+ All Categories
Home > Documents > 13 scsc wksp5 017 roomAPEC Session8...

13 scsc wksp5 017 roomAPEC Session8...

Date post: 04-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
15
___________________________________________________________________________ 2013/SOM3/SCSC/WKSP2/017 Session 8 Pathways Forward Submitted by: bimSCORE Joint APEC-ASEAN Workshop - How Building Information Modeling Standards Can Improve Building Performance Medan, Indonesia 24-25 June 2013
Transcript
Page 1: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

___________________________________________________________________________

2013/SOM3/SCSC/WKSP2/017 Session 8

Pathways Forward

Submitted by: bimSCORE

Joint APEC-ASEAN Workshop - How Building Information Modeling Standards

Can Improve Building Performance Medan, Indonesia

24-25 June 2013

Page 2: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

1

© 2013 bimSCORE

Session 8: Pathways ForwardAn interactive discussion between the audience and a panel of workshop speakers

June 25, 2013

© 2013 bimSCORE 2

Calvin Kam, PhD, AIA, PE, LEED AP

Founder, bimSCORE

[email protected]

Tony Rinella, Assoc. AIA

Director, bimSCORE

[email protected]

Session 8: Pathways Forward

Moderator

Page 3: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

2

© 2013 bimSCORE

The Speakers

Australia: John Mitchell, Chairman/President,BuildingSMART Australasia

Indonesia: Dr. Rahmi Andarini, Energy Efficiency Expert, Energy Efficiency and Conservation Clearing House Indonesia, Ministry of Energy and Mineral Resources

Korea: Dr. Ghang Lee, Associate Professor, Director Building Informatics Group, Architectural Engineering Yonsei University

Singapore: Dr. Cheng Tai Fatt, Deputy Managing Director, Building and Construction Authority Academy

United States: Dr. Calvin Kam, Co-Founder & Senior Program Expert, Public Buildings Service, U.S. General Services AdministrationFounder, bimSCORE

3

© 2013 bimSCORE

Process

Actions

Realizing Vision through Process and Actions

Strategy

Vision

Source: Kent Bauer

4

Page 4: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

3

© 2013 bimSCORE

Status-Quo Piloting Policy Industry Innovation

Source:

Building upon our experiences from America, Asia and  Europe,

bimSCORE has summarized the success of a economy’s BIM journey into 5 characteristics

5

© 2013 bimSCORE 6

TechnologyProvide the right tools

Image source: iPoint 3D

Four Primary Evaluation Areas

PlanningEstablish objectives and protocols

AdoptionFind the right people & process

Image source: actionmarketingcopy.com/tag/marketing-objectives/

Image source: www.businessihub.com/guide-for-choosing-your-business-objectives/

Image source: www.us.spinnaker-nt.com;betterhiringtoday.com/5-signs-your-hiring-process-needs-help/

PerformanceTrack impact, progress

Page 5: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

4

© 2013 bimSCORE

Vision

Process

Actions

Strategy

Exec

utiv

ePr

ojec

t Tea

mMonitor BIM / BIM Performance, Inform Enterprise Best Practices

BIM-enabled IPD

7

© 2013 bimSCORE

Performance

Source: ENR

8

Page 6: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

5

© 2013 bimSCORE

Adoption

Technology

Performance

bimSCORE

Confidence Level

Conventional Practice

Typical Practice

Advanced Practice

BestPractice

Innovative Practice

46

79

75

73%

PerformanceQuantitative

Qualitative

Leading vs. Lagging Indicators

Construction InjuriesOperation Injuries

Source: bimSCORE and CFF teams. 2012 AIA BIM/TAP Awards

49

Hazards modeledSafety equipment modeled

9

© 2013 bimSCORE

A Scientific Approach to BIM & BIM Implementation

10

Page 7: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

6

© 2013 bimSCORE

Performance Discussion

What benefits of BIM will be leveraged in the economy, and how is success measured?

• What are the most important measureable success factors for the built environment in your economy?

• What are the indicators and targets for success? • How are successful projects identified and

recognized in your economy?

11

© 2013 bimSCORE 12

Vision

Process

Actions

Strategy

Exec

utiv

ePr

ojec

t Tea

m

Translate Vision into Objectives, Targets, and Actions

BIM-enabled IPD

Page 8: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

7

© 2013 bimSCORE 13

Planning: Process

Sources: bimSCORE, SPAR

13

© 2013 bimSCORE

Planning: Standards

14

Source: GSA

Page 9: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

8

© 2013 bimSCORE

Planning Discussion

What is the role of public policy in establishing and furthering BIM-enabled goals?

• What programs do you have in place, and/or do you think would be most successful, promoting BIM-based improvements for your economy?

• What official mandates and standards does your economy have in place? How have these furthered your goals?

15

© 2013 bimSCORE 16

Vision

Process

Actions

Exec

utiv

ePr

ojec

t Tea

m

Implement Process Improvements throughout Project Teams

BIM-enabled IPD

16

Page 10: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

9

PBS OCA 3D-4D-BIM Program

GSA’s National 3D-4D-BIM Program

From introduction in 2003 to pilots and technology/guidance development,

to upper management policy and budgetto GSA national program deployment and

support to US national standardsto international

agreements

Mandated Requirement on all GSA Projects since 2006

100+ Projects To Date

16 National Contracts up to $30 million each

Source: GSA

17

© 2013 bimSCORE

Adoption: Education & Incentives

18

Source: Singapore Building Construction Authorityhttp://www.bca.gov.sg/cpcf/cpcf.html

Page 11: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

10

© 2013 bimSCORE

Adoption Discussion

What is the current state of BIM capability in the regional AEC industry, and how can capability be improved?

• How can industry be engaged to establish and support BIM-related improvements?

• How can BIM capability and proficiency be improved through training, education, incentives, mandates, and law to better support success?

19

© 2013 bimSCORE

Vision

Process

Actions

Strategy

Exec

utiv

ePr

ojec

t Tea

m

Process

Actions

Appropriately Support All Project Functions And Phases

BIM-enabled IPD

Page 12: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

11

© 2013 bimSCORE

Source: Optima

© 2013 bimSCORE

Technology Discussion

Which technologies can best be leveraged to support social, economic, and environmental goals?

• To what degree should proven technology be adopted?

• What technology development should be driven by domestic or local R&D efforts?

22

Page 13: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

12

© 2013 bimSCORE

Status-Quo Piloting Policy Industry Innovation

Source:

Moving from Status‐Quo to Innovation

23

© 2013 bimSCORE

Partnering for the Future

What forms of collaboration within this group would be most helpful for your economy?

• What types of projects are of interest? • What frequency and approaches to collaboration

will be most beneficial? • What types of support can your economy

contribute?

24

Page 14: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

13

© 2013 bimSCORE 25

Calvin Kam, PhD, AIA, PE, LEED AP

[email protected]

Tony Rinella, Assoc. AIA

[email protected]

© 2013 bimSCORE 26

Page 15: 13 scsc wksp5 017 roomAPEC Session8 2016-06-25fmddb.apec.org/.../2013/SCSC/WKSP5/13_scsc_wksp5_017.pdf · 2013-07-10 · PBS OCA 3D-4D-BIM Program GSA’s National 3D-4D-BIM Program

7/6/2013

14

© 2013 bimSCORE 27

© 2013 bimSCORE 28


Recommended