

ot)

1459

3259

2915

Flt

Per

mitt

ed0.

970.

781.

00

Sat

d. F

low

(pe

rm)

1459

2578

2915

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

7339

4624

457

319

4

RT

OR

Red

uctio

n (v

ph)

230

00

390

Lane

Gro

up F

low

(vp

h)89

00

290

728

0

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.054

.054

.0

Effe

ctiv

e G

reen

, g (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)34

316

3718

51

v/s

Rat

io P

rot

c0.0

6c0

.25

v/s

Rat

io P

erm

0.11

v/c

Rat

io0.

260.

180.

39

Uni

form

Del

ay, d

126

.56.

47.

5

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.8

0.2

0.6

Del

ay (

s)28

.36.

68.

2

Leve

l of S

ervi

ceC

AA

App

roac

h D

elay

(s)

28.3

6.6

8.2

App

roac

h LO

SC

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay9.

7H

CM

200

0 Le

vel o

f Ser

vice

A

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.36

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

61.1

%IC

U L

evel

of S

ervi

ceB

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 59: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)67

065

00

00

253

00

517

0

Fut

ure

Vol

ume

(vph

)67

065

00

00

253

00

517

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

98

Frt

0.92

6

Flt

Pro

tect

ed0.

975

Sat

d. F

low

(pr

ot)

028

710

018

420

033

360

035

000

Flt

Per

mitt

ed0.

815

Sat

d. F

low

(pe

rm)

023

730

018

420

033

360

035

000

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

72

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

155.

610

2.4

95.5

Tra

vel T

ime

(s)

14.3

11.7

7.7

7.2

Con

fl. P

eds.

(#/

hr)

201

136

136

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Adj

. Flo

w (

vph)

740

720

00

028

10

057

40

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

146

00

00

028

10

057

40

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

46.0

46.0

Tot

al S

plit

(%)

36.1

%36

.1%

36.1

%36

.1%

63.9

%63

.9%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

v/c

Rat

io0.

210.

150.

30

Con

trol

Del

ay11

.78.

09.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

11.7

8.0

9.0

LOS

BA

A

App

roac

h D

elay

11.7

8.0

9.0

App

roac

h LO

SB

AA

Que

ue L

engt

h 50

th (

m)

3.8

8.8

19.8

Que

ue L

engt

h 95

th (

m)

10.3

14.2

28.4

Inte

rnal

Lin

k D

ist (

m)

166.

213

1.6

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

711

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

210.

150.

30

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 7

2

Act

uate

d C

ycle

Len

gth:

72

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

T, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.30

Inte

rsec

tion

Sig

nal D

elay

: 9.1

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

7: B

ay S

t & C

umbe

rland

St

Page 60: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BT

NB

TS

BT

Lane

Gro

up F

low

(vp

h)14

628

157

4

v/c

Rat

io0.

210.

150.

30

Con

trol

Del

ay11

.78.

09.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

11.7

8.0

9.0

Que

ue L

engt

h 50

th (

m)

3.8

8.8

19.8

Que

ue L

engt

h 95

th (

m)

10.3

14.2

28.4

Inte

rnal

Lin

k D

ist (

m)

166.

278

.471

.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

711

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

210.

150.

30

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)67

065

00

00

253

00

517

0

Fut

ure

Vol

ume

(vph

)67

065

00

00

253

00

517

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

1.00

Flp

b, p

ed/b

ikes

0.99

1.00

1.00

Frt

0.93

1.00

1.00

Flt

Pro

tect

ed0.

981.

001.

00

Sat

d. F

low

(pr

ot)

2839

3336

3500

Flt

Per

mitt

ed0.

821.

001.

00

Sat

d. F

low

(pe

rm)

2374

3336

3500

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

740

720

00

028

10

057

40

RT

OR

Red

uctio

n (v

ph)

052

00

00

00

00

00

Lane

Gro

up F

low

(vp

h)0

940

00

00

281

00

574

0

Con

fl. P

eds.

(#/

hr)

201

136

136

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Act

uate

d G

reen

, G (

s)20

.040

.040

.0

Effe

ctiv

e G

reen

, g (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)65

918

5319

44

v/s

Rat

io P

rot

0.08

c0.1

6

v/s

Rat

io P

erm

c0.0

4

v/c

Rat

io0.

140.

150.

30

Uni

form

Del

ay, d

119

.67.

88.

5

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.5

0.2

0.4

Del

ay (

s)20

.07.

98.

9

Leve

l of S

ervi

ceC

AA

App

roac

h D

elay

(s)

20.0

0.0

7.9

8.9

App

roac

h LO

SC

AA

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay10

.2H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.24

Act

uate

d C

ycle

Len

gth

(s)

72.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 61: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)27

670

483

594

0

Fut

ure

Vol

ume

(vph

)27

670

483

594

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

1.00

Ped

Bik

e F

acto

r

Frt

0.90

4

Flt

Pro

tect

ed0.

986

Sat

d. F

low

(pr

ot)

1556

00

3305

3400

0

Flt

Per

mitt

ed0.

986

Sat

d. F

low

(pe

rm)

1556

00

3305

3400

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)69

.810

3.3

15.7

Tra

vel T

ime

(s)

5.2

7.7

1.2

Con

fl. P

eds.

(#/

hr)

148

341

313

313

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%1%

2%8%

5%0%

Adj

. Flo

w (

vph)

3074

053

766

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)10

40

053

766

00

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

2767

048

359

40

Fut

ure

Vol

ume

(Veh

/h)

2767

048

359

40

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)30

740

537

660

0

Ped

estr

ians

313

341

148

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e24

3013

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.95

vC, c

onfli

ctin

g vo

lum

e13

9098

497

3

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol12

9998

497

3

tC, s

ingl

e (s

)6.

96.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%69

4410

0

cM c

apac

ity (

veh/

h)95

133

537

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al10

426

826

833

033

0

Vol

ume

Left

300

00

0

Vol

ume

Rig

ht74

00

00

cSH

119

1700

1700

1700

1700

Vol

ume

to C

apac

ity0.

870.

160.

160.

190.

19

Que

ue L

engt

h 95

th (

m)

40.7

0.0

0.0

0.0

0.0

Con

trol

Del

ay (

s)11

8.9

0.0

0.0

0.0

0.0

Lane

LO

SF

App

roac

h D

elay

(s)

118.

90.

00.

0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

9.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.4

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 62: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

1842

00

1842

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

1842

00

1842

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

2.8

74.1

91.9

Tra

vel T

ime

(s)

11.5

5.6

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

374

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 63: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

018

4218

420

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

018

4218

420

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

5.6

69.8

91.9

Tra

vel T

ime

(s)

11.7

5.2

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

5

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 64: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

701

90

649

50

546

101

461

17

Fut

ure

Vol

ume

(vph

)1

701

90

649

50

546

101

461

17

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

991.

000.

990.

98

Frt

0.99

80.

999

0.99

70.

995

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

035

050

035

120

034

550

034

440

Flt

Per

mitt

ed0.

955

0.95

4

Sat

d. F

low

(pe

rm)

033

470

035

120

034

550

032

840

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

11

24

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Adj

. Flo

w (

vph)

173

89

068

35

057

511

148

518

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

748

00

688

00

586

00

504

0

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Non

eN

one

Non

eN

one

Non

eN

one

Act

Effc

t Gre

en (

s)61

.961

.924

.124

.1

Act

uate

d g/

C R

atio

0.64

0.64

0.25

0.25

v/c

Rat

io0.

350.

300.

680.

61

Con

trol

Del

ay8.

78.

436

.234

.6

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.7

8.4

36.2

34.6

LOS

AA

DC

App

roac

h D

elay

8.7

8.4

36.2

34.6

App

roac

h LO

SA

AD

C

Que

ue L

engt

h 50

th (

m)

29.0

25.7

52.3

43.8

Que

ue L

engt

h 95

th (

m)

47.0

41.8

64.1

55.0

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)2.

03.

5

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Non

eN

one

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 65: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2159

2266

961

915

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

350.

300.

610.

55

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.68

Inte

rsec

tion

Sig

nal D

elay

: 20.

2In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.5

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 66: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)74

868

858

650

4

v/c

Rat

io0.

350.

300.

680.

61

Con

trol

Del

ay8.

78.

436

.234

.6

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.7

8.4

36.2

34.6

Que

ue L

engt

h 50

th (

m)

29.0

25.7

52.3

43.8

Que

ue L

engt

h 95

th (

m)

47.0

41.8

64.1

55.0

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2159

2266

961

915

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

350.

300.

610.

55

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

701

90

649

50

546

101

461

17

Fut

ure

Vol

ume

(vph

)1

701

90

649

50

546

101

461

17

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

0.99

0.98

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3505

3512

3456

3441

Flt

Per

mitt

ed0.

951.

001.

000.

95

Sat

d. F

low

(pe

rm)

3346

3512

3456

3283

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

173

89

068

35

057

511

148

518

RT

OR

Red

uctio

n (v

ph)

00

00

00

01

00

30

Lane

Gro

up F

low

(vp

h)0

748

00

688

00

585

00

501

0

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)60

.960

.923

.123

.1

Effe

ctiv

e G

reen

, g (

s)61

.961

.924

.124

.1

Act

uate

d g/

C R

atio

0.64

0.64

0.25

0.25

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)21

5722

6486

782

4

v/s

Rat

io P

rot

0.20

c0.1

7

v/s

Rat

io P

erm

c0.2

20.

15

v/c

Rat

io0.

350.

300.

670.

61

Uni

form

Del

ay, d

17.

87.

532

.431

.8

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.4

0.1

2.1

1.3

Del

ay (

s)8.

27.

634

.533

.1

Leve

l of S

ervi

ceA

AC

C

App

roac

h D

elay

(s)

8.2

7.6

34.5

33.1

App

roac

h LO

SA

AC

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay19

.1H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.46

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.5

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 67: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)72

514

6995

475

101

137

853

996

417

104

Fut

ure

Vol

ume

(vph

)72

514

6995

475

101

137

853

996

417

104

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

840.

950.

850.

920.

841.

000.

900.

91

Frt

0.98

20.

974

0.99

90.

970

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1685

3307

016

3631

770

1685

3518

016

6830

900

Flt

Per

mitt

ed0.

340

0.34

20.

290

0.31

4

Sat

d. F

low

(pe

rm)

506

3307

050

331

770

432

3518

049

430

900

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

194

137

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Adj

. Flo

w (

vph)

7654

173

100

500

106

144

898

910

143

910

9

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)76

614

010

060

60

144

907

010

154

80

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

52

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.023

.023

.06.

023

.022

.022

.0

Min

imum

Spl

it (s

)29

.029

.029

.029

.010

.029

.029

.029

.0

Tot

al S

plit

(s)

40.0

40.0

40.0

40.0

15.0

50.0

35.0

35.0

Tot

al S

plit

(%)

44.4

%44

.4%

44.4

%44

.4%

16.7

%55

.6%

38.9

%38

.9%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

01.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-4.0

-1.0

2.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lead

/Lag

Lead

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Max

Max

Max

Max

Non

eC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)35

.035

.038

.035

.044

.045

.031

.631

.6

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.49

0.50

0.35

0.35

v/c

Rat

io0.

390.

470.

470.

490.

460.

520.

580.

49

Con

trol

Del

ay27

.221

.427

.922

.317

.916

.541

.223

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.5

Tot

al D

elay

27.2

21.4

27.9

22.3

17.9

16.5

41.2

23.9

LOS

CC

CC

BB

DC

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

22.0

23.1

16.6

26.6

App

roac

h LO

SC

CB

C

Que

ue L

engt

h 50

th (

m)

9.3

39.5

12.1

40.4

13.3

52.8

14.1

36.0

Que

ue L

engt

h 95

th (

m)

22.1

54.6

28.2

55.5

23.9

69.0

#37.

352

.4

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

196

1297

212

1237

336

1759

173

1108

Sta

rvat

ion

Cap

Red

uctn

00

00

00

020

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

390.

470.

470.

490.

430.

520.

580.

61

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.58

Inte

rsec

tion

Sig

nal D

elay

: 21.

4In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.3

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 68: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)76

614

100

606

144

907

101

548

v/c

Rat

io0.

390.

470.

470.

490.

460.

520.

580.

49

Con

trol

Del

ay27

.221

.427

.922

.317

.916

.541

.223

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.5

Tot

al D

elay

27.2

21.4

27.9

22.3

17.9

16.5

41.2

23.9

Que

ue L

engt

h 50

th (

m)

9.3

39.5

12.1

40.4

13.3

52.8

14.1

36.0

Que

ue L

engt

h 95

th (

m)

22.1

54.6

28.2

55.5

23.9

69.0

#37.

352

.4

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

196

1297

212

1237

336

1759

173

1108

Sta

rvat

ion

Cap

Red

uctn

00

00

00

020

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

390.

470.

470.

490.

430.

520.

580.

61

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)72

514

6995

475

101

137

853

996

417

104

Fut

ure

Vol

ume

(vph

)72

514

6995

475

101

137

853

996

417

104

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.92

1.00

1.00

1.00

0.91

Flp

b, p

ed/b

ikes

0.84

1.00

0.85

1.00

0.96

1.00

0.90

1.00

Frt

1.00

0.98

1.00

0.97

1.00

1.00

1.00

0.97

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1414

3307

1398

3176

1616

3517

1494

3091

Flt

Per

mitt

ed0.

