    Gunung Rosa Mine Q4 2012

    An Indonesian gold mine that can bereopened immediately

    ASX - PCP

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    2/36

    Important Notice and Disclaimer

    Paramount Mining Corporation Limited has prepared this presentation based on information available to it. No representation or

    warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and

    conclusions contained in this presentation.All dollar terms expressed in this presentation are in Australian dollars unless otherwise stated.

    To the maximum extent permitted by law, none of Paramount Mining Corporation Limited, its directors, employees or agents,

    advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the

    part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in

    connection with it.

    This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale

    of any security, and neither this presentation nor anything in it shall form the basis of any contract or commitment whatsoever. This

    presentation may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and

    production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected bya variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including

    but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of

    market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial

    market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.

    The information in this presentation that relates to exploration and production targets refers to targets that are conceptual in nature,

    where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the

    determination of a Mineral Resource.

    Terry Holohan is a Member of the Institute of Materials, Minerals and Mining (UK) and is a Chartered Engineer with the Engineering

    Council (UK) as well a full time employee of Paramount and thus acts as their internal Competent Person.

    He has sufficient experience and knowledge relevant to an acquisition of this type as well as understanding the geology in the region

    and the engineering requirements for the development of such a mine under consideration . This knowledge and experience qualifies

    him as a Competent Person as defined in the December 2004 edition of the Australasian Code for Reporting of Exploration Results,

    Mineral Resources and Ore Reserves (the JORC Code). This presentation is based upon field inspection of the Gunung Rosa

    Project area, West Java, including the drill core and results during 2011/12 along with input from his associates who have worked on

    the property. All of the significant information reported herein was available to Mr Holohan and was reviewed by him for this

    presentation.

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    3/36

    The Company ASX: PCP

    Capitalisation (at 26 October 2012)

    Share price 8c Issued shares ~318m

    Unlisted options 24m

    Convertibles AUD 5.15m @ 4c (~130 million shares)

    Market Capitalisation ~AUD 25m

    52 week high/low 8.1c/3.7c

    Shareholders Share Price Graph

    Top 20: 88%

    Substantial shareholders

    Resource Global Finance Ltd 16%

    Zurily Resources 16%

    J P Morgan Nominees 13%

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    4/36

    The People - Board and Management

    Mohammed (Mo) Munshi, Non-executive Chairman: Geologist with Mining Engineering background and Businessmanwith >30 years of experience in finding, funding and developing mineral resource properties. Previously with AshantiGoldfields, J CI, Normandy Mining and Ivanhoe Mines has worked extensively in Asia, Australia, Africa and SouthAmericaTerry Holohan, CEO & MD: Metallurgist and Chartered Engineer with >30 years of experience in exploring, developingand operating mineral resources with specialist experience in precious and base metals. Previously with Anglo American,

    Gencor, Golden Dumps, BHP Billiton, Ivanplats and Platmin has worked extensively in Africa, Australia and Asia. Overthe last ten years he has acted as a Competent Person on the TSX, ASX, AIM, and J SE bourses.Garry Taylor, CFO & Co. Sec: A Certified Practising Accountant with >30 years of experience in financial management,risk management, corporate governance and strategy implementation in publicly-listed resource companies. Previouslywith Mitsui & Co where he managed an international trading desk on steel products and has worked extensively inAustralia and AsiaNeil Rutherford, Head of Geology: Geologist with >35 years of experience in mineral exploration, project managementand evaluation with specialist experience in base metals. A recognised industry consultant and lecturer in a range of

    mineral commodities has worked extensively in Australia, Asia (including Turkey) and Africa.Over the last fifteen yearshe has acted as a Competent Person on the ASX bourse

    Mufti Habriansyah, Non-executive Director: Resources and commercial lawyer with >15 years of experience innatural resources and corporate law in Indonesia. P reviously a partner with S&T (Freehills) has advised to large miningcorporations such as BHPB and PT Antam

    Guy Anderson, Non-executive Director: Chemical Engineer, Chartered Accountant and Stockbroker with >30 years ofexperience in the resources industry. Previously with PWC, J ames Capel, CIBC WM and Ivanplats has worked primarilyin Europe and Africa.

