7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 1/18
WorleyParsons
EcoNomicS
resources &
energy
KUWAIT
OIL COMPANY
1 1
C8972-00-lC-SPC-1903
Rev
1
10,
December2012
LOWER
FARS
HEAVY OIL
DEVELOPMENT
FEED
WorleyParsons Canada Services
Ltd.
Calgary
Division Heavy
Oil Business Unit
540
-
12tn
Avenue
SW
Calgary,
Alberta
T2B OH4
Telephone:
(403)
508-5300
Facsimile:
(403)508-5301
www.worleypa
rsons.com
ABN
61 001
279812
@
Copyrlght
2010 Wor ôyParsons
:m
Addendum
To KOC
Specification
General
lnstruments
(01
5-JH-l
903)
r/"
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 2/18
@
WorløyParsons
ËcoNomicS
fesourtes
& enefgy
KUWAIT
OIL
COMPANY
LOWER
FARS
HEAVY
OIL DEVELOPMENT
ADOENDUM
TO KOC SPECIFICATIO¡I
GENEBAT
INSTRUMENTS
(015.,lH.I9O3)
SYNOPStS
This
doc-ument
presents
lhe
Addendum
To KOC
Specilication
General
lnstruments (O1S-JH-1903)
for
the
Kuwait
Oil
Company Lower
Fars Heavy
Oil
Development
Feed
project.
Disclaimer
This
document is
conceptual
in nature
and
represents
the work
oî WorteyParsons
performed
to
recognized
engineering
principles
and
practíces
appropriate tor
conceptual
engineering work
and
the terms
of reîerance
provided
by
WorleyParsons'contractual
Customer,
Kuwait
Oil
Company
(the
"Customel).
This
document
may
not
be
relied
upon
for
detailed
implementation
or
any other
puryose
not
spæifically identitied
within
thís
document.
This
document
is
confidential
and
prepared
solely
Íor
the
use
of
the Customer. The
contents
of this
document may
not
be used or
relied
upn
by
any
pafty
other than the
Customer,
and neither
Worleyparsons,
its
sub consultants
nor
their
respective
employees
assume
any
liability
îor
any rcason,
including,
but
not
limited
to,
nagligence,
to
any other
pafty
lor
any information
or
representation
herein.
The
extent
ol any
wananty
or
gu¿rantee
of
this document
or the informat¡on
contained
therein in favour
oÍ
the
Customer
is
limited
to
the
warranty
or
guarantee,
it
any,
contained ¡n
the contract
between
the
Customer
and
WorleyParsons.
DOC.
NO. 1
1
C8972-00-IC-SPC-1 903 R'l.doc
REV
OESCRIPÍION
002.0ü P0F.8{r8 tor7063t ÊPF.or?¿
OFGIN^TOR
aEvtEw
WOßT.EYPAFSOM¡
APPFOVAL
DAfE
CLIENI
APPñOI/AL
OATE
¡l.lø* 7
Oæ10,æ12ÍK
slu€d lor
D6lgr
Oct 15- 2of2
Ftiel- ÉltâøìrL. Sarr¡lidr
ßhdldDúñ
N/Am3-2û12
ÞÍdl
. Ellâ¡dÍú
.ßßdFdAffirc
N,l\bvlO.Ðtl
- PImll- ElÀÈJiul.
¡s¡d
Fc
R¡¡lm
N/
Hlaãl
- Ell¡ldìof
. S.nílth
- Shósr¡od
Fü
Souâd
Cilrd(
Påg.2ol
t8
tC6972{OlC€PC-l
8qt Rl.doc
41U1A?o12
Côæh3¡o
ù
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 3/18
m
WorleyParsons
€coNomic$
ffi
esources
& energy
KUWAIT
OIL COMPANY
LOWER
FARS HEAVY
OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-1903)
The
lollowing addendum
shall
apply
to
KOC Specification
No. 015-JH-1903
Revision
1
Replace
DCS with PCS
wherever
DCS is mentioned
in this document.
Section
1.0
-
SCOPE
Sub-Section
1.4
Add the following:
Where specific
standards
have been
withdrawn, superseded
or made obsolete,
the
latest replacement standards
shall be
used.
ln any document
where
reference
is
made to a KOC standard
or specification,
then
the
reference automatically
includes
the contents
of
the
project
specific criteria
for that
standard
or
the addendum to
that specification,
where
a
project
specific
criteria or
addendum
has been
issued.
