Prof. Dr. Md. Tajul IslamMember, UGC
2
Proposal Formats (8)Selection of proper format is obligatory.
W i n d o w s: UAIFS UGCAIFS
Win-1 Teaching-Learning PP Anx-5 CP Anx-6
Self-Assessment CP Anx-11 CP Anx-11
Win-2 Research not Leading to Degree
PP Anx-7 CP Anx-8
Research Leading to Degree
PP Anx-9 CP Anx-10
Win-3 University wide CP Anx-12 CP Anx-12
3
Window-1:
Probable Activities
for
Improvement of Teaching-Learning
444
Teaching-Learning: Objectives
1. To enhance the professional skills of the academic staff in providing innovative and high quality teaching;
2. To modernize education by formulating a flexible and student-centered curricula design that emphasizes learning outcomes, competencies, interdisciplinary and multidisciplinary courses, and by facilitating lifelong learning and employability;
3. To improve the institutional academic infrastructure
5
Teaching-Learning: Activities
a) Provisional/Contractual recruitment of qualified teachers holding PhD
b) Modernization of academic programs that meet demand of labour market and increase employability of graduates
c) Formulation of student centered curricula designs with emphasis on learning outcomes and competencies
6
Teaching-Learning: Activities
d) Invitation to post-doctoral fellows & scholars to offer courses and doing research
e) Improvement of library services
f) Design and implement self-assessment exercise at program or department level
7
Window-2:
Probable activities
for
Improvement of Research Capabilities
8
Improvement of Research: Objectives
1. To enhance the professional skills of the academic and support staff in conducting research that will contribute to social and economic growth and national innovation, competitiveness and development;
2. To improve the institutional research facilities
3. To support the development of high quality PhD programs, national and international inter-departmental and inter-university cooperation, & collaboration.
9
Improvement of Research: Activities
a) Modernization of postgraduate programs of national importance
b) Initiate joint academic-research programs with national and foreign universities and research organizations
c) Formulation of innovative research oriented to industries and market demands
10
Improvement of Research: Activities
d) Development of laboratories to conduct innovative research
e) Collaborative initiatives between academics, researchers and industries
f) Professional development of academic and support staff for research activities
11
PROJECT PROPOSAL
C O M P O N E N T S
12
Proposal Components
Components PP CP
1. Proposal title √ √
2. Institutional information √ √
3. General objectives √ √
4. Specific objectives √ √
5. Sub-project summary √ √
6. Strategic Analysis √ √
7. Background Data Substantiating the Strategic Analysis (Tables-1, 2/3)
√
13
Proposal ComponentsComponents PP CP
8. Table of Milestones √
9. Table Performance Indicators √
10. Relevance √ √
11. Benefits (Qualitative and Quantitative) √ √
12. Operation & Maintenance of Equipment/Instrument
√
13. Environmental effect/impact √
13. Summary of Estimated Budget √ √
14. Work/Activities Plan √ √
15. Financing Plan √
14
Proposal Components
Components PP CP
16. Procurement Plan √ √
17. Training Plan √
18. Detail Budget √ √
19. Sub-project Management Team √ √
20. Technical assistance/consulting √
21. Linkages/collaboration √
22. Experience of similar project √
23. Effect/impact of the sub-project √
15
Proposal Components
Components PP CP
24. Sustainability √
25. Safety Checklist & Mitigation Plan √
26. Name and address of two peers √
27. Signature of the SPM √ √
28. Signature of the Head of Proposal Submitting Entity
√ √
29. Institutional Commitment √
30. Signature of Vice-Chancellor √
16
Proposal ComponentsAnnex PP CP
Milestones to Evaluate Sub-project Implementation √
Performance Indicators to Evaluate Sub-project Impact
√
Work plan √ √
Financing Plan √
Procurement Plan: Goods, Works & Services √ √
Training Plan √
Details of Estimated Budget √ √
Organogram of Sub-project Management Office √ √
Attachment-A: RESUME √ √
17
Proposal title
Informative, not creative Brief, precise, informative, comprehensive Reflect objectives Should include well known “key words” Institutional and project responsibilities
should be well established
Complete “at the end of writing”
18
Institutional information
Self-explanatory
19
General objectives
Should reflectthe title; Repeat keywords if possible
Should be commensurate with vision, mission, goal of the University, entity
State main problem addressed by the proposal State objectives referred to medium-term
results and impact that the institution would like to achieve
In bullet form No overlapping
20
Specific objectives
Should support the General Objectives Several specific objectives against one
General objective Identified and numbered Clear and specific Measurable, not necessarily quantified Achievable during lifetime of the project
but outreach beyond Relevant in the local context Should allow periodic M&E
21
Proposal summary 150 for PP & 250 for CP A first concise view of the proposal Follow logical framework approach
a. Goal & Purpose General Objectives
b. Purpose & Output Specific Objective Expected Result Outcome
c. Output & Input Activities, Methods etc.
