Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | geoffrey-erick-richard |
View: | 215 times |
Download: | 0 times |
(1/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
PS East Area Update
• Outline
• Layout updates of the facility
• Conveyer options
• Mock-up preparation and cable handling
• Other news
(3/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
IRRAD proton facility
PH/DT
24 GeV/c proton beam
LHC experiments
24 GeV/c proton beam
(4/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Mixed Particle field facility
R2E Project
24 GeV/c proton beam
(5/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Ventilatio
n syste
m
Both zo
nes will
be ventila
ted
(6/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Technica
l loca
l
Connection to
the ra
diation are
a24 GeV/c proton beam
(7/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Control roomDry run test
24 GeV/c proton beam
(8/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Platform for the Dry Run test of
heavy equipment e. g. UPS,
Power converters
(9/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
East Area Facilities
Platform for the Dry Run test of
Heavy equipments e. g. UPS,
Power converter
This platform will be enlarged up to
here
24 GeV/c proton beam
(10/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
Mixed Field Facility
Target storage areaSliding Shielding door
Test area for small object
(components)
Small conveyer path (Montrac
rail)
Loading areaLocal shielding
doorCable path from the technical
local to the radiation area
Patch panel for connections
Motors for the mobile shielding
24 GeV/c proton beam
Mobile shielding
Example of test locations
(12/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
Conveyer systems
MLR (auto-guided):•We contacted the company
•For further iteration we would require the updated layout (incl. step-file) and sketch•Costs will likely be high (~100kEUR) for 1t payload
Other Options:•SEAQX
Motorized wheel (to integrate) Trailer system Damped lifting and transport
•Air cushion systems (to integrate) AEROGO TRANDLOG SMEYERS
We will take contact with them
(15/15)08/05/13 – RadWG meetingJ. MekkiM. Brugger
Other News
Target:
• Three fixed installed target for varying beam intensity
Materials Aluminium (×2) and copper (×1) (allowing for intensity reduction of about 2.5 and 4)
Second aluminium target shall include longitudinal holes to allow for the largest reduction (/4)
1 empty slot (e .g. direct beam sample tests)
Expected operation with Beam-Parameters (first guess):
• standard operation (with one of the massive targets in place): any sigma between 5 to 25mm is ok for us
• reduced intensity operation (with aluminum target including ‘holes’): any sigma between 10-25mm is ok for us
• small component tests
with target in place: sigma larger than 15mm required
without target in place: largest possible sigma at small sample location
Name of mixed-beam facility (thanks to Ruben!):
• CHARM-PS (Cern High Energy Accelerator Mixed field/facility at the PS)