  • 8/14/2019 13MProgress.xlsx

    1/282

    Ground

    Floor

    First

    Floor

    1 13 Marla 001+1

    2 13 Marla 2+3 3,790

    3 13 Marla 4+5 B-6 3,790 2,220

    4 13 Marla 6+7 B-4 3,790 1,782

    5 13 Marla 8+9 B-3 3,790 2,658

    6 13 Marla 10+11 10 (B2), 11 (B3) 3,790 2,476

    7 13 Marla 12+13 12 (B-1), 13 (B-2) 3,790 2,658

    8 13 Marla 14+15 B-5 3,790 2,515

    9 13 Marla 16 B-6 1,978 1,374

    10 13 Marla 17+18 B-6 3,956 2,678

    11 13 Marla 19+20 B-5 3,956 3,126

    12 13 Marla 21+22 B-6 3,956 2,748

    13 5 Marla 23+24

    14 5 Marla 25+26

    15 5 Marla 27+28

    16 7 Marla 30+31 B-5 2676 2456

    17 7 Marla 32+33 B-5 2604 2199

    18 7 Marla 34 B-6 1302 1242

    19 5 Marla 35+36

    20 5 Marla 37+38 B-4 2,175 1,131

    21 5 Marla 39+40 B-5 2,175 1,390

    22 5 Marla 41+42 B-5 2,175 1,505

    23 5 Marla 43+44 B-4 2,175 1,853

    24 10 Marla 45+46 B-6 3,400 2,542

    25 10 Marla 47+48 B-3 3,400 1,668

    26 10 Marla 49+50 49 (B-1), 50 (B-3) 3,400 2,850

    27 10 Marla 51 B-6 1,760 1,271

    28 10 Marla 52 B-6 1,760 1,271

    29 10 Marla 53+54 Modle House -- --

    30 10 Marla 55+56 B-3 3,400 2,542

    31 10 Marla 57+58 B-4 3,400 2,542

    32 7 Marla 59+60 B-4 2,604 2,400

    33 7 Marla 61+62 62 (B-1), 61 (B-2) 2,604 2,402

    Cantt Cottages, Multan

    Subject: Detail of Houses

    Sr. No.Area

    Category

    House/

    Duplex No.Batch No.

    Covered Area (Sft)

    Progress Report 13 Marla Houses

    Please Click on House no.

  • 8/14/2019 13MProgress.xlsx

    2/282

    34 7 Marla 63+64 B-1 2,604 1,604

    35 7 Marla 65+66 65 (B-2), 66 (B-3) 2,674 2,511

    36 7 Marla 68+69 Modle House -- --

    37 7 Marla 70+71 B-1 2,674 2,511

    38 7 Marla 72+73 B-3 2,674 2,511

    39 7 Marla 74+75 B-4 2,674 2,511

    40 5 Marla 76 B-6 1088 63341 5 Marla 77+78 B-4 2175 1618

    42 7 Marla 79+80 80 (B-1), 79 (B-3) 2,639 2,190

    43 7 Marla 81+82 82 (B-1), 81 (B-3) 2,674 2,511

    44 7 Marla 83+84 B-2 2,674 2,511

    45 7 Marla 85+86

    46 7 Marla 87+88

    47 7 Marla 89+90

    48 7 Marla 91

  • 8/14/2019 13MProgress.xlsx

    3/282

    13 Marla

    5 Marla

    7 Marla

    10 Marla

    --

    Supervisor Name

  • 8/14/2019 13MProgress.xlsx

    4/282

    --

  • 8/14/2019 13MProgress.xlsx

    5/282

    Description Total %age Work Done

    Ground Floor 85.5% 0.0%

    First Floor 83.0% 0.0%

    External Work 100.0% 0.0%

    Electric Work 100.0% 0.0%

    Overall work in house # 001+01 368.5% 0.0%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%

    DPC Completion 6.0%

    Earth Filling 2.0%

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%

    Upto Lintel Level 4.0%

    Casting of Lintel 3.0%

    Above Lintel upto Roof Level 4.0%

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%

    Casting of Porch Slab 2.0%

    Casting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster inculding Edge plastering complete8.5%

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%

    PCC flooring 3.0%

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 0.0%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%

    Upto Lintel Level 5.0%

    Casting of Lintel 5.0%

    Above Lintel upto Roof Level 6.0%

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    6/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%

    Casting of Slab 12.0%

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster complete 11.0%

    All Edge plastering of Doors, Windows etc.

