+ All Categories
Home > Documents > 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including...

1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including...

Date post: 27-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
17
ASX:CAI 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT PROGRESSING TO DEVELOPMENT PRESENTATION MAY 2019
Transcript
Page 1: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

ASX:CAI

1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECTPROGRESSING TO DEVELOPMENTPRESENTATION MAY 2019

Page 2: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

DISCLAIMER

DISCLAIMER

Thispresentationdoesnotconstituteinvestmentadvice.Neitherthispresentationnortheinformationcontainedinitconstitutesanoffer,invitation,solicitationorrecommendationinrelationtothepurchaseorsaleofsharesinanyjurisdiction.Thispresentationdoesnottakeintoaccountanyperson'sparticularinvestmentobjectives,financialresourcesorotherrelevantcircumstancesandtheopinionsandrecommendationsinthispresentationarenotintendedtorepresentrecommendationsofparticularinvestmentstoparticularpersons.Allsecuritiestransactionsinvolverisks,whichinclude(amongothers)theriskofadverseorunanticipatedmarket,financialorpoliticaldevelopments.

Tothefullestextentpermittedbylaw,CalidusResourcesLimited(theCompanyorCalidus)doesnotmakeanyrepresentationorwarranty,expressorimplied,astotheaccuracyorcompletenessofanyinformation,statements,opinions,estimates,forecastsorotherrepresentationscontainedinthispresentation.Noresponsibilityforanyerrorsoromissionsfromthispresentationarisingoutofnegligenceorotherwiseisaccepted.

Thispresentationmayincludeforwardlookingstatements.Forwardlookingstatementsareonlypredictionsandaresubjecttorisks,uncertaintiesandassumptionswhichareoutsidethecontrolofCalidus.Theserisks,uncertaintiesandassumptionsincludecommodityprices,currencyfluctuations,economicandfinancialmarketconditionsinvariouscountriesandregions,environmentalrisksandlegislative,fiscalorregulatorydevelopments,politicalrisks,projectdelayoradvancement,approvalsandcostestimates.Actualvalues,resultsoreventsmaybemateriallydifferenttothoseexpressedorimpliedinthispresentation.Giventheseuncertainties,readersarecautionednottoplacerelianceonforwardlookingstatements.Anyforwardlookingstatementsinthispresentationspeakonlyatthedateofissueofthispresentation.SubjecttoanycontinuingobligationsunderapplicablelawandtheASXListingRules, Calidusdoesnotundertakeanyobligationtoupdateorreviseanyinformationoranyoftheforwardlookingstatementsinthispresentationoranychangesinevents,conditionsorcircumstancesonwhichany suchforwardlookingstatementisbased.

COMPLIANCESTATEMENT

TheinformationinthispresentationthatrelatestoExplorationResultsandMineralResourcesreleasedpreviouslyontheASX.

TheCompanyconfirmsthatitisnotawareofanynewinformationordatathatmateriallyaffectstheinformationincludedinthe originalmarketannouncementsandthat,inthecaseofmineralresourcesestimates,allmaterialassumptionsandtechnicalparametersunderpinningtheestimatescontinuetoapplyandhavenot materiallychanged.TheCompanyconfirmsthattheformandcontextinwhichtheCompetentPerson’sfindingsarepresentedhavenotbeenmateriallymodifiedfromtheoriginalmarketannouncements.

MrDanielSaundersisprincipalandafulltimeemployeeofGeoServConsultingPtyLtd,andisaMemberoftheAusIMM.MrDaniel SaundershassufficientexperiencethatisrelevanttothestyleofmineralisationandtypesofdepositunderconsiderationandtotheactivitiesundertakentoqualifyasaCompetentPersonasdefinedinthe2012EditionoftheJORCCode.

MsJaneAllenisafulltimeemployeeoftheCompany,andisamemberoftheAusIMM.MsJaneAllenhassufficientexperiencethatisrelevanttothestyleofmineralisationandtypeofdepositsunderconsiderationandtotheactivatesundertakentoqualifyasaCompetentPersonasdefinedinthe2012EditionoftheJORCCode.

