Holcim Group Support Ltd 2009
OH&S at Holcim
Mr. Uwe Barkmann
Holcim Deutschland
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
2/22
2
Holcim Group Support Ltd 2009
Content
Our vision and our results
Our strategy: Shrink the hazard pyramid
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
3/22
3
Holcim Group Support Ltd 2009
We have a clear, attractive and ambitious Vision
Zero Harm to People
How far are we from realizing our vision?
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
4/22
4
Holcim Group Support Ltd 2009
Lost Time Injury Frequency Rate reduction along target
path during the 2009
8
7.1
4.1
2.32.31.9
2.7
5.2
3.9
2.6
8
7.1
5.6
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
2004 2005 2006 2007 2008 HY1
2009
2009
Group ac tual * Group ORM Target
* For own and subcontracted employeesTarget: LTIFR < 2*
LTIFR of 2004 reduced by > 30 % per year (2006 09) until
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
5/22
5
Holcim Group Support Ltd 2009
Content
Our vision and our results
Our strategy: Shrink the hazard pyramid
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
6/22
6
Holcim Group Support Ltd 2009
To shrink the Holcim Hazard Pyramid we must eliminate
unsafe acts and unsafe conditions (2009 results)
????? Hazards- Unsafe acts &
- Unsafe conditions
????
Near-Misses or First Aid
??? Medical
Treatment Injuries
~900 LostTime Injuries
28Fatal
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
7/22
7
Holcim Group Support Ltd 2009
Occupational
RehabilitationProcurement
Management
of Changes
Information
& Reporting
Incident
Investigation &
Corrective Action
Design
Safety
Induction
& Training
Safe Working
Procedures
Audi t andSystem
Improvement
Industrial
Hygiene &
Monitoring
Employee
Communication
& Consultation
Roles
Responsibilities
and
Accountabil it ies
Hazardous Work
Activi ties
Legal
Obligations
Hazard
Identification
and Risk
Assessment
Management
Commitment
& Planning
Planned
Inspections
Inspection
& Testing
Health &
Wellness
Issues
Implementation
85%
Legend
Shrinking the pyramid requires structure: let us implement
and live our OH&S Management System
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
8/22
8
Holcim Group Support Ltd 2009
Directives accelerate the shrinking of the pyramid
Fatality Prevention Elements
Contractor Safety Management
Occupational Health and Safety for AFR
Elimination of Asbestos in the Workplace
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
9/22
9
Holcim Group Support Ltd 2009
Fatality Prevention Elements (FPEs)
Approved and distributed in2007#1. Working at Heights
#2. Isolation and Lock-out
#3. Vehicle and Traffic Safety
#4. Electrical Safety
#5. Machine Guarding
#6. Confined Space Entry
#7. Hot Work
#8. Digging and Excavation
#9. Lif ting and Supporting Loads
Approved and distributed in2008#10. Working near Water
#11. Railway Safety
To be distributed in mid 2010
#12. Quarry & Stockpiles
#13. Working in Hot Zones
Replaced: Hazardous
Substances/AFR by (already
distributed) AFR Directive
Thorough implementation of each FPE requires time, people and resources
Focus in 2009 to ful ly implement in each OpCo the most cri tical three FPEs
OpCos can prioritze implementation of the rest based upon their injuryhistory
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
10/22
10
Holcim Group Support Ltd 2009
Contractor Safety Management
An updated version of the Directive Contractor SafetyManagement was put in place and distributed to allOpCos.
The update focuses much more on the execution phaseof contractor work and the related Holcim supervision. Learnings from incidents must also be communicated tocontractors.
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
11/22
11
Holcim Group Support Ltd 2009
OH&S for Alternative Fuels & Raw (AFR) Materials
OH&S together with CIE worked out a comprehensiveDirective concerning safety and occupational health forAFR. This Directive was approved by the EXCO and
sent to all OpCos.
The implementation uses the Train the Trainerapproach.
All OpCos using AFR must be externally certified by2010
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
12/22
12
Holcim Group Support Ltd 2009
Eliminating Asbestos from the workplace
Updated Asbestos Directive include monitoringexposure of asbestos minerals from natural sources.