Section
2.0
-
STANDARD
SPECIFICATIONS
Sub-Section
2.1.1
a
a
Replace
the following:
Replace NACE
MR0175 with
NACE MR0175/lSO
15156
Materialfor
Use
in H2S-
containing
Environment
in Oiland
Gas
Production
Add
the
following
slandards:
AGA REPORT
9 Measurement
of Gas by
Multipath Ultrasonic
Meters
-
Second
Edition
API
MPMS 5.8 Manual of
Petroleum
Measurement Standards
Chapter
5
-
Metering
-
Section
I
-
Measurement
of Liquid
Hydrocarbons
by
Ultrasonic
Flow Meters Using
Transit
Time Technology
-
First Edition
IEC
60079-27
Explosive
Atmospheres
-Parl27:
Fieldbus
lntrinsically Safe
Concept
(Frsco)
IEC 61158-2
lndustrial Communication
Networks
-
Fieldbus
Specifications
-
Part
2:
Physical
Layer
Specification
and
Service
Definition
Pag€ 3 of
18
*
Ê
2
'Í
<)
1
1C8972-00-IC-SPC-1
903
R1.doc
4
1011212012
74
rr
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 4/18
WorleyParsons
resources &
energy
KUWAIT
OIL
COMPANY
LOWER
FARS HEAVY OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-l 903)
ÊcoNomicË
:ffi:
Fieldbus
Foundation AG1
81
Fieldbus
Foundation FF569
Procedures
Fieldbus Foundation
FF831
Sub-Section
2.1.2
a
Sub-Sectlon
a
002-000-PDF-806
t0 17063) EPF-o1
74
System Engineering
Guidelines
Host lnteroperability
Support
Test Profile and
Fieldbus
Power Supply
Test Specification
Replace
the following standards
with the updated
standards:
Replace 8S5345
with
BSI BS
EN
60079.
Replace
BS
5490
with
BSI BS
EN
60529
Replace BS 5501
with BSI BS EN 60079
2.1.3
Delete
the following reference
to
the superseded
KOC Specifications:
015-AH-1001
Basic Design Criteria
015-AH-1002
lnternationalCodesandStandards
015-JH-1901
lnstrumentEngineeringBasicData
015-JH-1902
lnstrument
Design
015-JH-1905
Emergency Shutdown
Panel
015-JH-1906
Fire
and
Gas Panel
0'15-JH-1907
Motor-Operated
Valves
015-JH-1908
lnslrument
lnstallation
015-JH-1912
lnstrument Cables
015-KH-1902
Spare
Parts
and
Maintenance
Requirements
015-NH-1104
PlanVEquipmentNoiseControl
015-PH-1901
Electrical
Design, lnstallation and
Testing
015-UH-1001
Packing,MarkingandDocumentation
015-XH-1005
Shop and
Field Painting
Pags 4 of
l8
*
Ê
z
o
ú
,I
t
1
C8972-00-IC-SPC-1
903 Rl.doc
4
10112t2012
Corporalg
Base
d,
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 5/18
m
WorleyParsons
resources
&
energy
KUWAIT
OIL COMPANY
LOWER
FARS HEAVY OIL
DEVELOPMENT
ADDENDUM
TO
KOC SPECIFICATION
ËcoNomic
:Ø
GENERAL
TNSTRUMENTS
(01
5-JH-l903)
a
Add the
following
reference to the
updated
KOC Specifications:
KOC-E-003
Part
1
KOC
Recommended
Practice for
Design Basis
and
Selection
of
Electrical Systems
KOC-E-O13
KOC Standard
for
Motor
Operated
Valve Actuators
KOC-|-001
KOC Standard
for
lnstrumentat¡on and Control System Design
KOC-|-002
KOC Standard
for
lnstrument lnstallation
KOC-|-004
KOC Standard
for Shutdown
Systems
KOC-|-005
KOC
Recommended
Practice
for Fire and Gas System
Panels
KOC-I-OI0
KOC Standard
for Control
and Shutdown
Valves
KOC-|-O11
KOC Standard
for
lnstrument
Cables
KOC-G-004
KOC-G-007
KOC-G-009
KOC-G-012
KOC-L-030
KOC-P-001
KOC-L-006
KOC-MP-027,
Part
1
KOC-MP-027,Part2
KOC Standard
for
Packing, Marking and Documentation
KOC Standard
for
Basic Design
Data
KOC Standard
for Spare
Parts and Maintenance
Data
KOC Standard
for
Plant
Equipment ldentification
Nameplates
