    Document no. 13/90242-5 - ETS-21 v. 3

    Offshore Substation

    Materials and Fabrication of Steel for Topside andSub-Structure

    ETS-21 Rev. 3

       t   e   c    h

       n

        i   c   a    l

       s   t   a   n

        d

       a   r    d   s

     

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    2/40

     

    Document no.13/90242-5 ETS-21 v. 3

    Revision survey

    Document title Materials and Fabrication of Steel for Topside and Sub-Structures.

    Document no. 13/90242-5

    Target group Fabrications Contractors and Designer for Offshore substations.

    RevisionDocumentstatus

    Writer Reviewer Approver

    Init Date Init Date Init Date

    1 Approved N/A 12.10.09 N/A 12.10.09 AGS 12.10.09

    2 Approved xomo 22.11.2012 GKY, SVR 10.10.2012 POD 03.12.20123 Approved

    SBG,xomo

    28.11.2014POD, SBG,XHFN, OLJ

    16.12.2014 OLJ 16.12.2014

    Minor alterations, type errors, rephrases' etc. where the meaning of the text is leftunchanged are not shown.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    3/40

     

    Document no. 13/90242-5 - ETS-21 v. 3

    Table of contents

    1.  Scope ............................................................................................... 1 

    2.  References ....................................................................................... 1 

    2.1  Codes and Standards ............................................................................ 1 2.2  Energinet.dk Technical Standards........................................................... 3 

    3.  Definitions and abbreviations .......................................................... 3 

    3.1  Definitions ........................................................................................... 3 3.2  Abbreviations ...................................................................................... 4 

    4.  General ............................................................................................ 5 

    4.1  Quality and HSE - Project Plans ............................................................. 5 

    4.2 

    Structural categories ............................................................................ 5 

    5.  Structural Materials ......................................................................... 5 

    5.1  General............................................................................................... 5 5.2  Steel Material ...................................................................................... 5 

    5.2.1  Chemical Properties ...................................................................... 6 5.2.2  Bolting Material ............................................................................ 6 5.2.3  Internal Soundness ....................................................................... 7 

    5.3  Structural Categories ............................................................................ 7 5.3.1  Material Certificates and Markings ................................................... 8 

    5.4  Fabrication of Welded Structural Members ............................................... 8 5.5  Standard Tubulars and Sections ............................................................. 8 5.6  Stairs, Handrails and Grating for Topside ................................................ 8 

    5.7 

    Stairs and grating materials for Sub-structure ......................................... 8 

    5.8 

    Platform Doors. ................................................................................... 9 

    6.  Structural steel dimensions ............................................................. 9 

    6.1  Tubular dimensions and tolerances ......................................................... 9 6.2  Sections - dimensions and tolerances ..................................................... 9 6.3  Steel plates ....................................................................................... 10 6.4  Rectangular/square hollow sections ...................................................... 10 

    7.  Structural fabrication ..................................................................... 10 

    7.1  Storage and handling of steel materials ................................................ 10 7.1.1  Identification system ................................................................... 10 7.1.2  Alignment .................................................................................. 11 

    7.2  Structural sections and plates .............................................................. 11 7.3

     

    Scaffolding hooks ............................................................................... 11 

    7.4  Bolted connections ............................................................................. 11 7.4.1  Bolts in shear and tension connections .......................................... 12 7.4.2  Friction grip connections .............................................................. 12 

    7.5  Helidecks .......................................................................................... 12 7.6  Lifting fittings .................................................................................... 12 

    7.6.1  Definition ................................................................................... 12 7.6.2  Materials and Fabrication ............................................................. 13 7.6.3  Additional Requirements .............................................................. 13 

    7.7  Finishing of structural steel ................................................................. 14 7.8  Fabrication of non-structural steel and temporary attachments ................ 14 

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    4/40

     

    Document no.13/90242-5 ETS-21 v. 3

    7.8.1  Temporary cut-outs .................................................................... 14 7.8.2  Rat holes (Weld access hole) ........................................................ 14 

    7.9 

    Fabrication dimension tolerances ......................................................... 14 

    7.9.1 

    Tolerances for linear dimensions ................................................... 15 

    7.9.2  Tolerances for angular dimensions ................................................ 15 7.9.3  Tolerances for straightness, flatness and parallelism ....................... 15 7.9.4  Section ends .............................................................................. 16 7.9.5  Location of seams ....................................................................... 16 7.9.6  High-low .................................................................................... 17 7.9.7  Plates and grating ....................................................................... 17 7.9.8  Landings and stairways ............................................................... 17 7.9.9  Interface tolerance ...................................................................... 17 7.9.10  Markings Sub-structure. .............................................................. 17 

    8.  Welding .......................................................................................... 17 

    8.1  Welding processes .............................................................................. 17 

    8.2 

    Qualifications of welders and welding operators ..................................... 18 

    8.2.1  Welding coordinator .................................................................... 18 8.2.2  Welders and operators................................................................. 18 8.2.3  Identification of welder or welding operator .................................... 18 8.2.4  Welder's or operator's record ....................................................... 18 8.2.5  Test for branch connections ......................................................... 19 

    8.3  Welding procedures ............................................................................ 19 8.3.1  General ..................................................................................... 19 8.3.2  Specific requirements .................................................................. 20 8.3.3  Test of the procedure welds ......................................................... 20 

    8.4  Production welding ............................................................................. 21 8.4.1  Welding sequences ..................................................................... 21 8.4.2  Weld preparation ........................................................................ 21 

    8.4.3 

    Weld execution ........................................................................... 21 

    8.4.4 

    Pre-heating ................................................................................ 22 

    8.4.5  Inter-pass temperature ............................................................... 23 8.4.6  Post weld heat treatment (PWHT) ................................................. 23 8.4.7  Weld repairs ............................................................................... 23 8.4.8  Production testing ....................................................................... 24 

    9.  Non-destructive examination ......................................................... 24 

    9.1  Extent of examinations ....................................................................... 24 9.2  NDE Qualifications .............................................................................. 25 

    9.2.1  Examination organisation ............................................................. 25 9.2.2  Examination personnel ................................................................ 25 9.2.3  Procedures ................................................................................. 25 

    9.3  Execution of NDE ............................................................................... 25 

    9.4 

    NDE procedure and acceptance criteria. ................................................ 25 

    9.4.1  Visual (VT) procedure and acceptance criteria ................................ 25 9.4.2  Magnetic particle (MT) procedure and acceptance criteria ................ 26 9.4.3  Radiographic testing (RT) procedure and acceptance criteria ............ 26 9.4.4  Ultrasonic testing (UT) acceptance criteria ..................................... 26 9.4.5  Liquid Penetrant testing (LP) acceptance criteria ............................. 26 

    9.5  Execution of NDE, structural fabrication ................................................ 26 9.5.1  General ..................................................................................... 26 9.5.2  Sequence of examination ............................................................. 27 9.5.3  Surface conditions ...................................................................... 27 9.5.4  Random examination................................................................... 27 

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    5/40

     

    Document no.13/90242-5 ETS-21 v. 3

    9.5.5  Extent of examination in case of unacceptable welds ....................... 27 

    10. 

    Coating .......................................................................................... 28 

    11.  As-built documentation .................................................................. 28 

    11.1  Deliverables ...................................................................................... 29 

    12.  Appendix ........................................................................................ 30 

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    6/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 1/35

    1. 