    2.5%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%

    Extra Amount in PCC flooring 1.3%

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 0.0%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    7/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%

    Plaster of Parapet Wall 3.29%

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%

    x) AC Sills 0.8%

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    3.9%

  • 8/14/2019 13MProgress.xlsx

    8/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 0.0%

    1 Electric Condute work of slab 6.00%

    2 Down Piping on Wall with boxing 11.50%

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00%

    9 Down Piping on Wall with boxing 11.50%

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 0.00%

    Ground Floor

    First Floor

    Electric Works

  • 8/14/2019 13MProgress.xlsx

    9/282

    0.0% 0.0% 0.0% 0.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    100.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 001+01

    Overall work in house # 001+01

  • 8/14/2019 13MProgress.xlsx

    10/282

  • 8/14/2019 13MProgress.xlsx

    11/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    12/282

  • 8/14/2019 13MProgress.xlsx

    13/282

  • 8/14/2019 13MProgress.xlsx

    14/282

  • 8/14/2019 13MProgress.xlsx

    15/282

  • 8/14/2019 13MProgress.xlsx

    16/282

  • 8/14/2019 13MProgress.xlsx

    17/282

  • 8/14/2019 13MProgress.xlsx

    18/282

  • 8/14/2019 13MProgress.xlsx

    19/282

  • 8/14/2019 13MProgress.xlsx

    20/282

  • 8/14/2019 13MProgress.xlsx

    21/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    22/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    23/282

  • 8/14/2019 13MProgress.xlsx

    24/282

  • 8/14/2019 13MProgress.xlsx

    25/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    26/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    27/282

    Description Total %age Work Done

    Ground Floor 85.5% 23.0%

    First Floor 83.0% 0.0%

    External Work 100.0% 2.6%

    Electric Work 100.0% 0.0%

    Overall work in house # 2+3 368.5% 25.6%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%

    Above Lintel upto Roof Level 4.0%

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%

    Casting of Porch Slab 2.0%

    Casting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster inculding Edge plastering complete8.5%

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%

    PCC flooring 3.0%

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 23.0%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%

    Upto Lintel Level 5.0%

    Casting of Lintel 5.0%

    Above Lintel upto Roof Level 6.0%

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    28/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%

    Casting of Slab 12.0%

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster complete 11.0%

    All Edge plastering of Doors, Windows etc.

    2.5%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%

    Extra Amount in PCC flooring 1.3%

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 0.0%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%complete

    External Works

  • 8/14/2019 13MProgress.xlsx

    29/282

    Concrete with Steel 0.21%complete

    Brick Work for Parapet Wall 0.30%complete

    Plaster of Balcony 1.10%complete

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%complete

    Tile Work in Floor 0.48%complete

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%

    Plaster of Parapet Wall 3.29%

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%

    x) AC Sills 0.8%

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    3.9%

  • 8/14/2019 13MProgress.xlsx

    30/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 2.6%

    1 Electric Condute work of slab 6.00%

    2 Down Piping on Wall with boxing 11.50%

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00%

    9 Down Piping on Wall with boxing 11.50%

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 0.00%

    First Floor

    Electric Works

    Ground Floor

  • 8/14/2019 13MProgress.xlsx

    31/282

    23.0%

    0.0%

    2.6%

    0.0%

    0.0%

    5.0%

    10.0%

    15.0%

    20.0%

    25.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 2+3

    Overall work in house # 2+3

  • 8/14/2019 13MProgress.xlsx

    32/282

  • 8/14/2019 13MProgress.xlsx

    33/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    34/282

  • 8/14/2019 13MProgress.xlsx

    35/282

  • 8/14/2019 13MProgress.xlsx

    36/282

  • 8/14/2019 13MProgress.xlsx

    37/282

  • 8/14/2019 13MProgress.xlsx

    38/282

  • 8/14/2019 13MProgress.xlsx

    39/282

  • 8/14/2019 13MProgress.xlsx

    40/282

  • 8/14/2019 13MProgress.xlsx

    41/282

  • 8/14/2019 13MProgress.xlsx

    42/282

  • 8/14/2019 13MProgress.xlsx

    43/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    44/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    45/282

  • 8/14/2019 13MProgress.xlsx

    46/282

  • 8/14/2019 13MProgress.xlsx

    47/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    48/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    49/282

    Description Total %age Work Done

    Ground Floor 85.5% 65.5%

    First Floor 83.0% 40.0%

    External Work 100.0% 0.0%

    Electric Work 100.0% 23.5%

    Overall work in house # 4+5 368.5% 129.0%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%complete

    PCC flooring 3.0%complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 65.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    50/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster complete 11.0%

    All Edge plastering of Doors, Windows etc.

