A 000A 101A 201A 202A 301A 401A 402A 501
3rd Floor Tenant ImprovementWayne and William White Engineering Design Centre
The University of British Columbia, Vancouver, BC
ISSUE for CONSTRUCTION - OCTOBER 22, 2014
The University Of British Columbia,2345 East Mall,Vancouver, BC
A Portion Of District Lots 3044 And 4805, Group 1,New Westminster District University Of British Columbia
Governing Building Code
Major Occupancy
Building Area:Outermost WallsBCBC Definition
Building Storey Height
Building Measured HeightWest Plaza Grade To L3 Ceiling
No. Of Streets Faced
Fire Protection
BCBC Article(s)Governing Building Size
& Construction
Construction
Maximum Building Area
Floor Assemblies
Mezzanine Assemblies
Load-bearing Assemblies
2012 BCBC - Part 3
Group A, Division 2
742 sm
3 Storey + Mezzanine
13.710m
2 Streets
Sprinklered To NFPA-13
3.2.2.24 Group A, Division 2, Up To 6 Storeys, Any Area, Sprinklered
Noncombustible Construction
Any Area
1 H
1 H
Fire-resistance Rating as per Supported Assembly
Building Code Data
Cover | Project InfoBuilding Context Floor Plans3rd Floor Plan3rd Floor RCPSectionsInterior Elevations & DetailsPartition Framing & Millwork DetailsAssemblies & Schedules
Not to Scale
UBC Property Services1100 - 2329 West MallVancouver, V56 1Z4T: 604 822 0195E: [email protected]: Kyle Reese
McFarland Marceau Architects Ltd115 East 8th AvenueVancouver, V5T 1RBT: 604 733 1115E: [email protected]: Mark Chevalier
GHL Consultants Ltd950 - 409 Granville StreetVancouver, V6C 1T2T: 604 689 4449 x105E: [email protected]: Gary ChenE: [email protected]: David Graham
Stantec Consulting Inc1100 - 111 Dunsmuir StreetVancouver, V6B 6A3T: 604 696 8088E: [email protected]: Kevin Anthony
Acumen Engineering Ltd650 - 2700 Production WayBurnaby, V5A 4X1T: 604 676 9545E: [email protected]: Maciej Lewandowski
Total Site Area
Site Coverage
FSR
Building Height
Car Parking
Loading
Bike ParkingEquivalent to:
City of VancouverClass II Standard
1,685 Sm
44 % (Bldg Area/Site)
1.12 (GFA/Site)
+/- 13.215m (Ave East Mall Grade To Top Of Parapet)+/- 14.265m (Ave West Plaza Grade To Top Of Parapet)
N/a
1 Stall (shared)
24 Stalls on Project Site24 Stalls to CEME Courtyard
Project Statistics
Required Bike Spaces:1 x 16-rack per 100 people = 3x16 = 48 spacesDue to restrictions of Project Site UBC has agreed that remainder of bikes to be provided in adjacent CEME courtyard site.
40%
61 sm152 sm
Rooms 102/M102 Design StudioOpen Mezzanine * M102 Mezzanine Area * 102 Room Area
Rooms M160/M170/M170A/M170B/M170C M+E * M+E Rooms Enclosed Sevice Mezzanine AreaComplies to BCBC 3.2.1.1 Exemption from Mezzanine / Storey Calculation
Level 1
Mezz.
Level 2
Level 3_________
Gross Floor Areas (GFA)
681 sm
87 sm (Excl 108 sm M+E Room)
581 sm
573 sm____________________1,922 sm
Front Yard Setback: Level 1 + MezzanineFront Yard Setback: Level 2 + Level 3
North Side Yard
South Side Yard
West Rear Yard
Height: West Plaza Grade to T/O Roof Edge Curb
All Setbacks Measured to O/S Face of Wall
9.900m6.700m
3.500m
2.435m
16.250m
14.435m
M-1M-2M-3M-4M-5
Legends Notes & Drawing ListHVAC PlanPlumbing PlanFire Suppression PlanSpecifications
E1.01E2.01E3.01E4.01T3.01
Third Floor: PanelsThird Floor: Lighting PlanThird Floor: Power PlanElectrical SpecificationThird Floor: Rough-in for Comm + A/V Plan
FOR EXISTING BUILDING INFORMATION REFER TO UBC BUILDING PERMIT & OCCUPANCY PERMIT Ref: CBP10001-1 & OWNER RECORD DRAWINGS
McFARLAND MARCEAUA R C H I T E C T S L T D
DRAWING NO.
CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx
DRAWN BY
Drawn By
CHECKED BY
Checked ByPROJECT ID
SHEET TITLE
CoverProject Information
321
14/10/2214/09/1914/06/25
Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender
REV Y M D ISSUE
115 East 8th AvenueVancouver BC
V5T1R8T. 604.733.1115
www.mmal.ca
McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.
This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.
3rd
Floo
r Ten
ant I
mpr
ovem
ent
Way
ne &
Will
iam
Whi
te E
ngin
eerin
g D
esig
n C
entre
2345
Eas
t Mal
l, U
BC
Van
couv
er, B
C
1401
UB
C P
roje
ct #
: SR
0192
38
Approach to Building Code Complianceby GHL Consultants LtdJune 25th, 2014including:A 201 BCBC - Building Code Review Plan
Fit out existing 3rd floor shell space to include:
- teaching space - teaching space - teaching space
- male washrooms
Scope of Work & Viewing of Existing Conditions:Contractor & all trades are to view existing conditions to verify the extent and the scope of work required to complete tenant improvement.
Typically, proposed finishes, fixtures and fittings are to match those existing in the rest of the builidng, which can be seen when viewing existing conditions.
Architectural Specificationby McFarland Marceau Architects LtdSeptember 19th, 2014
Work comprises completion of fit out of partially completed shell space.
Work comprises the installation of a laptop counter & acoustic ceiling panels in previously completed corridor space.
D10
0.1
G100
GASMETER
EXIS. STAIR
EXIS. ASPHALT SIDEWALK
EXIS. CONCRETE SIDEWALK
EXIS. CONCRETE SIDEWALK
EXIS. BRICK PAD
UP
12
34
56
78
910
1112
1314
1516
1718
1921
2223
2425
2627
2829
3031
3233
3435
20
WIR
E TR
ELLI
SW
IRE
TREL
LIS
PLANTER
PLANTER
ATRIUM &STUDENT COMMONS
100
O/H
DOOR
UP
CANOPY ABOVE
O/H DOOR
O/H
DOOR
STAIR 2S02
ELEVATORE01
STAIR 5S05
COMPETITIONSPACE
101
UniWC111
CORRIDOR110
COMPOSITESWORKSHOP
101A
DESIGNSTUDIO
102JANITOR112
STAIR 7S07
M+E160
FUTUREACCESSIBLE
LIFT
FUTURELIFT
FUTURETOP LANDING
891011121314151617
1 2 3 4 5 6 7
UP
UP
1234567891011121314151617182223242526272829303132333435
192021
STAIR 1S01
STAIR 6S06
SLOPED GLAZING
100A
RWL
RWL
RWL
RWL
RWL
RWL
STEEL POST
STEELPOST
STEELPOSTSTEEL POST
STEEL POST
UP
1 2 3 4 5 6
1516
7 8 9 10 11 12 13
14
PRIN
TER
N.I.C
.
PLOTTER N.I.C.