341.

000.

341.

000.

291.

000.

311.

00

Sat

d. F

low

(pe

rm)

506

3307

503

3176

494

3517

494

3091

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

7654

173

100

500

106

144

898

910

143

910

9

RT

OR

Red

uctio

n (v

ph)

012

00

20

01

00

240

Lane

Gro

up F

low

(vp

h)76

602

010

060

40

144

907

010

152

40

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)34

.034

.034

.034

.044

.044

.030

.630

.6

Effe

ctiv

e G

reen

, g (

s)35

.035

.038

.035

.042

.045

.031

.631

.6

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.47

0.50

0.35

0.35

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

4.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)19

612

8621

212

3532

217

5817

310

85

v/s

Rat

io P

rot

0.18

0.19

0.04

c0.2

60.

17

v/s

Rat

io P

erm

0.15

c0.2

00.

17c0

.20

v/c

Rat

io0.

390.

470.

470.

490.

450.

520.

580.

48

Uni

form

Del

ay, d

119

.820

.518

.820

.715

.115

.223

.822

.8

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

5.7

1.2

7.4

1.4

1.0

1.1

13.6

1.5

Del

ay (

s)25

.521

.826

.122

.116

.116

.237

.424

.4

Leve

l of S

ervi

ceC

CC

CB

BD

C

App

roac

h D

elay

(s)

22.2

22.7

16.2

26.4

App

roac

h LO

SC

CB

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay21

.2H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.56

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.3

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 69: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

6020

132

124

7776

783

150

4241

782

Fut

ure

Vol

ume

(vph

)33

6020

132

124

7776

783

150

4241

782

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

900.

830.

970.

95

Frt

0.97

60.

969

0.97

80.

977

Flt

Pro

tect

ed0.

986

0.98

10.

996

0.99

6

Sat

d. F

low

(pr

ot)

016

890

016

100

033

580

032

690

Flt

Per

mitt

ed0.

844

0.82

80.

849

0.80

7

Sat

d. F

low

(pe

rm)

013

870

012

200

028

370

026

440

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

1318

3535

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

161.

795

.511

5.7

Tra

vel T

ime

(s)

15.0

12.1

7.2

8.7

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Adj

. Flo

w (

vph)

3563

2113

913

181

8082

415

844

439

86

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

119

00

351

00

1062

00

569

0

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

36.0

36.0

36.0

36.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

40.0

%40

.0%

40.0

%40

.0%

60.0

%60

.0%

60.0

%60

.0%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)29

.129

.150

.950

.9

Act

uate

d g/

C R

atio

0.32

0.32

0.57

0.57

v/c

Rat

io0.

260.

860.

660.

38

Con

trol

Del

ay21

.048

.915

.911

.3

Que

ue D

elay

0.0

0.0

5.6

0.0

Tot

al D

elay

21.0

48.9

21.5

11.3

LOS

CD

CB

App

roac

h D

elay

21.0

48.9

21.5

11.3

App

roac

h LO

SC

DC

B

Que

ue L

engt

h 50

th (

m)

12.9

52.0

63.6

26.2

Que

ue L

engt

h 95

th (

m)

25.6

#98.

285

.437

.4

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

486

432

1618

1509

Sta

rvat

ion

Cap

Red

uctn

00

490

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

240.

810.

940.

38

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 6

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.86

Inte

rsec

tion

Sig

nal D

elay

: 23.

3In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

85.2

%IC

U L

evel

of S

ervi

ce E

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 70: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)11

935

110

6256

9

v/c

Rat

io0.

260.

860.

660.

38

Con

trol

Del

ay21

.048

.915

.911

.3

Que

ue D

elay

0.0

0.0

5.6

0.0

Tot

al D

elay

21.0

48.9

21.5

11.3

Que

ue L

engt

h 50

th (

m)

12.9

52.0

63.6

26.2

Que

ue L

engt

h 95

th (

m)

25.6

#98.

285

.437

.4

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

486

432

1618

1509

Sta

rvat

ion

Cap

Red

uctn

00

490

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

240.

810.

940.

38

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

6020

132

124

7776

783

150

4241

782

Fut

ure

Vol

ume

(vph

)33

6020

132

124

7776

783

150

4241

782

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.94

0.93

0.97

0.96

Flp

b, p

ed/b

ikes

0.96

0.90

0.99

1.00

Frt

0.98

0.97

0.98

0.98

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

1621

1445

3328

3264

Flt

Per

mitt

ed0.

840.

830.

850.

81

Sat

d. F

low

(pe

rm)

1389

1220

2836

2645

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

3563

2113

913

181

8082

415

844

439

86

RT

OR

Red

uctio

n (v

ph)

09

00

120

015

00

150

Lane

Gro

up F

low

(vp

h)0

110

00

339

00

1047

00

554

0

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)28

.128

.149

.949

.9

Effe

ctiv

e G

reen

, g (

s)29

.129

.150

.950

.9

Act

uate

d g/

C R

atio

0.32

0.32

0.57

0.57

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)44

939

416

0314

95

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.08

c0.2

8c0

.37

0.21

v/c

Rat

io0.

250.

860.

650.

37

Uni

form

Del

ay, d

122

.428

.513

.510

.7

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.3

16.8

2.1

0.7

Del

ay (

s)22

.745

.415

.611

.5

Leve

l of S

ervi

ceC

DB

B

App

roac

h D

elay

(s)

22.7

45.4

15.6

11.5

App

roac

h LO

SC

DB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay19

.8H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.73

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

85.2

%IC

U L

evel

of S

ervi

ceE

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 71: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

068

094

1648

9

Fut

ure

Vol

ume

(vph

)0

068

094

1648

9

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

2

Flt

Pro

tect

ed0.

998

Sat

d. F

low

(pr

ot)

00

3475

00

3529

Flt

Per

mitt

ed0.

998

Sat

d. F

low

(pe

rm)

00

3475

00

3529

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

496

496

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

2%2%

1%0%

0%1%

Adj

. Flo

w (

vph)

00

716

9917

515

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

081

50

053

2

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

28.4

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

680

9416

489

Fut

ure

Vol

ume

(Veh

/h)

00

680

9416

489

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

071

699

1751

5

Ped

estr

ians

496

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.91

0.91

0.91

vC, c

onfli

ctin

g vo

lum

e15

5390

413

11

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol14

1770

611

52

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

097

cM c

apac

ity (

veh/

h)11

334

656

1

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al47

733

818

934

3

Vol

ume

Left

00

170

Vol

ume

Rig

ht0

990

0

cSH

1700

1700

561

1700

Vol

ume

to C

apac

ity0.

280.

200.

030.

20

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.7

0.0

Con

trol

Del

ay (

s)0.

00.

01.

40.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.5

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.2

Inte

rsec

tion

Cap

acity

Util

izat

ion

28.4

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 72: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)17

7061

656

1737

8

Fut

ure

Vol

ume

(vph

)17

7061

656

1737

8

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.89

10.

987

Flt

Pro

tect

ed0.

990

0.99

8

Sat

d. F

low

(pr

ot)

1492

034

490

035

29

Flt

Per

mitt

ed0.

990

0.99

8

Sat

d. F

low

(pe

rm)

1492

034

490

035

29

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

670

670

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%6%

2%4%

0%1%

Adj

. Flo

w (

vph)

1874

648

5918

398

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)92

070

70

041

6

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.9

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1770

616

5617

378

Fut

ure

Vol

ume

(Veh

/h)

1770

616

5617

378

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)18

7464

859

1839

8

Ped

estr

ians

670

Lane

Wid

th (

m)

3.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e51

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.86

0.86

0.86

vC, c

onfli

ctin

g vo

lum

e15

8210

2413

77

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

4469

111

04

tC, s

ingl

e (s

)6.

87.

04.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

42.

2

p0 q

ueue

free

%69

5493

cM c

apac

ity (

veh/

h)57

159

270

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al92

432

275

151

265

Vol

ume

Left

180

018

0

Vol

ume

Rig

ht74

059

00

cSH

118

1700

1700

270

1700

Vol

ume

to C

apac

ity0.

780.

250.

160.

070.

16

Que

ue L

engt

h 95

th (

m)

34.0

0.0

0.0

1.6

0.0

Con

trol

Del

ay (

s)10

0.6

0.0

0.0

3.5

0.0

Lane

LO

SF

A

App

roac

h D

elay

(s)

100.

60.

01.

3

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

8.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.9

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 73: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)16

859

9859

733

914

7

Fut

ure

Vol

ume

(vph

)16

859

9859

733

914

7

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

750.

960.

83

Frt

0.96

50.

955

Flt

Pro

tect

ed0.

964

0.99

3

Sat

d. F

low

(pr

ot)

1503

00

3495

2792

0

Flt

Per

mitt

ed0.

964

0.78

8

Sat

d. F

low

(pe

rm)

1230

00

2666

2792

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

1815

5

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)65

.276

.122

.2

Tra

vel T

ime

(s)

4.9

5.7

1.7

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Adj

. Flo

w (

vph)

177

6210

362

835

715

5

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)23

90

073

151

20

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

65.0

65.0

65.0

Tot

al S

plit

(%)

27.8

%72

.2%

72.2

%72

.2%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

v/c

Rat

io0.

690.

420.

27

Con

trol

Del

ay41

.28.

24.

8

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

41.2

8.2

4.8

LOS

DA

A

App

roac

h D

elay

41.2

8.2

4.8

App

roac

h LO

SD

AA

Que

ue L

engt

h 50

th (

m)

35.3

28.0

11.3

Que

ue L

engt

h 95

th (

m)

#65.

038

.417

.6

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

348

1747

1883

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

690.

420.

27

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.69

Inte

rsec

tion

Sig

nal D

elay

: 12.

4In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

66.0

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 74: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)23

973

151

2

v/c

Rat

io0.

690.

420.

27

Con

trol

Del

ay41

.28.

24.

8

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

41.2

8.2

4.8

Que

ue L

engt

h 50

th (

m)

35.3

28.0

11.3

Que

ue L

engt

h 95

th (

m)

#65.

038

.417

.6

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

348

1747

1883

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

690.

420.

27

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)16

859

9859

733

914

7

Fut

ure

Vol

ume

(vph

)16

859

9859

733

914

7

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.92

1.00

0.83

Flp

b, p

ed/b

ikes

1.00

0.96

1.00

Frt

0.96

1.00

0.95

Flt

Pro

tect

ed0.

960.

991.

00

Sat

d. F

low

(pr

ot)

1504

3359

2790

Flt

Per

mitt

ed0.

960.

791.

00

Sat

d. F

low

(pe

rm)

1504

2667

2790

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

177

6210

362

835

715

5

RT

OR

Red

uctio

n (v

ph)

140

00

530

Lane

Gro

up F

low

(vp

h)22

50

073

145

90

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.059

.059

.0

Effe

ctiv

e G

reen

, g (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)33

417

4818

29

v/s

Rat

io P

rot

c0.1

50.

16

v/s

Rat

io P

erm

c0.2

7

v/c

Rat

io0.

670.

420.

25

Uni

form

Del

ay, d

132

.07.

46.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

10.4

0.7

0.3

Del

ay (

s)42

.48.

16.

7

Leve

l of S

ervi

ceD

AA

App

roac

h D

elay

(s)

42.4

8.1

6.7

App

roac

h LO

SD

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay13

.2H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.48

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

66.0

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 75: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

989

053

539

00

Fut

ure

Vol

ume

(vph

)13

989

053

539

00

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

1.00

Ped

Bik

e F

acto

r

Frt

0.94

7

Flt

Pro

tect

ed0.

970

Sat

d. F

low

(pr

ot)

1607

00

3500

3535

0

Flt

Per

mitt

ed0.

970

Sat

d. F

low

(pe

rm)

1607

00

3500

3535

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)64

.710

3.3

15.7

Tra

vel T

ime

(s)

4.9

7.7

1.2

Con

fl. P

eds.

(#/

hr)

384

466

466

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

1%2%

2%2%

1%2%

Adj

. Flo

w (

vph)

146

940

563

411

0

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)24

00

056

341

10

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.8

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

139

890

535

390

0

Fut

ure

Vol

ume

(Veh

/h)

139

890

535

390

0

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)14

694

056

341

10

Ped

estr

ians

466

438

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e35

03

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.85

vC, c

onfli

ctin

g vo

lum

e11

9667

687

7

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol89

067

687

7

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%4

6310

0

cM c

apac

ity (

veh/

h)15

225

549

5

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al24

028

228

220

620

6

Vol

ume

Left

146

00

00

Vol

ume

Rig

ht94

00

00

cSH

181

1700

1700

1700

1700

Vol

ume

to C

apac

ity1.

330.

170.

170.

120.

12

Que

ue L

engt

h 95

th (

m)

105.

70.

00.

00.

00.

0

Con

trol

Del

ay (

s)23

1.1

0.0

0.0

0.0

0.0

Lane

LO

SF

App

roac

h D

elay

(s)

231.

10.

00.

0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

45.7

Inte

rsec

tion

Cap

acity

Util

izat

ion

34.8

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 76: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5679

430

660

876

150

4552

00

Fut

ure

Vol

ume

(vph

)47

5679

430

660

876

150

4552

00

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

770.