    Scope

    This technical standard specifies the minimum requirements for the materials,

    fabrication, testing and inspection of offshore steel structures for topsides and sub-structures (Jackets) intended for high voltage offshore transformer platforms

    (Substations).

    This technical standard covers also the main supporting steel structure for helideckon topside. However, the lattice structure typically integrated under the helidecks

    may be preferred by Energinet.dk to be made of aluminium. For aluminiumstructures this standard refers to the DNV standard DNV-OS-E401.

    This standard may only be departed from if the deviations are approved byEnerginet.dk and certifying agency or if specified on Energinet.dk approved design

    drawings.

    2.  References

    The following codes, standards and statutory regulations shall be considered as part

    of this technical standard.

    2.1 

    Codes and Standards

    All regulations, codes and standards referred to in the present standard shall apply inthe latest revision applicable at the beginning of the project unless noted otherwise.

    API 2B Specification for fabricated structural steel pipe

    API 5L Specification for line pipe

    ASME, Section V Article 7, Magnetic Particle Examination

    ASME, Section V Article 9, Visual Examination

    ASME, Section IX Qualification standard for welding and brazing procedures,

    welders, brazes and welding and brazing operators

    AWS D1.1 Structural welding code - steel

    BS 7448 Part 1, Specification for fracture mechanics toughness test

    DNV-OS-C101 Design of offshore steel structures (LRFD method)

    DNV-OS-C401 Fabrication and testing of offshore structures

    DNV-OS-E401 Offshore standard, Helicopter Decks

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    7/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 2/35

    DNV-OS-J201 Offshore Substations for Wind Farms

    EN 287-1 Approval Testing of Welders for Fusion Welding.

    EN 473 Qualification and certification of NDT personnel. Generalprinciples.

    EN 970 Welding – Visual Examination of Fusion Welded Joints.

    EN 1011 Recommendations for Arc Welding of Ferritic steels.

    EN 1418 Welding personnel – Approval testing of welding personnel forfully mechanized and automatic welding of metallic materials

    EN 10002-1 Metallic Materials - Tensile Testing - Part 1. Method of Test.

    EN 10025 Hot Rolled Products of Non-Alloy Structural Steels. Technical

    Delivery Conditions.

    EN 10225+AC Weld able structural steels for fixed offshore structures – Technical delivery conditions

    EN 10045 Metallic Materials - Charpy Impact Test.

    EN 10163-1 to 3 Delivery Requirements for Surface Conditions of Hot RolledSteel Plates, Wide Flats and Section.

    EN 10164 Steel Flat Products with Specified Through ThicknessProperties. Technical Conditions for Delivery.

    EN 10204 Metallic Products - Types of Inspection Documents.

    EN 10210 Hot Finished Structural Hollow Sections of Non-Alloy and FineGrain Structural Steels.

    EN 45004 General Criteria for the Operation of Various Types of BodiesPerforming Inspection.

    EN ISO 5817 Welding-Fusion-welded joints in steel, nickel, titanium and

    their alloys

    EN ISO 13920 Welding – General tolerances for welded constructions – 

    dimensions for lengths and angles – Shape and position

    EN ISO 17025 General Requirements for the Competence of Testing andCalibration Laboratories

    ISO 898 Part 1-6, Mechanical properties of fasteners made of carbonsteel and alloy steel

    ISO 1459 Protection against corrosion by hot dip galvanizing

    ISO 1461 Hot dip galvanized coatings on fabricated iron and steel articles– Specifications and test methods

    ISO 3690 Welding and allied processes. Determination of hydrogencontent in ferritic arc weld metal

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    8/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 3/35

    ISO 7090 Plain washers, chamfered. Normal series. Project grade A

    ISO 8501 Part 1-2, Preparation of steel substrates before application of

    paints and related products. Visual assessment of surfacecleanliness.

    ISO 1106 Recommended practice for radiographic Examination of Fusion

    Welded Joints.

    ISO 2553 Welds - Symbolic Representation on Drawings.

    ISO 3452 NDT - penetrant inspection - general principles.

    ISO 9606-2 Qualification test of welders – Fusion welding of aluminium andits alloys

    ISO 15614 Specification and qualification of welding procedures for

    metallic materials

    BL 3-5 Statens Luftfartsvæsen, Bestemmelser om helikopterdæk på

    havanlæg

    2.2 

    Energinet.dk Technical Standards

    ETS-00 Guideline for Use of Energinet.dk Technical Standards

    ETS-24 Weight Monitoring and Weighing

    ETS-25 Protective Coating of Steel

    EDS-50-01 Engineering Reports, Drawings and Lists

    EDS-02 Requirements for “As-Built” Documentation for Offshore Substations

    3. 

    Definitions and abbreviations

    3.1  Definitions

    The following definitions are used in the present standard:

    Employer: Energinet.dk

    Employer approval:  “Employer approval” or similar terms, requires approval in

    writing from Energinet.dk or his representative

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    9/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 4/35

    3.2 

    Abbreviations

    Within this specification the following abbreviations have been used. Abbreviations of

    standards and atomic elements are though not covered.

    CE: Carbon equivalent calculated according to EN 1011-2

    CTOD: Crack tip opening displacement

    Dnom: Nominal diameter

    ET: Eddy Current

    HV: Vickers hardness

    IQI: Image quality indicator

    +M: Delivery condition : thermo mechanical rolling

    MT: Magnetic particle examination/testing

    +N : Delivery condition: normalizing rolling

    NDE : Non destructive examination

    OD: Outer diameter

    PT: Liquid penetrant examination

    PWHT: Post weld heat treatment

    +Q: Delivery condition: quenched and tempered

    RT: Radiographic examination/testing

    t: Wall thickness

    UT: Ultrasonic examination

    VT: Visual examination/testing

    WPQR: Welding procedure qualification record

    WPS: Welding procedure specification

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    10/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 5/35

    4. 

    General

    All fabrication shall be carried out in accordance with agreed procedures and

    drawings and shall comply with applicable codes, standards and specifications aslisted in this ETS.

    Unless otherwise stated herein, the DNV standards DNV-OS-C401 “Fabrication and

    testing of offshore structures” and DNV-OS-C101 “Design of offshore steel structures(LRFD method)” shall form basis for this standard. 

    4.1 

    Quality and HSE - Project Plans

    Contractor shall submit a project specific quality plan to Energinet.dk for their review

    and approval. The document shall as minimum contain the following information:

      Detailed fabrication plan and schedule

      Organisation diagram

      Manpower plan

      Inspection and Test Plan.

      Dimension control procedure  Welding preparation details and procedures  NDE procedures

      Qualification of NDT operators  Qualification of welders  HSE manual

     

    List of major sub-contractors

    4.2 

    Structural categories

    Structural categories for selection of materials and determination of the extent ofinspection shall be in accordance with the relevant section of DNV-OS-C101.

    5.  Structural Materials

    5.1 

    GeneralThe steel type grades for topside structures shall comply with the requirements listedin appendix 1A.

    The steel type grades for steel Sub-structures shall comply with the requirementslisted in appendix 1B.

    5.2 

    Steel Material

    Steel type 2 can replace steel type 1 whereas steel type 4 can replace steel type 3.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    11/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 6/35

    Steel types shall be applied in accordance with approved design drawings. Thefollowing table shows typical material selections.