SHIPLADDERTO MECH
O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING
O/S FACE OF CURTAIN WALL @ U/S ROOF
O/S FACE OF ROOF OVERHANG
SUNSHADE
BEAM
OVE
R
BEAM
OVE
R
96
.000
94
.850
94
.850
94
.850
94
.850
9450 21605 6345
BEAM OVER
1100 750450
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE
OF
CONC
RETE
ABO
VE
EDGE OFCONCRETE ABOVE
2189
2
F
A
G
E
C
B
D
1525
4880
3050
4880
1982
5575
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
ENGINEERING LANE
DN123456789101112131415161718
2223242526272829303132333435
192021
UP
WIR
E TR
ELLI
SW
IRE
TREL
LIS
STAIR LANDING ABOVECONCRETE WALKWAY ABOVE
12
34
56
78
910
1112
1314
1516
1718
1921
2223
2425
2627
2829
3031
3233
3435
UP
DN
20
STAIR 3S03
ELEVATORE01
ELEVMACH RM
M170C
SHAFTOVER
COMPETITION SPACEBELOW
ATRIUMBELOW
CANOPY
MECH ROOMM170
STAIR 2S02
DESIGN STUDIOMEZZANINE
M102
STAIR 2S02
DATAROOMM170B
STAIR 5S05
SHAFTOVER
DNELEC ROOM
M170A
DN
1314151617 12
1 2 3 4 5 6 7 8 9
UP
12 11 1013
STAIR 1S01
CONCRETE LIDOVER DOOR BELOW
M+EM160
RWL
RWL
RWL
RWL
RWL
RWL
RWL
STEELPOST
STEELPOST
STEELPOST
STEELPOST
BEAM
OVE
R
LOUVRESEE MECHANICAL
DN
1 2 3 4 5 6 7 8 9 10 11 12 13
1516
14
DESIGN STUDIOBELOW
O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING
O/S FACE OF CURTAIN WALL @ U/S ROOF
O/S FACE OF ROOF OVERHANG
SUNSHADE
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE
OF
CONC
RETE
ABO
VE
EDGE OFCONCRETE ABOVE
2189
2
F
A
G
E
C
B
D
1525
4880
3050
4880
1982
5575
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
DN1234567891011121314151617181920
2223242526272829303132333435
21
CANOPYBELOW
STUDENT WORKSHOP211
ELECTRONICSWORKROOM
213
MTG ROOM224
STAIR 4S04
CORRIDOR200
PTPT
PT
MECHSHAFT
COFFEE
NICHE
MWC223
FWC221
JANITOR222
READING &STUDY ROOM
201
ELEVATORE01
MECHSHAFT
PERIMETER CURB
PERIMETER CURB
SHOWER212
FACULTYLOBBY
210
WCLOBBY
220
FACULTYCORRIDOR
230
PT
1314 121516171819 16
DN
UP
1 2 3 4 5 6 7 8 9 10 11
COMM
.CL
OSET
B
A
STAIR 2S02
WIR
E TR
ELLI
S
STAIR 1S01
UP
12
34
56
78
910
1112
1314
1516
1718
1920
21
9450 21605 9595
PT
FACULTY OFFICE 1231
FACULTY OFFICE 3233
FACULTY OFFICE 2232
FACULTY OFFICE 4234
EDC DIRECTOR235
MECHSHAFT
SLOPED SOFFITTO ALCOVE
DECK
STAIR 3S03
DN
12
34
56
78
910
1112
1314
1516
1718
1921
2223
2425
2627
2829
3031
3233
3435
20
O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING
O/S FACE OF CURTAIN WALL @ U/S ROOF
O/S FACE OF ROOF OVERHANG
SUNSHADE
EXTENT OF HEATEDSPACE BELOW
RD
RD
RD
RD
OUTLINE OF MEZZANINE BELOW
RD
EXTE
NT O
F HE
ATED
SPAC
E BE
LOW
A600
A600
A600
A600
RDRD
1100 750450
OUTL
INE
OFM
EZZA
NINE
BEL
OW
2189
2
F
A
G
E
C
B
D
1525
4880
3050
4880
1982
5575