710.

910.

99

Frt

0.93

50.

918

0.97

8

Flt

Pro

tect

ed0.

987

0.98

10.

996

Sat

d. F

low

(pr

ot)

026

860

013

720

031

590

034

910

Flt

Per

mitt

ed0.

859

0.80

50.

798

Sat

d. F

low

(pe

rm)

021

900

098

90

031

590

027

740

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

3637

1

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

160.

710

2.4

95.5

Tra

vel T

ime

(s)

14.3

12.1

7.7

7.2

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Adj

. Flo

w (

vph)

4959

8345

069

092

215

847

547

0

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

191

00

114

00

1080

00

594

0

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

62.0

62.0

62.0

Tot

al S

plit

(%)

29.5

%29

.5%

29.5

%29

.5%

70.5

%70

.5%

70.5

%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

v/c

Rat

io0.

360.

450.

540.

34

Con

trol

Del

ay25

.426

.610

.18.

0

Que

ue D

elay

0.0

0.0

2.2

0.7

Tot

al D

elay

25.4

26.6

12.2

8.7

LOS

CC

BA

App

roac

h D

elay

25.4

26.6

12.2

8.7

App

roac

h LO

SC

CB

A

Que

ue L

engt

h 50

th (

m)

11.5

11.0

47.4

21.8

Que

ue L

engt

h 95

th (

m)

21.0

26.8

62.4

30.5

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

525

253

2010

1765

Sta

rvat

ion

Cap

Red

uctn

00

751

782

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

360.

450.

860.

60

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

8

Act

uate

d C

ycle

Len

gth:

88

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.54

Inte

rsec

tion

Sig

nal D

elay

: 13.

3In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.6

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

8: B

ay S

t & C

umbe

rland

St

Page 77: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re B

ackgro

und P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)19

111

410

8059

4

v/c

Rat

io0.

360.

450.

540.

34

Con

trol

Del

ay25

.426

.610

.18.

0

Que

ue D

elay

0.0

0.0

2.2

0.7

Tot

al D

elay

25.4

26.6

12.2

8.7

Que

ue L

engt

h 50

th (

m)

11.5

11.0

47.4

21.8

Que

ue L

engt

h 95

th (

m)

21.0

26.8

62.4

30.5

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

525

253

2010

1765

Sta

rvat

ion

Cap

Red

uctn

00

751

782

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

360.

450.

860.

60

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5679

430

660

876

150

4552

00

Fut

ure

Vol

ume

(vph

)47

5679

430

660

876

150

4552

00

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.82

0.81

0.91

1.00

Flp

b, p

ed/b

ikes

0.94

0.88

1.00

0.99

Frt

0.93

0.92

0.98

1.00

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

2517

1205

3159

3463

Flt

Per

mitt

ed0.

860.

811.

000.

80

Sat

d. F

low

(pe

rm)

2189

990

3159

2775

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

4959

8345

069

092

215

847

547

0

RT

OR

Red

uctio

n (v

ph)

028

00

290

00

00

00

Lane

Gro

up F

low

(vp

h)0

163

00

850

010

800

059

40

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Act

uate

d G

reen

, G (

s)20

.020

.056

.056

.0

Effe

ctiv

e G

reen

, g (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)49

722

520

1017

65

v/s

Rat

io P

rot

c0.3

4

v/s

Rat

io P

erm

0.07

c0.0

90.

21

v/c

Rat

io0.

330.

380.

540.

34

Uni

form

Del

ay, d

128

.428

.88.

87.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.8

4.8

1.0

0.5

Del

ay (

s)30

.233

.69.

97.

9

Leve

l of S

ervi

ceC

CA

A

App

roac

h D

elay

(s)

30.2

33.6

9.9

7.9

App

roac

h LO

SC

CA

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay12

.6H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.50

Act

uate

d C

ycle

Len

gth

(s)

88.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.6

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 78: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

1842

00

1842

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

1842

00

1842

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

1.7

65.2

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

265

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 79: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re B

ackgro

und P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

018

4218

420

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

018

4218

420

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

0.7

64.7

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re B

ackgro

und P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

1

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 80: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

634

20

719

80

243

41

593

21

Fut

ure

Vol

ume

(vph

)0

634

20

719

80

243

41

593

21

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r1.

000.

990.

990.

99

Frt

0.99

80.

998

0.99

5

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

033

920

034

100

032

430

033

870

Flt

Per

mitt

ed0.

955

Sat

d. F

low

(pe

rm)

033

920

034

100

032

430

032

330

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

11

4

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Adj

. Flo

w (

vph)

070

42

079

99

027

04

165

923

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

706

00

808

00

274

00

683

0

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Max

Max

Max

Max

Max

Max

Act

Effc

t Gre

en (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

v/c

Rat

io0.

710.

810.

310.

78

Con

trol

Del

ay35

.239

.329

.039

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

35.2

39.3

29.0

39.3

LOS

DD

CD

App

roac

h D

elay

35.2

39.3

29.0

39.3

App

roac

h LO

SD

DC

D

Que

ue L

engt

h 50

th (

m)

61.3

72.8

21.2

61.2

Que

ue L

engt

h 95

th (

m)

81.5

95.3

32.1

81.7

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)3.

03.

0

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Max

Max

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 81: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

995

879

878

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

710.

810.

310.

78

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.81

Inte

rsec

tion

Sig

nal D

elay

: 37.

0In

ters

ectio

n LO

S: D

Inte

rsec

tion

Cap

acity

Util

izat

ion

46.6

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 82: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)70

680

827

468

3

v/c

Rat

io0.

710.

810.

310.

78

Con

trol

Del

ay35

.239

.329

.039

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

35.2

39.3

29.0

39.3

Que

ue L

engt

h 50

th (

m)

61.3

72.8

21.2

61.2

Que

ue L

engt

h 95

th (

m)

81.5

95.3

32.1

81.7

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

989

995

879

878

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

710.

810.

310.

78

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

634

20

719

80

243

41

593

21

Fut

ure

Vol

ume

(vph

)0

634

20

719

80

243

41

593

21

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

1.00

0.99

0.99

0.99

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3390

3411

3242

3385

Flt

Per

mitt

ed1.

001.

001.

000.

95

Sat

d. F

low

(pe

rm)

3390

3411

3242

3232

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

070

42

079

99

027

04

165

923

RT

OR

Red

uctio

n (v

ph)

00

00

10

01

00

30

Lane

Gro

up F

low

(vp

h)0

706

00

807

00

273

00

680

0

Con

fl. P

eds.

(#/

hr)

715

563

563

715

275

542

542

275

Hea

vy V

ehic

les

(%)

7%5%

50%

3%4%

0%15

%9%

25%

0%3%

25%

Tur

n T

ype

NA

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)27

.027

.025

.025

.0

Effe

ctiv

e G

reen

, g (

s)28

.028

.026

.026

.0

Act

uate

d g/

C R

atio

0.29

0.29

0.27

0.27

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)98

899

487

887

5

v/s

Rat

io P

rot

0.21

c0.2

40.

08

v/s

Rat

io P

erm

c0.2

1

v/c

Rat

io0.

710.

810.

310.

78

Uni

form

Del

ay, d

130

.431

.627

.932

.3

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

4.4

7.2

0.9

6.7

Del

ay (

s)34

.838

.828

.839

.1

Leve

l of S

ervi

ceC

DC

D

App

roac

h D

elay

(s)

34.8

38.8

28.8

39.1

App

roac

h LO

SC

DC

D

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay36

.6H

CM

200

0 Le

vel o

f Ser

vice

D

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.52

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

46.6

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 83: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)70

532

106

102

515

8157

426

854

521

58

Fut

ure

Vol

ume

(vph

)70

532

106

102

515

8157

426

854

521

58

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

870.

950.

910.

960.

891.

000.

900.

97

Frt

0.97

50.

980

0.99

70.

985

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1574

3189

016

3632

330

1465

3326

016

3632

510

Flt

Per

mitt

ed0.

400

0.21

30.

343

0.44

7

Sat

d. F

low

(pe

rm)

578

3189

033

532

330

468

3326

069

332

510

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

3229

214

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Adj

. Flo

w (

vph)

7859

111

811

357

290

6347

39

6057

964

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)78

709

011

366

20

6348

20

6064

30

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

38

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.06.

023

.022

.022

.023

.023

.0

Min

imum

Spl

it (s

)30

.030

.010

.030

.029

.029

.030

.030

.0

Tot

al S

plit

(s)

39.0

39.0

13.0

52.0

33.0

33.0

33.0

33.0

Tot

al S

plit

(%)

45.9

%45

.9%

15.3

%61

.2%

38.8

%38

.8%

38.8

%38

.8%

Yel

low

Tim

e (s

)3.

03.

03.

04.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

01.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lead

/Lag

Lag

Lag

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)26

.926

.939

.136

.135

.935

.935

.935

.9

Act

uate

d g/

C R

atio

0.32

0.32

0.46

0.42

0.42

0.42

0.42

0.42

v/c

Rat

io0.

430.

690.

410.

480.

320.

340.

200.

47

Con

trol

Del

ay30

.027

.615

.817

.226

.219

.121

.620

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

30.0

27.6

15.8

17.2

26.2

19.1

21.6

20.7

LOS

CC

BB

CB

CC

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

27.9

17.0

20.0

20.8

App

roac

h LO

SC

BB

C

Que

ue L

engt

h 50

th (

m)

10.1

51.0

9.8

36.0

6.9

28.1

6.2

39.1

Que

ue L

engt

h 95

th (

m)

21.0

61.7

15.5

41.9

20.2

45.6

17.2

61.8

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

224

1257

291

1725

197

1407

293

1382

Sta

rvat

ion

Cap

Red

uctn

00

00

00

029

4

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

350.

560.

390.

380.

320.

340.

200.

59

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.69

Inte

rsec

tion

Sig

nal D

elay

: 21.

6In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.5

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 84: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)78

709

113

662

6348

260

643

v/c

Rat

io0.

430.

690.

410.

480.

320.

340.

200.

47

Con

trol

Del

ay30

.027

.615

.817

.226

.219

.121

.620

.3

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

Tot

al D

elay

30.0

27.6

15.8

17.2

26.2

19.1

21.6

20.7

Que

ue L

engt

h 50

th (

m)

10.1

51.0

9.8

36.0

6.9

28.1

6.2

39.1

Que

ue L

engt

h 95

th (

m)

21.0

61.7

15.5

41.9

20.2

45.6

17.2

61.8

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

224

1257

291

1725

197

1407

293

1382

Sta

rvat

ion

Cap

Red

uctn

00

00

00

029

4

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

350.

560.

390.

380.

320.

340.

200.

59

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)70

532

106

102

515

8157

426

854

521

58

Fut

ure

Vol

ume

(vph

)70

532

106

102

515

8157

426

854

521

58

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.96

1.00

1.00

1.00

0.97

Flp

b, p

ed/b

ikes

0.87

1.00

0.99

1.00

0.88

1.00

0.90

1.00

Frt

1.00

0.98

1.00

0.98

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1373

3189

1613

3232

1288

3326

1467

3251

Flt

Per

mitt

ed0.

401.

000.

211.

000.

341.

000.

451.

00

Sat

d. F

low

(pe

rm)

578

3189

362

3232

465

3326

690

3251

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

7859

111

811

357

290

6347

39

6057

964

RT

OR

Red

uctio

n (v

ph)

022

00

160

01

00

80

Lane

Gro

up F

low

(vp

h)78

687

011

364

60

6348

10

6063

50

Con

fl. P

eds.

(#/

hr)

286

295

295

286

428

191

191

428

Hea

vy V

ehic

les

(%)

7%4%

1%3%

3%6%

15%

6%37

%3%

4%9%

Tur

n T

ype

Per

mN

Apm

+pt

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

38

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)26

.926

.936

.936

.935

.135

.135

.135

.1

Effe

ctiv

e G

reen

, g (

s)26

.926

.936

.936

.935

.135

.135

.135

.1

Act

uate

d g/

C R

atio

0.32

0.32

0.43

0.43

0.41

0.41

0.41

0.41

Cle

aran

ce T

ime

(s)

6.0

6.0

4.0

7.0

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)18

210

0926

014

0319

213

7328

413

42

v/s

Rat

io P

rot

c0.2

20.

04c0

.20

0.14

c0.2

0

v/s

Rat

io P

erm

0.13

0.15

0.14

0.09

v/c

Rat

io0.

430.

680.

430.

460.

330.

350.

210.

47

Uni

form

Del

ay, d

123

.025

.315

.917

.016

.917

.116

.018

.2

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.6

1.9

1.2

0.2

4.5

0.7

1.7

1.2

Del

ay (

s)24

.627

.217

.017

.221

.517

.817

.719

.4

Leve

l of S

ervi

ceC

CB

BC

BB

B

App

roac

h D

elay

(s)

27.0

17.2

18.2

19.3

App

roac

h LO

SC

BB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay20

.7H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.56

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.5

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 85: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

3416

108

9252

4835

711

976

524

93

Fut

ure

Vol

ume

(vph

)13

3416

108

9252

4835

711

976

524

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

930.

890.

940.

94

Frt

0.96

50.

972

0.96

60.

980

Flt

Pro

tect

ed0.

990

0.97

90.