and
Pipeline Markers
KOC Standard
for Plant and
Equipment
Noise Control
KOC Standard
for
Painting and Coating
of
External
Metal
Surfaces
KOC Standard
for Fire
and
Gas Detection
Equipment
KOC Standard
for
Pressure Relief
Devices: Design
and
Materials
KOC Recommended
Practice
for Pressure
Relief Devices:
Sizing,
Selection,
Twining and
lnstallation
Page5ol18
I
1 C8972-00-IC-SPC-'l
903
R1.doc
4
1011212012
.1;n
t)us
,þ
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 6/18
WorleyParsons
resources &
energy
KUWAIT OIL
COMPANY
LOWER FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM TO KOC SPECIFICATION
EcoNomicS
,ffi
GENERAL
TNSTRUMENTS
(01
5-JH-1903)
a
015-JH-191
1
01s-ZH-1002
KOC Specification
for Standard
Auxiliary
Control
Room Cabinets
KOC Specification
for Reporting Computer
Condition
Monitoring,
Telecommunication
and
Security
System
Change
references
to specifications
as
follows:
Change references
to
Engineering Group Specification titled lnstrument Engineering
Basic Data
(Number
015-JH-1901)
to
KOC Standard
for lnstrumentation
and Control
System
Design
(Number
KOC-l-001).
Change
references to
Engineering Group
Specification
titled
lnstrument
Design '
(Number
015-JH-1902)
to
KOC Standard
for
lnstrumentation
and Control
System
Design
(Number
KOC-l-001
).
Change
references
to Engineering
Group Specification
titled
Basic
Design
Criteria
(Number
015-AH-1001)
to
KOC Standard
for Basic
Design Data
(Number
KOC-G-oo7)
Change
references to
Engineering
Group Specilication
titled
Packing,
Marking
arid
Documentation (Number 015-UH-1001) to KOC Standard
for
Packing, Marking and
Documentation
(Number
KOC-G-004).
Change
references to
Engineering Group
Specification
titled
Motor
Operated
Valves
(Number
015-JH-1907)
to
KOC
Standard
for Motor Operated
Valve Actuators
(Number
KOC-E-013).
Change
references
to Engineering
Group Specification
titled
Emergency Shutdown
Panel
(Number
015-JH-1905)
to KOC
Standard
for
Shutdown
Systems
(Number
KOC-l-004).
Change
references
to Engineering
Group
Specification
titled
Spare
Parts and
Maintenance
Requirements
(Number
015-KH-1902)
to
KOC Standard
for Spare
Parts
and Maintenance Data (Number KOC-G-009).
Change
references
to Engineering
Group
Specification
titled
PlanVEquipment
Noise
Control
(Number
015-NH-1104)
to
KOC Standard
for Plant and
Equipment
Noise
Control
(Number
KOC-L-030).
Change
references to
Engineering
Group Specification
titled
lnstrument
lnstallation
(Number
015-JH-1908)
to
KOC
Standard
for lnstrument
lnstallation
(Number
KOC-l-002).
Pago 6 of
18
1
1
C8972-00-IC-SPC-1
903 R1.doc
4
10t12t2012
d
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 7/18
m
WorleyParsons
resources &
energy
KUWAIT
OIL COMPANY
LOWER
FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM TO KOC SPECIFICAT¡ON
€coNomic$
m
GENERAL
TNSTRUMENTS
(01
5-JH-1903)
Change
references to
Engineering
Group Specification
titled
Shop
and
Field Painting
(Number
015-XH-1005)
to KOC Standard
for Painting and
Coating of
External
Metal
Surfaces
(Number
KOC-P-001
).
Change
references to
Engineering
Group Specification
titled
Electrical
Design,
lnstallation and
Testing
(Number
015-PH-1901)
to KOC
Recommended
Practice
for
Design Basis and Selection of
ElectricalSystems
(Number KOC-E-003 Part
1).