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
MILLWORK:Similar Existing Millwork Installation
LAPTOP COUNTER:Similar Laptop Counter Installation
P1:
MALE WASHROOMS:Similar Male Washroom Installation
SIMILAR INSTALLATIONSIN EXISTING BUILDING
ACOUSTIC CEILING PANELS:Similar Acoustic Ceiling Panel Installation
P2:
P3:
P4:
P1 P2 P3 P4
DECK
STAIR 3S03
DN
12
34
56
78
910
1112
1314
1516
1718
1921
2223
2425
2627
2829
3031
3233
3435
20
PT PT
PT
PT
ROOF
LIN
E AB
OVE
STAIR 4S04
MECHSHAFT
MECHSHAFT
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE
OF
CONC
RETE
ABO
VE
WCCORRIDOR
310
109876
171819 162021 111215 14 13
DN
STAIR 2S02
WIR
E TR
ELLI
S
UP
12
34
56
78
910
1112
1314
1516
1718
1920
21
JANITOR302
MECHSHAFT
MECHSHAFT
FWC311
FD
CLOSET321
FD
PT
PT
PT
MAINCORRIDOR
300
ELEVATORE01
MWC312
FLEX SPACE 2303
FLEX SPACE 1301
FLEX SPACE 3322
NORTHCORRIDOR
320
RECYCLE ALCOVE
LADDER WITHROOF ACCESSHATCH OVER
STAIR BELOW
43895
O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING
O/S FACE OF CURTAIN WALL @ U/S ROOF
O/S FACE OF ROOF OVERHANG
SUNSHADE
EDGE OF CONCRETE ABOVE
RD RD
5600
1982
1325
INSULATIONSLOPE TO ROOF
DRAIN
INSULATIONSLOPE TO ROOF
DRAIN
2189
2
F
A
G
E
C
B
D15
2548
8030
5048
8019
8255
75
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
FIT OUT SHELL SPACEFlex Space 1 Rm 301 - teaching spaceFlex Space 2 Rm 303 - teaching spaceFlex Space 3 Rm 322 - teaching spaceMWC Rm 312 - male washrooms
INSTALL LAPTOP COUNTER & ACOUSTIC CEILING PANELSMain Corridor Rm 300
EXISTING SPACE REMAINS AS-IS
LEVEL 1Scale = 1:200
Shown For Context Only
LEVEL 2Scale = 1:200
Shown For Context Only
LEVEL 1 MEZZANINEScale = 1:200
Shown For Context Only
TENANT IMPROVEMENTLEVEL 3Scale = 1:200
Fit Out of Existitg Shell Space
McFARLAND MARCEAUA R C H I T E C T S L T D
DRAWING NO.
CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx
DRAWN BY
Drawn By
CHECKED BY
Checked ByPROJECT ID
SHEET TITLE
Building ContextFloor Plans
321
14/10/2214/09/1914/06/25
Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender
REV Y M D ISSUE
115 East 8th AvenueVancouver BC
V5T1R8T. 604.733.1115
www.mmal.ca
McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.
This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.
3rd
Floo
r Ten
ant I
mpr
ovem
ent
Way
ne &
Will
iam
Whi
te E
ngin
eerin
g D
esig
n C
entre
2345
Eas
t Mal
l, U
BC
Van
couv
er, B
C
1401
UB
C P
roje
ct #
: SR
0192
38
Scale = 1:75
DECK
STAIR 3S03
DN
12
34
56
78
910
1112
1314
1516
1718
1921
2223
2425
2627
2829
3031
3233
3435
20
D312
PT PT
D302RRR
PT
PT
ROOF
LINE
ABO
VE
D30
0.1
STAIR 4S04
MECHSHAFT
MECHSHAFT
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE
OF
CONC
RETE
ABO
VE
WCCORRIDOR
310
109876
171819 162021 111215 14 13
DN
STAIR 2S02
WIR
E TR
ELLIS
UP
12
34
56
78
910
1112
1314
1516
1718
1920
21
JANITOR302
D301.1
MECHSHAFT
MECHSHAFT
D303.1
FWC311
FD
D30
0.2
D31
0.2
D31
0.1
D321
D311
CLOSET321
D320
FD
PT
PT
PT
MAINCORRIDOR
300
ELEVATORE01
MWC312
FLEX SPACE 2303
FLEX SPACE 1301
FLEX SPACE 3322
D301.2D303.2
NORTHCORRIDOR
320
RECYCLE ALCOVE
LADDER WITHROOF ACCESSHATCH OVER
STAIR BELOW
43895
O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING
O/S FACE OF CURTAIN WALL @ U/S ROOF
O/S FACE OF ROOF OVERHANG
SUNSHADE
EDGE OF CONCRETE ABOVE
RD RD
5600
1982
1325
INSULATIONSLOPE TO ROOF
DRAIN
INSULATIONSLOPE TO ROOF
DRAIN
WORK BENCHC/W STORAGE ABOVE
WOR
K BE
NCH
C/W
STO
RAGE
ABO
VE WOR
K BE
NCH
C/W
STO
RAGE
ABO
VE
P2
1829610
1100
12200
A600
A600
43A402
12
14 / 15
11 A401 1341A401
41 A401
41
A40110A402
10 A402 REVERSE
SCREEN
SCREEN
5360
1710
3010
805
1828
NEW TI PARTITIONALIGN TO C/L VERTICAL MULLION @ WINDOW
c-W2c-P2
c-P2
c-P2
c-P5 c-P5
c-P2
c-P2
c-P2
NEW TI PARTITIONALIGN TO C/L VERTICAL
MULLION @ WINDOW
NEW TI PARTITIONALIGN FACE OF DRYWALL TO FLEX SPACE 1 WITH FACE OF ADJACENT SHAFT
SHIM DRYWALL AS REQUIRED TO ENSURE FLUSH ALIGNMENT OF FACES OF DRYWALL AT ADJOINING WALL TYPES
P2
2 x G
WB
1 x G
WB
2 x G
WB
1 x G
WB
2 / A
301
1 / A
301
1 / A
301
2 / A
301
e-S1
c-P2
c-P2
c-P5e-S1
e-S1
c-P1.1
c-P1.1
c-P2
e-S1ae-S1a
e-S1
e-S1
e-S1
e-W3
e-W2a
e-P3
e-P3
e-W
3
e-W3
e-W2a
e-W
2a
600
P2
P2
52
A402
55
A402
56
A402
SIM
SIM
AT MALE WASHROOM, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH WC STALL, FIXTURES & MILLWORK & FINISHES
1a / A
301
1a / A
301
SIM
e-S1
e-S1
e-W
2
e-W2 e-W2
e-P1
e-P3
e-P1
GWB HORIZONTALSHAFT OVER
e-S1
He-P4
c-P2
MILLWORK LAPTOP COUNTER:STOOLS NIC - BY OWNER 51
A401
TABLES & STOOLSNIC - BY OWNER
TABLES & STOOLSNIC - BY OWNER
TABLES & STOOLSNIC - BY OWNER
AT FLEX SPACE, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH MILLWORK, CEILING PANELS & FINISHES
AT MAIN CORRIDOR FIT OUT WITH MILLWORK & CEILING PANELS
AT FLEX SPACE, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH MILLWORK, CEILING PANELS & FINISHES
AT FLEX SPACE, COMPLETEPARTIAL WALL ASSEMBLIES,& FIT OUT WITH MILLWORK,
CEILING PANELS & FINISHES
54 / A402
53 / A402
44 / A402
41 / A402
41 / A402
42 / A402
41 / A402
41 / A402
53 / A402SIM
50 / A401
NEW DOOR& SIDELIGHT
NEW DOOR& SIDELIGHT
NEW DOOR INEXTG FRAME
ALIGN SOUTH EDGE OF SIDELIGHT TONORTH FACE OF MWC SERVICE WALL
FIRE EVACUATION PLAN & FIRE SAFETY REPORT:OWNER WILL UPDATE & REPLACE EXISTING WALL MOUNTED FIRE EVACUATION PLAN & EXISTING FIRE SAFETY REPORT.