995

0.99

5

Sat

d. F

low

(pr

ot)

015

530

015

900

030

620

031

980

Flt

Per

mitt

ed0.

918

0.82

90.

825

0.81

4

Sat

d. F

low

(pe

rm)

014

090

012

450

025

150

025

930

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

1816

7634

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

152.

895

.511

5.7

Tra

vel T

ime

(s)

15.0

11.5

7.2

8.7

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Adj

. Flo

w (

vph)

1438

1812

010

258

5339

713

284

582

103

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

700

028

00

058

20

076

90

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

31.0

31.0

31.0

31.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

36.5

%36

.5%

36.5

%36

.5%

63.5

%63

.5%

63.5

%63

.5%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)25

.425

.449

.649

.6

Act

uate

d g/

C R

atio

0.30

0.30

0.58

0.58

v/c

Rat

io0.

160.

730.

390.

50

Con

trol

Del

ay18

.338

.19.

111

.4

Que

ue D

elay

0.0

0.0

0.6

0.0

Tot

al D

elay

18.3

38.1

9.7

11.4

LOS

BD

AB

App

roac

h D

elay

18.3

38.1

9.7

11.4

App

roac

h LO

SB

DA

B

Que

ue L

engt

h 50

th (

m)

6.2

38.6

20.5

33.4

Que

ue L

engt

h 95

th (

m)

15.5

#72.

531

.748

.5

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

443

391

1499

1527

Sta

rvat

ion

Cap

Red

uctn

00

525

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

160.

720.

600.

50

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.73

Inte

rsec

tion

Sig

nal D

elay

: 15.

5In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

71.5

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 86: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)70

280

582

769

v/c

Rat

io0.

160.

730.

390.

50

Con

trol

Del

ay18

.338

.19.

111

.4

Que

ue D

elay

0.0

0.0

0.6

0.0

Tot

al D

elay

18.3

38.1

9.7

11.4

Que

ue L

engt

h 50

th (

m)

6.2

38.6

20.5

33.4

Que

ue L

engt

h 95

th (

m)

15.5

#72.

531

.748

.5

Inte

rnal

Lin

k D

ist (

m)

176.

312

8.8

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

443

391

1499

1527

Sta

rvat

ion

Cap

Red

uctn

00

525

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

160.

720.

600.

50

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

3416

108

9252

4835

711

976

524

93

Fut

ure

Vol

ume

(vph

)13

3416

108

9252

4835

711

976

524

93

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.95

0.96

0.95

0.95

Flp

b, p

ed/b

ikes

0.98

0.92

0.99

0.99

Frt

0.97

0.97

0.97

0.98

Flt

Pro

tect

ed0.

990.

981.

000.

99

Sat

d. F

low

(pr

ot)

1521

1470

3034

3168

Flt

Per

mitt

ed0.

920.

830.

830.

81

Sat

d. F

low

(pe

rm)

1409

1245

2515

2593

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

1438

1812

010

258

5339

713

284

582

103

RT

OR

Red

uctio

n (v

ph)

013

00

110

032

00

140

Lane

Gro

up F

low

(vp

h)0

570

026

90

055

00

075

50

Con

fl. P

eds.

(#/

hr)

182

182

182

182

144

7676

144

Hea

vy V

ehic

les

(%)

0%3%

31%

14%

2%5%

10%

8%2%

0%4%

3%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)24

.424

.448

.648

.6

Effe

ctiv

e G

reen

, g (

s)25

.425

.449

.649

.6

Act

uate

d g/

C R

atio

0.30

0.30

0.58

0.58

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)42

137

214

6715

13

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.04

c0.2

20.

22c0

.29

v/c

Rat

io0.

140.

720.

380.

50

Uni

form

Del

ay, d

121

.826

.69.

410

.4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.1

6.8

0.7

1.2

Del

ay (

s)21

.933

.410

.211

.6

Leve

l of S

ervi

ceC

CB

B

App

roac

h D

elay

(s)

21.9

33.4

10.2

11.6

App

roac

h LO

SC

CB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay15

.1H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.57

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

71.5

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 87: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

026

936

769

8

Fut

ure

Vol

ume

(vph

)0

026

936

769

8

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

2

Flt

Pro

tect

ed0.

999

Sat

d. F

low

(pr

ot)

00

3358

00

3463

Flt

Per

mitt

ed0.

999

Sat

d. F

low

(pe

rm)

00

3358

00

3463

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

712

712

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

5%0%

0%3%

Adj

. Flo

w (

vph)

00

299

408

776

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

033

90

078

4

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.5

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

269

367

698

Fut

ure

Vol

ume

(Veh

/h)

00

269

367

698

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

029

940

877

6

Ped

estr

ians

712

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.97

0.97

0.97

vC, c

onfli

ctin

g vo

lum

e14

3588

210

51

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

9382

599

9

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

099

cM c

apac

ity (

veh/

h)12

830

768

3

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al19

914

026

751

7

Vol

ume

Left

00

80

Vol

ume

Rig

ht0

400

0

cSH

1700

1700

683

1700

Vol

ume

to C

apac

ity0.

120.

080.

010.

30

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.3

0.0

Con

trol

Del

ay (

s)0.

00.

00.

40.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.2

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

27.5

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 88: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

3125

863

4450

5

Fut

ure

Vol

ume

(vph

)13

3125

863

4450

5

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.90

40.

971

Flt

Pro

tect

ed0.

986

0.99

6

Sat

d. F

low

(pr

ot)

1550

032

040

035

23

Flt

Per

mitt

ed0.

986

0.99

6

Sat

d. F

low

(pe

rm)

1550

032

040

035

23

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

805

805

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

2%2%

7%13

%0%

1%

Adj

. Flo

w (

vph)

1434

287

7049

561

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)48

035

70

061

0

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.9

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1331

258

6344

505

Fut

ure

Vol

ume

(Veh

/h)

1331

258

6344

505

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)14

3428

770

4956

1

Ped

estr

ians

805

Lane

Wid

th (

m)

3.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e61

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.94

vC, c

onfli

ctin

g vo

lum

e15

0698

411

62

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol14

0298

411

62

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%63

6579

cM c

apac

ity (

veh/

h)38

9723

7

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al48

191

166

236

374

Vol

ume

Left

140

049

0

Vol

ume

Rig

ht34

070

00

cSH

6717

0017

0023

717

00

Vol

ume

to C

apac

ity0.

720.

110.

100.

210.

22

Que

ue L

engt

h 95

th (

m)

24.6

0.0

0.0

5.7

0.0

Con

trol

Del

ay (

s)14

2.9

0.0

0.0

9.4

0.0

Lane

LO

SF

A

App

roac

h D

elay

(s)

142.

90.

03.

6

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

8.9

Inte

rsec

tion

Cap

acity

Util

izat

ion

41.9

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 89: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)75

4651

220

516

181

Fut

ure

Vol

ume

(vph

)75

4651

220

516

181

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

790.

970.

87

Frt

0.94

90.

961

Flt

Pro

tect

ed0.

970

0.99

1

Sat

d. F

low

(pr

ot)

1443

00

3327

2901

0

Flt

Per

mitt

ed0.

970

0.74

9

Sat

d. F

low

(pe

rm)

1248

00

2445

2901

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

3411

3

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)74

.176

.122

.2

Tra

vel T

ime

(s)

5.6

5.7

1.7

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Adj

. Flo

w (

vph)

8351

5724

457

320

1

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)13

40

030

177

40

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

60.0

60.0

60.0

Tot

al S

plit

(%)

29.4

%70

.6%

70.6

%70

.6%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

v/c

Rat

io0.

370.

190.

41

Con

trol

Del

ay23

.56.

87.

1

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

23.5

6.8

7.1

LOS

CA

A

App

roac

h D

elay

23.5

6.8

7.1

App

roac

h LO

SC

AA

Que

ue L

engt

h 50

th (

m)

13.4

9.5

24.1

Que

ue L

engt

h 95

th (

m)

28.9

14.8

34.3

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

365

1553

1884

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

370.

190.

41

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

5

Act

uate

d C

ycle

Len

gth:

85

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.41

Inte

rsec

tion

Sig

nal D

elay

: 8.9

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

65.3

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 90: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)13

430

177

4

v/c

Rat

io0.

370.

190.

41

Con

trol

Del

ay23

.56.

87.

1

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

23.5

6.8

7.1

Que

ue L

engt

h 50

th (

m)

13.4

9.5

24.1

Que

ue L

engt

h 95

th (

m)

28.9

14.8

34.3

Inte

rnal

Lin

k D

ist (

m)

50.1

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

365

1553

1884

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

370.

190.

41

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)75

4651

220

516

181

Fut

ure

Vol

ume

(vph

)75

4651

220

516

181

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.91

1.00

0.87

Flp

b, p

ed/b

ikes

1.00

0.97

1.00

Frt

0.95

1.00

0.96

Flt

Pro

tect

ed0.

970.

991.

00

Sat

d. F

low

(pr

ot)

1442

3233

2901

Flt

Per

mitt

ed0.

970.

751.

00

Sat

d. F

low

(pe

rm)

1442

2445

2901

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

8351

5724

457

320

1

RT

OR

Red

uctio

n (v

ph)

260

00

410

Lane

Gro

up F

low

(vp

h)10

80

030

173

30

Con

fl. P

eds.

(#/

hr)

162

170

180

180

Hea

vy V

ehic

les

(%)

3%3%

12%

5%3%

4%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.054

.054

.0

Effe

ctiv

e G

reen

, g (

s)20

.054

.054

.0

Act

uate

d g/

C R

atio

0.24

0.64

0.64

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)33

915

5318

42

v/s

Rat

io P

rot

c0.0

7c0

.25

v/s

Rat

io P

erm

0.12

v/c

Rat

io0.

320.

190.

40

Uni

form

Del

ay, d

126

.96.

47.

6

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

2.5

0.3

0.6

Del

ay (

s)29

.36.

78.

2

Leve

l of S

ervi

ceC

AA

App

roac

h D

elay

(s)

29.3

6.7

8.2

App

roac

h LO

SC

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay10

.2H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.38

Act

uate

d C

ycle

Len

gth

(s)

85.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

65.3

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 91: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)67

084

00

00

256

00

517

0

Fut

ure

Vol

ume

(vph

)67

084

00

00

256

00

517

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

98

Frt

0.91

6

Flt

Pro

tect

ed0.

978

Sat

d. F

low

(pr

ot)

028

520

018

420

033

360

035

000

Flt

Per

mitt

ed0.

828

Sat

d. F

low

(pe

rm)

023

900

018

420

033

360

035

000

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

93

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

155.

610

2.4

95.5

Tra

vel T

ime

(s)

14.3

11.7

7.7

7.2

Con

fl. P

eds.

(#/

hr)

201

136

136

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Adj

. Flo

w (

vph)

740

930

00

028

40

057

40

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

167

00

00

028

40

057

40

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

46.0

46.0

Tot

al S

plit

(%)

36.1

%36

.1%

36.1

%36

.1%

63.9

%63

.9%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

v/c

Rat

io0.

230.

150.

30

Con

trol

Del

ay10

.68.

09.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

10.6

8.0

9.0

LOS

BA

A

App

roac

h D

elay

10.6

8.0

9.0

App

roac

h LO

SB

AA

Que

ue L

engt

h 50

th (

m)

3.8

9.0

19.8

Que

ue L

engt

h 95

th (

m)

10.6

14.3

28.4

Inte

rnal

Lin

k D

ist (

m)

166.

213

1.6

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

731

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

230.

150.

30

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 7

2

Act

uate

d C

ycle

Len

gth:

72

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

T, S

tart

of G

reen

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.30

Inte

rsec

tion

Sig

nal D

elay

: 9.0

Inte

rsec

tion

LOS

: A

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

7: B

ay S

t & C

umbe

rland

St

Page 92: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BT

NB

TS

BT

Lane

Gro

up F

low

(vp

h)16

728

457

4

v/c

Rat

io0.

230.

150.

30

Con

trol

Del

ay10

.68.

09.

0

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

10.6

8.0

9.0

Que

ue L

engt

h 50

th (

m)

3.8

9.0

19.8

Que

ue L

engt

h 95

th (

m)

10.6

14.3

28.4

Inte

rnal

Lin

k D

ist (

m)

166.

278

.471

.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

731

1853

1944

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

230.

150.

30

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

7: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)67

084

00

00

256

00

517

0

Fut

ure

Vol

ume

(vph

)67

084

00

00

256

00

517

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

1.00

Flp

b, p

ed/b

ikes

0.99

1.00

1.00

Frt

0.92

1.00

1.00

Flt

Pro

tect

ed0.

981.

001.

00

Sat

d. F

low

(pr

ot)

2825

3336

3500

Flt

Per

mitt

ed0.

831.

001.

00

Sat

d. F

low

(pe

rm)

2392

3336

3500

Pea

k-ho

ur fa

ctor

, PH

F0.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

900.

90

Adj

. Flo

w (

vph)

740

930

00

028

40

057

40

RT

OR

Red

uctio

n (v

ph)

067

00

00

00

00

00

Lane

Gro

up F

low

(vp

h)0

100

00

00

028

40

057

40

Con

fl. P

eds.

