+ All Categories
Home > Documents > (1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of...

(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of...

Date post: 30-Dec-2015
Category:
Upload: geoffrey-erick-richard
View: 215 times
Download: 0 times
Share this document with a friend
15
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline • Layout updates of the facility • Conveyer options • Mock-up preparation and cable handling • Other news
Transcript

(1/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

PS East Area Update

• Outline

• Layout updates of the facility

• Conveyer options

• Mock-up preparation and cable handling

• Other news

(2/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

24 GeV/c proton beam

(3/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

IRRAD proton facility

PH/DT

24 GeV/c proton beam

LHC experiments

24 GeV/c proton beam

(4/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Mixed Particle field facility

R2E Project

24 GeV/c proton beam

(5/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Ventilatio

n syste

m

Both zo

nes will

be ventila

ted

(6/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Technica

l loca

l

Connection to

the ra

diation are

a24 GeV/c proton beam

(7/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Control roomDry run test

24 GeV/c proton beam

(8/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Platform for the Dry Run test of

heavy equipment e. g. UPS,

Power converters

(9/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

East Area Facilities

Platform for the Dry Run test of

Heavy equipments e. g. UPS,

Power converter

This platform will be enlarged up to

here

24 GeV/c proton beam

(10/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Mixed Field Facility

Target storage areaSliding Shielding door

Test area for small object

(components)

Small conveyer path (Montrac

rail)

Loading areaLocal shielding

doorCable path from the technical

local to the radiation area

Patch panel for connections

Motors for the mobile shielding

24 GeV/c proton beam

Mobile shielding

Example of test locations

(11/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Target storage area

(12/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Conveyer systems

MLR (auto-guided):•We contacted the company

•For further iteration we would require the updated layout (incl. step-file) and sketch•Costs will likely be high (~100kEUR) for 1t payload

Other Options:•SEAQX

Motorized wheel (to integrate) Trailer system Damped lifting and transport

•Air cushion systems (to integrate) AEROGO TRANDLOG SMEYERS

We will take contact with them

(13/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Montrac conveyer

(14/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Mock-up preparation and cable handling

(15/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger

Other News

Target:

• Three fixed installed target for varying beam intensity

Materials Aluminium (×2) and copper (×1) (allowing for intensity reduction of about 2.5 and 4)

Second aluminium target shall include longitudinal holes to allow for the largest reduction (/4)

1 empty slot (e .g. direct beam sample tests)

Expected operation with Beam-Parameters (first guess):

• standard operation (with one of the massive targets in place): any sigma between 5 to 25mm is ok for us

• reduced intensity operation (with aluminum target including ‘holes’): any sigma between 10-25mm is ok for us

• small component tests

with target in place: sigma larger than 15mm required

without target in place: largest possible sigma at small sample location

Name of mixed-beam facility (thanks to Ruben!):

• CHARM-PS (Cern High Energy Accelerator Mixed field/facility at the PS)


Recommended