    John Arbuckle, Non-executive Director: Accountant and corporate advisor with >20 years of experience in theminerals resources industry. Previously with Mount Gibson, Perilya, Rio Tinto, North Limited and Anaconda nickel hisexperience is predominantly in Australasia

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    5/36

    The Asset - 125km from capital city Jakarta

    GUNUNG ROSAPROJECT

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    6/36

    The Asset - Gunung Rosa Mine

    Purchasing 85% shares in PT CKP (72.25% attributable to PCP) containingthe Gunung Rosa asset:

    Mining License (IUP) valid for 20 years from 2010

    Inferred Mineral Resource of 634koz of Au over 900m of 2.5km strike down to 250m still open on all sides

    10-20m vein on surface could be accessed by open pit mining

    600kg bulk underground sample collected measuring 11.4gpt Au

    Aeromagnetic Program and follow-up geochemistry confirmed presence of manysignificant geological targets including several parallel veins at surface

    Original local shareholders will retain 15% shares represented, asCommissioner of PT CKP, by prominent captain of Indonesian Mining IndustryDr Ir Rozik Soetjipto

    President and COO of PT Freeport, Indonesia

    Previously State Minister of Public Works and Director General of Mines

    Not positioned in any Forestry or National Parks areas

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    7/36

    Recent Highlights

    Resource extended to 634koz Au (358koz) over 900m of strike

    Inferred 3Mt at 6.8 gpt Au for 634koz Au at 1.5gpt cut-off

    By-products of 1Moz Ag, 59kt Zinc, 13kt Lead and 8kt Copper

    Metallurgical Gold recovery presently 86%

    Base Case EBITDA of ~USD 1k/ounce

    AMDAL/EIA study being initiated

    Exploration confirmed strike 2.5km and located several veins parallel

    to main vein with exciting geochemistry values

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    8/36

    The Asset A Brownfields Project

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    9/36

    The Asset - Metal in the Ground

    Above 900m RL at 3 gpt cut-off ~ Century

    Grade at 11.73 gpt Au1 drilling supported by underground sampling

    Bulk metallurgical sampling at 11.4 gpt Au in Level 1

    Lower levels flooded to be drained shortly

    Below 900m RL at 1.5 gpt Au cut-off ~ PCP

    Grade at 5.5 gpt Au2 not supported by underground sampling

    Historically Dutch and J apanese miners recovered ~20koz of gold at

    >15gpt Au

    Alteration mineralogy in drill holes and Aeromag indicates the

    potential for a porphyry system source for precious and base metals

    1 The portion of the Mineral Resource and Reserves estimated by Century is appended as Appendix I

    2 The PCP Mineral Resource is appended as Appendix II

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    10/36

    Historic Mineral Resource and Reserve1

    Cut-off 3gpt Au Tonnes Au g/t Au oz Zn % Zn t Measured Resource 125,470 12.77 51,514 3.33 4,178Indicated Resource 302,878 13.59 132,336 2.99 9,056Inferred Resource 371,000 14.67 174,983 3.71 13,764Total 799,348 13.96 358,832 3.38 26,998

    Cut-off 3gpt Au Tonnes Au g/t (cut) Au oz Zn % Zn t Proved Ore Reserves 142,000 11.20 51,133 3.31 4,700Probable Ore Reserves 258,000 11.52 95,557 2.88 7,430Total 400,000 11.41 146,690 3.03 12,130

    Century based this on 34 intersecting drill-holes: the metal grade of this resource wassignificantly boosted by over 2,500 channel samples from the underground development

    despite a top-cut at 50gpt Au.

    1 For more information see Companys ASX announcement of 08 September 2011

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    11/36

    Combined Century and Paramount Resource

    Conservative mining cuts have been used with 0.5m dilution either side for competent rockand 1m either side for less-competent rock as well as a minimum mining width of 2m:further engineering studies will determine the optimal mining parameters

    Cut-off Tonnes Augpt

    Auoz

    Agoz

    Znt

    Pbt

    Cut

    1.5gpt Au 2,992,710 6.8 633,900 1,045,220 59,488 13,020 8,230

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    12/36

    The Asset Progress on Metallurgical Test-work

    The preliminary saleable product metallurgical recoveries on bulk sample as

    determined by Rob Burger of SGS Perth are:

    Gold ~86% - from preliminary sighter tests

    82% of the gold recovered by CIL;