    2.5%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%

    Extra Amount in PCC flooring 1.3%

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 40.0%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    51/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%

    Plaster of Parapet Wall 3.29%

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    3.9%

  • 8/14/2019 13MProgress.xlsx

    52/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 0.0%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50%

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 23.50%

    First Floor

    Electric Works

    Ground Floor

  • 8/14/2019 13MProgress.xlsx

    53/282

    65.5%

    40.0%

    0.0%

    23.5%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 4+5

    Overall work in house # 4+5

  • 8/14/2019 13MProgress.xlsx

    54/282

  • 8/14/2019 13MProgress.xlsx

    55/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    56/282

  • 8/14/2019 13MProgress.xlsx

    57/282

  • 8/14/2019 13MProgress.xlsx

    58/282

  • 8/14/2019 13MProgress.xlsx

    59/282

  • 8/14/2019 13MProgress.xlsx

    60/282

  • 8/14/2019 13MProgress.xlsx

    61/282

  • 8/14/2019 13MProgress.xlsx

    62/282

  • 8/14/2019 13MProgress.xlsx

    63/282

  • 8/14/2019 13MProgress.xlsx

    64/282

  • 8/14/2019 13MProgress.xlsx

    65/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    66/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    67/282

  • 8/14/2019 13MProgress.xlsx

    68/282

  • 8/14/2019 13MProgress.xlsx

    69/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    70/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    71/282

    Description Total %age Work Done

    Ground Floor 85.5% 79.0%

    First Floor 83.0% 68.8%

    External Work 100.0% 10.4%

    Electric Work 100.0% 58.0%

    Overall work in house # 6,7 368.5% 216.2%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%completeInternal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%complete

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%complete

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%complete

    PCC flooring 3.0%complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 79.0%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    72/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%complete

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster complete 11.0%complete

    All Edge plastering of Doors, Windows etc.

    2.5%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%complete

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%complete

    Extra Amount in PCC flooring 1.3%complete

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 68.8%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%completeConcrete with Steel 1.17%complete

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    73/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%complete

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%complete

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%complete

    3.9% complete

  • 8/14/2019 13MProgress.xlsx

    74/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 10.4%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50% complete4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50% complete

    10 Wiring with UPS Completion 11.50% complete

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 58.00%

    First Floor

    Electric Works

    Ground Floor

  • 8/14/2019 13MProgress.xlsx

    75/282

    79.0%

    68.8%

    10.4%

    58.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 6,7

    Overall work in house # 6,7

  • 8/14/2019 13MProgress.xlsx

    76/282

  • 8/14/2019 13MProgress.xlsx

    77/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    78/282

  • 8/14/2019 13MProgress.xlsx

    79/282

  • 8/14/2019 13MProgress.xlsx

    80/282

  • 8/14/2019 13MProgress.xlsx

    81/282

  • 8/14/2019 13MProgress.xlsx

    82/282

  • 8/14/2019 13MProgress.xlsx

    83/282

  • 8/14/2019 13MProgress.xlsx

    84/282

  • 8/14/2019 13MProgress.xlsx

    85/282

  • 8/14/2019 13MProgress.xlsx

    86/282

  • 8/14/2019 13MProgress.xlsx

    87/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    88/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    89/282

  • 8/14/2019 13MProgress.xlsx

    90/282

  • 8/14/2019 13MProgress.xlsx

    91/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    92/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    93/282

    Description Total %age Work Done

    Ground Floor 85.5% 81.5%

    First Floor 83.0% 82.3%

    External Work 100.0% 61.7%

    Electric Work 100.0% 58.0%

    Overall work in house # 8,9 368.5% 283.5%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%completeInternal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%complete

    External Plastering 7.0%

    Front Elevation 2.5%complete

    Side/Back walls &other External Plaster4.5%complete

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%complete

    PCC flooring 3.0%complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 81.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    94/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%complete

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster complete 11.0%complete

    All Edge plastering of Doors, Windows etc.

    2.5%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%complete

    External Plastering 9.0%

    Front Elevation external plaster 4.0%complete

    Side wall And other external plaster with perpet

    plaster 5.0%complete

    Roof Treatment 6.0%

    Roof Treatment 6.0%complete

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%complete

    Extra Amount in PCC flooring 1.3%complete

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 82.3%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00% complete

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%completeConcrete with Steel 1.17%complete