    Steel type Structural category

    Special Primary Secondary

    ST1 x x

    ST2 x x

    ST3 x x

    ST4 x x

    ST5 x

    Table 5-1 – Material selection

    Type 1-4 steel are used where charpy impact tests and CTOD testing is required.

    Type 2 and 4 steel shall be used where loads in thickness direction occur for

    thickness of 25 mm and above.

    5.2.1  Chemical Properties

    Where galvanising has been required the content of Silicon (Si) in the steel shall beminimum 0.15% and maximum 0.40%. The desirable content of Silicon is between

    0.15% and 0.25%. Steel type 3 and 4 shall not be galvanised.

    5.2.2  Bolting Material

    All bolts and nuts shall be delivered and marked according to ISO 898-1 class 8.8and ISO898-2 class 8 respectively unless otherwise specified on design drawings. Allbolts and nuts shall be hexagon type with ISO metric thread.

    Bolts and nuts with diameter 10 mm or more shall be hot dip galvanised according toISO 1461 class E and ISO 1459.

    Bolts with diameter less than 10 mm shall be made of stainless steel, ISO 3506

    grade A4-70, unless otherwise specified on design drawings. Where used forassembling carbon steel, insulation washers to be used.

    For bolting material used below LAT +4 m, a waxy rust proofing compound shall beapplied. Bolts and nuts for sub-sea installation (below LAT - 2 m) shall be PTFE(Teflon) coated.

    Washers shall be according to ISO 7090 quality class HV 200. The diameter ofwasher holes to be 1 mm greater than bolt size for bolts up to 18 mm and 1.5 mm

    for larger bolts. Hardened washers must be used for friction grip bolts.

    Bolt, nuts and washers shall be delivered with 2.2 certificates according to EN 10204.

    For assembling stainless steel parts, only stainless steel bolts shall be used.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    12/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 7/35

    Split pins materials shall be stainless steel, ISO 3506 grade A4-70.

    5.2.3  Internal Soundness

    For internal soundness, requirements stipulated in EN 10025-X option 6, 7 and 8shall apply.

    5.3  Structural Categories

    Table 5-2 Structural Classification – typical applications

    Structural category for Topside Structures

    Special Primary Secondary

    All Pad-eyes/lifting trunnion Supports for main cables& Hang-off's

    Ladders

    Main tubular columns Deck beams in grid lines HandrailsCrane pedestal Bracing members Stairs

    Support structure for

    helideck

    Sea-fastening Cable ladder supports

    (minor cables)

    Support beams/structure for

    main transformer

    Deck plates GratingSecondary deck beams Supports for minor

    equipment (e.g.antennas & satellite

    discs)

    Nodes in main tubular

    Cones in main tubular

    Pipe supports

    Structural category for Sub-structures (Jacket)

    Special Primary Secondary

    Pad-eyes/lifting trunnion Mudmat Ladders

    Jacket legs and braces J-tubes Handrails

    Piles and pile sleeves Caissons Stairs

    Boat landing (integrated) Boat landing Grating

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    13/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 8/35

    5.3.1  Material Certificates and Markings

    Steel materials shall be delivered with inspection certificates according to EN 10204

    Structural category: Material Certificate:

    Special 3.2

    Primary 3.1

    Secondary 2.2

    Table 5-3 Material certificates according to EN 10204

    Where traceability is required all steel material shall be marked according to relevantstandards listed in appendix 1.

    If traceability of a material is not required the material shall as minimum be marked

    with material grade.Material that cannot be identified as outlined above shall be rejected.

    5.4  Fabrication of Welded Structural Members

    Welded tubulars shall be fabricated in accordance with API 2B. Mechanical tests for

    tubulars must be carried out in the finished configuration.

    Welded profiles (sections) shall be in accordance with the requirements stipulated in

    appendix 1.

    5.5 

    Standard Tubulars and Sections

    Seamless tubulars shall be manufactured in accordance with API 5L unless otherwisespecified. Seamless tubulars shall be inspected in accordance with SR4.

    Rolled profiles (Sections) shall be in accordance with the requirements stipulated in

    appendix 1.

    5.6  Stairs, Handrails and Grating for Topside

    See standard drawings ref. appendix 2, 3, 4 and 5.

    5.7  Stairs and grating materials for Sub-structure

    Materials for grating and steps for stairs shall be GRP. Grating shall be as MouldedGrating 50x50", with anti-slip surface.

    Stair treads to be as Moulded Grating Steps of a recognized industrial standard,

    subject for Employer approval.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    14/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 9/35

    Min 4 pcs fixations for the GRP grating is required per square meter and not lessthan 3 for each grating piece. The fasteners shall be of stainless steel AISI 316

    quality.

    Grating fasteners shall not be installed onto closed sections (e.g RHS e.t.c.), I.e. nopenetration of closed sections allowed.

    5.8  Platform Doors.

    A door schedule shall be developed as part of the design and construction. It shall be

    continuously updated throughout the design and construction phase, until allrequired information is specified prior to procurement.

    All external and internal doors shall be designed and fabricated in accordance with

    NORSOK C-002 with respect to: Materials, fire rating and hardware.

    All doors on the substation shall be of stainless steel AISI 316L with a suitablepainted surface after supplier's recommendation.

    Gutter shall be installed above all external doors - made of suitable angel bar,welded to wall plate. Slope 1:100 to both sides from middle of gutter.

    6.  Structural steel dimensions

    6.1  Tubular dimensions and tolerances

    Tubulars are to fulfil the following dimensional tolerances:

      OD < 406 mm tolerances according to API 5L  OD  406 mm tolerances according to API 2B

    As a supplementary requirement the minimum wall thickness must be as specified,i.e. no negative tolerance allowed.

    All tubulars shall meet the straightness requirements for API-2B.

    Out-of-roundness shall be limited to the lesser of:

      OD(max.) - OD(min.)  1% of Dnom 

      OD(max.) - OD(min.)  max{6 mm, (t mm)/10}

    Additionally, the local out-of-roundness shall be measured using a 20 gauge. This

    shall not depart from the theoretical shape by more than 10% of wall thickness.

    6.2  Sections - dimensions and tolerances

    Mechanical tests for profiles must be carried out in the finished configuration.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    15/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 10/35

    Profiles shall meet the dimensional tolerance requirements of applicable standard asper Appendix 1, except for length tolerance, which shall be in accordance with EN

    ISO 13920. Maximum straightness deviation shall not exceed 1/1000 of the lengthand maximum 10 mm for lengths greater than 10 m.

    6.3  Steel plates

    Mechanical tests for steel plates must be carried out in the finished configuration.

    Steel plates shall meet the dimensional tolerance requirements of EN 10225 and EN10025.

    6.4  Rectangular/square hollow sections

    Mechanical tests for rectangular/square hollow sections must be carried out in thefinished configuration.Rectangular/square hollow sections shall meet the dimensional tolerance

    requirements of EN 10225 and EN 10025.For primary steel only seamless hollow sections are allowed.

    7. 

    Structural fabrication

    All fabrication shall be carried out in accordance with agreed procedures, approved

    design drawings and shall comply with applicable codes and standards listed in saidETS.