Add the
following
project
specifications:
11C8972-00-lC-SPC-0001
Project Specific Criteria
for
KOC Standard
for
lnstrumentation
and Control System
Design
(KOC-|-OO1
)
11C8972-OO-|C-SPC-0004
Project Specific
Criteria
for KOC Standard
for Shutdown
Systems
(KOC-l-004)
11C8972-00-lC-SPC-0010
Project Specific
Criteria
for KOC Standard
for Control
and
Shutdown
Valves
(KOC-|-O10)
11C8972-00-|C-SPC-0011
Project Specific
Criteria
for KOC Standard
for lnstrument
Cables
(KOC-l-011)
11C8972-00-|C-SPC-1909
Addendum
to
KOC
Specification
lnstruments
for
Packaged
Equipment
(01
s-JH-1
909)
11C8972-OO-|C-SPC-1911
Addendum to
KOC Specification
for Standard
Auxiliary
Control
Room Cabinets
(01
S-JH-191
1
)
1
1C8972-Oo-EL-SPC-0019
Project Specific
Criteria
-
KOC Standard
for Motor
Operated
Valve Actuators
(KOC-E-01
3)
Rewrite
Sub-Section
2.21o
read as
follows:
A non-inclusive
listing of applicable
codes and
standards
shall be
found in the
KOC
Standard
for lnstrumentation
and Control
System
Design
(KOC-l-001)'
SectiON 3.0
-
SERVICE
CONDITIONS
Sub-Section
2.1.4
Sub-Section
2.2
a
Pago 7 of 18
¿[0t$
I 1
C8972-00-IC-SPC-'1903
R1.doc
410t12t2012
74
,þ
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 8/18
WorleyParson
resources
&
energy
KUWAIT OIL
COMPANY
LOWER
FARS HEAVY
OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-1 903)
ËcoNomic
Sub-Section
3.2.1
Replace
the
following:
NACE MR0175
with NACE MR0175/lSO
15156
SectioN
4.0
-
BASIC
ENGINEERING
REQUIREMENTS
Sub-Sectlon
4.1
Sub-Section 4.2
Sub-Section
4.3
Replace Seclion 4.3.1 to
read as
follows
BS 5490
with
BSIBS
EN 60529
Sub-Section
4.4
a
Rewrite to
read
as
follows
a
¡
Rewrite
to
read
as
follows:
General
information on
allocation of
hazardous area divisions
and
responsibilities are
stated
in
the
KOG
Standard
for
lnstrumentation
and Control System
Design
(KOC-|-001).
Contractor shall
be
responsible
for confirmation
of suitable
selections of
hazardous area
and of
proactive
execution
methods to ensure the
safety
of the
complete
facility.
Rewrite Section 4.2.3 to
read
as
follows:
The
preferred priority
for the
protection
methods are
given
in the
KOC Standard
for
lnstrumentation and Control
System
Design
(Number
KOC-l-001).
Replace Section
4.2.41o read
as
follows:
BS
5501 with
BSI BS
EN
60079
Replace Section
4.2.6 to read as
follows:
BS
5345 with BSI BS
EN
60079
a
a
a
a
Pags I of
l8
*
'f
&
o
R
1 1 C8972-00-IC-SPC-l
903 R1.doc
4
1011212012
rr/
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 9/18
m
WorleyParaons
resources
& energy
EcoNomicË
:ffi;
KUWAIT OIL
COMPANY
LOWER
FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-1 903)
Sub-Section
4.5
Sub-Section
4.6
Sub-Section
4.7
a
The available
utilities
and their
process
conditions
are
detailed
in the
KOC Standard
for
lnslrumentation
and Control
System
Design
(KOC-l-001
).
Rewrite
to read
as
follows:
The
selected units
for calculations
and scales
are listed
in
the
KOG
Standard
for
lnstrumentation
and Control
System
Design
(KOC-l-001
).
Rewrite Section
4.6.2
paragraph
c) to
read as
follows:
c) Pneumatic
(instrument
air) connections
shall
be
1/tin.
NPT unless
air flow
requirements dictate
a
larger size. lnstrument
air tubing/connections
supplied
as
part
of
the
instrument
items
shallconform
to
the
instrument
air
hook-up details
given
in lhe
KOC
Standard
for
lnstrument
lnstallation
(KOC-|-002).