PAGE 2

Page 3: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

3

RAPIDLY PROGRESSING TOWARDS PRODUCTION

SNAPSHOT

• Simpleandcompellingstory

• ConsolidationofHistoricGoldfield

• 1.25Mozresourceat1.83g/tAuincluding1.1Mozat2.37g/t

• 795,000ozofIndicatedResources(64%)

• 203%increaseinresourcesincelistingJune2017(412,000oz)

• FullyfundedPre-feasibilityStudy(PFS)commenced,completiondueQ32019

• PlanningtoDevelopin2020

• Significantexplorationupside,drillingunderway

PAGE 3

Page 4: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

DRIVING DEVELOPMENT PROGRESSA CENTURY OF EXPERIENCE IN PRECIOUS-METAL PROJECT DEVELOPMENT

PAGE 4

MARKCONNELLYNON-EXECUTIVECHAIRMAN

Over30years’ resourceindustryexperienceinCEOandManagingDirectorrolesacrossmultiplejurisdictionsincludingAustralia,WestAfrica,NorthAmericaandEurope.Currently Non-ExecutiveChairmanatWestAfricanResourcesLtd

KEITHCOUGHLANNON-EXECUTIVEDIRECTOR

30years’experienceinstockbrokingandfundsmanagementonASX,AIMandTSX.Currently theMDofEuropeanMetalsHoldingsandrecentlyretiredaschairmanofTalgaResources

ADAMMIETHKENON-EXECUTIVEDIRECTOR

Over15years’experienceinexplorationandminegeology,fundsmanagementandcorporateadvisory.PrevioustechnicalandcorporaterolesatRioTinto,Snowden,RegentPacificGroupandArgonaut

BOARD

EXECUTIVE MANAGEMENT

DAVEREEVESMANAGINGDIRECTOR

30years’miningexperienceinAustralia,AfricaandEurope.Instrumentalintheprogressionoffourminingprojectsthroughfeasibilitytoprojectdevelopment

FERNANDOMOUTINHOPROJECTMANAGER30years’internationalexperiencewithGRDMinproc,SheffieldResources,SyrahResources,NewCenturyResources

JANEALLENGEOLOGYMANAGER30years’internationalminingexperiencewithAnglogold Ashanti,ResoluteMining,AvionGoldCorporationandGCM

PAULBRENNANCOO

20years’miningexperienceinAustralia,AfricaandEurope.MostrecentlyGMatSaracen’sCarasoueDamoperation

Page 5: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

CORPORATE OVERVIEW

CAPITALSTRUCTURESHARESONISSUE 1,501

Million1

MARKETCAP(undilutedatA$0.025)

$37.5Million2

CASH(asat31Dec2018)

$4.3Million3

LISTEDINVESTMENTS $2.2Million

ENTERPRISEVALUE $31.0Million

OPTIONS(willraise$6.9mifexercised)

254Million4

PERFORMANCESHARES

275Million5

CAPITAL STRUCTURE AND SHAREHOLDERS

1. IncludingplacementtoAlkaneannounced30/4/192. Usingsharepriceof$0.25asat30April20193. $2.3mcash30/4/19plus$2mfromAlkaneRaise4. [email protected],[email protected],[email protected]@3.0c5. PerformanceSharesvestoncompletionofapositivePFS6. CAIboardandmanagementown18%ofKeras7. ALKcashbalanceasat31March2019

KEYSHAREHOLDERSKERASRESOURCES6(AIM:KRS) 30.5%

ALKANERESOURCES(ASX:ALK) 15.2%

NOVORESOURCES(TSX:NVO) 3.8%

PAGE 5

WELL FUNDED• Cashreservesof$4.3m• InvestmentinPactonGold(TSX:PAC)valuedat$2.2m• 2.5cexercisableoptionstoraise$2.2mdueJune2019

STRONGCORPORATEMININGSUPPORT• KerasResources– Londonlistedexplorationcompany2

• AlkaneResources– ASXlistedAustraliandomiciledgoldproducerwithc.$72mincashreserves7