    7.1 

    Storage and handling of steel materials

    When materials are received contractor shall inspect them in order to ensure that:

    a)  Marking of materials complies with the documentation

     b) Documentation complies with the latest revision of the relevant specification

    c)  Materials are not damaged during transportation

    The inspection shall be documented in a materials receiving inspection report

    Storage of material or subassemblies shall be above ground level, ensuring that it is

    kept free of dirt, grease, paint and other alien materials. All materials and

    subassemblies shall be handled and stored in a way that will ensure that the materialis not damaged.

    All materials shall be traceable to the Energinet.dk contract in question.

    7.1.1  Identification system

    Before starting of fabrication contractor shall establish a numbering system to

    identify each weld and structural member in order to eliminate conflicting orduplicating of identification systems.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    16/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 11/35

    For structures in the structural categories Special  and Primary , the numberingsystem shall ensure traceability for all welds and materials during all stages of

    fabrication and in the as-built documentation.

    For structures in the structural category Secondary , the numbering system shall

    ensure traceability during all stages of fabrication.

    7.1.2  Alignment

    Wherever practical, clamps, magnets holding devices or other setting-up fixturesshall be used in assembling parts of the structures in order to minimise tack welding

    in the weld groove.

    If fit-up clamps cannot be used spacer strips shall be used in order to ensure the

    specified root gap prior to tack welding.

    7.2  Structural sections and plates

    All welds shall be continuous (closed welds). A minimum of 4 mm throat thicknessseal weld shall be applied where structural welds are not required.

    Beam sections with identical cross sections may be spliced. Minimum distancebetween 2 splices shall be 1200 mm.

    The splices cannot be located within the first 1/8 or the middle 1/4 of a section

    7.3  Scaffolding hooks

    Unless otherwise noted on design drawings, scaffolding hooks are to be installed

    below all decks in a 2m x 2m grid.

    7.4  Bolted connections

    Procedures for the bolt tightening shall be prepared prior to the work and records of

    the tensioning shall be maintained during the work.If bolt pre-stressing is required according to the design drawings hydraulic pulling

    pre-stress tool shall be used unless otherwise agreed with Energinet.dk. Calibrationof pre-stressing tools shall be documented.

    Bolt heads and nuts shall rest squarely within 3 against the base material, and bolts

    shall be of lengths that will extent entirely through and up to a maximum of 6 mm

    beyond the nuts.

    No welding is allowed on bolt items.

    Counter nuts shall secure all nuts unless otherwise noted.

    Washers shall be used at both bolt head and nut except when tensioning equipmentis used. Spring washers are not allowed in structural members.The galvanized surface for the fasteners must remain intact after tensioning.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    17/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 12/35

    All holes shall be drilled and reamed as necessary prior to application of protectivecoating. Outside burrs resulting from drilling or reaming operations shall be removed

    with a tool making a 2 mm bevel.

    Grease shall always be applied when using torque-tensioning technique. The grease

    shall be of the non-corrosive type and must not contain Sulphur (e.g. MoS2).

    7.4.1  Bolts in shear and tension connections

    Bolts in structural members from M12 mm and up shall be pre-stressed to 50% ofyield strength unless otherwise specified.

    7.4.2  Friction grip connections

    Bolts shall be pre-stressed and documented as specified on drawings.

    Enlarging of holes for high stress bolts shall be carried out by reaming only. Holesshall be clean-cut without torn or ragged edges. Outside burrs resulting from drillingor reaming operations shall be removed with a tool making a 2 mm bevel.

    7.5 

    Helidecks

    The main supporting steel structure for a helideck on the topside structure is coveredby this standard.

    The lattice structure typically integrated under the helidecks shall be made of

    seawater resistant aluminium unless otherwise stated. For classification, reference is

    made to ‘Offshore Standard, Helicopter Decks DNV-OS-E401.

    The helidecks shall be designed and marked to comply with ‘Statens Luftfartsvæsen’regulation BL 3-5.

    Walkways, railings and stairs from the decks to the topside shall be included and arealso to be designed in seawater-resistant aluminium, if assembled with aluminiumhelideck.

    7.6  Lifting fittings

    Lifting fittings are defined as lifting lugs, lifting trunnion and pad eyes.

    For lifting fittings, the additional requirements presented in this section must befulfilled.

    7.6.1  Definition

    Lifting fitting loads are defined as follows:

    Low load: Max 10 tonnes unit load

    Normal load: Max 50 tonnes unit load

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    18/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 13/35

    High load: Above 50 tonnes unit load

    Unit load is the total current weight of the structure to be lifted.

    7.6.2  Materials and Fabrication

    All materials for lifting fittings shall be of steel type 3 special steel.

    Welding of lifting fittings shall be of full penetration type welds unless noted

    otherwise on the design drawings.

    All plates for lifting fittings shall be examined 100% according to EN 10160 Class S1

    Pinholes in pad eyes shall be machined. If cheek plates are fitted the machining of

    the hole shall be carried out after welding of the cheek plates.

    Full dimensional and orientation checks of all lifting fittings shall be made upon

    completion. Complete non-destructive re-testing by means of MT and UT shall becarried out on all lifting fittings after each lift or when load has been applied.

    The lifting fittings shall be completed with a topcoat RAL 1004 (yellow) and markedwith SWL in black letters.

    7.6.3 

    Additional RequirementsThe following additional requirements apply for “high load”  and “normal load”  lifting

    fittings:

      In pad eye plates, the final rolling direction shall be indicated by hard stamping

      Lifting direction shall be in the final rolling direction

    For “high load” the following further requirements apply:

      Full mechanical and chemical re-test shall be performed

      Charpy impact testing shall be performed transverse to the final rolling direction  Tensile test pieces shall be tested transverse to the final rolling direction  Where “high load”  lifting fittings are welded directly onto a structure, the

    structural members shall have documented through thickness properties (i.e.type 2 or 4 steel). Otherwise, the pad eye shall be sliced into the structure

    For “normal load” and “low load”  the following additional requirements apply:

      A chemical re-test shall be performed to document the traceability between thematerial and the original certificate. 

      For lifting fittings in “low load” , the chemical re-test may be avoided if an

    additional material factor of 1.5 is used in the design.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    19/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 14/35

    7.7  Finishing of structural steel

    All temporary attachments for scaffolding, temporary bracing etc. shall be removedby cutting not closer than 3 mm to the structure and then ground flushed with thesurface. Subsequently, 100% MT shall be performed. Minor surface defects on

    primary steel shall be ground to sound metal, 100% magnetic particle inspected,

    weld repaired, if necessary, and magnetic particle re-inspected.

    7.8  Fabrication of non-structural steel and temporary attachments

    When welding non-structural and temporary attachments to primary structural

    components a minimum clearance of 200 mm between any attachments weld toeand any structural component weld toe shall be kept.

    All temporary welds shall require a minimum of two weld passes. The last pass (es)shall be deposited against the temporary part.

    7.8.1  Temporary cut-outs

    When temporary cut-outs are necessary they shall be prepared with the same careas for permanent cut-outs including carefully rounded corners.

    7.8.2  Rat holes (Weld access hole)

    Rat holes shall only be used where absolutely required and they shall then have aradius of 30 mm. The welds shall be continued through the rat hole.

    Rat holes shall be sealed with closure plates fillet welded to the structure after

    completion of NDE on the main steel.