    Parapet Wall With Shuttering 1.12%complete

    Plaster of Balcony 2.44%complete

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%complete

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%complete

    External Works

  • 8/14/2019 13MProgress.xlsx

    95/282

    Concrete with Steel 0.21%complete

    Brick Work for Parapet Wall 0.30%complete

    Plaster of Balcony 1.10%complete

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%complete

    Tile Work in Floor 0.48%complete

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%complete

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%complete

    vii) Front Terrace Parapet Wall Pouring 4.2%complete

    vii - a) Front Terrace Parapet Wall Plaster 1.7%complete

    viii) Top Parapet Wall Pouring 13.8%complete

    viii - a) Top Parapet Wall Plaster 5.5%complete

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%complete

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%complete

    P.C.C(1:3:6) with Brick Ballast 4.51%complete

    Earth filling in Lawn 0.84%complete

    iv) Manholes 5.97%complete

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%complete

    xi) Front crown plaster 1.7%complete

    xii) Patio PCC inculding Tile & skirting 3.65%complete

    xiii) Front Terrace Common wall complete 3.1%complete

    xiv) Front Terrace PCC complete 5.3%complete

    3.9% complete

  • 8/14/2019 13MProgress.xlsx

    96/282

    xv) Patio wall plaster complete 0.9%complete

    Total Work for External Area: 100.0% 61.7%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50% complete4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50% complete

    10 Wiring with UPS Completion 11.50% complete

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 58.00%

    Electric Works

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    97/282

    81.5% 82.3%

    61.7%58.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 8,9

    Overall work in house # 8,9

  • 8/14/2019 13MProgress.xlsx

    98/282

  • 8/14/2019 13MProgress.xlsx

    99/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    100/282

  • 8/14/2019 13MProgress.xlsx

    101/282

  • 8/14/2019 13MProgress.xlsx

    102/282

  • 8/14/2019 13MProgress.xlsx

    103/282

  • 8/14/2019 13MProgress.xlsx

    104/282

  • 8/14/2019 13MProgress.xlsx

    105/282

  • 8/14/2019 13MProgress.xlsx

    106/282

  • 8/14/2019 13MProgress.xlsx

    107/282

  • 8/14/2019 13MProgress.xlsx

    108/282

  • 8/14/2019 13MProgress.xlsx

    109/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    110/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    111/282

  • 8/14/2019 13MProgress.xlsx

    112/282

  • 8/14/2019 13MProgress.xlsx

    113/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    114/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    115/282

    Description Total %age Work Done

    Ground Floor 85.5% 81.5%

    First Floor 83.0% 78.8%

    External Work 100.0% 59.1%

    Electric Work 100.0% 58.0%

    Overall work in house # 10,11 368.5% 277.4%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%completeInternal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%complete

    External Plastering 7.0%

    Front Elevation 2.5%complete

    Side/Back walls &other External Plaster4.5%complete

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%complete

    PCC flooring 3.0%complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 81.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    116/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%complete

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster complete 11.0%complete

    All Edge plastering of Doors, Windows etc.

    2.5%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%complete

    Side wall And other external plaster with perpet

    plaster 5.0%complete

    Roof Treatment 6.0%

    Roof Treatment 6.0%complete

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%complete

    Extra Amount in PCC flooring 1.3%complete

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 78.8%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00% complete

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%completeConcrete with Steel 1.17%complete

    Parapet Wall With Shuttering 1.12%complete

    Plaster of Balcony 2.44%complete

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%complete

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    117/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%complete

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%complete

    vii) Front Terrace Parapet Wall Pouring 4.2%complete

    vii - a) Front Terrace Parapet Wall Plaster 1.7%complete

    viii) Top Parapet Wall Pouring 13.8%complete

    viii - a) Top Parapet Wall Plaster 5.5%complete

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%complete

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%complete

    P.C.C(1:3:6) with Brick Ballast 4.51%complete

    Earth filling in Lawn 0.84%complete

    iv) Manholes 5.97%complete

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%complete

    xi) Front crown plaster 1.7%complete

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%complete

    xiv) Front Terrace PCC complete 5.3%complete

    3.9% complete

  • 8/14/2019 13MProgress.xlsx

    118/282

    xv) Patio wall plaster complete 0.9%complete

    Total Work for External Area: 100.0% 59.1%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50% complete4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50% complete

    10 Wiring with UPS Completion 11.50% complete

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 58.00%

    Electric Works

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    119/282

    81.5%78.8%

    59.1% 58.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 10,11

    Overall work in house #

    10,11

  • 8/14/2019 13MProgress.xlsx

    120/282

  • 8/14/2019 13MProgress.xlsx

    121/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    122/282

  • 8/14/2019 13MProgress.xlsx

    123/282

  • 8/14/2019 13MProgress.xlsx

    124/282

  • 8/14/2019 13MProgress.xlsx

    125/282

  • 8/14/2019 13MProgress.xlsx

    126/282

  • 8/14/2019 13MProgress.xlsx

    127/282

  • 8/14/2019 13MProgress.xlsx

    128/282

  • 8/14/2019 13MProgress.xlsx

    129/282

  • 8/14/2019 13MProgress.xlsx

    130/282

  • 8/14/2019 13MProgress.xlsx

    131/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    132/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    133/282

  • 8/14/2019 13MProgress.xlsx

    134/282

  • 8/14/2019 13MProgress.xlsx

    135/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    136/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    137/282