Rewrite Section
4.7.41o read
as
follows:
The Contractor
shall
provide
plant
equipment
identification
for each
instrument
as
per
KOC-G-O12,
KOC
Standard
for
Plant
Equipment
ldentification,
Nameplates
and
Pipeline
Markers.
The Contractor
shallcoordinate
with Company's
Maintenance
Planning
Department
by
obtaining blocks
of
numbers
for each instrument
type.
The
Contractor
shall
manufacture
and fit tag bearing
the allocated
numbers to
each
instrument.
a
a
Sub-Section
4.12
Sub-Section
4.13
a
Rewrite Section 4.12.21o read
as
follows:
Where
an item cannot
be
rendered suitable
for the conditions
by
selection of
materials,
a
paint
finish shall
be applied
in accordance
with
the
KOC Standard
for Painting and
Coating of
External
Metal Surface
(KOC-P-001
).
a
Rewrite
Section
4.13.1 to
read
as
follows:
Page9ol18
IFø
z
Í
o
ú
o
*
ÉR
1
C8972-00-IC-SPC-1
903
R1.doc
4
10t12t2012
r/r
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 10/18
m
WorleyParsons
HccNomicË
.m
resources
anergy
KUWAIT OIL COMPANY
LOWER
FARS HEAVY OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
cENERAL
TNSTRUMENTS
(01
5-JH-l
903)
For
all
relevant requirements,
refer
to the
KOC Standard
for
Packing, Marking and
Documentation
(KOC-G-004).
Rewrite Section
4.13.2 item b)to
read as
follows:
For all relevant
requirements,
refer
to the
KOC Standard
for
Packing,
Marking and
Documentation
(KOC-G-004).
Sub-Section
4.14
o
Rewrite
to
read
as
follows:
For all
relevant requirements,
refer to the
KOC Standard
for Spare
Parts
and
Maintenance
Data
(KOC-G-009).
Add Sub-Section
4.15
Signals
from Hazardous
Locations
For Foundation
Fieldbus devices,
junction
box
hubs shall incorporate
intrinsic safety
which
is compatible
with FISCO or
entity-approved
field instrumenls.
Section
5.0
-
CONTROL
VALVES
SectioN
6.0
-
RELIEF
AND SAFETY
VALVES
Section
7.0
-
FLOW
MEASUREMENT
Sub-Section
7.1
a
Page
10
ol
l8
*
z
¡-
o
fl
,
1 I
C8972.00-IC-SPC-1
903
R
l.doc
4
10t1212012
74
rp
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 11/18
m
WorleyParsons
€coNomicË
m
esources
& enetgy
KUWAIT
OIL COMPANY
LOWER FARS HEAVY
OIL DEVELOPMENT
ADDENDUM
TO
KOC SPECIF¡CATION
GENERAL
INSTRUMENTS
(01
s-JH-l 903)
Delete
as
follows:
ISA RP 3.2
Replace
as
follows:
ISO 5167 with BS
EN ISO 5167
Replace Sub-Section
7.3.2
item
m)
with
the
following:
For
the
Lower Fars
Heavy Oil
Facility the
following
metering devices
are also
allowed
o
Vortex
meter
r
Electromagnetic
flow meters
o Ultrasonic
flow meters
o
Coriolis
mass flow
meters
Replace Sub-Section
7.3.4 with the
followingr
Flow measurement
for remote
control or
indication shall
have
an integral
signal
indicator with
scale characteristic
in
engineering
units.
Rewrite Sub-Section
7.5.2
paragraph
a) to
read as follows:
a)
Orifice
plates
shall be
manufactured
in accordance
with the dimensions
and
tolerances
given
in BS EN
ISO
5167.
