+ All Categories
Home > Documents > 116037-D-EIA-3.5a-1.0.0 Figure 3.5a - Viewpoint 2- Detailed … · VIEWPOINT 2 - Ben Tee FIGURE...

116037-D-EIA-3.5a-1.0.0 Figure 3.5a - Viewpoint 2- Detailed … · VIEWPOINT 2 - Ben Tee FIGURE...

Date post: 28-Jan-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
O 39.6 O 65.5 O 27 N 0m 0.5km Scale 1:25000 @A3 Grid Ref: 224578 797097 Distance to development: 2.07km AOD: 700.7m © Crown Copyright and database rights 2017. Ordnance Survey License Number 100048957 VIEWPOINT 2 - Ben Tee FIGURE 3.5a On ascending Ben Tee stop at 700m at location with view of Coire. Drawing No. - 116037-D-EIA3.5a Revision - 1.0.0 Date - 14.03.2018 Tailrace Tunnel (underground) Access Tunnel (underground) Headrace Tunnel (underground) Cavern Power Station (underground) Temporary New Access Track Emergency Access Tunnel Portal Lower Control Works Jetty & Administration Building Dam and Embankment Upper Reservoir Spillway Channel Intake Tower Emergency Access Tunnel (underground) Permanent New Access Track Existing Track to be Upgraded Indicative Borrow Pit Area Indicative Site Establishment Area Existing Road to be Upgraded Surge / Ventilation Shafts Key:
Transcript
  • O

    39.6

    O

    65.5

    O 27

    N

    0m 0.5km

    Scale 1:25000 @A3

    Grid Ref: 224578 797097 Distance to development: 2.07km AOD: 700.7m

    © C

    row

    n C

    op

    yrig

    ht

    and

    dat

    abas

    e ri

    ghts

    20

    17

    . Ord

    nan

    ce S

    urv

    ey L

    icen

    se N

    um

    ber

    10

    00

    48

    95

    7

    VIEWPOINT 2 - Ben TeeFIGURE 3.5a

    On ascending Ben Tee stop at 700m at location with view of Coire.

    Drawing No. - 116037-D-EIA3.5aRevision - 1.0.0Date - 14.03.2018

    Tailrace Tunnel (underground)

    Access Tunnel (underground)

    Headrace Tunnel (underground)

    Cavern Power Station(underground)

    Temporary New Access Track

    Emergency Access Tunnel Portal

    Lower Control Works

    Jetty & Administration Building

    Dam and Embankment

    Upper Reservoir

    Spillway Channel

    Intake Tower

    Emergency Access Tunnel(underground)

    Permanent New Access Track

    Existing Track to be Upgraded

    Indicative Borrow Pit Area

    Indicative Site Establishment Area

    Existing Road to be Upgraded

    Surge / Ventilation Shafts

    Key:

    Page 1


Recommended