Item-wise paragrapgh captions
Strategic Analysis (SWOT)
22
23
Strategic Analysis
- Basically SWOT analysis (Annex 1-B)
- Should clearly indicate that all categories of stakeholders participated in the exercise
- Both internal (strength & weaknesses) and external (opportunities & threats) factors should be analyzed & highlighted
- Link SWOT results with objective, activity, outcome, performance indicator
24
Background Data
- Should link the background data with SWOT (S & W part)
- Should generate extra relevant information along with the given questions
- Data should relate to the sub-project issues
- Some quantitative facts about the entity
- Some important items not to be omitted: Basic academic indicators (input, output, outcomes); physical facilities, institutional tendencies
Note: SWOT analysis & background data should be related
25
Research Area (non-degree)
• For Window-2 CPs only
• Conceptual framework of research
• Narrow down topic
• With necessary technical jargons
• Hypothesis expected results and outcomes
• Link between facilities to be created and research
26
Research area (Degree)
For Window-2 CPs only
Conceptual framework of broad research field
With necessary technical jargon
Identify specific areas for students
Link between facilities to be created and research
27
Project Indicators
Level 1. Milestones. Describe progress in sub-project implementation Expressed in terms of critical activities/outcome
Level 2. Performance indicators. key variables that affect beneficiaries
Refer to Annex-2 of AIFOM (2nd ed)
Essential for M&E, measurement of achievement of results, effectivity in resource’s use and improvement of project design.
28
Milestones Level 1
Achievement of critical activities / Results Only critical activities & critical results Activity-Result relation should be well visible
and self explanatory
• Should indicate a new level in implementation Must be objectively verifyable Relate to work plan, procurement plan,
financing plan
29
Performance Indicators (level 2)
Relation between milestones & performance indicators, log frame
Log-frame: Input →Output → Purpose →Goal
Milestone Performance Indicator
- May be within the sub-project period, some may go beyond
- May be quantitative and qualitative (but verifiable) - Assumptions should be realistic - Verification methods clear, operational- Refer to general objective, specific objectives,
benefits, University characteristics etc.
30
Table of Milestones (example from HEQEP)
Milestone Specific Objective
Critical activities
Verification method
Assumption
AIFOM published
Teaching – learning, research
Manuscript printing contract
Physical Sufficient no. of tenders
AIF startup -Do- Proposal call evaluation contract sign
List of subprojects
All time schedule maintained
BDREN first phase
High speed Internet
Design Fiber laying NOC creation
Physical No administrative hindrance Univ. coop-n
31
Table of PI (example from HEQEP)
PI Space objective
Cal. method
Assump-tion
Verif. method
Cal. base value
Base value 2011
Desired value 2014
Devt. of new curriculum
Teach-g learning
% Academic Council Approval
MNE report
% **** ****
Student access to Internet
High speed Internet
% Sufficient internal connec-tivity
Survey % **** ****
32
Relevance
Explicit:
University & Entity relevance (eg. Agri Univ. projects should be agri related)
Regional relevance
National relevance
Relate to sub-project activities, specific objective, SWOT results
33
Benefits (qualitative and quantitative)
• Be imaginative but objective• Direct and indirect benefit
• Relate to general objective, specific objective• Relate to performance indicators Some examples
Better R&D infrastructure and capacity Wider Ph.D. disciplinary coverage, enrolment
and graduation Higher research outputs, productivity and
international linkages
34
Operation and Maintenance of equipment and instruments
Institutional capacity in operation and maintenance of equipment and instruments that will be used in the project:
In-house preventive maintenance In-house servicing Repair parts Externaly procured servicing
35
Budget (Aggregate and Detail)
• Detail and aggregate are structurally related
• Detail first and Aggregate will follow
• Employ economic code
• Comply ceiling and rates e.g.– SPM incentive, no. of Assoc. SPM, Civil work, etc.– Ph.D., MPhil scholarship, Foreign visit etc.