    7.9  Fabrication dimension tolerances

    The fabrication dimensional tolerances for erection of constructions shall be inaccordance with DNV-OS-C401.

    In addition to the requirements in DNV-OS-C401, the tolerances for linear andangular dimensions and straightness shall be as stated in the following tables.

    The fabrication tolerances for design dimensions for sections at interface points I.e.stabbing guides, top of jacket e.c.t shall be within table 7-1, but never exceed 10mm

    regardless of the design dimension.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    20/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 15/35

    7.9.1  Tolerances for linear dimensions

    Tolerances for linear dimensions shall be in accordance with EN ISO 13920, Class B

    and C.

    Range of nominal length in mm

    Tolerance Class

    (Structural

    Category)

      < 

       3   0

      <   1   2   0

      <   4   0   0

      <   1   0   0   0

      <   2   0   0   0

      <   4   0   0   0

      <   8   0   0   0

      <   1   2   0   0   0

      <   1   6   0   0   0

           ≤   2   0   0   0   0

      > 

       2   0   0   0   0

      Tolerances in mm

    B (Special)  ±1 ±2 ±2 ±3 ±4 ±6 ±8 ±10 ±12 ±14 ±16

    B (Primary) ±1 ±2 ±2 ±3 ±4 ±6 ±8 ±10 ±12 ±14 ±16

    C (Secondary) ±1 ±3 ±4 ±6 ±8 ±11 ±14 ±18 ±21 ±24 ±27

    Table 7-1 – Tolerances for linear dimensions

    7.9.2  Tolerances for angular dimensions

    Tolerances for angular dimensions shall be in accordance with EN ISO 13920, Class B

    and C. The length of the shorter angle leg as specified in the following table shall be

    used to determine which tolerances are to apply.

    Range of nominal sizes l in mm (l=length of shorter leg)

    Tolerance Class

    (StructuralCategory)

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    21/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 16/35

    Range of nominal length in mm

    Tolerance Class

    (Structural

    Category)   <    1

       2   0

      <   4   0   0

      <   1   0   0   0

      <   2   0   0   0

      <   4   0   0   0

      <   8   0   0   0

      <   1   2   0   0   0

      <   1   6   0   0   0

      <   2   0   0   0   0

      <   2   0   0   0   0

      Tolerances in mm

    E (Special)  ±0,5 ±1 ±1,5 ±2 ±3 ±4 ±5 ±6 ±7 ±8

    E (Primary)  ±0,5 ±1 ±1,5 ±2 ±3 ±4 ±5 ±6 ±7 ±8

    F (Secondary)  ±1 ±1,5 ±3 ±4,5 ±6 ±8 ±10 ±12 ±14 ±16

    Table 7-3 – Tolerances for straightness, flatness and parallelism

    The dimensions given in the drawings are applicable at a temperature of +10C.

    Corrections must be performed if the manufacturing temperature differs from this,by more than 10 C.

    Contractor shall submit construction drawings marked up to as-built status and

    indicate as-built interface dimensions, which could affect offshore operations. 

    7.9.4  Section ends

    The ends of sections cut perpendicular to the longitudinal axis shall be perpendicularto the axis with a maximum deviation of 3 mm, unless otherwise indicated on the

    drawings. 

    7.9.5  Location of seams

    Minimum distance between circumferential seams in tubular shall be 1200 mmunless shown otherwise on the drawings. Length of node stubs shall not be less than

    the outside diameter or 610 mm whichever is the strictest.

    Circumferential seams shall be avoided within node stubs.

    Longitudinal seams shall preferably be 180 degrees offset wherever practical and

    shall not be less than 15 degrees offset.

    The longitudinal seams on node chord cans shall be located at a minimum radial

    distance of 75 mm from the edge of any brace to chord welds. 

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    22/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 17/35

    7.9.6  High-low

    High-low, defined as a condition where tubular surfaces are misaligned, can be

    accepted provided the misalignment does not exceed 3 mm for single sided weldingand 6 mm for double sided welding. The root of adjacent tubular joints shall be

    completely tied-in (bonded) by weld metal and smooth transition shall be assured.

    The maximum acceptable misalignment as specified in EN ISO 5817.

    7.9.7  Plates and grating

    Grating shall be flat and without visible warping. Maximum allowable warping is 2mm. Slope of plates and grating shall be maximum ±6 mm/3 m.

    7.9.8  Landings and stairways

    Horizontal and vertical location of landings and stairways shall not deviate fromtheoretical measures on design drawings with more than 10 mm.

    7.9.9  Interface tolerance

    Interface checks between Topside and Sub-structure shall be subject for detailedreview and scrutiny by the Contractor.

    The result of said review shall be subject for approval by Energinet.dk.

    7.9.10  Markings Sub-structure.

    Water level figures shall be painted on the jacket legs, oriented 450 with respect tothe gridlines.

    The water level marking shall consist of a circumferential marking line at every

    meter, start and end elevation to be agreed. The lines shall be black on yellowbackground. Line width shall be 100 mm for El (+) 0.000, and 50 mm for all other

    elevations.

    The figures shall be min 500 mm high, painted black on yellow background.

    The jacket leg id number shall be painted on 3 locations around the circumferencewith 400 mm high identification letters at agreed elevation. The id's letter/figuresshall be black on rectangular white background.

    8.  Welding

    The welding workshop shall have a quality management system in accordance with

    ISO 9001, ISO 3834 series or equivalent standard.

    An organisation chart, which as a minimum shall include the names of the

    responsible manager, quality responsible, welding and NDE coordinator, and NDElevel III, shall be available.

    8.1  Welding processes

    Welding may be performed with the following processes unless otherwise specified:

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    23/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 18/35

      Metal-arc welding with covered electrode

     

    Self-shielded tubular-cored arc welding  Submerged arc welding

      Metal inert gas welding (MIG)

      Metal active gas welding (MAG)  Tubular-cored Metal arc welding  Tungsten inert gas arc welding (TIG)

      Plasma arc welding

    Other welding processes shall be agreed with Energinet.dk prior to fabrication.

    8.2 

    Qualifications of welders and welding operators

    8.2.1  Welding coordinator

    The workshop shall have one welding coordinator whereby welding personnel can besupplied with the necessary procedure specifications and work instructions to ensure

    that the work is correctly executed and managed.

    The welding coordinator shall be certified European Welding Engineer (EWE) or

    similar.

    8.2.2  Welders and operators

    All welders and operators shall be experienced and qualified in the workshop in

    accordance with the requirements of EN 287 series, ISO 9606, ASME IX orANSI/AWS D1.1 for welders and EN 1418 for operators or equivalent standardsapproved by Energinet.dk.

    The welder performance qualification test shall be carried out in accordance with a

    qualified welding procedure specification (WPS).

    8.2.3  Identification of welder or welding operator

    Welder Performance Qualification (WPQ) sheets with photograph shall be used fordocumentation purpose.

    Each qualified welder or welding operator shall be assigned a symbol, which alwaysshall be visible during welding. The welder or welding operator shall mark his welds

    with his symbol. Welder's symbol shall be stated in NDE-reports and as-builtdocumentation for high and normal safety class structure.

    8.2.4  Welder's or operator's record

    A record shall be kept of the welder’s or welding operator’s symbols and be availableat all times.