• NovoResources– Canadianlisted,wellfundedPilbaraGoldexplorerwithnearbygoldpropertiesandJORCresources

TIGHTLYHELDSHAREREGISTER• Over15%Tier1institutionalownership• Top20hold70%

Page 6: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

LOCATED IN AREA WITH PROVEN RESOURCE POTENTIAL

WARRAWOONA GOLD PROJECT

PAGE 6

Page 7: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

780KM2 OF CONTIGUOUS TENURE

CONTROL OF PROVEN GREENSTONE BELT

PAGE 7

780km2undercontrol,applicationoroption

• +200historicmineslocatedontenements

• VerylimitedpreviousexplorationfocusedaroundtheKlondykeworkings

• Majorityofpackagenotcoveredbyanysoilsamplingordrilling

Page 8: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

HIGH GRADE MINERALISATION REMAINS OPEN AT DEPTH

KLONDYKE DEPOSIT

PAGE 8 CORPORATEPRESENTATIONMARCH 2019

Page 9: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

KLONDYKE DEPOSIT

PAGE 9

76% INCREASE IN GLOBAL RESOURCE BASE TO 1.15 Moz

Klondyke(0.5g/tcut-offsummary)

Cut-off Indicated Inferred Total

Aug/t Mt g/tAu Ozs Mt g/tAu Ozs Mt g/tAu Ozs

KlondykeOpenPit 0.5 12.3 1.69 670,000 5.5 1.47 260,000 17.8 1.62 930,000

KlondykeUnderground 2.0 0.8 3.3 80,000 1.4 3.03 140,000 2.2 3.13 220,000

Total 13.1 1.78 750,000 6.9 1.79 400,000 20.0 1.79 1,150,000

Deposit(0.8g/tcut-offsummary)

Cut-off Indicated Inferred Total

Aug/t Mt g/tAu Ozs Mt g/tAu Ozs Mt g/tAu Ozs

KlondykeOpenPit 0.8 8.4 2.19 590,000 3.1 2.16 210,000 11.4 2.19 800,000

KlondykeUnderground 2.0 0.8 3.3 80,000 1.4 3.03 140,000 2.2 3.13 220,000

Total 9.1 2.21 670,000 4.5 2.44 350,000 13.6 2.23 1,020,000

Page 10: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

UPDATED MINERAL RESOURCE

PAGE 10

CONTINUOUS OUTCROPPING RESOURCE OPEN IN ALL DIRECTIONS

Page 11: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

MULTIPLE HIGH GRADE SATELLITE TARGETS, WITHIN 10KM OF KLONDYKEREGIONAL UPSIDE – LARGELY UNTESTED

PAGE 11

Deposit Cut-off Indicated Inferred Total

Aug/t Mt g/tAu Ozs Mt g/tAu Ozs Mt g/tAu OzsCopenhagen 0.5 0.2 5.27 36,000 0.1 1.84 3,000 0.3 4.65 39,000Coronation 0.5 - - - 0.5 2.19 34,000 0.5 2.19 34,000

FieldingsGully 0.5 0.2 1.65 9,000 0.3 1.62 16,000 0.5 1.63 24,000

Total 0.4 3.70 45,000 0.9 1.96 53,000 1.3 2.53 98,000

Page 12: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

RAPID PROGRESSION OF PFS, SCHEDULED FOR Q3 2019 COMPLETION

METALLURGICALTESTWORK• Highgoldrecoveries- 96.7%

• CoarseGrind

• SoftRock

ENVIRONMENTAL• Allfieldworktobecompletein

April,submitpermitapplicationsinQ32019

HYDROLOGICAL• Pitwaterholesdrilled

• Borefield tobedrilledinApril

HERITAGE• Heritageclearanceworkcompleted

overareaofdisturbance

TAILINGS• Thickeningtestwork andgeotechnical

testingcomplete

• Valleyfilltailings,stableandlowcapital

PRE-FEASIBILITY STUDY INPUTS

PAGE 12

GEOTECHNICAL• Allgeotechnicaldrillingandanalysis

complete

Page 13: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

13

WELL SERVICED BY EXISTING INFRASTRUCTURE

PAGE 13

ASSISTS WITH RAPID COST EFFECTIVE DEVELOPMENT

MININGREGISTRARLOCATEDINTOWN

SEALEDAIRSTRIPINMARBLEBAR

2HOURSDRIVEFROMPORTHEDLANDONSEALEDROAD(AUSTRALIA’SLARGESTPORT)