SectioN
8.0
-
PRESSURE MEASUREMENT
Sub-Section
8.5.1
Rewrite
item
I
paragraph
e)to
read
as
follows:
e) Other
key details,
e.9.,
To
NACE
MR0175/lSO
15156
002-000-PDF-806
l0 t
7063)
EPF-o1
74
a
a
a
a
a
a
PagoIIol18
1
1
C8972-00-IC-SPC-
l
903
R1.doc
4
10112t2012
Corooralg
Base
,t/'
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 12/18
m
WorleyParsons
ütoNomicË
:m;
resources
&
energy
KUWAIT
OIL
COMPANY
LOWER FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-l903)
Sub-Section
8.5.2
a
Rewrite
paragraph
c)
to read
as
follows:
c)
Electronic transmitters
shall
have an output
ol
4-20 mA
with HART
protocol
and
using
a 24VDC supply
for ESD applications
or shall
be
with Foundation
Fieldbus
H1
communication
protocolfor
PCS
applications.
They shall
be
certified
for
the
hazardous
area in accordance
with
the
execution
code noted
in the KOC Standard
for
lnstrumentalion
and Control
System
Design
(Number
KOC-l-001
).
SectioN
9.0
-
TEMPERATURE
MEASUREMENT
Sub-Section
9.1
æ
:J@ffi
.
Replace to
read as follows:
BS 4937
with BS
EN
60584
Thermocouples
Reference
Tables
Sub-Section
9.3.2
Rewrite
paragraph
d)
to read as
follows:
d)
Thermocouples
and RTDs shall
be
provided
with field
mounted 4-20
mA with HART
protocol,
two-wire
smart
transmitters
for ESD applications,
and transmitters
with
Foundation
Fieldbus
H1 communication
protocol
for
PCS
applications.
Alltransmitters
shall
be
certilied for the electrical area classification.
a
Sub-Section
9.5.3
r
Rewrite
paragraph
a)
to read
as
follows:
a)
Thermocouples shall
comply
with BS EN 60584
lnternationalthermocouple
reference tables.
Sub-Section
9.5.7
Base
*
Page
12
of
'18
z
Þ
o
,f
o
t-
*
ER
1 C8972-00-IC-SPC-1 903
R1.doc
4 10t12t2012
d/títut
,rl.
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 13/18
M
WorleyParsons
€coNomic
ffi
esources & energy
KUWAIT OIL COMPANY
LOWER
FARS
HEAVY OIL DEVELOPMENT
ADDENDUM
TO KOC SPEC¡FICATION
GENERAL
]NSTRUMENTS
(01
5-JH-l
903)
Rewrite
paragraph
a)
to read as
follows:
a) Thermowells
shall be specified
for all
temperature
detecting
elements,
with the
exception
of
detectors that
are surface
mounted and
wellhead temperature.
Thermowell shall
enable the
element to be
removed during
plant
operations.
SectioN
1O.O
-
LEVEL MEASUREMENT
Sub-Section
10.3.3
.
Replace
paragraph
h)
to
read as
follows:
h)
Other
types of
level transmitters shall
be used
if
process
conditions
can
not allow the
use of displacer
type
level
transmitters.
These are open
path
radar,
guided
wave radar
and magnetically
coupled
float.
Sub-Section
10.3.4
Replace
paragraph
c) to
read as follows:
lnterface transmitters
shall normally
be of displacer
type. Where
the specific
gravity
difference
is
0.1 or
less,
guided
wave radar, microwave
adsorption
or capacitance{ype
instruments shall
be considered.
a
Sub-Section
10.5.5
a
Rewrite
paragraph
d)
1o read
as
follows:
d)
Electronic transmitters
shall
have an output
ol 4-20 mA
with HART
protocol
and
using
a
24 VDC supply
for ESD applicat¡ons
or shall be
with Foundation
Fieldbus
H1
communication
protocol
for PCS
applications.
They shall
be
certified
in
accordance
with the hazardous
area and execution
code stated
in
the
KOC Standard for
lnstrumentation and
Control System
Design
(Number
KOC-l-001).
An output
indicator
shall
be
provided.
Page 13
of 18
*
z
Ê
,f
,
1 I C8972-00-lC-SPC-
l 903 Rl.doc
4 10/t212012
rt
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 14/18
m
WorleyPar$on$
ËcoNomicË
.m
nsources
&
energy
KUWAIT
OIL COMPANY
LOWER
FARS HEAVY
OIL DEVELOPMENT
ADDENDUM
TO KOC
SPECIFICATION
GENERAL
INSTRUMENTS
(01
5-JH-l903)
Sub-Section
10.5.6
Rewrite
paragraph
i) to
read
as
follows:
i) Electronic
transmitters
shall
have an output
of
4-20
mA with
HART
protocol
and using
a24YDC
supply
for ESD applications
or
shall
be
with
Foundation
Fieldbus
H1
communication
protocolfor
PCS
applications. They shall
be
certified
in
accordance
with the hazardous
area and
execution
code stated
in the
KOC Standard
for
lnstrumentation
and Control System
Design
(Number
KOC-l-001).