    Description Total %age

    Ground Floor 85.5%

    First Floor 83.0%

    External Work 100.0%

    Electric Work 100.0%

    Overall work in house # 12,13 368.50%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%

    DPC Completion 6.0%

    Earth Filling 2.0%

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%

    Upto Lintel Level 4.0%

    Casting of Lintel 3.0%

    Above Lintel upto Roof Level 4.0%

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%

    Casting of Porch Slab 2.0%

    Casting of Slab (Shuttering, Steel fixing & pouring) 10.0%

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform, Kitchen Slab and

    Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster inculding Edge plastering complete 8.5%

    All Bath & Kitchen walls inculding Edge plastering complete4.0%

    Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc.

    2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble & Window

    sill 7.5%

    Earth filling & compaction 0.5%

    PCC flooring 3.0%

    Stair Marble 2.0%

    Window Sill 2.0%

    Total Work for Ground Floor: 85.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%

    Upto Lintel Level 5.0%

    Casting of Lintel 5.0%

    Above Lintel upto Roof Level 6.0%

    Casting of RCC Slab & Front Crown 20.0%

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    138/282

    Shuttring at site 7.0%

    Casting of Slab 12.0%

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform, Kitchen Slab and

    Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%

    Internal Plaster complete 11.0%

    All Edge plastering of Doors, Windows etc.

    2.5%

    Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc.

    3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%

    Extra Amount in PCC flooring 1.3%

    Window Sill 2.0%

    Total Work for First Floor: 83.0%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%

    iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding excavation,

    PCC, Brick work in F&P, DPC, Bick work in other

    than building, Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%

    Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    External Works

  • 8/14/2019 13MProgress.xlsx

    139/282

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    Shuttering

    Concrete with Steel

    Brick Work for Parapet WallPlaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%

    Plaster of Parapet Wall 3.29%

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculding excavation, PCC,

    Brick work in F&P, DPC, Bick work in other than

    building, Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works4.4%

    x) AC Sills 0.8%

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0%

    Electric Works

    3.9%

  • 8/14/2019 13MProgress.xlsx

    140/282

    1 Electric Condute work of slab 6.00%

    2 Down Piping on Wall with boxing 11.50%

    3 Wiring with UPS Completion 11.50%

    4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6 Switch light with Arthaning A,C Drain pipe Completion 10.00%

    7 Home light compeltion hand over to project Manager 3.00%

    8 Electric Condute work of slab 6.00%

    9 Down Piping on Wall with boxing 11.50%

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13 Switch light with Arthaning A,C Drain pipe Completion 10.00%

    14 Home light compeltion hand over to project Manager 3.00%

    Total Work for Electric: 100.0%

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    141/282

    Work Done

    85.5%

    84.3%

    63.1%

    58.0%

    290.91%

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    85.5%

    complete

    complete

    complete

    complete

    85.5% 84.3%

    63.1%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    90.0%

    Ground Floor First Floor External Work Ele

    Overall work in house # 12,13

    Overall work in house #

  • 8/14/2019 13MProgress.xlsx

    142/282

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    84.3%

    complete

    complete

    complete

    completecomplete

    complete

    complete

    complete

    complete

    complete

    complete not

  • 8/14/2019 13MProgress.xlsx

    143/282

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    complete

    86.0%

    included

    notincluded

    complete

  • 8/14/2019 13MProgress.xlsx

    144/282

    complete

    complete

    complete

    complete

    complete

    complete

    58.00%

  • 8/14/2019 13MProgress.xlsx

    145/282

    58.0%

    ctric Work

  • 8/14/2019 13MProgress.xlsx

    146/282

  • 8/14/2019 13MProgress.xlsx

    147/282

  • 8/14/2019 13MProgress.xlsx

    148/282

  • 8/14/2019 13MProgress.xlsx

    149/282

  • 8/14/2019 13MProgress.xlsx

    150/282

  • 8/14/2019 13MProgress.xlsx

    151/282

  • 8/14/2019 13MProgress.xlsx

    152/282

  • 8/14/2019 13MProgress.xlsx

    153/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666

    608 0.493814 8988 4108.75

    1200 0.974633 8988

    480 0.389853 8988

    2282.408 1.845379 8905.129

    5580.619 4.511551 8906.129

    1042.103 0.842374 8907.129

  • 8/14/2019 13MProgress.xlsx

    154/282

  • 8/14/2019 13MProgress.xlsx

    155/282

  • 8/14/2019 13MProgress.xlsx

    156/282

  • 8/14/2019 13MProgress.xlsx

    157/282

    1.306364 5738.416

    3.293062 5739.416

    478.8 0.391632 3178.7

    258.4 0.211357 3178.7

    368.6 0.301494 3178.7

    1349 1.103407 3178.7

    133 0.108787 3178.7

    590.9 0.483323 3178.7

  • 8/14/2019 13MProgress.xlsx

    158/282

    Description Total %age Work Done

    Ground Floor 85.5% 74.0%

    First Floor 83.0% 73.8%

    External Work 100.0% 7.3%

    Electric Work 100.0% 35.0%

    Overall work in house # 14,15 368.5% 190.1%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%Complete