LOCATED20KMSOUTHEASTOFMARBLEBAR

• AllweatherroadfromMarbleBartoleases

• AccesstotruckedLNGfromNWShelf

• 100roomsavailableintown

• Allweatherairstrip

• Negotiatingthepurchaseofa2nd handcampinthePilbara

Page 14: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

PARALLEL WORKSTREAMS TO PROVIDE CONSISTENT NEWSFLOW

DEVELOPMENT TIMELINEEXPLORATION TIMELINE

PAGE 14

Page 15: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

ONE OF FEW HIGH GRADE INDEPENDENT DEVELOPMENT PROJECTS

AUSTRALIAN OPEN PIT DEVELOPERS

PAGE 15

UNDEVELOPEDOPEN-PITWAPROJECTS(>1MozAu)1,2

ScarcityofindependentASXopenpitgolddeveloperswithResourcebasesover1MozAu1. Dataasat30April20192. [email protected]/t

*BubblesizerepresentsEnterpriseValue

Yandal,EAR

Karlawinda,CMM

Bombora,BRBWarrawoona(0.5g/tAucut-

offgrade)

Warrawoona(0.8g/tAucut-off

grade)

Katanning,AUC

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

2.6

1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350 1,400 1,450 1,500

ResourceGrade

(g/tAu)

MineralResourceOunces(koz)

Page 16: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

147

117

6054 49

33 30 27

0

25

50

75

100

125

150

175

EV/Resou

rce(A$/oz)

VALUE GROWTH ASSOCIATED WITH DEVELOPMENT

NEAR-TERM DEVELOPMENT

1. Dataasat30April20192. CalidusEVdoesn’taccountforlistedinvestmentsofc.$2.2m

PAGE 16

UNDERVALUEDCOMPAREDTODEVELOPMENTPEERS1CompletedFeasibilityStudy

PriortoFeasibilityStudy

Average=$71/oz

BGL VAN CMM EAR BRB KIN GMD

KeyProject Bellevue Trident Karlawinda Yandal Bombora Leonora Ulysses Warrawoona

Stage ResourceDevelopment

ResourceDevelopment Financing Feasibility PFSCommenced Resource

Development Feasibility PFSCommenced

MktCap(A$m) 254 101 67 80 60 30 27 38

EV(A$m) 225 100 67 75 53 26 23 332

Resource(koz) 1,530 854 1,114 1,405 1,084 782 760 1,248

Grade(g/t) 11.8 3.5 1.1 2.1 1.4 1.4 3.3 1.8

MineType Underground Underground Open-pit Open-pit Open-pit Open-pit UndergroundOpen-pit&UndergroundPotential

Page 17: 1.25 Moz HIGH-GRADE, SHALLOW WA GOLD PROJECT · • 1.25 Moz resource at 1.83 g/t Au including 1.1Moz at 2.37g/t • 795,000oz of Indicated Resources (64%) • 203% increase in resource

17

• Criticalmassforastandalonedevelopmentachieved

• Highgradeopenpitoutcroppingresource

• Excellentmetallurgy

• Experiencedminedevelopmentteam

• FullyfundedthroughtoPre-feasibilityStudycompletion

•Locatedincloseproximitytohighqualityinfrastructureandoperatingmines

•Greenfieldsexplorationunderwayandhassignificantpotential

•Uniquelypositionedasoneoffewremaininghighgradeopen-pitgolddevelopmentcompaniesontheASX

PAGE 17

WEST AUSTRALIAN 1.25Moz HIGH-GRADE, SHALLOW GOLD DEVELOPER

REASONS TO INVEST


Recommended