Directive focuses on :
defining measures to minimize the health risk related
to asbestos containing materials (ACM), if any in
Group Companies;
ensuring that each Group Company has and updates
an Asbestos Register;
managing of asbestos containing materials via
proper monitoring and auditing;
banning future purchase of ACM;
and removal of damaged ACM with approved
specialized contractors
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
13/22
13
Holcim Group Support Ltd 2009
Enhance Skills and Competencies
Training various levels in essential OH&S tools
Auditing and continuously improving the system as well as proactiveimprovement by correcting unsafe acts (during Safety Observations)
Projects addressing safety in high risk areas
Keeping momentum via good communication
Passion for Safety must be strengthened
DriveAccountability
Set the Culture
Manage
Performance
Mobil ize People
Make OH&S a Condit ion of Success
Commitment (no compromise on OH&S): Policy and Principles
Cardinal Rules
Goals and KPIs
Reinforce Leadership & Establish Structures
OH&S responsibility with Line Management (organizational accountability)
Corporate OH&S supports common needs
Local committees (OpCo & Site based)
OH&S Network leverages best practices and fosters communication
Monitoring and Recognizing
Analysis of performance and consequent actions
Consequence management and zero tolerance (career, recognitions,disciplinary actions)
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
14/22
14
Holcim Group Support Ltd 2009
Setting the culture - 5 Cardinal Rules
Cardinal Rules to be applied without compromise and zero
tolerance as of 1.1.2007
1. Do not override or interfere with any safety provision nor
allow anyone else and to override or interfere with them
2. Personal Protective Equipment (PPE) rules applicable to a
given task must be adhered to at all times.
3. Isolation and Lock Out Procedures must always be
followed.
4. No person may work if under the influence of alcohol or
drugs.
5. All injuries & incidents must be reported.
DriveAccountability
Set the Culture
Manage
Performance
Mobil ize People
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
15/22
15
Holcim Group Support Ltd 2009
Mobilize People: Training Programs and Projects
Joint Projects with Syndicates
Pocket guides (Cement, AGG, RMX, AFR)
Poster campaigns
Toolbox talks
Employee cards
Delegate OH&S Training (DOT)
Reduction of RCS in the workplace
Training programs for Supervisors
Incident investigations
Hazard Identification
Safety Observation
Contractor Management
Training Programs for Management
Safety Observations
Safety Leadership
DriveAccountability
Set the Culture
Manage
Performance
Mobil ize People
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
16/22
16
Holcim Group Support Ltd 2009
Joint Projects - Overview of the DOT
Goal
To provide safety leadershiptraining to the delegates
Give safety awareness training
Provide a common OH&Svision
Concept
Use of case studies toreinforce understanding of the
Holcim Cardinal rules
To actively involve allparticipants in the process
Methodology
Use of role play with casestudies
Use of observers to providefeedback
Use of feedback to reinforce
learning
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
17/22
17
Holcim Group Support Ltd 2009
Posters, Tool box talks and employee cards
Five sets of communication andtraining materials have beenprepared to reinforce the launch
of the AGG and RMX pocket
guides
Topics include:
Holcim OH&S methodology
Working at heights on Large
Mobile equipment
Mobile equipment and human
interaction
Vehicle stability especially during
RMX and AGG transport
Avoiding engulfment during
excavations
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
18/22
18
Holcim Group Support Ltd 2009
Reduction of RCS in workplace
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
19/22
19
Holcim Group Support Ltd 2009
Job Observations a Proactive Tool
HAZARD
(Risk Controls)
Injury
orIllness
(Incident/event ) (Consequence )
(Proactive)
Proactive by observing workpractices and conditions to act
before they become accidents
(Reactive)
Reactive by conducting
investigations into accidents
Safety Observations
are good means to be
proactive and showwe care
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
20/22
20
Holcim Group Support Ltd 2009
Undertaking the Change
The penguin does not havesufficient equipment nor amethod to fly . Try Harderwithout the right processes
will not work
We Must have the correct
equipment, environment
We Must define Safe work
methods
We Must have the propertraining
We Must have the interpersonal
skills to convince people to
change.
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
21/22
21
Holcim Group Support Ltd 2009
Improving Performance Our Approach
OH&S Policy & Objectives
Zero Harm To People
Frame Work
Action Plan
People & Organization
8/14/2019 13 - HOLCIM Occupational Safety and Health Uwe Barkmann
22/22
22
Holcim Group Support Ltd 2009
Holcim OH&S House