32
January 2016 Application Ref: EN020017 National Grid (Richborough Connection Project) Order Regulation (5)(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 and TEN-E Regulation EU347/2013 11B Night-time Background Noise Measurements 5.4.11B DOCUMENT
Transcript
Page 1: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

January 2016Application Ref: EN020017

National Grid (Richborough Connection Project) Order Regulation (5)(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 and TEN-E Regulation EU347/2013

11B Night-time Background Noise Measurements

5.4.11BDO

CU

ME

NT

Page 2: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Page intentionally blank

Page 3: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project

Volume 5

5.4 Environmental Statement Appendices

5.4.11B Night-time Background NoiseMeasurements

National GridNational Grid HouseWarwick Technology ParkGallows HillWarwickCV34 6DA

Final

January 2016

Page 4: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Page intentionally blank

Page 5: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final January 2016

Document Control

Document Properties

Organisation National Grid

Author Janine Dickinson

Approved by Steve Self

Title Night-time Background Noise Measurements

Document Reference 5.4.11B

Version History

Date Version Status Description/Changes

04/01/16 1 Final 1st Issue

Page 6: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final January 2016

Page intentionally blank

Page 7: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final i January 2016

Table of Contents

1. NIGHT-TIME BACKGROUND NOISE MEASUREMENTS 1

1.1 Introduction 1

1.2 Equipment and Calibration 2

2. ANNEXES 3

ANNEX 11B.1 MONITORING LOCATIONS A TO E

ANNEX 11B.2 MONITORING LOCATIONS G AND H

ANNEX 11B.3 MONITORING LOCATIONS I TO L

ANNEX 11B.4 MONITORING LOCATIONS M TO P

ANNEX 11B.5 SURVEY DETAIL MONITORING LOCATION A

ANNEX 11B.6 SURVEY DETAIL MONITORING LOCATION B

ANNEX 11B.7 SURVEY DETAIL MONITORING LOCATION C

ANNEX 11B.8 SURVEY DETAIL MONITORING LOCATION D

ANNEX 11B.9 SURVEY DETAIL MONITORING LOCATION E

ANNEX 11B.10 SURVEY DETAIL MONITORING LOCATION G

ANNEX 11B.11 SURVEY DETAIL MONITORING LOCATION H

ANNEX 11B.12 SURVEY DETAIL MONITORING LOCATION I

ANNEX 11B.13 SURVEY DETAIL MONITORING LOCATION J

ANNEX 11B.14 SURVEY DETAIL MONITORING LOCATION K

ANNEX 11B.15 SURVEY DETAIL MONITORING LOCATION L

ANNEX 11B.16 SURVEY DETAIL MONITORING LOCATION M

ANNEX 11B.17 SURVEY DETAIL MONITORING LOCATION N

ANNEX 11B.18 SURVEY DETAIL MONITORING LOCATION O

ANNEX 11B.19 SURVEY DETAIL MONITORING LOCATION P

Page 8: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final ii January 2016

Page intentionally blank

Page 9: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final 1 January 2016

1. NIGHT-TIME BACKGROUND NOISE MEASUREMENTS

1.1 Introduction

1.1.1 This report documents the night-time background noise measurements taken in thevicinity of the proposed route for the Richborough Connection overhead line forinclusion in the operational noise assessment.

1.1.2 To establish the prevailing background noise conditions along the proposed route,a series of five minute attended measurements were taken at the convenient publicaccess points [road crossings] representative of residential receptors along theproposed route during the early hours on several different occasions as detailedbelow.

The route was surveyed in the early hours of the following dates, all of whichwere normal working week days :

16th July 2013;

23rd September 2014;

18th February 2015; and

8th April 2015.

1.1.3 Monitoring locations were identified as part of a desktop study and were labelled Ato P. Location F was found to be unsuitable for carrying out noise monitoring whenit was visited in person. Consequently no measurements were taken at location Fand it is not identified on any of the figures. The monitoring locations are shown inFigure 11.1, Volume 5, Document 5.3.11.

1.1.4 On all of the above occasions the weather was suitable for noise monitoring. It wasfine, calm and dry allowing the representative minimum background noise levels tobe measured without the influence of wind and precipitation. Throughout themeasurement surveys the weather remained fine and there were no obviouspeculiar or atypical noise sources to contend with. For the great majority of themeasurements, the measurement intervals were not disturbed by passing localtraffic or other human activity. When there was passing local traffic, it wasconsidered to be typical for that location. Surveyor comments were noted at eachlocation and recorded in National Grid files.

1.1.5 This report is not a noise assessment; it is simply a record of prevailing backgroundnoise measurements. These measurements have been used to guide the audiblenoise impact assessment included in the Environmental Statement, Volume 5,Document 5.2, Chapter 11: Noise and Vibration. Based on the range ofbackground noise levels measured at each monitoring location, professionaljudgement has been used to determine the representative background noise levelat each receptor location, which has then fed into the noise assessment included inthe Environmental Statement, Volume 5, Document 5.2, Chapter 11: Noise andVibration.