    DPC Completion 6.0%Complete

    Earth Filling 2.0%Complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%Complete

    Upto Lintel Level 4.0%Complete

    Casting of Lintel 3.0%Complete

    Above Lintel upto Roof Level 4.0%Complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%Complete

    Casting of Porch Slab 2.0%CompleteCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%Complete

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%Complete

    Internal Plaster inculding Edge plastering complete8.5%Complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%Complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%Complete

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%Complete

    PCC flooring 3.0%Complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 74.0%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%Complete

    Upto Lintel Level 5.0%Complete

    Casting of Lintel 5.0%Complete

    Above Lintel upto Roof Level 6.0%Complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    159/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%Complete

    Casting of Slab 12.0%Complete

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%Complete

    Internal Plaster complete 11.0%Complete

    All Edge plastering of Doors, Windows etc.

    2.5%Complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%Complete

    Roof Treatment 6.0%

    Roof Treatment 6.0%Complete

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%Complete

    Extra Amount in PCC flooring 1.3%Complete

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 73.8%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    160/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%complete

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%complete

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%complete

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%complete

    3.9%

  • 8/14/2019 13MProgress.xlsx

    161/282

    xv) Patio wall plaster complete 0.9%complete

    Total Work for External Area: 100.0% 7.3%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50% complete

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 35.00%

    Electric Works

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    162/282

  • 8/14/2019 13MProgress.xlsx

    163/282

  • 8/14/2019 13MProgress.xlsx

    164/282

    .

  • 8/14/2019 13MProgress.xlsx

    165/282

    74.0% 73.8%

    7.3%

    35.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 14,15

    Overall work in house # 14,15

  • 8/14/2019 13MProgress.xlsx

    166/282

    All Most

  • 8/14/2019 13MProgress.xlsx

    167/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    168/282

  • 8/14/2019 13MProgress.xlsx

    169/282

  • 8/14/2019 13MProgress.xlsx

    170/282

  • 8/14/2019 13MProgress.xlsx

    171/282

  • 8/14/2019 13MProgress.xlsx

    172/282

  • 8/14/2019 13MProgress.xlsx

    173/282

  • 8/14/2019 13MProgress.xlsx

    174/282

  • 8/14/2019 13MProgress.xlsx

    175/282

  • 8/14/2019 13MProgress.xlsx

    176/282

  • 8/14/2019 13MProgress.xlsx

    177/282

  • 8/14/2019 13MProgress.xlsx

    178/282

  • 8/14/2019 13MProgress.xlsx

    179/282

  • 8/14/2019 13MProgress.xlsx

    180/282

  • 8/14/2019 13MProgress.xlsx

    181/282

  • 8/14/2019 13MProgress.xlsx

    182/282

  • 8/14/2019 13MProgress.xlsx

    183/282

  • 8/14/2019 13MProgress.xlsx

    184/282

  • 8/14/2019 13MProgress.xlsx

    185/282

  • 8/14/2019 13MProgress.xlsx

    186/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    187/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    188/282

  • 8/14/2019 13MProgress.xlsx

    189/282

  • 8/14/2019 13MProgress.xlsx

    190/282

  • 8/14/2019 13MProgress.xlsx

    191/282

  • 8/14/2019 13MProgress.xlsx

    192/282

  • 8/14/2019 13MProgress.xlsx

    193/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    194/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    195/282

    Description Total %age Work Done

    Ground Floor 85.5% 69.5%

    First Floor 83.0% 62.8%

    External Work 100.0% 28.1%

    Electric Work 100.0% 35.0%

    Overall work in house # 16 368.5% 195.4%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%complete

    PCC flooring 3.0%complete

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 69.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    196/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster complete 11.0%complete

    All Edge plastering of Doors, Windows etc.