(#/

hr)

201

136

136

Hea

vy V

ehic

les

(%)

13%

2%10

%2%

2%2%

2%7%

2%2%

2%2%

Tur

n T

ype

Per

mN

AN

AN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

8

Act

uate

d G

reen

, G (

s)20

.040

.040

.0

Effe

ctiv

e G

reen

, g (

s)20

.040

.040

.0

Act

uate

d g/

C R

atio

0.28

0.56

0.56

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)66

418

5319

44

v/s

Rat

io P

rot

0.09

c0.1

6

v/s

Rat

io P

erm

c0.0

4

v/c

Rat

io0.

150.

150.

30

Uni

form

Del

ay, d

119

.67.

88.

5

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.5

0.2

0.4

Del

ay (

s)20

.17.

98.

9

Leve

l of S

ervi

ceC

AA

App

roac

h D

elay

(s)

20.1

0.0

7.9

8.9

App

roac

h LO

SC

AA

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay10

.5H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.25

Act

uate

d C

ycle

Len

gth

(s)

72.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

45.0

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 93: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)27

670

483

594

2

Fut

ure

Vol

ume

(vph

)27

670

483

594

2

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.90

4

Flt

Pro

tect

ed0.

986

Sat

d. F

low

(pr

ot)

1556

00

3305

3400

0

Flt

Per

mitt

ed0.

986

Sat

d. F

low

(pe

rm)

1556

00

3305

3400

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)69

.810

3.3

15.7

Tra

vel T

ime

(s)

5.2

7.7

1.2

Con

fl. P

eds.

(#/

hr)

148

341

313

313

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hea

vy V

ehic

les

(%)

3%1%

2%8%

5%0%

Adj

. Flo

w (

vph)

3074

053

766

02

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)10

40

053

766

20

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.5

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

8: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

2767

048

359

42

Fut

ure

Vol

ume

(Veh

/h)

2767

048

359

42

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)30

740

537

660

2

Ped

estr

ians

313

341

148

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e24

3013

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.95

vC, c

onfli

ctin

g vo

lum

e13

9098

597

5

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

0098

597

5

tC, s

ingl

e (s

)6.

96.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%68

4410

0

cM c

apac

ity (

veh/

h)95

133

536

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al10

426

826

844

022

2

Vol

ume

Left

300

00

0

Vol

ume

Rig

ht74

00

02

cSH

119

1700

1700

1700

1700

Vol

ume

to C

apac

ity0.

870.

160.

160.

260.

13

Que

ue L

engt

h 95

th (

m)

40.8

0.0

0.0

0.0

0.0

Con

trol

Del

ay (

s)11

9.3

0.0

0.0

0.0

0.0

Lane

LO

SF

App

roac

h D

elay

(s)

119.

30.

00.

0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

9.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.5

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 94: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

1217

026

20

Fut

ure

Vol

ume

(vph

)0

1217

026

20

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

0.86

50.

942

Flt

Pro

tect

ed0.

950

0.97

2

Sat

d. F

low

(pr

ot)

1593

00

1750

1592

0

Flt

Per

mitt

ed0.

950

0.97

2

Sat

d. F

low

(pe

rm)

1593

00

1750

1592

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

2.8

74.1

91.9

Tra

vel T

ime

(s)

11.5

5.6

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

013

190

2922

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)13

00

1951

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

17.6

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

012

170

2620

Fut

ure

Vol

ume

(Veh

/h)

012

170

2620

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

1319

029

22

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

374

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e13

446

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

446

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%99

9798

cM c

apac

ity (

veh/

h)16

0695

510

76

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al13

1951

Vol

ume

Left

019

29

Vol

ume

Rig

ht13

022

cSH

1700

1606

1003

Vol

ume

to C

apac

ity0.

010.

010.

05

Que

ue L

engt

h 95

th (

m)

0.0

0.3

1.2

Con

trol

Del

ay (

s)0.

07.

38.

8

Lane

LO

SA

A

App

roac

h D

elay

(s)

0.0

7.3

8.8

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

7.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

17.6

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 95: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

00

019

0

Fut

ure

Vol

ume

(vph

)1

00

019

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed0.

950

0.95

0

Sat

d. F

low

(pr

ot)

017

5018

420

1652

0

Flt

Per

mitt

ed0.

950

0.95

0

Sat

d. F

low

(pe

rm)

017

5018

420

1652

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

5.6

69.8

91.9

Tra

vel T

ime

(s)

11.7

5.2

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

10

00

210

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

10

021

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

13.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

10

00

190

Fut

ure

Vol

ume

(Veh

/h)

10

00

190

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)1

00

021

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

5

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

20

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

20

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

098

100

cM c

apac

ity (

veh/

h)16

2310

2010

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al1

021

Vol

ume

Left

10

21

Vol

ume

Rig

ht0

00

cSH

1623

1700

1020

Vol

ume

to C

apac

ity0.

000.

000.

02

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.5

Con

trol

Del

ay (

s)7.

20.

08.

6

Lane

LO

SA

A

App

roac

h D

elay

(s)

7.2

0.0

8.6

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

8.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

13.3

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 96: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 1

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

701

90

649

60

546

104

461

44

Fut

ure

Vol

ume

(vph

)1

701

90

649

60

546

104

461

44

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

991.

000.

990.

95

Frt

0.99

80.

999

0.99

70.

987

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

035

050

035

090

034

550

033

150

Flt

Per

mitt

ed0.

955

0.95

0

Sat

d. F

low

(pe

rm)

033

470

035

090

034

550

031

450

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

11

210

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)23

2.1

233.

518

9.9

103.

3

Tra

vel T

ime

(s)

17.4

17.5

14.2

7.7

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Adj

. Flo

w (

vph)

173

89

068

36

057

511

448

546

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

748

00

689

00

586

00

535

0

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Det

ecto

r P

hase

22

66

44

88

Sw

itch

Pha

se

Min

imum

Initi

al (

s)20

.020

.020

.020

.020

.020

.020

.020

.0

Min

imum

Spl

it (s

)26

.026

.026

.026

.026

.026

.026

.026

.0

Tot

al S

plit

(s)

33.0

33.0

33.0

33.0

31.0

31.0

31.0

31.0

Tot

al S

plit

(%)

34.4

%34

.4%

34.4

%34

.4%

32.3

%32

.3%

32.3

%32

.3%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lag

Lag

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

esY

es

Rec

all M

ode

C-M

axC

-Max

Non

eN

one

Non

eN

one

Non

eN

one

Act

Effc

t Gre

en (

s)61

.961

.924

.124

.1

Act

uate

d g/

C R

atio

0.64

0.64

0.25

0.25

v/c

Rat

io0.

350.

300.

680.

67

Con

trol

Del

ay8.

78.

436

.236

.0

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.7

8.4

36.2

36.0

LOS

AA

DD

App

roac

h D

elay

8.7

8.4

36.2

36.0

App

roac

h LO

SA

AD

D

Que

ue L

engt

h 50

th (

m)

29.0

25.7

52.3

46.9

Que

ue L

engt

h 95

th (

m)

47.0

42.0

64.1

58.7

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 2

Lane

Gro

upØ

7

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)

Fut

ure

Vol

ume

(vph

)

Idea

l Flo

w (

vphp

l)

Lane

Util

. Fac

tor

Ped

Bik

e F

acto

r

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

Rig

ht T

urn

on R

ed

Sat

d. F

low

(R

TO

R)

Link

Spe

ed (

k/h)

Link

Dis

tanc

e (m

)

Tra

vel T

ime

(s)

Con

fl. P

eds.

(#/

hr)

Pea

k H

our

Fac

tor

Hea

vy V

ehic

les

(%)

Adj

. Flo

w (

vph)

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)

Tur

n T

ype

Pro

tect

ed P

hase

s3

7

Per

mitt

ed P

hase

s

Det

ecto

r P

hase

Sw

itch

Pha

se

Min

imum

Initi

al (

s)28

.028

.0

Min

imum

Spl

it (s

)31

.032

.0

Tot

al S

plit

(s)

32.0

32.0

Tot

al S

plit

(%)

33%

33%

Yel

low

Tim

e (s

)2.

03.

5

All-

Red

Tim

e (s

)0.

00.

0

Lost

Tim

e A

djus

t (s)

Tot

al L

ost T

ime

(s)

Lead

/Lag

Lead

Lead

Lead

-Lag

Opt

imiz

e?Y

esY

es

Rec

all M

ode

Non

eN

one

Act

Effc

t Gre

en (

s)

Act

uate

d g/

C R

atio

v/c

Rat

io

Con

trol

Del

ay

Que

ue D

elay

Tot

al D

elay

LOS

App

roac

h D

elay

App

roac

h LO

S

Que

ue L

engt

h 50

th (

m)

Que

ue L

engt

h 95

th (

m)

Page 97: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 3

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2159

2264

961

880

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

350.

300.

610.

61

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

6

Act

uate

d C

ycle

Len

gth:

96

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:EB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 8

5

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.68

Inte

rsec

tion

Sig

nal D

elay

: 20.

6In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

47.0

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

1: Y

onge

St &

Blo

or S

t

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 4

Lane

Gro

upØ

7

Inte

rnal

Lin

k D

ist (

m)

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

Sta

rvat

ion

Cap

Red

uctn

Spi

llbac

k C

ap R

educ

tn

Sto

rage

Cap

Red

uctn

Red

uced

v/c

Rat

io

Inte

rsec

tion

Sum

mar

y

Page 98: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 5

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)74

868

958

653

5

v/c

Rat

io0.

350.

300.

680.

67

Con

trol

Del

ay8.

78.

436

.236

.0

Que

ue D

elay

0.0

0.0

0.0

0.0

Tot

al D

elay

8.7

8.4

36.2

36.0

Que

ue L

engt

h 50

th (

m)

29.0

25.7

52.3

46.9

Que

ue L

engt

h 95

th (

m)

47.0

42.0

64.1

58.7

Inte

rnal

Lin

k D

ist (

m)

208.

120

9.5

165.

979

.3

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

2159

2264

961

880

Sta

rvat

ion

Cap

Red

uctn

00

00

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

350.

300.

610.

61

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

1: Y

onge S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 6

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)1

701

90

649

60

546

104

461

44

Fut

ure

Vol

ume

(vph

)1

701

90

649

60

546

104

461

44

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

0.95

0.95

0.95

0.95

Frp

b, p

ed/b

ikes

0.99

1.00

0.99

0.95

Flp

b, p

ed/b

ikes

1.00

1.00

1.00

1.00

Frt

1.00

1.00

1.00

0.99

Flt

Pro

tect

ed1.

001.

001.

001.

00

Sat

d. F

low

(pr

ot)

3505

3508

3456

3310

Flt

Per

mitt

ed0.

951.

001.

000.

95

Sat

d. F

low

(pe

rm)

3346

3508

3456

3146

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

173

89

068

36

057

511

448

546

RT

OR

Red

uctio

n (v

ph)

00

00

00

01

00

70

Lane

Gro

up F

low

(vp

h)0

748

00

689

00

585

00

528

0

Con

fl. P

eds.

(#/

hr)

1751

1320

1320

1751

1116

1271

1271

1116

Hea

vy V

ehic

les

(%)

0%1%

0%2%

1%20

%2%

2%0%

0%1%

5%

Tur

n T

ype

Per

mN

AN

AN

AP

erm

NA

Pro

tect

ed P

hase

s2

64

8

Per

mitt

ed P

hase

s2

64

8

Act

uate

d G

reen

, G (

s)60

.960

.923

.123

.1

Effe

ctiv

e G

reen

, g (

s)61

.961

.924

.124

.1

Act

uate

d g/

C R

atio

0.64

0.64

0.25

0.25

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)21

5722

6186

778

9

v/s

Rat

io P

rot

0.20

c0.1

7

v/s

Rat

io P

erm

c0.2

20.

17

v/c

Rat

io0.

350.

300.

670.

67

Uni

form

Del

ay, d

17.

87.

532

.432

.4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.4

0.1

2.1

2.2

Del

ay (

s)8.

27.

634

.534

.5

Leve

l of S

ervi

ceA

AC

C

App

roac

h D

elay

(s)

8.2

7.6

34.5

34.5

App

roac

h LO

SA

AC

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay19

.6H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.46

Act

uate

d C

ycle

Len

gth

(s)

96.0

Sum

of l

ost t

ime

(s)

13.5

Inte

rsec

tion

Cap

acity

Util

izat

ion

47.0

%IC

U L

evel

of S

ervi

ceA

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 99: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 7

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)94

514

6995

502

101

137

854

996

417

104

Fut

ure

Vol

ume

(vph

)94

514

6995

502

101

137

854

996

417

104

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Sto

rage

Len

gth

(m)

15.2

0.0

13.7

0.0

20.4

0.0

10.4

0.0

Sto

rage

Lan

es1

01

01

01

0

Tap

er L

engt

h (m

)7.

67.

67.

67.

6

Lane

Util

. Fac

tor

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

1.00

0.95

0.95

Ped

Bik

e F

acto

r0.

850.

950.

850.

930.

841.

000.

900.

91

Frt

0.98

20.

975

0.99

90.

970

Flt

Pro

tect

ed0.

950

0.95

00.

950

0.95

0

Sat

d. F

low

(pr

ot)

1685

3307

016

3631

920

1685

3518

016

6830

900

Flt

Per

mitt

ed0.

323

0.34

20.