An output
indicator
shallbe
provided.
Section
11.0
-
TANK
METERING
Sub-Section
11.3.5
¡
Rewrite to
read
as
follows:
Shutdown inputs
to
the
ESD
system shall
be
derived from dedicated
leveltransmitters.
Sub-Section
11.6.3
a
Rewrite
to read as
follows:
The system
shall
be
installed
in
accordance
with the
requirements ol
the
KOC
Standard
for
lnstrument
lnstallation
(Number
KOC-|-002) and any
applicable
special
notes contained
in the
Level
Measurement
Section
10.0 of
lhis
specification.
All
instruments shall
be
provided
with isolation
valves to
enable
removalfor
maintenance
without tank
drainage.
Section
15.0
-
SOLENOID
VALVES
Sub-Section
15.5.1
o
Add the following
reference:
IEC
60085
Electrical
lnsulation
-
Thermal
evaluation
and designation
Paqs 14 of
l8
a
1
1C8972-00-IC SPC-l
903
R1.doc
4 1U1,,2012
d00l$
d,
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 15/18
WorleyParsons
resources & energy
KUWAIT OIL COMPANY
LOWER
FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM TO KOC SPECIFICAT¡ON
EcoNomic
:ffi
GENERAL
TNSTRUMENTS
(ol
5-JH-1903)
Sub-Section
15.5.3
Rewrite to
read as
follows:
Coils
shall be
rated for conlinuous
operation
when
connected
to the
electrical
supply
stated
¡n
the
KOC Standard
for
lnstrumentation
and Control
System Design
(Number
KOC-|-001). The temperature must not
rise
to more than
70t(158f),
(or
the coil
service
rating if lower)
when used
at the ambient
conditions
prevalent
at the
Facility
and
with the
sun shielding
and
heat dissipation/cooling
arrangements
provided
by
the Contractor.
Sub-Section
15.5.4
¡
Change
sentence as
follows:
Coil
insulation shall
be Class
H
not Class
A.
Sub'Section
15.5.7
¡
Rewrite paragraph
a)
to read
as
follows:
Pneumatic
solenoid
valves shall be
constructed
of stainless
steel body, stainless
steel
trim
and stainless
steel enclosure.
o
Delete
paragraphs
b) and c).
Section
16.0
-
SIGNAL
CONVERTORS
Add a new Sub-Section:
Sub-Section
16.2.4
o
Positioners:
Allcontrol
valves shall be
provided
with Foundation
Fieldbus
positioners.
Smart
transmitters
with
HART
protocolthat
support
partial
stroke
testing shall
be used
for
ESD
valves.
Sub-Section
16.5.2
a
Rewrite to
read as follows
Page
l5
of
18
a
I
1
C8972-00-IC-SPC-1903
R'l.doc
4 10t1,,2012
Base
r*
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 16/18
ffi
WorleyParsons
resources
enetgy
KUWAIT
OIL COMPANY
LOWER
FARS HEAVY
OIL
DEVELOPMENT
ADDENDUM
TO
KOC SPECIFICATION
ËcoNomicË
:ffi
GENERAL
INSTRUMENTS
(01
5-JH-l903)
All
convertors
shall be
piped
up using
materials
in
accordance
with the
requirements of
the
KOC
Standard
for lnstrument
lnstallation
(Number
KOC-|-002).
Section
19.0
-
MISCELLANEOUS
INSTRUMENTS
Sub-Section
19.5.2
Rewrite to
read as
follows:
Items
containing
electrical
parts
shall
be certified as
suitable
for the
hazardous area by
a
recognized
European testing
authority and
be
in
accordance
with BSI
BS EN 60079.
Sub-Section
19.6
Rewrite to
read
as
follows:
lnstallation
shall
be
carried
out
in accordance
with the
requirements of
the KOC
Standard
for
lnstrument lnslallation (Number KOC-|-002).