SIM 42 / A402 44 / A402AT CABLE TRAY
AT CABLE TRAY
31 / A402
125
MAXOLS
MAXOLS
57 / A402BASE of WALL &TOP OF WALL
57 / A402BASE of WALL &TOP OF WALL
2189
2
F
A
G
E
C
B
D
1525
4880
3050
4880
1982
5575
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
INDICATES AREA PREVIOUSLY COMPLETED:REMAINING AREAS ARE INCLUDED IN LEVEL 3 FIT OUT
"c" PREFIX INDICATES:COMPLETE EXTG PARTITION [P] OR EXTERIOR WALL [W]:OVER EXTG STEEL STUD FRAMING, COMPLETE ASSEMBLY WITH ACOUSTIC INSULATION BATT FILL, DRYWALL LAYER[S].APPLY TO ONE OR BOTH FACES OF FRAMING AS APPROPRIATE.
c-P_
e-P_
P2 NEW PARTITION WALL - REFER TO ASSEMBLY SCHEDULE
c-W_
e-W_
e-S_
ALL NEW & EXTG FLOOR, WALL, CEILING & SOFFIT SURFACES, WITHIN FIT OUT SPACES, ARE REQUIRED TO BE FINISHED.REFER TO FIT OUT FINISHES SCHEDULE.WINDOW COVERINGS & FURNITURE NIC - BY OWNER.
RD ROOF DRAIN
FLOOR DRAIN
CLEAR DIM @ DOOR JAMB FOR ACESSIBILITY600mm OR 300mm
CORNER GUARD - see DETAIL 31/A402
MAXIMUM OCCUPANT LOAD SIGNTO BLDG INSPECTOR APPROVAL
FD
A600A300
G
"e" PREFIX INDICATES:RETAIN EXTG PARTITION [P] OR EXTERIOR WALL [W] OR SHAFTWALL [S]:PREVIOUSLY COMPLETED IN ORIGINAL CONSTRUCTION.
FOR COMPLETED EXISTING, OR PARTIALLY COMPLETED EXISTINGTYPE "P", TYPE "W" & TYPE "S" ASSEMBLIES, REFER TO ASSEMBLY SCHEDULE.
FOR DETAILED WALL ASSEMBLIES REFER TO ASSEMBLY SCHEDULE
MAXOLS
McFARLAND MARCEAUA R C H I T E C T S L T D
DRAWING NO.
CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx
DRAWN BY
Drawn By
CHECKED BY
Checked ByPROJECT ID
SHEET TITLE
3rd FloorPlan
321
14/10/2214/09/1914/06/25
Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender
REV Y M D ISSUE
115 East 8th AvenueVancouver BC
V5T1R8T. 604.733.1115
www.mmal.ca
McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.
This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.
3rd
Floo
r Ten
ant I
mpr
ovem
ent
Way
ne &
Will
iam
Whi
te E
ngin
eerin
g D
esig
n C
entre
2345
Eas
t Mal
l, U
BC
Van
couv
er, B
C
1401
UB
C P
roje
ct #
: SR
0192
38
Scale = 1:75
AP: 8'x4'
AP: 10'x4'AP: 10'x4'
AP: 12'x4' [cut]SUSPENDED PANEL
CUT NORTH EDGE TO SUIT
AP: 10'x4'
AP: 8'x4' AP: 8'x4'
AP: 8'x4' AP: 8'x4'
AP: 8'x2'8 AP: 8'x2'8
AP: 8'x2'8
AP: 8'x4'
AP: 8'x4'
AP: 8'x4'
AP: 8'x4'
AP: 8'x4'
AP: 8'x2'8
AP: 8'x4'
AP: 8'x4' AP: 8'x4'
AP: 8'x2'8
AP: 8'x2'8
AP: 8'x4'
AP: 8'x4'
CS
CSCS
CS