    A record of the welders or welding operators work performed during the last 12

    months shall be available to Energinet.dk at all times.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    24/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 19/35

    8.2.5  Test for branch connections

    Tests of welders for branch connections (Y-joints) are given below for the structuralcategories Special  and Primary .

     ‘Y’ joint welder's qualification shall be required for branch connections (Y and K

    connections between tubulars or tubulars welded to plates, branch outside diameterabove 150 mm) in addition to the welding test piece positions either PC and PF or to

    H-L045/G6 qualification.

    The test weld is a Y-joint between a vertical plate and a tube (branch) with a min.diameter of 200 mm and with an inclination of 35. Groove geometry shall be as

    specified in the relevant welding procedure qualification record. The plate thickness

    shall be at least 15 mm and shall have a minimum length and width equal to two

    times branch outside diameter. The thickness of the branch shall be at least 15 mm.

    Free end of the branch shall be oriented downwards in relation to vertical and becovered by a temporary plate during welding.

    The welding parameters shall be in accordance with a qualified welding procedure.No back welding is permitted.

    All test welds shall be 100% ultrasonic tested in accordance with section 8.0

    From the test weld three macro sections taken from 6 o’clock, 9 o’clock and 12

    o’clock shall be made. 

    Each macro section shall be examined and found to be acceptable to ASME codesection VIII.

    8.3  Welding procedures

    8.3.1  General

    Welding Procedure Qualification Records (WPQR's) shall reflect the production andshall be performed in accordance with EN ISO 15614-1 or ASME IX, unless otherwise

    stated in this section.WPS (Welding Procedure Specification) shall be prepared in accordance with EN-288-1, AWS D1.1 or an equivalent standard approved by Energinet.dk

    WPS's inclusive copy of reference WPQR shall be issued to Energinet.dk for approvalprior to commencement of welding.

    The material used in the WPQR shall be made on project materials only.Already established, sufficiently tested and documented procedures may however,

    be acceptable, if approved by Energinet.dk prior commencement of production.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    25/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 20/35

    Test body shall be acceptable to Energinet.dk. Test bodies will be approved ifaccredited by national authorities according to EN 45004 for certification of welding

    procedures according to EN ISO 15614-1 series or ASME IX.

    The validity of a qualified welding procedure is restricted to the workshop specifying

    the procedure and performing the procedure welding. Workshops or workshopbranches under the same technical management and working in accordance with thesame QA-programme and procedures are considered as one workshop.

    For welding of structural category Secondary  only approved WPS’ are required. 

    8.3.2  Specific requirements

    The degree of cold deformation of special and primary structural elements shall be

    less than 5%. If the deformation exceeds 5%, either heat treatment or strain ageing

    tests shall be carried out according to agreed procedure.

    The carbon equivalent (CE) of the production material shall not exceed that of the

    steel used for the WPQR by more than 0.03%.

    Deviations from the specific requirements shall require a new welding proceduretest.

    8.3.3  Test of the procedure welds

    Examinations shall be performed not earlier than 48 hours after completion of theweld.

    CTOD testing (Fracture mechanics testing) shall be performed in accordance with therequirements stipulated in DNV-OS-C101.

    CTOD test shall be carried out according to BS 7448 Part 2 (with detailedrequirements as given in DNV-OS-C401).

    Hydrogen removal treatment is not allowed without prior approval fromEnerginet.dk.

    CTOD results shall be calculated using appropriate values of yield stresses.

    Charpy-V Impact test:

    The following minimum values shall apply:

    Steel type Steel type 1 - 4 Steel type 5

    Charpy-V impactvalues (J)

    50 27

    Temperature (oC) -40 -20

    Table 8-1 Minimum average Charpy-V notch impact test value

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    26/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 21/35

    8.4 

    Production welding

    8.4.1 

    Welding sequencesContractor shall develop erection sequences, which shall include welding sequencesto control fabrication tolerances within the specified limits and prevent the build-up

    of excessive internal stresses in the structure.

    8.4.2  Weld preparation

    Contractor shall establish shielding to protect each welding site from rain, snow andwind. No welding shall be carried out when the surface is damp, wet or icy'.

    Preparation and welding of materials shall be in accordance with the qualifiedwelding procedures.

    Welds shall be made from both sides whenever possible. Single sided butt weldsshown on the design drawings may be executed from the other side to suit

    fabrication.

    8.4.3  Weld execution

    Workmanship

    Clean, sound metal shall be provided as a base for weld metal deposition; this maynecessitate grinding or gouging followed by grinding at a depth of min. 2 mm.

    Double-sided welds shall be back-gouged and ground or ground to sound metal

    before the second side is welded. The resulting excavation shall have a profilesuitable for welding.

    Each run of weld metal shall be thoroughly cleaned of flux, spatter and slag beforedepositing the next weld run. If necessary, crater cracks shall be removed prior to

    deposition the next weld run.

    Arc strikes

    Arc strikes outside the welding groove are not permitted. Repair will be grinding inaccordance with section 7.7. Suitable NDE methods shall be used to search forcracks.

    Tack welds

    Tack welds shall be of a minimum length of four times the base metal thickness or

    100 mm, which is lesser, and carried out according to a qualified welding procedure.

    Tack welds shall have adequate cross section to prevent cracking.

    Tack welds that form part of the completed weld shall be cleansed, crack detectedand completely fused with the root run.

    Cracked tack welds shall be completely removed by grinding and shall not beincorporated into the finished weld. After removal, the parent material shall be

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    27/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 22/35

    magnetic particle or liquid penetrant examined to ensure that crack propagationfrom the tack weld into the parent material has not occurred.

    Arc/air gouging

    All arc/air-gouged surfaces shall be dressed to bright clean metal by grinding at an

    additional depth of min. 2 mm. The gouged/grounded profile shall be suitable forwelding with the applicable process.Specific care shall be taken that the arc is not struck before full airflow is

    established.

    Energinet.dk shall approve the procedure prior to gouging.

    Weld interruption

    Welding shall not be discontinued before 25% or 3 passes of the weld thickness is

    complete, whichever is more stringent. At this stage the weld profile should beconcave particularly at the weld material/parent plate interface.

    Branch connections

    Qualified T-joint welders shall be used for the first 25% or 3 passes of the weld,whichever is more stringent. For the other passes welders qualified in the H-L045position may by used.

    Joint preparation and cleaningWire brushing and grinding of materials shall be performed using silicon carbide

    grinding wheels and steel wire brushes, which have not been used previously on

    another type of material.

    BackingPermanent backing is not permitted unless accepted by Energinet.dk prior to

    fabrication.

    8.4.4  Pre-heating

    Pre-heating shall be carried out by electrical resistance, induction equipment or by

    use of gas burners specifically made and shaped for this type of operation. Cutting

    torches are not allowed for pre-heating.

    The minimum pre-heat temperature shall be the higher of the following:

    a)  The temperature specified in the relevant approved welding procedure.

    b) 

    Work pieces shall be heated to ensure a minimum temperature of 25 C and

    dryness.

    c) 

    The minimum temperature shall be calculated according to EN 1011

    The pre-heat temperature shall be established for a distance of at least 75 mm on

    either side of the weld and through the wall thickness prior to welding. Pre-heating

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    28/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 23/35

    shall be maintained over the full length of the joint or min. 1 m ahead of the arc andthroughout the whole welding operation.

