The Use of Modern Technology in the
Ceiba Field and Okume Complex
Hess Equatorial Guinea, Inc.Presented by: Mike Guerra, Operations Manager
November 6, 2008
NOT AN OFFICIAL UNCTAD RECORD
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 2/17
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 3/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – General Layout
C4
750m WD
C5
800m WD
C3
660m WD
C1
700m WD
C2725m WDCC
775m WD
RSS
90m WD
•~7 km
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 4/17November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Framo Subsea Multiphase Pumps
Purpose of the Pump:• provides pressure boost to assist with displacementof well fluids (oil, water & gas) to the FPSO.
• maximum pressure differential is 45 bar, maximum
volume throughput for a Phase II skid is 38,000 bfpd.
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 5/17November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Framo Subsea Multiphase Pumps
Phase II Multiphase PumpTypical Phase II Pump Skid
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 6/17November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Framo Subsea Multiphase Pumps
C26
C25
W/O
C24
C22
C21
CCPUMP
C1 CLUSTER
PUMPC1
PUMP
PUMP
C2
C7
C CLUSTER
C4 CLUSTER
C2 CLUSTER
C3 CLUSTER
C5 CLUSTER
C8
C5
C10
C1
C4
C4
C3
C19 ST2
C5PUMP
C13
C31
C-33
C-34
C30
C36
C38
C-35
Single Pump Skid
Dual Pump Skid - Two Pumps
Dual Pump Skid - One Pump
Layout includes –• twin pumps (Phase II) at C1, C5, CC
with a December 2003 startup
• single pump (Phase I) at C3, C4
with a October 2002 startup
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 7/17November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – FRIEND (Framo Interactive Enabling Diagnostics)
Internet
ServiceProvider
FramoEngineer Sandsli
HessEngineer Bata/Hou.
Subsea Pump Stations
►Condition monitoring through real-time streaming of data
►24hr, 7 days a week coverage.
► Allows for proactive maintenance and improved pump operations
►Communication functionality, documents and status reports
►Remote expert analysis and online advice
►Reduced operating cost & increased oil production
FRIEND
Portal
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 8/17November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Framo: FRIEND Support Room in Norway
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 9/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Flowline Gas Lift
C-19 Gas Inj
C-22 Gas Inj
Ceiba Flowline Gas Lift
- provides 22 mmcfg/d of gas lift at 4 clusters.- provides injection of gas for future use.- assists flow when Framo MPP fails.- reduced head gives Framo MPPs less wear.
- reduced suction pressure means more reserves.
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 10/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Flowline Gas Lift
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 11/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Ceiba Field – Subsea Tree Installation on Wire
Subsea tree resting on deck
of intervention vessel
Subsea tree as it is lowered via crane into the sea
• less time spent means $3 million savings• eliminates the requirement to pull and rerun
the marine riser, an inherently risky operation
Lowering of the subsea tree on wire instead ofrunning on drillpipe accomplishes:
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 12/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex
Okume Complex:
• discovered in May 2001, located within the Rio Muni Basin• Ceiba FPSO is 24 km from Okume Complex central facility• water depth ranges 50 m to 650 m• field is about 190 km2 in size
Field Layout:
• 2ea. mini-Tension Leg Platforms (TLP)• at Okume and Oveng fields
• production & water injection• all dry tree• 3ea. fixed wellhead platforms at Elon
• A-WHP, water injection (WI)• B-WHP, production & WI• D-WHP, production• all dry tree
• crude oil export to Ceiba FPSO
Sendje CeibaFPSO
Mini-TLP
Satellite 1
Central
Processing
Facility
Satellite 2
Satellite 3CeibaCeibaOkumeOkume
EbanoEbanoOvengOveng
ElonElon
Mini-TLP
Ok C l L t
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 13/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex - Layout
F E A B&C
DSendje Ceiba,
FPSO
Ok C l T i Mi i T i L Pl tf (TLP)
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 14/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex, Twin Mini-Tension Leg Platforms (TLP)
Tension Leg Platforms (Oveng, Okume) aboard dry tow vessel arrive in Equatorial Guinea.
• TLP floats under tension while fastened to the seafloor via steel tendons.• smaller footprint, lighter weight, faster construction time means less cost.• riser tensioning system allows for dry tree installation, reduced cost versus subsea.
• tender assist drilling rig versus semisubmersible means less cost.
Ok me Comple Tender Assist Drilling Rig ne t to Ok me TLP
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 15/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex – Tender Assist Drilling Rig next to Okume TLP
Okume Complex ‘SMART’ Well Design
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 16/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex – SMART Well Design
Oil Producing
Zone ‘A’
Oil ProducingZone ‘B’
“SMART’ Well Design:• provides isolation between multiple pay zones• allows individual zone testing
• allows either zone to be isolated• allows downhole choking on both zones
Downhole manipulation is accomplished
via hydraulics through control lineslocated at the wellhead.
Hess has successfully manipulated adownhole control valve via ROV onCeiba subsea well C-33.
Okume Complex and Ceiba Field
8/12/2019 12th African_ Mike Guerra
http://slidepdf.com/reader/full/12th-african-mike-guerra 17/17
November 6, 2008 Hess Equatorial Guinea, Inc.
Okume Complex and Ceiba Field
other operations and projects driven by technology
• at Okume• water injection (125 kbd) helps to sustain reservoir pressureand insure maximum reserve recovery.
• a water-alternating-gas project will start soon with theobjective of increasing sweep efficiency and increasing the
utilization of associated gas production.• gas compression is used to provide gas lift gas to individual
producing wells including those on and both TLPs.
• at Ceiba• water injection (120 kbd) helps to sustain reservoir pressure
and insure maximum reserve recovery.