SectiON
2O.O
-
ANALYSERS
Sub-Sectlon
20.1
o
Rewrile
to read
as
follows:
API MPMS
Manualof
Petroleum
Measurement Standards
API RP 555
Process
AnalYzers
Sub-Section
20.5.1
o
Rewrite
paragraph
d) to
read as follows:
d)
All
components
exposed to
process
fluid
on sour service
shall comply
with the
requirements
of NACE
MR0175/lSO
15156.
Sub-Section
20.5.2
o
Rewrite
paragraph
k)
to read
as
follows:
Pago 16 of
l8
a
Ê
*
,f
,
2
o
t
.¡l
:,
¿
a
1 1
C8972-00nC-SPC-1903
B1.doc
4
1011212012
,*
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 17/18
m
WorleyParsons
EcoNomic
:ffi
resoufces &
energy
KUWAIT OIL COMPANY
LOWER
FARS
HEAVY
OIL
DEVELOPMENT
ADDENDUM TO KOC SPECIFICATION
GENERAL
TNSTRUMENTS
(01
5-JH-l903)
k) Unless a
fast loop
is
provided, process
samples
shall
be
drawn
by
probes
constructed
to API
MPMS. For
lines below
100
mm
(4
in) diameter, the
length of the
stub connection
shall
be increased
so
that the
probe
insertion is
not
greater
than one
quarters
of
the
line
diameter.
Section
21.0
-
LOCAL
PANELS
AND
GAUGE
BOARDS
TYPE
AND
SELECTION
Sub-Section
21.2.1
¡
Rewrite to
read as
follows:
Controland
monitoring shallbe
via
the
control
room operator
interface consoles.
The
use
of
local
panels
shall
be minimized
within constraints
of secure
control of
Facility.
Sub-Section
21.4.2
Rewrite
to read as
follows:
Gauge
boards
shall
be
constructed
as
free standing.
The
front facing shall
be
5
mm
(3/16
in.)
plate,
suitably
plated
or
painted
for the service
conditions.
The
gauges
and
isolating
valves shall be
pre-assembled
and
piped
to bulkhead
or termination
fittings.
The method of
mounting
gauges
shall
not infringe
upon the blow-out
integrity. The
gauges
shall
be
labeled
with
fulltag
number and the
service,
in English and
Arabic.
All
installation
materials,
including tray
work,
shall
be as
specified
in
the
KOC Standard
for
lnstrument
lnstallation
(Number
KOC-l-002).
a
Sub-Section
21.4.7
Sub-Section
21.4.9
a
Rewrite
paragraph
a)
to
read
as
follows:
a) Fabricated cubicles, side panels, etc. shall
be
of minimum 2 mm (3/32 in.) plate
with
folded edges
and
welded construction.
They shall
be
painted
in accordance
with
the
KOC Standard
for Painting and
Coating
ol External
Metal Surfaces
(Number
KOC-P-001).
Ventilated
panels
shall
have high level
louvers
with mesh screens.
Opening doors
shall
be
supplied
with robust
stainless steel
hinges and
Ï-key
door
fastening
system.
Door
locks
shall
be
fitted only
where agreed to
as
specifically
required
by the Company.
Pâge 17 of
18
z
R
*
É
1 1
C8972-00-IC-SPC-
l
903
R1.doc
4 1U1',2012
r*
7/25/2019 11C8972-00-IC-SPC-1903- Criteria to 015-JH-1903
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1903-criteria-to-015-jh-1903 18/18
WorleyParsons
resources
energy
KUWAIT OIL COMPANY
LOWEH
FARS HEAVY OIL
DEVELOPMENT
ADDENDUM
TO KOC SPECIFICATION
[coNomicË
ffi;
GENERAL
INSTRUMENTS
(01
5-JH-1903)
Rewrite to read
as
follows:
Terminations,
wiring, etc.
within the
junction
boxes
shall be
in accordance
w¡th
the
KOC Standard
for lnstrument
lnstallation
(Number
KOC-l-002),
including
glanding,
numbering, earthing,
etc.
The minimum cable
core size shall
be 1.5
mm2.
EPF-0174
Pags 18 ol
18
a
.¡
I
1C8972-00-lC-SPC-l 903
R1.doc
4 10t12t2012
Y