    The temperature measurement for pre-heating shall be thermocouples or

    temperature-indicating crayons.

    8.4.5  Inter-pass temperature

    The minimum inter-pass temperature shall be at least equal to the pre-heat

    temperature and shall not exceed 250 C.

    8.4.6  Post weld heat treatment (PWHT)

    Post weld heat treatment (PWHT) shall always be performed according to the sameapproved WPQR as the welding has been based on.

    Due to requirements from the design code PWHT shall be performed with electricresistance, induction equipment or in a fixed furnace, when applicable. The

    temperature shall be monitored by means of thermocouples. Sufficient amount ofthermocouples shall be used to cover the area being PWHT adequately.

    PWHT shall be determined in accordance with DNV-OS-C401.

    The weld shall be PWHT and the surrounding area shall be covered with insulationmaterial covering minimum 500 mm on each side of the weld. The insulationmaterial shall not be removed before the temperature is below 250 C. For tubular

    the open ends shall be covered to avoid draught inside the tubular during the heat

    treatment.

    PWHT temperature/time charts shall be clearly identified and retained. Theinformation shall be accurately transferred from the charts to thermal history graphs.

    8.4.7  Weld repairs

    All corrective work consisting of removal of defects and deposition of repair weldsshall be in accordance with the qualified repair welding procedure. Alternatively, thedeposition of repair weld shall be in accordance with a welding procedure qualified

    for the original weld.

    Removal of defective areas shall be by machining, grinding, chipping or arc/airgouging followed by grinding. The resulting excavation shall be clean, free from scaleand have a contour to permit ease in repair welding. MT or PT shall assure defect

    removal.

    The mechanical properties of repair weld shall satisfy the minimum specifiedproperties of the steel in question.

    Repairs and modifications shall be identified and documented.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    29/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 24/35

    Second weld repair requires Energinet.dk approval.Frequent repairs shall result in increased NDE according to DNV-OS-C401, Section 3

    – B400.

    8.4.8  Production testing

    Energinet.dk reserves the right to select test welds for production tests directly from

    the production welds.

    The testing shall be performed to the requirements of this ETS, however; CTOD

    testing is not required. If a full test procedure cannot be performed because of lackof material (e.g. small diameter pipes, etc.), only the hardness tests and the

    technically possible amount of Charpy tests shall be performed with the belowpriority:

    1) 

    The notch crossing the fusion line symmetrically2)

     

    1) + 2 mm3)

     

    1) + 5 mm

    4) 

    The notch on the weld centre line

    If the production test is not fulfilling the requirements the cause of failing shall be

    established immediately and brought to the attention of Energinet.dk

    9.  Non-destructive examination

    This section specifies the requirements to NDE for the structural welds performed onthe fabrication site.

    Inspection categories are in accordance with the requirements stipulated in DNV-OS-

    C101.

    Non-destructive examination shall be carried out according to DNV-OS-C401,

    Following methods are applicable: 

      Visual examination (VT)

      Magnetic particle examination (MT)

      Liquid penetrant examination (PT)

      Ultrasonic examination (UT)

      Radiographic examination (RT)

      Eddy current (ET)

    9.1  Extent of examinations

    The extent of NDE shall be based on type and level of design stresses and on the

    importance of the connection in question.

    The welds shall be assigned inspection categories equal to the highest structuralcategory of the two components.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    30/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 25/35

    NDE shall be carried out to an extent not less than required in DNV-OS-C401.

    9.2  NDE Qualifications

    9.2.1  Examination organisation

    The organisation performing NDE shall be an independent inspection unit accredited

    according to EN ISO 17025 or equivalent.

    9.2.2  Examination personnel

    All personnel shall be certified in accordance with EN 473 or equivalent and the unitshall as a minimum include one certified level III inspector, who shall have theoverall technical responsibility for the NDE activities, i.e. approval of procedures,

    equipment, technique etc.The personnel performing NDE shall, as a minimum be certified as level II, or work

    under direct supervision of a certified level II person.

    9.2.3  Procedures

    All NDE shall be performed in accordance with agreed written procedures, which

    have been approved by the responsible level 3 inspector and in accordance with therequirements of DNV-OS-C401 standard.

    9.3  Execution of NDE

    All plates, tubulars and profiles in the structural categories Special  and Primary  shallbe checked by NDE according to one or more of the methods specified in DNV-OS-

    C401.

    Radiographic examination may be replaced by ultrasonic examination and vice versa,

    when methodologically justifiable and in agreement with the Energinet.dk.

    9.4 

    NDE procedure and acceptance criteria.

    The acceptance criteria level shall, for special structures comply with ISO 5817 levelB. Welds of category primary/secondary shall comply with ISO 5817 level C.

    9.4.1  Visual (VT) procedure and acceptance criteria

    100% VT shall be performed on all welds.

    EN 970 or AWS D1.1 shall be used as examination technique for visually examinationof weld preparation and finished welds.

    Acceptance criteria for visual and magnetic testing shall be according to ISO 5817quality level B or C with the additional requirement that pinholes, slag stripes, poresetc. shall not be accepted for welds, which shall be coated.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    31/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 26/35

    9.4.2  Magnetic particle (MT) procedure and acceptance criteria

    Examination technique shall be in accordance with EN 1290 or ASTM E 709.

    Examination shall be performed for indications in any directions. AC electromagneticyoke shall be used.

    Detection media shall be of liquid type, fluorescent or black. If black suspended

    power is used, the examination surface shall be covered by a thin layer of contrast

    paint.

    Acceptance level shall be as per EN ISO 23278 2x or ISO 5817 level B or C

    9.4.3  Radiographic testing (RT) procedure and acceptance criteria

    Examination technique shall be in accordance with EN 1435 class B.

    Acceptance level: EN 12517 level 1.

    9.4.4  Ultrasonic testing (UT) acceptance criteria

    The examination shall be performed and evaluated as follows:

    Examination level: EN 1714 level B, annex A.

    Acceptance level: EN 1712 level 2.

    9.4.5  Liquid Penetrant testing (LP) acceptance criteria

    Examination technique shall be in accordance with EN 571-1.

    Acceptance level: EN 1291 2X.

    9.5  Execution of NDE, structural fabrication

    9.5.1  General

    All NDE shall be performed after final post weld heat treatment, if applicable.

    NDE examination shall, at the earliest, be commenced 48 hours after weldingcompletion. Alternatively, the welding can be heated to 200 °C and held at that

    temperature for two (2) hours. NDE can then be executed after cooling to thetemperature required for performance of the examination.

    This procedure is subject to Energinet.dk approval.

    For welds in secondary structure (handrails, kick plates ladders e.t.c) not welded to

    special or primary structures, NDE can be performed after cooling to the temperaturerequired for performance of the examination required.

    All Plates which are subjected to tensile stresses in the thickness direction in way ofcross joints, etc. shall be ultrasonically tested after welding into the structure, to

    make sure that lamellar tearing has not taken place. If steel with improved through

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    32/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 27/35

    thickness properties (steel type 2 and 4) has been adopted, this test may be reducedto spot-check only.

    Welds in hollow sections shall be 100% leak tested or 100% MPI tested.

    9.5.2  Sequence of examination

    Visual examination shall always be performed prior to other examinations. Whenexaminations for detection of internal as well as external defects are required for thesame weld the examination for external defects shall be performed prior to the

    examination for internal defects.