    Further 4% of the gold recovered in the base metal concentrates

    Base Metals and Silver into Concentrates

    ~96% of the Zinc

    ~87% of the Lead

    ~92% of the Copper

    ~94% of the Silver

    Now focussing on optimising these recoveries, including alternative unitoperations, however expect Indonesian-standard CIL/flotation circuit for this typeof ore

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    13/36

    The Asset - The 2012 Development Plan

    Complete metallurgical optimisation test-work, to improve on present

    Gold recoveries of 86% (target >90%), and alter plant design

    accordingly

    Pre-Development Engineering:

    Initiate AMDAL

    Investigate open-pit options on surface veins of 10-20m thick

    Revise Base Case engineering study scope

    Purchase both surface rights (63ha) and long lead items

    Drain the mine fully and resample drives

    Enter into refining agreement with Indonesian entities to treat products

    from late 2014

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    14/36

    The Asset - Plant hasadequate space forexpansion

    Cap PaluPortal

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    15/36

    The Asset 2013 Mine Development

    Re-open sub-level adits to drain mine tostart refurbishment of development

    drives and shafts

    Start open pit mining if feasible

    Start cut and fill underground panel

    development with hand-held drills,

    focusing on the high grade material

    initially

    Start stoping when development

    advanced a la Way Linggo!

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    16/36

    Start mining in Q2 2013

    Within ~20 months (Q3 2014) mine at a rate of 30-35koz of Au per annum(>100ktpa run-of-mine) from existing development drives;

    expected cash-cost of 900m RL)

    First metal pour Q4 2014 (~18 months plant construction)

    Expand mining during 2015 increase production to 40-50koz per annum during 2015-16

    Post 2016 expand into optimal size as identified by Exploration

    The Asset Base Case without Open Pit Acceleration

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    17/36

    Key:1 - AGM approve purchase of WL 2 - KRM buys WL 3 - Mine development starts/Plant ordered 4 -Forestry Permit Received 5 - 15k tons of ROM (8 months of mining) 6 - Plant commissioning starts 7 - firstgold poured (17mths from plant ordered) 8 - Producing at 20koz Au per annum rate (20 months of mining) 9 -Producing at 40koz Au per annum rate (24 months of mining - plateaud)

    1 2 3 4 5 6 7

    Paramount

    8 9

    The Asset Position on the Enterprise Value Curve

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    18/36

    The Asset - Target Posit ion on Cost Curve

    Gunung Rosa - Should be in First Quartile!

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    19/36

    The Company Juniors best leverage on gold price

    Kingsrose1

    (Way Linggo)Medusa1

    (Co-O)PCP

    (G Rosa)

    Total Au Resources (koz) 486 3,119 634

    Total Au Reserves (koz) - 568 1472

    Enterprise Value (AUD mill ion) 290 1,070 30

    EV/Resource oz (AUD/oz)(Attributable)

    701 343 65*

    1 Annual Reports of J une 2012

    2 Original Reserve ex Century in Appendix III

    * Significant further upside available when considering the recentlyidentif ied mineralisation

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    20/36

    Use of Proceeds estimate for Pre-Development of AU$ 3 million:

    Geology and Mine Survey AU$ 1 million

    Met Work, Mine Design, Engineering Study and Amdal AU$ 1 million

    G&A (including Land Acquisition applications) AU$ 1 million

    Total AU$ 3 mil lion*

    *of which AU$1.5 million raised on 19 October 2012 through an issue at 7 cents per share

    The Company Equity Raising Q4 2012

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    21/36

    Contacts

    Mo Munshi

    +86 139 1017 5192 (M)[email protected]

    Terry Holohan Garry Taylor

    +65 9230 7751 (M) +65 9665 5840 (M)

    [email protected] [email protected]

    Operations Office Corporate Office

    6 Temasek Boulevard 100 Parry St

    25-03 Suntec Tower 4 Perth, WA

    Singapore, 038986 Australia, 6000

    +65 6884 9423 (O) +61 8 9328 5600 (O)

    Website Information

    www.paramountmining.com [email protected]

    mailto:[email protected]:[email protected]:[email protected]://www.paramountmining.com/mailto:[email protected]:[email protected]://www.paramountmining.com/mailto:[email protected]:[email protected]:[email protected]
  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    22/36