36
Budget AIF: Eligible Expenditures (Article-13)
1. Training, conference, scholarship2. Academic collaboration, visit, remuneration3. Self assessment4. Procurement of goods, TLM, ICTs, chemicals5. Procurement of small works (renovation)6. Procurement of services: consulting fees7. Operational cost (2% of costs)8. Non-eligible recurring expenditures
Works Salaries Other costs
37
Budget
AIF: Non-Eligible Expenditures (Article 13.10) Salary and allowances for permanent
academic and support staff of university Any expenditure of the office other than
the sub-project Large civil works Cost not related to the sub-project
38
Workplan should be progressive and realistic
Activities should be logically sequenced Where, when and who questions should be
answered! Clear milestones should be set Duration of preparation versus
implementation should be realistic
Workplan: Actions in time chart (Gantt chart)
39
Training PlanTwo types:
(a) Training for implementation of the SP
(b) Training as specific objective of the SP
Should be logically sequenced
Academic staff upgrading
Academic staff development. Post-graduate degrees, local and abroad. New qualified staff
Support/ management staff. Technicians
40
Procurement Plan Goods, Works and Services separately
Use World Bank format Useful management tool for project activity planning and
implementation of purchases
Links to budget and work plan. Coherence
On time adjustments for delays and contingencies will allow on time updates of work-plan and efficiency improvements
Careful management of procurement will normally produce project savings that can be used to support other project purposes
41
Sub-project management team
Sub-project Team includes SPM, ASPM & Associate SPMs
Human resources behind a project Responsibilities and challenges Institutional role Academic role Project organization Technical committee
42
Institutional linkages
Links with other improvement programs in the institution
Links with other universities. Links with other organizations; example: industry If possible, consider their participation in the first
design stages
University-1 Development Plan
Proposal Proposal Proposal Proposal
Other institutions Other institutions University-2
Development Plan
43
Effects and Impacts
Environment Women and children Employment and poverty reduction Institutional performance Human resource development Academic program Research Food security Productive innovation Governance Disaster management
44
Proposal Sustainability Continuation after the contract can be
foreseen and is realistic Capitalisation on previous experiences
Medium/long term impact can be expected
Long-lasting effect on institutions/target groups
Environmental, safety hazard protection and risk mitigation have been considered
Institutional commitments on implementation and sustainability are clear and convincing
454545
ANNEXES
1. Table of (a) Milestones & (b) Performance Indicators
2. Work / Activity Plan3. Financing Plan4. Procurement Plan (Goods)5. Procurement Plan (Works)6. Procurement Plan (Services)7. Training Plan8. Details of Estimated Budget9. Indicative Organogram of SPM office10. Attachment-A: Resume of SPM & ASPM
46
AIF preliminary proposal evaluation
A: Coherence with AIF & institutional objectives: 50 point
1. Clarity of proposal defined/presentation2. Clarity of the proposal objectives3. Compatibility of the proposal with the
mission/development plan of the: University/ faculty/ department/center/institute; & national development goal
4. Innovative nature of the project5. Clarity of engagement of the University/faculty/
department/center/institute
(Excellent=10, Good=8, Fair=6, Weak=4, Deficient=2 & Incomplete=0)
47
AIF preliminary proposal evaluation
B: Benefits and viability; Quality of drafting: 50 point
1. Quality of the strategic analysis2. Quality of the presentation of the problem/
hypothesis and expected results3. Quality of the analysis of data4. Reasonability of budget5. Overall proposal viability
(Excellent=10, Good=8, Fair=6, Weak=4, Deficient=2 and Incomplete=0)
48
CP Evaluation Criteria
Strategic analysis and proposal design (4) 20
Milestones and performance indicators (2) 10
Relevance to the national need & benefits 4) 20
Justification of the budget (2) 10
Quality of the management plan (2) 10
Institutional engagement & sub-project management (2)
10
Clarity of impact analysis (2) 10
Sustainability (2) 10Excellent=5, Good=4, Fair=3, Weak=2, Deficient=1 and Incomplete=0
494949
50
Experience from 1st Round
• Date-line was not maintained strictly by UAIFS• CP format selection was wrong• Mixed up Window-1& 2 items• Paragraphs were disorganized in some CPs• Detailed budget was absent in many CPs• Budget & item cost limit exceeded • Budget & other plans was not given in xls format• Environment Safety Checklist … ignored• Too many foreign visit included• Single person signed in more than one CPs• CP binding and CD marking was not proper• ………
51
Precautions for 2nd Round• Date-line will be maintained strictly• Strict scrutiny by UGCAIFS/UGCBAIF • All paragraphs should be organized & filled• Justification of budget asked for• Detailed budget format added in all Annexes• Budget & all plans should be given in xls format• Justification needed if vehicle is included in CP• Environment Safety Checklist … must• UGCBAIF will apply complementary selection criteria• Fatty budget will be a disqualification• Foreign visit made restricted• Single person in more than one CP not allowed
52