290

0.31

4

Sat

d. F

low

(pe

rm)

486

3307

050

331

920

432

3518

049

430

900

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

194

137

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)28

5.7

232.

113

4.3

102.

4

Tra

vel T

ime

(s)

21.4

17.4

10.1

7.7

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Adj

. Flo

w (

vph)

9954

173

100

528

106

144

899

910

143

910

9

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)99

614

010

063

40

144

908

010

154

80

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

52

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)23

.023

.023

.023

.06.

023

.022

.022

.0

Min

imum

Spl

it (s

)29

.029

.029

.029

.010

.029

.029

.029

.0

Tot

al S

plit

(s)

40.0

40.0

40.0

40.0

15.0

50.0

35.0

35.0

Tot

al S

plit

(%)

44.4

%44

.4%

44.4

%44

.4%

16.7

%55

.6%

38.9

%38

.9%

Yel

low

Tim

e (s

)3.

03.

03.

03.

03.

03.

03.

03.

0

All-

Red

Tim

e (s

)3.

03.

03.

03.

01.

03.

03.

03.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-4.0

-1.0

2.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lead

/Lag

Lead

Lag

Lag

Lead

-Lag

Opt

imiz

e?Y

esY

esY

es

Rec

all M

ode

Max

Max

Max

Max

Non

eC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)35

.035

.038

.035

.044

.045

.031

.631

.6

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.49

0.50

0.35

0.35

v/c

Rat

io0.

520.

470.

470.

510.

460.

520.

580.

49

Con

trol

Del

ay33

.321

.427

.922

.617

.916

.541

.223

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.5

Tot

al D

elay

33.3

21.4

27.9

22.6

17.9

16.5

41.2

23.9

LOS

CC

CC

BB

DC

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 8

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

App

roac

h D

elay

23.0

23.3

16.7

26.6

App

roac

h LO

SC

CB

C

Que

ue L

engt

h 50

th (

m)

12.9

39.5

12.1

42.7

13.3

53.0

14.1

36.0

Que

ue L

engt

h 95

th (

m)

30.4

54.6

28.2

58.3

23.9

69.3

#37.

352

.4

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

189

1297

212

1243

336

1759

173

1108

Sta

rvat

ion

Cap

Red

uctn

00

00

00

020

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

520.

470.

470.

510.

430.

520.

580.

61

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 7

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.58

Inte

rsec

tion

Sig

nal D

elay

: 21.

7In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.3

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

2: B

ay S

t & B

loor

St

Page 100: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 9

Lane

Gro

upE

BL

EB

TW

BL

WB

TN

BL

NB

TS

BL

SB

T

Lane

Gro

up F

low

(vp

h)99

614

100

634

144

908

101

548

v/c

Rat

io0.

520.

470.

470.

510.

460.

520.

580.

49

Con

trol

Del

ay33

.321

.427

.922

.617

.916

.541

.223

.5

Que

ue D

elay

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.5

Tot

al D

elay

33.3

21.4

27.9

22.6

17.9

16.5

41.2

23.9

Que

ue L

engt

h 50

th (

m)

12.9

39.5

12.1

42.7

13.3

53.0

14.1

36.0

Que

ue L

engt

h 95

th (

m)

30.4

54.6

28.2

58.3

23.9

69.3

#37.

352

.4

Inte

rnal

Lin

k D

ist (

m)

261.

720

8.1

110.

378

.4

Tur

n B

ay L

engt

h (m

)15

.213

.720

.410

.4

Bas

e C

apac

ity (

vph)

189

1297

212

1243

336

1759

173

1108

Sta

rvat

ion

Cap

Red

uctn

00

00

00

020

9

Spi

llbac

k C

ap R

educ

tn0

00

00

00

0

Sto

rage

Cap

Red

uctn

00

00

00

00

Red

uced

v/c

Rat

io0.

520.

470.

470.

510.

430.

520.

580.

61

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

2: B

ay S

t &

Blo

or

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 10

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)94

514

6995

502

101

137

854

996

417

104

Fut

ure

Vol

ume

(vph

)94

514

6995

502

101

137

854

996

417

104

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

3.0

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

5.0

2.0

5.0

6.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

0.95

1.00

0.95

1.00

0.95

1.00

0.95

Frp

b, p

ed/b

ikes

1.00

0.95

1.00

0.93

1.00

1.00

1.00

0.91

Flp

b, p

ed/b

ikes

0.85

1.00

0.85

1.00

0.96

1.00

0.90

1.00

Frt

1.00

0.98

1.00

0.97

1.00

1.00

1.00

0.97

Flt

Pro

tect

ed0.

951.

000.

951.

000.

951.

000.

951.

00

Sat

d. F

low

(pr

ot)

1429

3307

1398

3191

1616

3517

1494

3091

Flt

Per

mitt

ed0.

321.

000.

341.

000.

291.

000.

311.

00

Sat

d. F

low

(pe

rm)

486

3307

503

3191

494

3517

494

3091

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

9954

173

100

528

106

144

899

910

143

910

9

RT

OR

Red

uctio

n (v

ph)

012

00

20

01

00

240

Lane

Gro

up F

low

(vp

h)99

602

010

063

20

144

908

010

152

40

Con

fl. P

eds.

(#/

hr)

845

695

695

845

966

546

546

966

Hea

vy V

ehic

les

(%)

0%1%

0%3%

1%1%

0%1%

0%1%

1%4%

Tur

n T

ype

Per

mN

AP

erm

NA

pm+

ptN

AP

erm

NA

Pro

tect

ed P

hase

s4

85

26

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)34

.034

.034

.034

.044

.044

.030

.630

.6

Effe

ctiv

e G

reen

, g (

s)35

.035

.038

.035

.042

.045

.031

.631

.6

Act

uate

d g/

C R

atio

0.39

0.39

0.42

0.39

0.47

0.50

0.35

0.35

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

4.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

03.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)18

912

8621

212

4032

217

5817

310

85

v/s

Rat

io P

rot

0.18

0.20

0.04

c0.2

60.

17

v/s

Rat

io P

erm

c0.2

00.

200.

17c0

.20

v/c

Rat

io0.

520.

470.

470.

510.

450.

520.

580.

48

Uni

form

Del

ay, d

121

.120

.518

.821

.015

.115

.223

.822

.8

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

10.0

1.2

7.4

1.5

1.0

1.1

13.6

1.5

Del

ay (

s)31

.121

.826

.122

.516

.116

.337

.424

.4

Leve

l of S

ervi

ceC

CC

CB

BD

C

App

roac

h D

elay

(s)

23.1

23.0

16.2

26.4

App

roac

h LO

SC

CB

C

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay21

.4H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.57

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

16.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

97.3

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 101: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 11

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

7520

133

147

8576

783

150

5041

782

Fut

ure

Vol

ume

(vph

)33

7520

133

147

8576

783

150

5041

782

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

920.

850.

970.

95

Frt

0.97

90.

969

0.97

80.

978

Flt

Pro

tect

ed0.

987

0.98

20.

996

0.99

5

Sat

d. F

low

(pr

ot)

017

100

016

130

033

580

032

720

Flt

Per

mitt

ed0.

849

0.82

70.

847

0.76

9

Sat

d. F

low

(pe

rm)

014

220

012

350

028

310

025

240

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

1118

3535

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)20

0.3

161.

795

.511

5.7

Tra

vel T

ime

(s)

15.0

12.1

7.2

8.7

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Adj

. Flo

w (

vph)

3579

2114

015

589

8082

415

853

439

86

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

135

00

384

00

1062

00

578

0

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Det

ecto

r P

hase

44

88

22

66

Sw

itch

Pha

se

Min

imum

Initi

al (

s)24

.024

.024

.024

.017

.017

.017

.017

.0

Min

imum

Spl

it (s

)30

.030

.030

.030

.023

.023

.023

.023

.0

Tot

al S

plit

(s)

36.0

36.0

36.0

36.0

54.0

54.0

54.0

54.0

Tot

al S

plit

(%)

40.0

%40

.0%

40.0

%40

.0%

60.0

%60

.0%

60.0

%60

.0%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

-1.0

-1.0

-1.0

-1.0

Tot

al L

ost T

ime

(s)

5.0

5.0

5.0

5.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Rec

all M

ode

Non

eN

one

Non

eN

one

C-M

axC

-Max

C-M

axC

-Max

Act

Effc

t Gre

en (

s)29

.829

.850

.250

.2

Act

uate

d g/

C R

atio

0.33

0.33

0.56

0.56

v/c

Rat

io0.

280.

910.

670.

41

Con

trol

Del

ay21

.755

.816

.411

.9

Que

ue D

elay

0.0

0.0

7.2

0.0

Tot

al D

elay

21.7

55.8

23.6

11.9

LOS

CE

CB

App

roac

h D

elay

21.7

55.8

23.6

11.9

App

roac

h LO

SC

EC

B

Que

ue L

engt

h 50

th (

m)

15.2

59.1

63.7

27.1

Que

ue L

engt

h 95

th (

m)

29.1

#111

.385

.738

.8

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 12

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

497

437

1595

1424

Sta

rvat

ion

Cap

Red

uctn

00

487

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

270.

880.

960.

41

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

L, S

tart

of G

reen

Nat

ural

Cyc

le: 6

0

Con

trol

Typ

e: A

ctua

ted-

Coo

rdin

ated

Max

imum

v/c

Rat

io: 0

.91

Inte

rsec

tion

Sig

nal D

elay

: 26.

1In

ters

ectio

n LO

S: C

Inte

rsec

tion

Cap

acity

Util

izat

ion

87.2

%IC

U L

evel

of S

ervi

ce E

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

3: B

ay S

t & Y

orkv

ille

Ave

Page 102: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 13

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)13

538

410

6257

8

v/c

Rat

io0.

280.

910.

670.

41

Con

trol

Del

ay21

.755

.816

.411

.9

Que

ue D

elay

0.0

0.0

7.2

0.0

Tot

al D

elay

21.7

55.8

23.6

11.9

Que

ue L

engt

h 50

th (

m)

15.2

59.1

63.7

27.1

Que

ue L

engt

h 95

th (

m)

29.1

#111

.385

.738

.8

Inte

rnal

Lin

k D

ist (

m)

176.

313

7.7

71.5

91.7

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

497

437

1595

1424

Sta

rvat

ion

Cap

Red

uctn

00

487

0

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

270.

880.

960.

41

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

3: B

ay S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 14

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)33

7520

133

147

8576

783

150

5041

782

Fut

ure

Vol

ume

(vph

)33

7520

133

147

8576

783

150

5041

782

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

5.0

5.0

5.0

5.0

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.95

0.93

0.97

0.96

Flp

b, p

ed/b

ikes

0.97

0.91

0.99

1.00

Frt

0.98

0.97

0.98

0.98

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

1654

1467

3329

3265

Flt

Per

mitt

ed0.

850.

830.

850.

77

Sat

d. F

low

(pe

rm)

1423

1235

2831

2524

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

3579

2114

015

589

8082

415

853

439

86

RT

OR

Red

uctio

n (v

ph)

07

00

120

015

00

150

Lane

Gro

up F

low

(vp

h)0

128

00

372

00

1047

00

563

0

Con

fl. P

eds.

(#/

hr)

263

358

358

263

106

6060

106

Hea

vy V

ehic

les

(%)

0%0%

5%5%

2%2%

1%1%

0%0%

2%0%

Tur

n T

ype

Per

mN

AP

erm

NA

Per

mN

AP

erm

NA

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

82

6

Act

uate

d G

reen

, G (

s)28

.828

.849

.249

.2

Effe

ctiv

e G

reen

, g (

s)29

.829

.850

.250

.2

Act

uate

d g/

C R

atio

0.33

0.33

0.56

0.56

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Veh

icle

Ext

ensi

on (

s)3.

03.

03.

03.

0

Lane

Grp

Cap

(vp

h)47

140

815

7914

07

v/s

Rat

io P

rot

v/s

Rat

io P

erm

0.09

c0.3

0c0

.37

0.22

v/c

Rat

io0.

270.

910.

660.

40

Uni

form

Del

ay, d

122

.128

.814

.011

.3

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

0.3

24.2

2.2

0.8

Del

ay (

s)22

.453

.116

.212

.2

Leve

l of S

ervi

ceC

DB

B

App

roac

h D

elay

(s)

22.4

53.1

16.2

12.2

App

roac

h LO

SC

DB

B

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay22

.1H

CM

200

0 Le

vel o

f Ser

vice

C

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.75

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

10.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

87.2

%IC

U L

evel

of S

ervi

ceE

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 103: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 15

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

069

295

1649

8

Fut

ure

Vol

ume

(vph

)0

069

295

1649

8

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.98

2

Flt

Pro

tect

ed0.

998

Sat

d. F

low

(pr

ot)

00

3475

00

3529

Flt

Per

mitt

ed0.

998

Sat

d. F

low

(pe

rm)

00

3475

00

3529

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)11

1.8

22.2

163.

1

Tra

vel T

ime

(s)

8.4

1.7

12.2

Con

fl. P

eds.