Page 10: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final 2 January 2016

1.2 Equipment and Calibration

1.2.1 Measurements were taken with a variety of instruments, all of which werecalibrated in accordance with the relevant standards:

Bruel & Kjaer 2270 Investigator, Serial No. 2664167

Bruel & Kjaer 4189 microphone, Serial No. 2662754

Bruel & Kjaer 2250 Investigator, Serial No. 2506571

Bruel & Kjaer 4189 microphone, Serial No. 2529520

Bruel & Kjaer 2250 Investigator, Serial No. 3000223

Bruel & Kjaer 4189 microphone, Serial No. 2775412

1.2.2 Sound level equipment was also successfully field calibrated immediately beforeand after each noise survey in accordance with manufacturer's instructions.Meteorological parameters were recorded for indication.

Page 11: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final 3 January 2016

2. ANNEXES

Table 11B.2.1 List of annexes summarising night-time background noisemeasurement locations

Annex Number Section of proposed 400kVoverhead line route

Monitoring locations

Annex 11B.1 A A to E

Annex 11B.2 B G and H

Annex 11B.3 C I to L

Annex 11B.4 D M to P

Table 11B.2.2 List of annexes detailing the night-time background noisemeasurements at each location

Annex Number Monitoring Location Description of monitoringlocation

Annex 11B.5 A Vauxhall Avenue

Annex 11B.6 B Vauxhall Road

Annex 11B.7 C Shalloak Road

Annex 11B.8 D Hawe Lane

Annex 11B.9 E Herne Bay Road

Annex 11B.10 G St Alban’s Road

Annex 11B.11 H Sandpit Hill

Annex 11B.12 I Island Road

Annex 11B.13 J Island Road

Annex 11B.14 K Sarre Court

Annex 11B.15 L Gore Street

Annex 11B.16 M Sherriffs Court Lane

Annex 11B.17 N Station Approach

Annex 11B.18 O Ebbsfleet Lane

Annex 11B.19 P Marsh Farm Road

Page 12: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final 4 January 2016

Page intentionally blank

Page 13: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.1 January 2016

ANNEX 11B.1MONITORING LOCATIONS A TO E

Background noise surveys were undertaken in the following locations in Section Aof the proposed route:

Location A Vauxhall Avenue

Location B Vauxhall Road

Location C Shalloak Road

Location D Hawe Lane

Location E Herne Bay Road

Inset 2 The proposed alignment within Section A of the route (in red) and the areasclose to residential areas along the route where background surveys have beenundertaken (yellow pins).

Page 14: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.2 January 2016

ANNEX 11B.2MONITORING LOCATIONS G AND H

Background noise surveys were undertaken in the following locations in Section Bof the proposed route:

Location G St Alban’s Road

Location H Sandpit Hill

Inset 2 The proposed alignment within Section B of the route (in red) and the areasclose to residential areas along the route where background surveys have beenundertaken (yellow pins).

Page 15: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.3 January 2016

ANNEX 11B.3MONITORING LOCATIONS I TO L

Background noise surveys were undertaken in the following locations in Section Cof the proposed route:

Location I Island Road

Location J Island Road

Location K Sarre Court

Location L Gore Street

Inset 3 The proposed alignment within Section C of the route (in red) and the areasclose to residential areas along the route where background surveys have beenundertaken (yellow pins).

Page 16: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.4 January 2016

ANNEX 11B.4MONITORING LOCATIONS M TO P

Background noise surveys were undertaken in the following locations in Section Dof the proposed route:

Location M Sherriffs Court Lane

Location N Station Approach

Location O Ebbsfleet Lane

Location P Marsh Farm Road

Inset 4 The proposed alignment within Section D of the route (in red) and the areasclose to residential areas along the route where background surveys have beenundertaken (yellow pins).

Page 17: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.5 January 2016

ANNEX 11B.5SURVEY DETAIL MONITORING LOCATION A

Inset 5 Survey detail, Location A – Vauxhall Avenue

Table 11B.2.3 Location A - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 02:32 5 36 Noise from commercialoperations

23/09/2014 03:13 5 31 Occasional industrial noise

18/02/2015 01:35 5 34

08/04/2015 00:50 5 31

Page 18: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.6 January 2016

ANNEX 11B.6SURVEY DETAIL MONITORING LOCATION B

Inset 6 Survey detail, Location B – Vauxhall Road

Table 11B.2.4 Location B - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

23/09/2014 03:01 5 47 Industrial noise

18/02/2015 01:45 5 47 Industrial noise

08/04/2015 00:59 5 45 Industrial noise

Page 19: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.7 January 2016

ANNEX 11B.7SURVEY DETAIL MONITORING LOCATION C

Inset 7 Survey detail, Location C – Shalloak Road

Table 11B.2.5 Location C - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 02:16 5 31 Industrial noise