    2.5%complete

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%complete

    Extra Amount in PCC flooring 1.3%complete

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 62.8%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00% complete

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    197/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%complete

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%complete

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%complete

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%complete

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    3.9%

  • 8/14/2019 13MProgress.xlsx

    198/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 28.1%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50% complete

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 35.00%

    First Floor

    Electric Works

    Ground Floor

  • 8/14/2019 13MProgress.xlsx

    199/282

    69.5%

    62.8%

    28.1%

    35.0%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    80.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house # 16

    Overall work in house # 16

  • 8/14/2019 13MProgress.xlsx

    200/282

  • 8/14/2019 13MProgress.xlsx

    201/282

    Not

    included

    Not

    included

  • 8/14/2019 13MProgress.xlsx

    202/282

  • 8/14/2019 13MProgress.xlsx

    203/282

  • 8/14/2019 13MProgress.xlsx

    204/282

  • 8/14/2019 13MProgress.xlsx

    205/282

  • 8/14/2019 13MProgress.xlsx

    206/282

  • 8/14/2019 13MProgress.xlsx

    207/282

  • 8/14/2019 13MProgress.xlsx

    208/282

  • 8/14/2019 13MProgress.xlsx

    209/282

  • 8/14/2019 13MProgress.xlsx

    210/282

  • 8/14/2019 13MProgress.xlsx

    211/282

    9100 7.00% 130059

    9462 7.28% 130059

    3346 2.57% 130059

    5018 3.86% 130059

    6040 4.64% 130059

    5406 4.16% 1300592163 1.66% 130059

    18000 13.84% 130059

    7200 5.54% 130059

    10864 8.35% 130059

    4524 3.48% 130059

    9374 7.21% 130059

    7760 5.97% 130059

    2622 2.02% 130059

    5672 4.36% 130059

    1040 0.80% 130059

    2200 1.69% 130059

    4750 3.65% 130059

    3988 3.07% 130059

    6900 5.31% 130059

    1140 0.88% 130059

    880 0.714731 8988

    1440 1.169559 8988

    1380 1.120828 8988

    3000 2.436582 8988 1629.666 1.306364 5738.416

    608 0.493814 8988 4108.75 3.293062 5739.416

    1200 0.974633 8988

    480 0.389853 8988

    478.8 0.391632

    258.4 0.211357

    2282.408 1.845379 8905.129 368.6 0.301494

    5580.619 4.511551 8906.129 1349 1.103407

    1042.103 0.842374 8907.129 133 0.108787

  • 8/14/2019 13MProgress.xlsx

    212/282

    590.9 0.483323

  • 8/14/2019 13MProgress.xlsx

    213/282

  • 8/14/2019 13MProgress.xlsx

    214/282

  • 8/14/2019 13MProgress.xlsx

    215/282

    3178.7

    3178.7

    3178.7

    3178.7

    3178.7

  • 8/14/2019 13MProgress.xlsx

    216/282

    3178.7

  • 8/14/2019 13MProgress.xlsx

    217/282

    Description Total %age Work Done

    Ground Floor 85.5% 64.5%

    First Floor 83.0% 57.0%

    External Work 100.0% 15.1%

    Electric Work 100.0% 23.5%

    Overall work in house # 17,18 368.5% 160.1%

    Brick Work upto DPC Level 15.0%

    Brick work in substructure upto 9" 7.0%complete

    DPC Completion 6.0%complete

    Earth Filling 2.0%complete

    Brick Work upto Roof Level 15.0%

    Brick work upto 3'-0" Height 4.0%complete

    Upto Lintel Level 4.0%complete

    Casting of Lintel 3.0%complete

    Above Lintel upto Roof Level 4.0%complete

    Casting of RCC Slab & Stair 21.0%

    Shuttring at Site 6.5%complete

    Casting of Porch Slab 2.0%completeCasting of Slab (Shuttering, Steel fixing &

    pouring) 10.0%complete

    Casting of Stair 2.5%completeInternal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 20.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster inculding Edge plastering complete8.5%complete

    All Bath & Kitchen walls inculding Edge plasteringcomplete 4.0%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 2.5%

    External Plastering 7.0%

    Front Elevation 2.5%

    Side/Back walls &other External Plaster4.5%

    Earth filling, Brick Ballast, PCC, Stair Marble

    & Window sill 7.5%

    Earth filling & compaction 0.5%

    PCC flooring 3.0%

    Stair Marble 2.0%Window Sill 2.0%

    Total Work for Ground Floor: 85.5% 64.5%

    Brick Work upto Roof Level 21.0%

    Brick work upto 3'-0" Height 5.0%complete

    Upto Lintel Level 5.0%complete

    Casting of Lintel 5.0%complete

    Above Lintel upto Roof Level 6.0%complete

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    218/282

    Casting of RCC Slab & Front Crown 20.0%

    Shuttring at site 7.0%complete

    Casting of Slab 12.0%complete

    Front Crown 1.0%complete

    Internal Plaster with Wabrobe Platform,

    Kitchen Slab and Bath vanity 22.0%

    Plaster under sofit (Ceiling) 5.0%complete

    Internal Plaster complete 11.0%complete

    All Edge plastering of Doors, Windows etc.