(#/

hr)

496

496

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

2%2%

1%0%

0%1%

Adj

. Flo

w (

vph)

00

728

100

1752

4

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

082

80

054

1

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

28.7

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

4: Y

onge S

t &

Colli

er

St

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 16

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

692

9516

498

Fut

ure

Vol

ume

(Veh

/h)

00

692

9516

498

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

072

810

017

524

Ped

estr

ians

496

Lane

Wid

th (

m)

0.0

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e0

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)22

pX, p

lato

on u

nblo

cked

0.91

0.91

0.91

vC, c

onfli

ctin

g vo

lum

e15

7091

013

24

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol14

3370

911

63

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%10

010

097

cM c

apac

ity (

veh/

h)11

134

355

5

Dire

ctio

n, L

ane

#N

B 1

NB

2S

B 1

SB

2

Vol

ume

Tot

al48

534

319

234

9

Vol

ume

Left

00

170

Vol

ume

Rig

ht0

100

00

cSH

1700

1700

555

1700

Vol

ume

to C

apac

ity0.

290.

200.

030.

21

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.7

0.0

Con

trol

Del

ay (

s)0.

00.

01.

40.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.5

App

roac

h LO

S

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.2

Inte

rsec

tion

Cap

acity

Util

izat

ion

28.7

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 104: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 17

Lane

Gro

upW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)17

8161

756

3638

1

Fut

ure

Vol

ume

(vph

)17

8161

756

3638

1

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r

Frt

0.88

90.

987

Flt

Pro

tect

ed0.

991

0.99

6

Sat

d. F

low

(pr

ot)

1577

034

490

035

23

Flt

Per

mitt

ed0.

991

0.99

6

Sat

d. F

low

(pe

rm)

1577

034

490

035

23

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)19

1.3

15.7

76.1

Tra

vel T

ime

(s)

14.3

1.2

5.7

Con

fl. P

eds.

(#/

hr)

670

670

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%6%

2%4%

0%1%

Adj

. Flo

w (

vph)

1885

649

5938

401

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)10

30

708

00

439

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

47.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

5: Y

onge S

t &

Asquith A

venue

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 18

Mov

emen

tW

BL

WB

RN

BT

NB

RS

BL

SB

T

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

1781

617

5636

381

Fut

ure

Vol

ume

(Veh

/h)

1781

617

5636

381

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)18

8564

959

3840

1

Ped

estr

ians

670

Lane

Wid

th (

m)

3.5

Wal

king

Spe

ed (

m/s

)1.

1

Per

cent

Blo

ckag

e59

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)11

976

pX, p

lato

on u

nblo

cked

0.86

0.86

0.86

vC, c

onfli

ctin

g vo

lum

e16

2510

2413

78

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol13

9469

211

06

tC, s

ingl

e (s

)6.

87.

04.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

42.

2

p0 q

ueue

free

%54

3583

cM c

apac

ity (

veh/

h)39

132

223

Dire

ctio

n, L

ane

#W

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al10

343

327

517

226

7

Vol

ume

Left

180

038

0

Vol

ume

Rig

ht85

059

00

cSH

9317

0017

0022

317

00

Vol

ume

to C

apac

ity1.

110.

250.

160.

170.

16

Que

ue L

engt

h 95

th (

m)

52.1

0.0

0.0

4.6

0.0

Con

trol

Del

ay (

s)20

8.1

0.0

0.0

8.9

0.0

Lane

LO

SF

A

App

roac

h D

elay

(s)

208.

10.

03.

5

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

18.4

Inte

rsec

tion

Cap

acity

Util

izat

ion

47.3

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 105: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 19

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)18

282

111

597

339

157

Fut

ure

Vol

ume

(vph

)18

282

111

597

339

157

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

750.

960.

82

Frt

0.95

80.

953

Flt

Pro

tect

ed0.

967

0.99

2

Sat

d. F

low

(pr

ot)

1469

00

3490

2760

0

Flt

Per

mitt

ed0.

967

0.76

7

Sat

d. F

low

(pe

rm)

1220

00

2583

2760

0

Rig

ht T

urn

on R

edY

esY

es

Sat

d. F

low

(R

TO

R)

2316

5

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)65

.276

.122

.2

Tra

vel T

ime

(s)

4.9

5.7

1.7

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Adj

. Flo

w (

vph)

192

8611

762

835

716

5

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)27

80

074

552

20

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Min

imum

Spl

it (s

)24

.022

.022

.022

.0

Tot

al S

plit

(s)

25.0

65.0

65.0

65.0

Tot

al S

plit

(%)

27.8

%72

.2%

72.2

%72

.2%

Yel

low

Tim

e (s

)3.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

5.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

v/c

Rat

io0.

810.

440.

28

Con

trol

Del

ay50

.18.

54.

7

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

50.1

8.5

4.7

LOS

DA

A

App

roac

h D

elay

50.1

8.5

4.7

App

roac

h LO

SD

AA

Que

ue L

engt

h 50

th (

m)

42.1

29.1

11.4

Que

ue L

engt

h 95

th (

m)

#82.

140

.117

.7

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

344

1693

1866

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 20

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

810.

440.

28

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 9

0

Act

uate

d C

ycle

Len

gth:

90

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

TL

and

6:S

BT

, Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

0

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.81

Inte

rsec

tion

Sig

nal D

elay

: 14.

7In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

68.7

%IC

U L

evel

of S

ervi

ce C

Ana

lysi

s P

erio

d (m

in)

15

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

Spl

its a

nd P

hase

s:

6: Y

onge

St &

Yor

kvill

e A

ve

Page 106: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 21

Lane

Gro

upE

BL

NB

TS

BT

Lane

Gro

up F

low

(vp

h)27

874

552

2

v/c

Rat

io0.

810.

440.

28

Con

trol

Del

ay50

.18.

54.

7

Que

ue D

elay

0.0

0.0

0.0

Tot

al D

elay

50.1

8.5

4.7

Que

ue L

engt

h 50

th (

m)

42.1

29.1

11.4

Que

ue L

engt

h 95

th (

m)

#82.

140

.117

.7

Inte

rnal

Lin

k D

ist (

m)

41.2

52.1

0.1

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

344

1693

1866

Sta

rvat

ion

Cap

Red

uctn

00

0

Spi

llbac

k C

ap R

educ

tn0

00

Sto

rage

Cap

Red

uctn

00

0

Red

uced

v/c

Rat

io0.

810.

440.

28

Inte

rsec

tion

Sum

mar

y

#

95th

per

cent

ile v

olum

e ex

ceed

s ca

paci

ty, q

ueue

may

be

long

er.

Q

ueue

sho

wn

is m

axim

um a

fter

two

cycl

es.

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

6: Y

onge S

t &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 22

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)18

282

111

597

339

157

Fut

ure

Vol

ume

(vph

)18

282

111

597

339

157

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th

3.0

3.0

3.5

3.5

3.5

3.5

Tot

al L

ost t

ime

(s)

5.0

6.0

6.0

Lane

Util

. Fac

tor

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.90

1.00

0.82

Flp

b, p

ed/b

ikes

1.00

0.96

1.00

Frt

0.96

1.00

0.95

Flt

Pro

tect

ed0.

970.

991.

00

Sat

d. F

low

(pr

ot)

1469

3341

2759

Flt

Per

mitt

ed0.

970.

771.

00

Sat

d. F

low

(pe

rm)

1469

2581

2759

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

192

8611

762

835

716

5

RT

OR

Red

uctio

n (v

ph)

180

00

570

Lane

Gro

up F

low

(vp

h)26

00

074

546

50

Con

fl. P

eds.

(#/

hr)

173

274

289

289

Hea

vy V

ehic

les

(%)

0%2%

4%1%

1%1%

Tur

n T

ype

Pro

tP

erm

NA

NA

Pro

tect

ed P

hase

s4

26

Per

mitt

ed P

hase

s2

Act

uate

d G

reen

, G (

s)20

.059

.059

.0

Effe

ctiv

e G

reen

, g (

s)20

.059

.059

.0

Act

uate

d g/

C R

atio

0.22

0.66

0.66

Cle

aran

ce T

ime

(s)

5.0

6.0

6.0

Lane

Grp

Cap

(vp

h)32

616

9118

08

v/s

Rat

io P

rot

c0.1

80.

17

v/s

Rat

io P

erm

c0.2

9

v/c

Rat

io0.

800.

440.

26

Uni

form

Del

ay, d

133

.17.

56.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

18.2

0.8

0.3

Del

ay (

s)51

.38.

36.

8

Leve

l of S

ervi

ceD

AA

App

roac

h D

elay

(s)

51.3

8.3

6.8

App

roac

h LO

SD

AA

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay15

.5H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.53

Act

uate

d C

ycle

Len

gth

(s)

90.0

Sum

of l

ost t

ime

(s)

11.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

68.7

%IC

U L

evel

of S

ervi

ceC

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 107: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 23

Lane

Gro

upE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)13

911

60

536

393

0

Fut

ure

Vol

ume

(vph

)13

911

60

536

393

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.0

3.0

3.5

3.5

3.5

3.5

Lane

Util

. Fac

tor

1.00

1.00

1.00

0.95

0.95

1.00

Ped

Bik

e F

acto

r

Frt

0.93

9

Flt

Pro

tect

ed0.

973

Sat

d. F

low

(pr

ot)

1597

00

3500

3535

0

Flt

Per

mitt

ed0.

973

Sat

d. F

low

(pe

rm)

1597

00

3500

3535

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)64

.710

3.3

15.7

Tra

vel T

ime

(s)

4.9

7.7

1.2

Con

fl. P

eds.

(#/

hr)

384

466

466

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

1%2%

2%2%

1%2%

Adj

. Flo

w (

vph)

146

122

056

441

40

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)26

80

056

441

40

Sig

n C

ontr

olS

top

Fre

eF

ree

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.5

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

7: Y

onge S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 24

Mov

emen

tE

BL

EB

RN

BL

NB

TS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

139

116

053

639

30

Fut

ure

Vol

ume

(Veh

/h)

139

116

053

639

30

Sig

n C

ontr

olS

top

Fre

eF

ree

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)14

612

20

564

414

0

Ped

estr

ians

466

438

Lane

Wid

th (

m)

3.0

3.5

3.5

Wal

king

Spe

ed (

m/s

)1.

11.

11.

1

Per

cent

Blo

ckag

e35

03

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)10

392

pX, p

lato

on u

nblo

cked

0.85

vC, c

onfli

ctin

g vo

lum

e12

0067

788

0

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol89

467

788

0

tC, s

ingl

e (s

)6.

86.

94.

1

tC, 2

sta

ge (

s)

tF (

s)3.

53.

32.

2

p0 q

ueue

free

%3

5210

0

cM c

apac

ity (

veh/

h)15

125

549

4

Dire

ctio

n, L

ane

#E

B 1

NB

1N

B 2

SB

1S

B 2

Vol

ume

Tot

al26

828

228

220

720

7

Vol

ume

Left

146

00

00

Vol

ume

Rig

ht12

20

00

0

cSH

185

1700

1700

1700

1700

Vol

ume

to C

apac

ity1.

450.

170.

170.

120.

12

Que

ue L

engt

h 95

th (

m)

125.

00.

00.

00.

00.

0

Con

trol

Del

ay (

s)27

5.5

0.0

0.0

0.0

0.0

Lane

LO

SF

App

roac

h D

elay

(s)

275.

50.

00.

0

App

roac

h LO

SF

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

59.3

Inte

rsec

tion

Cap

acity

Util

izat

ion

36.5

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 108: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 25

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5779

430

660

876

174

4552

01

Fut

ure

Vol

ume

(vph

)47

5779

430

660

876

174

4552

01

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Lane

Util

. Fac

tor

0.95

0.95

0.95

1.00

1.00

1.00

1.00

0.95

0.95

0.95

0.95

0.95

Ped

Bik

e F

acto

r0.

770.

710.

900.

99

Frt

0.93

50.

918

0.97

5

Flt

Pro

tect

ed0.

987

0.98

10.

996

Sat

d. F

low

(pr

ot)

026

890

013

720

031

100

034

880

Flt

Per

mitt

ed0.

859

0.80

50.

795

Sat

d. F

low

(pe

rm)

021

930

098

90

031

100

027

620

Rig

ht T

urn

on R

edY

esY

esY

esY

es

Sat

d. F

low

(R

TO

R)

3637

1

Link

Spe

ed (

k/h)

4848

4848

Link

Dis

tanc

e (m

)19

0.2

160.

710

2.4

95.5

Tra

vel T

ime

(s)

14.3

12.1

7.7

7.2

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

0.95

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Adj

. Flo

w (

vph)

4960

8345

069

092

218

347

547

1

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

192

00

114

00

1105

00

595

0

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Min

imum

Spl

it (s

)25

.025

.025

.025

.029

.029

.029

.0

Tot

al S

plit

(s)

26.0

26.0

26.0

26.0

62.0

62.0

62.0

Tot

al S

plit

(%)

29.5

%29

.5%

29.5

%29

.5%

70.5

%70

.5%

70.5

%

Yel

low

Tim

e (s

)4.

04.

04.

04.

04.

04.

04.

0

All-

Red

Tim

e (s

)2.

02.

02.

02.

02.

02.

02.

0

Lost

Tim

e A

djus

t (s)

0.0

0.0

0.0

0.0

Tot

al L

ost T

ime

(s)

6.0

6.0

6.0

6.0

Lead

/Lag

Lead

-Lag

Opt

imiz

e?