    Appendix

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    23/36

    The People Commissioners and Directors of PT CKP

    Mohammed (Mo) MunshiChairman Commissioner Mufti Habriansyah

    President Director

    Terry Holohan

    Director

    Dr Ir Rozik Soetjipto

    Commissioner

    COO/Director, PT Freeport Indonesia

    Donny Padmanagara

    Commissioner

    Ir Prianda Raspati

    DirectorJasir Karwita

    Commissioner

    Police General (Ret)

    Ir Koswara Sasmitapura

    Commissioner

    Head of Resources, PT Antam (Ret)

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    24/36

    The Asset on Indonesian Sunda-Banda Volcanic Arc

    GUNUNG

    ROSA

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    25/36

    The Asset Schematic Model of the Magmatic Arc

    Gunung Rosa position- Mesothermal!

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    26/36

    Outcrop of intrusive breccia in

    porphyritic intrusive

    Pebble dyke cutting porphyritic intrusive. The

    pebble dyke and hydrothermal breccias precedethe mineralisation event

    Hydrothermal breccia in massive porphyritic

    diorite typical host to mineralised veins

    Narrow mineralised quartz-sphalerite-pyrite

    veins cutting altered hydrothermally altered

    breccia in massive porphyritic diorite

    The Asset Host Intrusive Rocks and Breccias

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    27/36

    Banded quartz-sphalerite-pyrite-clay vein Massive quartz-chalcopyrite-pyrite vein

    High grade sphalerite-galena-chalcopyrite-pyrite

    vein intersection - generally with high Au-grades

    Multiple events are shown by distinct

    colour changes to sphalerite

    sphal

    gn

    py-cpy

    The Asset Sulphide Vein Ores

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    28/36

    The Asset Century Block Model for 198/358koz Auabove 900m RL

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    29/36

    The Asset PCP Resource of 436koz Au from 900m RL

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    30/36

    The Asset Isopacs show High Grade Areas

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    31/36

    Blue Sky - The Future

    The Aeromagnetic program of

    April 2012:

    6 major target centres discovered

    within the IUP under soil cover

    Supports the interpretation that thecluster of veins are part of a

    porphyry related mesothermal

    system

    Could indicate the potential for

    discovery of a Au-Cu porphyry

    system at depth

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    32/36

    Blue Sky 8 Outcrop Veins Sampled within Target 2

    Vein 3: Leugok Haji 600meast several collapsed

    adits along the vein

    Structure 6: Nagrak1.2km east floats and

    outcrops

    Qtz-Py-Cpy-Sphal-Gnwith associated clay

    alteration

    Highly oxidised, gossanoushydrothermal Breccia

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    33/36

    Blue Sky - Geochemistry

    Cluster of parallel veins showingsignificant anomalous values of

    gold, silver and base metals

    Ground magnetics program being

    undertaken east-west to cross vein

    strike

    Target 2 area incorporating main

    vein clusters east of Gunung Rosa

    Vein to be soil sampled at 100m x

    50m spaced intervals

    Blue Sky Ground

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    34/36

    RTP Ground Magnetics over maintarget areas - 100 m line spacingshowing veins and old workings.

    Test area of 25m detail at Cap Paluillustrated below showing drill holemagnetic response in relation toground survey. Target 2 area to bedetailed at 25 m line spacing.

    Blue Sky GroundMagnetics

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    35/36

    RTP Ground Magneticimage draped overtopography showing maintarget veins and oldworkings - 100 m linespacing.

    Test area of 25m detail atCap Palu Mine site shown

    Blue Sky GroundMagnetics

  • 7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012

    36/36

    Historic Gold Price & Project History

    Paramount open discussions with PT CKP

    Key:1 PT Antam drill 4 holes 2 PT Antam form J V with PT CKP 3 Century Metals contracted as Technical Partner andspend USD10m; drill 60 holes, develop 2 x vertical shafts, 1 x decline and 2.5km of drives, positive engineering study, receiveMining License 4 PT Antam publish internal positive DFS work stops due to lack of finance 5 Delta Gold and ChaseManhattan contracted as Technical Partner Snowden Group carries out positive Technical Review 6 BreX scandal andAsian Financial Crisis 7 PT Antam cede their Shares to PT CKP 8 Paramount open discussions with PT CKP