Date post: | 24-Feb-2018 |
Category: |
Documents |
Upload: | shashi-kant |
View: | 215 times |
Download: | 0 times |
of 9
7/25/2019 110 Kw Vfd With DOL Bypass
1/9
nderung
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
TITLE PAGE
5 6 7 8
=
+
9
Bl.
22 Bl.
1.1
1
ELECTRICAL CIRCUITS
110 KW VFD WITH DOL BYPASS
7/25/2019 110 Kw Vfd With DOL Bypass
2/9
nderung
1
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
Table of contents
5 6 7 8
=
+
9
Bl.
22 Bl.
2
1.1
Page overviewPage Designation
Coloum X: an automatically created page was manually reworked
Additional field Date Revisor X
WUPJ005E 01.03.1994
1
1.12
3
4
TITLE PAGE
Table of contentsPOWER DISTRIBUTION
POWER CKT.
CONTROL LOGIC
31.May.2010
31.May.201030.May.2010
31.May.2010
31.May.2010
7/25/2019 110 Kw Vfd With DOL Bypass
3/9
nderung
1.1
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
POWER DISTRIBUTION
5 6 7 8
=
+
9
Bl.
22 Bl.
3
2
R
R0
1Q315A
2
1
4
3
6
5
X0 1
R
Y
T1400/5A
S1
S2
Y0
2
Y
B
T2400/5A
S1
S2
B0
3
B
T3400/5A
S1
S2
4
N
N
D40
ASS
-P1400/5A
A1
A2
D10
D20
D30
R1
F16A
1
2
VSS
V1
V2
-P20--500V
V1
V2
Y1
F26A
1
2
B1
F36A
1
2
HRA1
A2
HYA1
A2
HBA1
A2
R10
R11
F76A
1
2
TH
HTR80 WATT
L
N
R2
P0
P1
F46A
1
2
3
4
T4415/230V
,500VA
P1
S1
P2
S2
F56A
1
2
3
4
B2
N0
N
DS121
22
-E111W
L N
PANEL LIGHT
P12
F66A
1
2
M
~M1
L N
FAN 1
M
~M2
L N
FAN 2
P10
F96A
1
2
SKT
/3.0R
/3.0Y
/3.0B
/2.9N
/2.9N
/3.0P1
7/25/2019 110 Kw Vfd With DOL Bypass
4/9
nderung
2
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
POWER CKT.
5 6 7 8
=
+
9
Bl.
22 Bl.
4
3
P16
VFD110 KW
X1 7
2.9/R2.9/Y2.9/B3.9/N
2.9/P1
3.1/N1
ROC
R1.0
23
24
8
N1
P17
V
F
D
H
E
A
L
T
H
Y
R0N0
P14
7 11 5.513 14 4.0
23 24 .0
R1A1
A2
R1C
/4.0P1
V
F
D
F
A
U
L
T
R1NO
P15
H2A1
A2
/3.0N1
A00+
AO0+
5
.
2
/
A
O
0
+
A00-
AO0-
5
.
2
/
A
O
0
-
A01+
AO1+
5
.
7
/
A
O
1
+
AO1-
AO1-
5
.
7
/
A
O
1
-
AI1+
AI1+
3
.
3
/
A
I
1
+
AI1-
AI1-
3
.
2
/
A
I
1
+
+10V
POT110K,10T
AI0+ AI0- 10VC DI4
DI4
RESET13
14
R
E
S
E
T
DI3
R54.5
13
14
D
C
S
M
O
D
E
S
E
L
E
C
T
DI1
R24.8
13
14
S
T
A
R
T
/
S
T
O
P
+24V
R
K14.4
185A
1
2
L1220A,0.06mH
U1
U2
V1
V2
W1
W2
L1
Y
3
4
L2
U
K24.4
225A
1
2
X2 1
M3 ~
M1110KW
U1 V1 W1
PE
B
5
6
L3
V
3
4
2
W
5
6
3
PE
4
K34.7
225A
1
2
1O/L135-225A
1
2
3
4
5
6
3
4
5
6
RYB/3.0N
7/25/2019 110 Kw Vfd With DOL Bypass
5/9nderung
3
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
CONTROL LOGIC
5 6 7 8
=
+
9
Bl.