AP: 12'x4'
AP: 12'x4'
AP: 8'x2'8
AP: 8'x2'8
AP: 6'x4'
AP: 6'x4'
AP: 6'x4'
AP: 6'x4'
AP: 8'x4'
AP: 8'x4'
CBCB
AP: 8'x4'
AP: 8'x4'
AP: 6'x2'8
AP: 6'x2'8
AP: 6'x4'
AP: 6'x4'
T
AP: 12'x4'
AP: 12'x4'
CS
CS
CS
2550 +FFE
CS
21
A402TRIM BACK AP EDGETO SUIT PIPES &
HORIZ SHAFT
DIM TO WEST EDGE OF PIPES &STRUTS TO NW OF COLUMN C4
21
A402
ACCESS PANELSEE MECH
CS
ACCESS PANELSEE MECH
AP: 10'x4'
SUSPENDED PANELAP: 12'x4' [cut]
CUT SOUTH EDGE TO SUIT
HORIZSHAFT
PIPESZONE
ALIGN WEST EDGE OF LIGHTTO LTG EAST OF GRIDS C4+D4
ALIGN LIGHTS TO LTGEAST OF GRIDS C7+D7
"D" NOTE:ALIGN HVAC DIFFUSERS TO BE CONSISTENT DISTANCE FROM EDGE OF BEAM
"D" NOTE:ALIGN HVAC DIFFUSERS TOBE CONSISTENT DISTANCE
FROM EDGE OF BEAM
AP: 12'x4' AP: 12'x4' [cut]
CUT TO ALLOW PASSAGEOF MECHANICAL DUCT
AP: 12'x4'AP: 12'x4'
42 / A402
SIM42 / A402 SIM: 21 / A402
3658
106550
067
0
670
500
670
185
185
820
600
300
300
300
300 300
CS
CS
CS
CB
CS
CB
CB
CB
CS
CS
CS
CS
CS
CS
CB
CB
CB
CB
CS
CS
CS
CS
CS
CS
CONC BEAM OVER
CONC BEAM OVER
CONC BEAM OVER
CONC BEAM OVER CS
670
CS
CS
CB
CB
CB
CB
CS
CS
CS
CONC BEAM OVER
CONC BEAM OVER
CONC BEAM OVER
CONC BEAM OVER
CS
670
500
500
670
535
670
185
185
300300
670
32 / 33
A402ALL CONC - GWBABUTMENTS
PANELS SUSPENDED ON STEEL STUD HANGERS.HANGERS TO STEEL STUD ENGINEER DESIGN
DD
DD
DD
DD
300
21
A402
21
A402
52
A402
21
A402
32 / 33
A402ALL CONC - GWBABUTMENTS
PT PT
PT
PT
ROOF
LINE
ABO
VE
STAIR 4S04
MECHSHAFT
MECHSHAFT
EDGE OF CONCRETE ABOVE
EDGE OF CONCRETE ABOVE
EDGE
OF
CONC
RETE
ABO
VE
WCCORRIDOR
310
109876
171819 162021 111215 14 13
DN
STAIR 2S02
WIR
E TR
ELLIS
UP
12
34
56
78
910
1112
1314
1516
1718
1920
21
JANITOR302
MECHSHAFT
MECHSHAFT
FWC311
FD
CLOSET321
FD
PT
PT
PT
MAINCORRIDOR
300
ELEVATORE01
MWC312
FLEX SPACE 2303
FLEX SPACE 1301
FLEX SPACE 3322
NORTHCORRIDOR
320
RECYCLE ALCOVE
MINIMUM T-BAR HEIGHT:SET CLG AS HIGH AS POSSIBLE
54 / A402
2 / A
301
1 / A
301
1 / A
301
2 / A
301
1a / A
301
1a / A
301
53 / A402
54 / A402SIM
2189
2
F
A
G
E
C
B
D
1525
4880
3050
4880
1982
5575
42700
30503050 4575 9150 9150 9525 4200
7 8654321
3.1 5.1
F.1
CB
CEILINGS LEGEND:ACOUSTIC PANEL
GYPSUM CLG BOARD
CONCRETE SLAB SOFFIT
CONCRETE BEAM
T-BAR SYSTEM CEILING
HORIZONTAL SHAFTWALL
AP: 8'x4'
CS
GWB
T
TO GWB CEILINGS INCLUDE ACCESS PANELS TO SUIT ABOVE CEILING MECH EQUIPMENT REQUIREMENTS.
