Method Statement Vivasil Silicone Primer For Repainting
EXTERIOR & INTERIOR
Product Vivasil Silicone Primer is suitable for interior and exterior wall surfaces existingDescription or repainting purposes
Solvent Vivasil Silicone Primer is water based and easy to use.
Mixing ratio Dilution not more than 5% of water.
Covering Capacity 10 to 11m/litre per coat on non porous surfaces minimum one coat
Drying times Touch to dry 25 min, surface dry 3 to 4 hours Recoatable 1 hours
hard dry 24 hours
Application By spray, roller or brush
Application - Inspect the surface before painting and all hairline cracks to beProcedure patched use Vivasil Patching Compound before application.
For repainting purposes wash old paint powdery surfaces with waterjet 1500 psi before paint application. Fungus a�ected areas must be washed with Vivasil Fungus Kill Treatment
Undercoat Vivasil Silicone Primer used where surfaces are chalky or powdery,followed by 2 coats of Vivasil Breathable Silicone Paint
Application system Undercoat -Vivasil Silicone PrimerFor Repainting Intermediate coat -Vivasil Breathable Silicone Paint Finish coat -Vivasil Breathable Silicone Paint
Pail must be stored upright with lid tightly closed.Store in a cool and dry place. Do not re use pails to store food or drink.Keep away from children.Do not pour left over paint into drain, leave in pail for safe disposal.
Copyright © 2014 Vivasil Paints (M) Sdn Bhd 1117204-T38A, Jalan Sentosa 3, Taman Sentosa Sungai Jelok,Industrial 43000 Kajang, Selangor. MalaysiaTel:/Fax +603 8737 2495, Email: [email protected]: www.vivasil.com