    2.5%

    Wardrobe Platforms , Bath Vanity slab, Kitchen

    Slab etc. 3.5%

    External Plastering 9.0%

    Front Elevation external plaster 4.0%

    Side wall And other external plaster with perpet

    plaster 5.0%

    Roof Treatment 6.0%

    Roof Treatment 6.0%

    Brick Ballast, PCC & Window sill 5.0%

    PCC flooring 3.0%

    Extra Amount in PCC flooring 1.3%

    Window Sill 2.0%

    Total Work for First Floor: 83.0% 57.0%

    1 Altration Work 0.0%

    i) Altration According to Drawing 0.0%

    ii) Qibla Altration 0.0%

    iii) Marketing Altration 0.0%iv) Architect Altertaion 0.0%

    2

    Side & Back Boundary Wall , inculding

    excavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster & copping.

    Plan No.

    Amount @ 182/- Per Rft

    7.00%

    3 Out of Covered Area Work

    i) Front Balcony 7.3%

    Shuttering 0.71%Concrete with Steel 1.17%

    Parapet Wall With Shuttering 1.12%

    Plaster of Balcony 2.44%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.49%

    Tile Work in Floor 0.97%

    Skirting 0.39%

    ii) Side Balcony 2.6%

    Shuttering 0.39%

    External Works

  • 8/14/2019 13MProgress.xlsx

    219/282

    Concrete with Steel 0.21%

    Brick Work for Parapet Wall 0.30%

    Plaster of Balcony 1.10%

    P.C.C.(1:3:6) with Brick Ballast in Floor 0.11%

    Tile Work in Floor 0.48%

    iii) Laundry

    ShutteringConcrete with Steel

    Brick Work for Parapet Wall

    Plaster of Balcony

    P.C.C.(1:3:6) with Brick Ballast in Floor

    Tile Work in Floor

    iv) Big Arch with Projection 3.9%

    Shuttering

    Concrete with Steel

    Plaster of Balcony

    v) Back Tarrace Parapet Wall 4.6%

    Brick Work for Parapet Wall 1.31%complete

    Plaster of Parapet Wall 3.29%

    vi) Back Terrace Flooring Work 2.7%

    P.C.C.(1:3:6) with Brick Ballast in Floor 2.7%

    vii) Front Terrace Parapet Wall Pouring 4.2%

    vii - a) Front Terrace Parapet Wall Plaster 1.7%

    viii) Top Parapet Wall Pouring 13.8%complete

    viii - a) Top Parapet Wall Plaster 5.5%

    4 External Work

    i)

    Front Boundary Wall , inculdingexcavation, PCC, Brick work in F&P,

    DPC, Bick work in other than building,

    Cement plaster, copping & steel railing .

    Plan No.

    Amount @ 200/- Per Rft

    8.35%

    ii) Toe Wall 3.5%

    iii) External Flooring Work 7.2%

    Earth filling in passages 1.85%

    P.C.C(1:3:6) with Brick Ballast 4.51%

    Earth filling in Lawn 0.84%

    iv) Manholes 5.97%

    vii) Ramp 2.0%

    ix) Over Head Water Tank Civil Works 4.4%complete

    x) AC Sills 0.8%

    xi) Front crown plaster 1.7%

    xii) Patio PCC inculding Tile & skirting 3.65%

    xiii) Front Terrace Common wall complete 3.1%

    xiv) Front Terrace PCC complete 5.3%

    3.9%

  • 8/14/2019 13MProgress.xlsx

    220/282

    xv) Patio wall plaster complete 0.9%

    Total Work for External Area: 100.0% 15.1%

    1 Electric Condute work of slab 6.00% complete

    2 Down Piping on Wall with boxing 11.50% complete

    3 Wiring with UPS Completion 11.50%4 Gate light,Gardon light,M,C,B and 4.50%

    5 Service line completion 3.50%

    6

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    7

    Home light compeltion hand over to

    project Manager 3.00%

    8 Electric Condute work of slab 6.00% complete

    9 Down Piping on Wall with boxing 11.50%

    10 Wiring with UPS Completion 11.50%

    11 Gate light,Gardon light,M,C,B 4.50%

    12 Service line completion 3.50%

    13

    Switch light with Arthaning A,C Drain pipe

    Completion 10.00%

    14

    Home light compeltion hand over to

    project Manager 3.00%

    Total Work for Electric: 100.0% 23.50%

    Electric Works

    Ground Floor

    First Floor

  • 8/14/2019 13MProgress.xlsx

    221/282

    64.5%

    57.0%

    15.1%

    23.5%

    0.0%

    10.0%

    20.0%

    30.0%

    40.0%

    50.0%

    60.0%

    70.0%

    Ground Floor First Floor External Work Electric Work

    Overall work in house #