22 Bl.
5
4
1/P1
N1
P18
R13.0
13
14
-H1
VFD RUN
A1
A2
P19
K3.7
13
14
-H3
BYPASSRUN
A1
A2
P20
1O/L3.7
97
98
-H4
O/LTRIP
A1
A2
-H5VFDMODE
A1
A2
VFD
P23
P22
1S0E.STOP
21
22
1SS
1
R4.3
21
22
13 14 .421 22 .3
R3
A1
A2
0
P21
2
R3.2
21
22
13 14 .721 22 .2
R4
A1
A2
BYPASS
P24
P25
-H6BYPASSMODE
A1
A2
R3.2
13
14
K3.7
21
22
1 2 3.53 4 3.65 6 3.613 14 .4
K1
A1
A2
P27
P26
P28
K1.4
13
14
1 2 3.63 4 3.65 6 3.6
K2
A1
A2
P29
SS2
AUTO
13
14
7 11 5.613 14 3.4
21 22 .823 24 .833 34 .6
R5
A1
A2
P30
R5.5
33
34
X19 10
P31
R4.3
13
14
R2.8
23
24
1O/L3.7
95
96
1 2 3.73 4 3.75 6 3.713 14 .0
21 22 .4
K3
A1
A2
P32
P33
P34 DCS
P36
R5.5
23
24
X1 5
X1 6
P35
R5.5
21
22
S3STOP
21
22
S2START
13
14
13 14 3.523 24 .733 34 .9
R2
A1
A2
P38
P37
N1
R2.8
33
34
P1
7/25/2019 110 Kw Vfd With DOL Bypass
6/9nderung
4
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
TERMINALS
5 6 7 8
=
+
9
Bl.
22 Bl.
20
5
TERMINALS FOR DCS
/
3
.
1
A
O
0
+
X1 1
R
P
M
F
/
B
T
O
D
C
S
/
3
.
2
A
O
0
-
2
/
5
.
3
A
I
1
+
3
S
E
T
P
O
I
N
T
F
R
O
M
D
C
S
/
5
.
2
A
I
1
+
4
DCS4.8
START/STOP
5
S
T
A
R
T
/
S
T
O
P
F
R
O
M
D
C
S
6
R13.0
VFD HEALTHY
11
7
7
V
F
D
H
E
A
L
T
H
Y
F
/
B
T
O
D
C
S
8
R54.5
AUTO MODE
11
7
9
A
U
T
O
F
/
B
T
O
D
C
S
10
/
3
.
2
A
O
1
+
11
C
U
R
R
E
N
T
F
/
B
T
O
D
C
S
/
3
.
2
A
O
1
-
12 13 14
7/25/2019 110 Kw Vfd With DOL Bypass
7/9nderung
5
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
X0
5 6 7 8
=
+
9
Bl.
22 Bl.
21
20
W
U
P
K
0
0
5
E
0
1
.
0
3
.
1
9
9
4
T
e
r
m
i
n
a
l
d
i
a
g
r
a
m
T
e
r
m
i
n
a
l
s
t
r
i
p
d
es
i
g
n
a
t
i
o
n
Cable designation
Cable designation
Page/path
Connection
Destination
Terminalname
Jumper
Terminal-
number
Connection
Destination
Cable type
Cable type
F
u
n
c
t
i
o
n
X
0
1
1
Q
2
.
0
1
R
1
3
1
Q
2
.
0
2
Y
1
5
1
Q
2
.
0
3
B
1
_
3
S
K
T
2
.
0
4
N
1
A
2
H
R
7/25/2019 110 Kw Vfd With DOL Bypass
8/9
7/25/2019 110 Kw Vfd With DOL Bypass
9/9nderung
21
0
Datum Name
Datum
Bearb.
Gepr.
Norm
1
Urspr.
2
Ers.f.
3
Ers.d.
110 KW WITH DOL BYPASS
4
X2
5 6 7 8
=
+
9
Bl.
22 Bl.
22
W
U
P
K
0
0
5
E
0
1
.
0
3
.
1
9
9
4
T
e
r
m
i
n
a
l
d
i
a
g
r
a
m
T
e
r
m
i
n
a
l
s
t
r
i
p
d
es
i
g
n
a
t
i
o
n
Cable designation
Cable designation
Page/path
Connection
Destination
Terminalname
Jumper
Terminal-
number
Connection
Destination
Cable type
Cable type
F
u
n
c
t
i
o
n
X
2
2
K
2
3
.
6
1
U
1
M
1
1
2
1
O
/
L
4
K
2
3
.
6
2
V
1
M
1
2
4
1
O
/
L
6
K
2
3
.
6
3
W
1
M
1
3
6
1
O
/
L
P
E
3
.
6
4
P
E
M
1
4