Date post: | 20-Jan-2016 |
Category: |
Documents |
Upload: | franklin-gibbs |
View: | 215 times |
Download: | 0 times |
21-04-23
Rotterdam Electric
21-04-232
Ambition
50% C02-reduction in 2025 compared to 1990
100% climate proof in 2025
Improved air quality
Economically strong city
21-04-233 21-04-233
Sustainability Program 2011-2014
Goal: Rotterdam as a clean, green, healthy and economically
strong city.
Objectives for Electric Mobility in the Sustainability Program:
Reduce CO2 emissions as leading city
Improve energy efficiency
Promote sustainable mobility and transport
Promote clean air and reduce noise hindrance
Enlarge sustainable investments and promote sustainable
products and services
21-04-234
Benefits of Electric Mobility
Internal combustion engine~ 15%
Electric engine with fossil electricity~ 25%
Electric engine with green electricity~ 65%
Important for Rotterdam:- Locally zero-emission
- Less CO2 emissions in the total energy chain
- Less noise hindrance- Maintain good accessibility by car
21-04-235 21-04-235
Rotterdam Electric
Goal: encourage the use of electric vehicles
At least 1.000 charging stations in 2014
A covering network of charging stations for e-bikes and e-
scooters
Replacement of 4.000 petrol scooters by e-scooters
A portfolio of innovation projects on electric mobility
All new parking garages are designed to be ‘EV-Ready’
25% of the municipal vehicle fleet is electric or hybrid in 2014
21-04-236
Rotterdam Electric
Charging Infrastructure
Electric2- and 3-wheelers
Innovation Projectsand Vehicle Fleets
Collaborationand Lobby
Monitoring & Communication
21-04-237
Charging Infrastructure
Targets:
1. 1000 charging points linked to vehicle owners:
- Private terrain: subsidies (€ 1.000 and € 450 for green electricity) or
- In parking garages or
- In public space
2. 60 charging stations at strategic locations
3. Fast-charging
21-04-238
Electric 2- and 3-wheelers
Network of charging stations installed in public bicycle sheds
Old target: replacement of 4.000 fossil scooters with e-scooters,
promoted with financial incentive (demolition premium)
In 2011 city council decree against demolition premium
E-scooter promotion remains political priority
Potential new target: by 2014 15% of the newly sold scooters is
an e-scooter (innovators & early adopters)
21-04-239
Electric 2- and 3-wheelers - Projects
E-scooter platform Rotterdam
Electric Scooter Factory Rotterdam
Experience to convince 2.0
E-scooter in municipal vehicle fleet
Charging stations in public bicycle sheds
Electric food delivery
Scooter party @ RDM
Domino’s and Croon TBI as forerunners
New
Experience to convince 3.0
Electric thuisbezorgd.nl (takeaway.com)
Electric scooter experience HNR|EVC
21-04-2310
Innovation Projects
Target:
Promote and/or facilitate projects of external stakeholders
which implement innovations with electric transport
Assessment criteria per project:
External stakeholder initiative
Added value for Rotterdam
Uniqueness in the region
Up scaling potential
21-04-2311
Innovation Projects - Milestones
Pilot with 75 electric vehicles in Rotterdam
Pilot with 25 electric car sharing vehicles in the 4 big cities
Electric Tuc Tuc transport by Flex Overschie
Pilot with 4 electric hybrid busses at RET
Start of ESFA: Electric Scooter Factory Rotterdam
Application of 2 hybrid heavy garbage trucks
Fast charging stations
21-04-2312
Innovation Projects - Milestones
Launch of the Electric Vehicle Center
21-04-2313
Innovation Projects
Possible new innovation projects in 2012 and beyond
Electric city distribution
Electric taxis
Full-electric city busses
…
21-04-2314
Sustainable City Logistics
Transport Analysis
Binnenstadservice
Environmental Zone
Nighttime Distribution
ECOSTARS
Together with public and private partners in the city
21-04-2315
Transport Analysis (2008)
21-04-2316
Binnenstadservice Rotterdam
Reduction of 150 trips per week compared to 2010
21-04-2317
Environmental Zone for trucks > 3.5t
21-04-2318
Nighttime Distribution
In Rotterdam:
Noise constraints (23:00 – 7:00 < 60 dB)
Distribution time frame constraints (e.g. 7:00 – 17:00)
21-04-2319
Nighttime Distribution
17% CO2 reduction because of fuel savings
Less vehicles needed for the same deliveries due to:
1. Use of larger trucks
2. Operation without time frame constraints
Agreement: all supermarkets joined
21-04-2320
ECOSTARS
21-04-2321
ECOSTARS
Incentives for transport companies
8 European cities, 3 years
Goods and people
Vehicle fleet scan
Score: stars
Award: incentives
21-04-2322
Collaboration and Lobby
Green Deal on electric transport
European collaboration in HyER and POLIS
European projects: Hybrid User Forum (approved) Clean Fleets (approved) TIDE (approved) E-FACTS E-mobility 3 cities NL Clean City Logistics City 2.0 DELIVER
Shanghai Electric Vehicle Center
21-04-2323
Contact
Projectmanager Rotterdam Electric
incl. Collaboration and Lobby
Lutske Lindeman, +31(0)10 489 6395, [email protected]
Charging Infrastructure
Arjan Oranje, +31(0)10 489 7239, [email protected]
Innovation Projects and Vehicle Fleets
Lode Messemaker, +31(0)10 489 7775, [email protected]
Electric 2- and 3-wheelers
PM
Communication
Kim Hooning, +31(0)10 261 1853, [email protected]