    9.5.3  Surface conditions

    The surface and the adjacent area to be examined shall be clean and free of all dirt,grease, paint, spatter, heavy oxidation etc. that may interfere with the examination.

    To assure the examination and interpretation of results the weld surface shall beprepared by grinding, if necessary.

    NDE shall be performed prior to application of linings and coatings. 

    9.5.4  Random examination

    Where random examination (spot check) is required a complete examination of the

    specified percentage of the welds in the lot shall take place.

    The selection of welds to be examined may be at the discretion of the inspector fromEnerginet.dk. Where practical, the selection shall ensure that the work product of

    each welder or welding operator performing the welding is included. 

    9.5.5  Extent of examination in case of unacceptable welds

    All unacceptable indications shall be removed. Where weld repair is required, the

    repair area shall be re-examined for external defects prior to welding including 100mm on either side. Weld repairs (or replaced welds) shall be examined with thesame method as the original weld.

    Where random examination reveals unacceptable indications the following actions

    shall be taken:

    a) 

    Two additional welds by the same welder or welding operator shall beexamined with the same examination method.

    b)  If the results of the examination according to a) are acceptable the defective

    weld shall be repaired and re-examined and all welds in the lot areconsidered acceptable.

    c)  If the results of the examination according to a) are unacceptable two furtherwelds by the same welder or welding operator shall be examined for each

    defective weld.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    33/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 28/35

    d) 

    If the results of the examination according to c) are acceptable, the defective

    welds shall be repaired and re-examined, and all welds in the lot areconsidered acceptable.

    e)  If the results of the examination according to c) are unacceptable, all weldswelded by the same welder or welding operator shall be either:

    - Examined 100%. Repaired and re-examined as applicable.

    10.  Coating

    The minimum requirements are given in Energinet.dk technical standard “Protective

    Coating of Steel – ETS-25”  

    11.  As-built documentation

    As-built documentation shall be compiled and submitted by the contractor to

    Energinet.dk after execution of the work. The as-built documentation shall include,but not be limited to the following:

      Documentation index

      Third part inspection release note (If applicable)  Manufactures declaration of conformity (certificate of conformity)

      List of as-built drawings  As-built traceability drawings. The traceability shall cover all welding, materials

    and NDE of the structure

      Dimension reports, when applicable

      NDE reports

      NDE personnel certificates

      List of approved WPS

      List of approved welders

      Weight reports, when applicable

     

    Approved deviation reports and technical site queries  List of material certificates

      Material certificates  Coating documentation

    The as-built documentation shall further be compiled in accordance with EDS - 02.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    34/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 29/35

    11.1 

    Deliverables

    Contractor shall deliver the following set of documentation to Energinet.dk:

      Shop and design drawings in AutoCAD and PDF format, as per EDS-50-01.

    The electronic documentation shall be prepared as pdf files with bookmarks.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    35/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 30/35

    12.  Appendix 

    Appendix 1A. Steel Types and Quality for Topside structures

    SteelType

    Material Type Material Dim Standard Steel Quality Description

    ST1 Plates

    Plates

    Sections

    Welded hollow sections

    Seamless hollow sections

    T ≤ 50 mm 

    T > 50 mm

    All

    All

    All

    EN 10025

    EN 10025

    EN 10025

    EN 10219

    EN 10210

    S355J2

    S355NL

    S355J2

    S355J2H

    S355J2H

    Primary Steel

    ST2 Plates

    PlatesSections

    Welded hollow sections

    Seamless hollow sections

    T ≤ 50 mm 

    T > 50 mmAll

    All

    All

    EN 10025

    EN 10025EN 10025

    EN 10219

    EN 10210

    S355J2

    S355NLS355J2

    S355J2H

    S355J2H

    Primary Steel withrequirements for improved

    deformation propertiesperpendicular to the surfaceof the product , EN 10164Quality Class Z35

    ST3 Plates

    Plates

    Sections

    Welded hollow sections

    Seamless hollow sections

    T ≤ 50 mm 

    T > 50 mm

    All

    All

    All

    EN 10025

    EN 10025

    EN 10025

    EN 10219

    EN 10210

    S420N

    S420NL

    S420N

    S420N

    S420N

    Primary Steel

    ST4PlatesPlates

    Sections

    Welded hollow sections

    Seamless hollow sections

    T ≤ 50 mm T > 50 mm

    All

    All

    All

    EN 10025EN 10025

    EN 10025

    EN 10219

    EN 10210

    S420NS420NL

    S420N

    S420N

    S420N

    Primary Steel withrequirements for improveddeformation propertiesperpendicular to the surfaceof the product , EN 10164Quality Class Z35

    ST3-S Plates All EN 10225

    EN 10225

    S420G1+Q

    S420G1+M

    Special Steel:

    ST4-S Plates All EN 10225

    EN 10225

    S420G1+Q

    S420G1+M

    Special Steel withrequirements for improveddeformation propertiesperpendicular to the surface

    of the product , EN 10164Quality Class Z35 

    ST5 Plates

    Plates

    Sections

    Welded hollow sections

    Seamless hollow sections

    Bulb flats

    All EN 10025

    EN 10025

    EN 10025

    EN 10219

    EN 10210

    EN 10067

    S235

    S235

    S235

    S235

    S235

    S235

    Secondary Steel.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    36/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 31/35

    Appendix 1B  Steel Types and Quality for Sub-structure (Jacket) 

    Steel

    Type

    Standard Steel Quality

    1 EN 10225 Plates: S355G9+N/G9+M

    Sections: S355G11+N/G11+M

    Welded hollow sections: S355G13+N

    Seamless hollow sections: S355G14+Q/G14+N

    2 EN 10225 Steel with requirements for improved deformation propertiesperpendicular to the surface of the product , EN 10164Quality Class Z35

    Plates: S355G9+N/G9+M+Option 13

    Sections: S355G11+N/G11+M+Option 13Welded hollow sections: S355G13+N+Option 13

    Seamless hollow sections: S355G14+Q/G14+N+Option 13

    3 EN 10225 Plates: S420G1+Q/G1+M

    Sections: S420G3+M

    Welded hollow sections: S420G5+Q

    Seamless hollow sections: S420G6+Q

    4 EN 10225 Steel with requirements for improved deformation propertiesperpendicular to the surface of the product , EN 10164

    Quality Class Z35Plates: S420G1+Q/G1+M+Option 13

    Sections: S420G3+M+Option 13

    Welded hollow sections: S420G5+Q+Option 13

    Seamless hollow sections: S420G6+Q+Option 13

    5 EN 10025 S235-S275

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    37/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 32/35

    Appendix 2

    Drawing 10H 04 050 Stair - Standard drawing.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    38/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 33/35

    Appendix 3

    Drawing 10H 04 051 - Standard drawing, removable/fixed handrail.

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    39/40

     

    Document no. 13/90242-5 - ETS-21 v. 3 34/35

    Appendix 4

    Drawing 10H 05 052 -. Standard drawing, removable handrail, heavy duty

  • 8/17/2019 13-90242-5 ETS - 21 Materials and Fabrication of Steel for Topside and Substructures

    40/40

     

    Appendix 5

    Drawing 10H4 04 053 -. Typical details, grating