Act

Effc

t Gre

en (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

v/c

Rat

io0.

370.

450.

560.

34

Con

trol

Del

ay25

.426

.610

.48.

1

Que

ue D

elay

0.0

0.0

2.4

0.7

Tot

al D

elay

25.4

26.6

12.8

8.8

LOS

CC

BA

App

roac

h D

elay

25.4

26.6

12.8

8.8

App

roac

h LO

SC

CB

A

Que

ue L

engt

h 50

th (

m)

11.5

11.0

49.5

21.8

Que

ue L

engt

h 95

th (

m)

21.1

26.8

65.4

30.7

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

526

253

1979

1757

Sta

rvat

ion

Cap

Red

uctn

00

713

776

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 26

Lane

Gro

upE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

370.

450.

870.

61

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Cyc

le L

engt

h: 8

8

Act

uate

d C

ycle

Len

gth:

88

Offs

et: 0

(0%

), R

efer

ence

d to

pha

se 2

:NB

T a

nd 6

:SB

TL,

Sta

rt o

f Gre

en

Nat

ural

Cyc

le: 5

5

Con

trol

Typ

e: P

retim

ed

Max

imum

v/c

Rat

io: 0

.56

Inte

rsec

tion

Sig

nal D

elay

: 13.

6In

ters

ectio

n LO

S: B

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.6

%IC

U L

evel

of S

ervi

ce F

Ana

lysi

s P

erio

d (m

in)

15

Spl

its a

nd P

hase

s:

8: B

ay S

t & C

umbe

rland

St

Page 109: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Queues

Futu

re T

ota

l P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 27

Lane

Gro

upE

BT

WB

TN

BT

SB

T

Lane

Gro

up F

low

(vp

h)19

211

411

0559

5

v/c

Rat

io0.

370.

450.

560.

34

Con

trol

Del

ay25

.426

.610

.48.

1

Que

ue D

elay

0.0

0.0

2.4

0.7

Tot

al D

elay

25.4

26.6

12.8

8.8

Que

ue L

engt

h 50

th (

m)

11.5

11.0

49.5

21.8

Que

ue L

engt

h 95

th (

m)

21.1

26.8

65.4

30.7

Inte

rnal

Lin

k D

ist (

m)

166.

213

6.7

78.4

71.5

Tur

n B

ay L

engt

h (m

)

Bas

e C

apac

ity (

vph)

526

253

1979

1757

Sta

rvat

ion

Cap

Red

uctn

00

713

776

Spi

llbac

k C

ap R

educ

tn0

00

0

Sto

rage

Cap

Red

uctn

00

00

Red

uced

v/c

Rat

io0.

370.

450.

870.

61

Inte

rsec

tion

Sum

mar

y

HC

M S

ignaliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

8: B

ay S

t &

Cum

berland S

t12

/10/

2018

Syn

chro

9 R

epor

t

Pag

e 28

Mov

emen

tE

BL

EB

TE

BR

WB

LW

BT

WB

RN

BL

NB

TN

BR

SB

LS

BT

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)47

5779

430

660

876

174

4552

01

Fut

ure

Vol

ume

(vph

)47

5779

430

660

876

174

4552

01

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

0019

00

Tot

al L

ost t

ime

(s)

6.0

6.0

6.0

6.0

Lane

Util

. Fac

tor

0.95

1.00

0.95

0.95

Frp

b, p

ed/b

ikes

0.82

0.81

0.90

1.00

Flp

b, p

ed/b

ikes

0.94

0.88

1.00

0.99

Frt

0.94

0.92

0.98

1.00

Flt

Pro

tect

ed0.

990.

981.

001.

00

Sat

d. F

low

(pr

ot)

2522

1205

3111

3460

Flt

Per

mitt

ed0.

860.

811.

000.

79

Sat

d. F

low

(pe

rm)

2194

990

3111

2761

Pea

k-ho

ur fa

ctor

, PH

F0.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

950.

95

Adj

. Flo

w (

vph)

4960

8345

069

092

218

347

547

1

RT

OR

Red

uctio

n (v

ph)

028

00

290

00

00

00

Lane

Gro

up F

low

(vp

h)0

164

00

850

011

050

059

50

Con

fl. P

eds.

(#/

hr)

239

582

582

239

530

471

471

530

Hea

vy V

ehic

les

(%)

4%0%

0%0%

2%0%

2%1%

1%0%

2%2%

Tur

n T

ype

Per

mN

AP

erm

NA

NA

Per

mN

A

Pro

tect

ed P

hase

s4

82

6

Per

mitt

ed P

hase

s4

86

Act

uate

d G

reen

, G (

s)20

.020

.056

.056

.0

Effe

ctiv

e G

reen

, g (

s)20

.020

.056

.056

.0

Act

uate

d g/

C R

atio

0.23

0.23

0.64

0.64

Cle

aran

ce T

ime

(s)

6.0

6.0

6.0

6.0

Lane

Grp

Cap

(vp

h)49

822

519

7917

57

v/s

Rat

io P

rot

c0.3

6

v/s

Rat

io P

erm

0.07

c0.0

90.

22

v/c

Rat

io0.

330.

380.

560.

34

Uni

form

Del

ay, d

128

.428

.89.

07.

4

Pro

gres

sion

Fac

tor

1.00

1.00

1.00

1.00

Incr

emen

tal D

elay

, d2

1.8

4.8

1.1

0.5

Del

ay (

s)30

.233

.610

.27.

9

Leve

l of S

ervi

ceC

CB

A

App

roac

h D

elay

(s)

30.2

33.6

10.2

7.9

App

roac

h LO

SC

CB

A

Inte

rsec

tion

Sum

mar

y

HC

M 2

000

Con

trol

Del

ay12

.7H

CM

200

0 Le

vel o

f Ser

vice

B

HC

M 2

000

Vol

ume

to C

apac

ity r

atio

0.51

Act

uate

d C

ycle

Len

gth

(s)

88.0

Sum

of l

ost t

ime

(s)

12.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

95.6

%IC

U L

evel

of S

ervi

ceF

Ana

lysi

s P

erio

d (m

in)

15

c

Crit

ical

Lan

e G

roup

Page 110: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 29

Lane

Gro

upE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

2424

034

37

Fut

ure

Vol

ume

(vph

)0

2424

034

37

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

0.86

50.

930

Flt

Pro

tect

ed0.

950

0.97

7

Sat

d. F

low

(pr

ot)

1593

00

1750

1580

0

Flt

Per

mitt

ed0.

950

0.97

7

Sat

d. F

low

(pe

rm)

1593

00

1750

1580

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

1.7

65.2

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

025

250

3639

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)25

00

2575

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

18.8

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

9: S

ite D

rivew

ay &

York

vill

e A

ve

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 30

Mov

emen

tE

BT

EB

RW

BL

WB

TN

BL

NB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

024

240

3437

Fut

ure

Vol

ume

(Veh

/h)

024

240

3437

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)0

2525

036

39

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

265

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e25

6212

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol25

6212

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%98

9696

cM c

apac

ity (

veh/

h)15

8992

910

68

Dire

ctio

n, L

ane

#E

B 1

WB

1N

B 1

Vol

ume

Tot

al25

2575

Vol

ume

Left

025

36

Vol

ume

Rig

ht25

039

cSH

1700

1589

996

Vol

ume

to C

apac

ity0.

010.

020.

08

Que

ue L

engt

h 95

th (

m)

0.0

0.4

1.9

Con

trol

Del

ay (

s)0.

07.

38.

9

Lane

LO

SA

A

App

roac

h D

elay

(s)

0.0

7.3

8.9

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

6.8

Inte

rsec

tion

Cap

acity

Util

izat

ion

18.8

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 111: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Futu

re T

ota

l P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)25

00

027

0

Fut

ure

Vol

ume

(vph

)25

00

027

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed0.

950

0.95

0

Sat

d. F

low

(pr

ot)

017

5018

420

1652

0

Flt

Per

mitt

ed0.

950

0.95

0

Sat

d. F

low

(pe

rm)

017

5018

420

1652

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)16

0.7

64.7

92.0

Tra

vel T

ime

(s)

12.1

4.9

6.9

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Adj

. Flo

w (

vph)

260

00

280

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

260

028

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

13.3

%IC

U L

evel

of S

ervi

ce A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Futu

re T

ota

l P

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

250

00

270

Fut

ure

Vol

ume

(Veh

/h)

250

00

270

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.95

0.95

0.95

0.95

0.95

0.95

Hou

rly fl

ow r

ate

(vph

)26

00

028

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)16

1

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

520

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

520

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%98

9710

0

cM c

apac

ity (

veh/

h)16

2394

110

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al26

028

Vol

ume

Left

260

28

Vol

ume

Rig

ht0

00

cSH

1623

1700

941

Vol

ume

to C

apac

ity0.

020.

000.

03

Que

ue L

engt

h 95

th (

m)

0.4

0.0

0.7

Con

trol

Del

ay (

s)7.

30.

08.

9

Lane

LO

SA

A

App

roac

h D

elay

(s)

7.3

0.0

8.9

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

8.1

Inte

rsec

tion

Cap

acity

Util

izat

ion

13.3

%IC

U L

evel

of S

ervi

ce

A

Ana

lysi

s P

erio

d (m

in)

15

Page 112: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Lanes, V

olu

mes, T

imin

gs

Exis

ting A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 31

Lane

Gro

upE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(vph

)0

00

00

0

Fut

ure

Vol

ume

(vph

)0

00

00

0

Idea

l Flo

w (

vphp

l)19

0019

0019

0019

0019

0019

00

Lane

Wid

th (

m)

3.5

3.5

3.5

3.5

3.0

3.0

Lane

Util

. Fac

tor

1.00

1.00

1.00

1.00

1.00

1.00

Frt

Flt

Pro

tect

ed

Sat

d. F

low

(pr

ot)

018

4218

420

1739

0

Flt

Per

mitt

ed

Sat

d. F

low

(pe

rm)

018

4218

420

1739

0

Link

Spe

ed (

k/h)

4848

48

Link

Dis

tanc

e (m

)15

5.6

69.8

91.9

Tra

vel T

ime

(s)

11.7

5.2

6.9

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Adj

. Flo

w (

vph)

00

00

00

Sha

red

Lane

Tra

ffic

(%)

Lane

Gro

up F

low

(vp

h)0

00

00

0

Sig

n C

ontr

olF

ree

Fre

eS

top

Inte

rsec

tion

Sum

mar

y

Are

a T

ype:

Oth

er

Con

trol

Typ

e: U

nsig

naliz

ed

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

HC

M U

nsig

naliz

ed Inte

rsection C

apacity A

naly

sis

Exis

ting A

M

10: C

um

berland S

t &

Site D

rivew

ay

12/1

0/20

18

Syn

chro

9 R

epor

t

Pag

e 32

Mov

emen

tE

BL

EB

TW

BT

WB

RS

BL

SB

R

Lane

Con

figur

atio

ns

Tra

ffic

Vol

ume

(veh

/h)

00

00

00

Fut

ure

Vol

ume

(Veh

/h)

00

00

00

Sig

n C

ontr

olF

ree

Fre

eS

top

Gra

de0%

0%0%

Pea

k H

our

Fac

tor

0.90

0.90

0.90

0.90

0.90

0.90

Hou

rly fl

ow r

ate

(vph

)0

00

00

0

Ped

estr

ians

Lane

Wid

th (

m)

Wal

king

Spe

ed (

m/s

)

Per

cent

Blo

ckag

e

Rig

ht tu

rn fl

are

(veh

)

Med

ian

type

Non

eN

one

Med

ian

stor

age

veh)

Ups

trea

m s

igna

l (m

)15

5

pX, p

lato

on u

nblo

cked

vC, c

onfli

ctin

g vo

lum

e0

00

vC1,

sta

ge 1

con

f vol

vC2,

sta

ge 2

con

f vol

vCu,

unb

lock

ed v

ol0

00

tC, s

ingl

e (s

)4.

16.

46.

2

tC, 2

sta

ge (

s)

tF (

s)2.

23.

53.

3

p0 q

ueue

free

%10

010

010

0

cM c

apac

ity (

veh/

h)16

2310

2310

85

Dire

ctio

n, L

ane

#E

B 1

WB

1S

B 1

Vol

ume

Tot

al0

00

Vol

ume

Left

00

0

Vol

ume

Rig

ht0

00

cSH

1700

1700

1700

Vol

ume

to C

apac

ity0.

000.

000.

00

Que

ue L

engt

h 95

th (

m)

0.0

0.0

0.0

Con

trol

Del

ay (

s)0.

00.

00.

0

Lane

LO

SA

App

roac

h D

elay

(s)

0.0

0.0

0.0

App

roac

h LO

SA

Inte

rsec

tion

Sum

mar

y

Ave

rage

Del

ay

0.0

Inte

rsec

tion

Cap

acity

Util

izat

ion

0.0%

ICU

Lev

el o

f Ser

vice

A

Ana

lysi

s P

erio

d (m

in)

15

Page 113: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

APPENDIX

B P1 PLAN WITH

PEDESTRIAN

CONNECTION

Page 114: 11 YORKVILLE PARTNERS INC. 11-21 YORKVILLE · 2019-01-07 · 11-21 yorkville proposed mixed-use development transportation impact study addendum 11 yorkville partners inc. project

Recommended