ALL MECH, PLUMBING, FIRE PROTECTION COMPONENTS TO BE SET AS HIGH AS POSSIBLE TO MAXIMISE CEILING HEIGHTS.
COORDINATE DRAINS & TRAPS FROM SLAB ABOVE, TO AVOID ACOUSTIC CEILING PANELS WHEREVER POSSIBLE.
IN ALL AREAS MIN 2100mm HEAD CLEARANCE MUST BE ACHIEVED TO MEET BCBC REQUIREMENTS.
FOR ALL ELEC, HVAC & SPRINKLER LEGENDS SEE MECH & ELEC DRAWINGS.
ALL ACOUSTIC CEILING PANELS TO BE TEMPORARILY MARKED ON CONCRETE SOFFITS AT THE START OF THE WORK, TO ENSURE MECH & ELEC COORDINATION OF SERVICES WITH ACOUSTIC PANEL LOCATIONS.ADVISE ARCHITECT & REQUEST CLARIFACTION IF ANY CONFLICT ARISES.
PROVIDE DUCT TRIM FLANGE OVER DRYWALL AT ALL DUCT PENETRATIONS THROUGH DRYWALL WALL OR CEILING. TRIM FLANGE FINISH TO MATCH DUCT FINISH.
TO ALL ACCESS PANEL DOORS ADHERE 75mm DUCT LINER BATT TO TOP SIDE OF ACCESS PANEL.
SH1
WHERE LIGHTING OCCURS AT ACOUSTIC PANEL LOCATION, LIGHT TO BE CENTRED ON PANEL.
WHERE NOTED SUSPENDED ACOUSTIC PANELS REQUIRE SUPPORT BY STEEL STUD BACK FRAMING, TO THE DESIGN OF THE STRUCTURAL ENGINEER OF THE STEEL STUD TRADE.
EXEX
EX
EX
EX EX
OCS
321
303301
STAIR BELOW
E E E
E E E
E E E
EE
E E E
E E E
E E E
E E E E
E E
E
E
E
EE
INDICATES AREA PREVIOUSLY COMPLETED:REMAINING AREAS ARE INCLUDED IN LEVEL 3 FIT OUT
PRIOR TO INSTALLING STEEL STUD FRAMING FOR ACOUSTIC PANELS, COORDINATE HVAC, CABLE TRAY, SPRINKLER & OTHER SERVICES LOCATIONS.ADVISE ARCHITECT IF ANY SERVICES, STRUTS OR HANGERS, COMPROMISE ACOUSTIC PANEL LAYOUT.
ALL NEW & EXTG FLOOR, WALL, CEILING & SOFFIT SURFACES, WITHIN FIT OUT SPACES, ARE REQUIRED TO BE FINISHED.REFER TO FIT OUT FINISHES SCHEDULE.
ALIGN SUSPENDED LTG FIXTURES TO C/L OF ACOUSTIC PANELS EXCEPT WHERE NOTED
51 / A402
McFARLAND MARCEAUA R C H I T E C T S L T D
DRAWING NO.
CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx
DRAWN BY
Drawn By
CHECKED BY
Checked ByPROJECT ID
SHEET TITLE
3rd FloorReflected Celing Plan
321
14/10/2214/09/1914/06/25
Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender
REV Y M D ISSUE
115 East 8th AvenueVancouver BC
V5T1R8T. 604.733.1115
www.mmal.ca
McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.
This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.
3rd
Floo
r Ten
ant I
mpr
ovem
ent
Way
ne &
Will
iam
Whi
te E
ngin
eerin
g D
esig
n C
entre
2345
Eas
t Mal
l, U
BC
Van
couv
er, B
C
1401
UB
C P
roje
ct #
: SR
0192
38
Scale = 1:75