23/09/2014 02:48 5 32 Industrial noise

18/02/2015 01:55 5 35 Industrial noise

08/04/2015 01:11 5 34 Industrial noise

Page 20: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.8 January 2016

ANNEX 11B.8SURVEY DETAIL MONITORING LOCATION D

Inset 8 Survey detail, Location D – Hawe Lane

Table 11B.2.6 Location D - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 01:48 5 24

23/09/2014 02:24 5 24

18/02/2015 02:18 5 28

Page 21: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.9 January 2016

ANNEX 11B.9SURVEY DETAIL MONITORING LOCATION E

Inset 9 Survey detail, Location E – Herne Bay Road

Table 11B.2.7 Location E - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 01:57 5 26

23/09/2014 02:36 5 24

18/02/2015 02:07 5 33 Agricultural machinery noise

Page 22: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.10 January 2016

ANNEX 11B.10SURVEY DETAIL MONITORING LOCATION G

Inset 10 Survey detail, Location G – St Alban’s Road

Table 11B.2.8 Location G - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 01:31 5 23

23/09/2014 02:08 5 33 Agricultural machinery noise

18/02/2015 02:33 5 23

08/04/2015 01:27 5 25

Page 23: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.11 January 2016

ANNEX 11B.11SURVEY DETAIL MONITORING LOCATION H

Inset 11 Survey detail, Location H – Sandpit Hill

Table 11B.2.9 Location H - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 01:09 5 24

23/09/2014 01:52 5 21

18/02/2015 02:47 5 28 Trickling noise (drainageworks)

Page 24: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.12 January 2016

ANNEX 11B.12SURVEY DETAIL MONITORING LOCATION I

Inset 12 Survey detail, Location I – Island Road

Table 11B.2.10 Location I - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 00:54 5 26

23/09/2014 01:37 5 22

18/02/2015 02:59 5 28 Trickling noise (water)

Page 25: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.13 January 2016

ANNEX 11B.13SURVEY DETAIL MONITORING LOCATION J

Inset 13 Survey detail, Location J – Island Road

Table 11B.2.11 Location J - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 00:47 5 29

23/09/2014 01:26 5 22

18/02/2015 02:43 5 28

Page 26: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.14 January 2016

ANNEX 11B.14SURVEY DETAIL MONITORING LOCATION K

Inset 14 Survey detail, Location K – Sarre Court

Table 11B.2.12 Location K - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 00:29 5 32 Traffic and chiller noise

23/09/2014 01:17 5 25

18/02/2015 02:34 5 26

Page 27: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.15 January 2016

ANNEX 11B.15SURVEY DETAIL MONITORING LOCATION L

Inset 15 Survey detail, Location L – Gore Street

Table 11B.2.13 Location L - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 00:14 5 25

23/09/2014 01:02 5 25

18/02/2015 02:17 5 26

Page 28: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.16 January 2016

ANNEX 11B.16SURVEY DETAIL MONITORING LOCATION M

Inset 16 Survey detail, Location M – Sherriffs Court Lane

Table 11B.2.14 Location M - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

16/07/2013 00:19 5 23

23/09/2014 00:49 5 29

18/02/2015 02:03 5 26

Page 29: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.17 January 2016

ANNEX 11B.17SURVEY DETAIL MONITORING LOCATION N

Inset 17 Survey detail, Location N – Sherriffs Court Lane

Table 11B.2.15 Location N - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

23/09/2014 00:35 5 25

18/02/2015 01:45 5 24

08/04/2015 01:50 5 25

Page 30: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.18 January 2016

ANNEX 11B.18SURVEY DETAIL MONITORING LOCATION O

Inset 18 Survey detail, Location O – Ebbsfleet Lane

Table 11B.2.16 Location O - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

23/09/2014 00:17 5 34

18/02/2015 01:25 5 37 Noise from sewage works

08/04/2015 02:11 5 32

Page 31: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date

Richborough Connection Project – Volume 5, Document 5.4, Appendix 11B

Final Annex 11B.19 January 2016

ANNEX 11B.19SURVEY DETAIL MONITORING LOCATION P

Inset 19 Survey detail, Location P – Marsh Farm Road

Table 11B.2.17 Location P - night-time background noise measurement details

Date Time Measurementduration, mins

LA90, dB Notes

18/02/2015 00:52 5 27 Noise from sewage works

18/02/2015 01:00 5 28 Noise from sewage works

Page 32: 11B Night-time Background Noise Measurements · Inset 9 Survey detail, Location E – Herne Bay Road Table 11B.2.7 Location E - night-time background noise measurement details Date