T op-down construction requires columns to be plunged into piles to tight structural tolerances. Balfour Beatty Ground Engineering (BBGE) are experienced in achieving these high standards. CONCEPT Plunge columns can be installed into rotary bored piles to allow for a ‘top-down’ construction sequence, 'launching' structures before the basement is excavated. By adopting this method of construction the client can gain advantage of a reduced construction programme. Plunge columns have been used in the past but it is only recently that they have been brought back to the forefront of construction and BBGE are helping to drive this resurgence.  CONSTRUCTION PROCESS Generally the construction process is as follows; a rotary bored pile is excav ated to the required depth, a reinforcement cage is then installed and then the void is lled with concrete stopping the required distance below ground level. Whilst the concrete is still wet a hydraulic plunging frame is installed within the temporary casing and then the plunge column is installed to structural tolerances. The concrete is then lef t to set in the pile and once this is complete the empty bore PLUNGE COLUMNS www.bbge.com
Transcript
Page 1: 1142-Plunge Columns Web

7/16/2019 1142-Plunge Columns Web

http://slidepdf.com/reader/full/1142-plunge-columns-web 1/2

Top-down construction requires columns to be plunged into piles to

tight structural tolerances. Balour Beatty Ground Engineering (BBGE)

are experienced in achieving these high standards.

concept

Plunge columns can be installed into rotary bored piles to

allow or a ‘top-down’ construction sequence, 'launching'

structures beore the basement is excavated. By adopting

this method o construction the client can gain advantage o a

reduced construction programme. Plunge columns have been

used in the past but it is only recently that they have been

brought back to the oreront o construction and BBGE are

helping to drive this resurgence.

construction process

Generally the construction process is as ollows; a rotary

bored pile is excavated to the required depth, a reinorcement

cage is then installed and then the void is flled with concrete

stopping the required distance below ground level. Whilst the

concrete is still wet a hydraulic plunging rame is installed

within the temporary casing and then the plunge column is

installed to structural tolerances. The concrete is then let

to set in the pile and once this is complete the empty bore

plunge columns

www.bb.

Page 2: 1142-Plunge Columns Web

7/16/2019 1142-Plunge Columns Web

http://slidepdf.com/reader/full/1142-plunge-columns-web 2/2

above is backflled. When all the plunge columns are installed

the construction o the structural rame above ground level

can begin.

previous experience

BBGE have designed and installed plunge columns on many

dierent projects, most recently plunge columns have been

installed at The Shard o Glass (London), Heathrow Terminal

2B and at Oxord University. The table below highlights the

how successul the installation o plunge columns were at

The Shard.

HeAD oFFice

Pavilion C2, Ashwood Park, Ashwood Way,

Basingstoke, Hampshire, RG23 8BG

T +44 (0)1256 365200

F +44 (0)1256 365201

E [email protected]

For FurtHer inFormAtion contAct:

Top-down construction reduces the overall construction programme

resulting in earlier project completion dates.

Plunge Column and Frame

Finished Column

Attributes

Required by the

specifcation

Achieved on Site

at The Shard

Plan Position at

Head

10mm any

direction

Average 7mm

Angular Rotation

at Head

< 2 degrees < 0.25 degrees

Level at Column

Head

+/-10mm + 3mm/-5.5mm

Verticality 1:400 Average 1:880

www.bb.


Recommended