Faig Mammadov,
“Promoting Development
of Sustainable Energy in Azerbaijan”
UNDP Project, Local consultant
14.03.2012Baku, AzerbaijanAmbassador Hotel
� SAARES (State Agency for Alternative and Renewable Energy Sources)
� Ministry of Economic Development� Ministry of Taxes� Ministry of Industry and Energy� Antimonopoly Committee� State Statistical Committee� Ministry of Emergency Situations� Ministry of Ecology and National Sources� SOCAR� AzerEnergy� Geodesy Cartography and Mapping Committee� UNDP� NGOs
2Faig Mammadov @ 2012
There is a great potential to use wind energy, particularly on the coastline and offshore, which is now recognised in official circles. Estimates for the technical capacity for wind power range from 1,500 MW upwards according to different sources.
� The wind farms currently operating or under construction are:
(according to data on www.windpower.net)
� Pilot Project – 2 No 850 kW Vestas v52/850 Turbines installed in 2010 and owned by Caspian Technologies+500 kw training Center
� Shurabad Project – 16 No 3MW Vestas turbines owned by Caspian Technologies and under construction 09/2011
� Mitaki Project– 20 No 2.5 MW Fuhrlander turbines (under construction) owned by Caspian Management
� Sitalcaj Project – 4 No 900kW Powerwind 56 turbines (under construction) and owned by Trans T S
� Alten Group Project – 4 No 2MW Gamesa turbines installed in 2011 and owned by Alten Group
Faig Mammadov @ 2011 3
Faig Mammadov @ 2011 4
�Caspian Technology Company
� SAARES (State Agency for Alternative and Renewable Energy Sources)
�Alten Group
� Kfw
�UNDP + Norwegian Government
5Faig Mammadov @ 2012
The Pilot Project which consists of two V52 wind turbines manufactured by Vestas
Deutchland GmbH as the The project site is located in 55th km of Baku-Guba highway.
Due to correct site selection, the project was completed in a very short time of 8 months.
Pilot Project has 35 KV grid connection which provides transfer of green energy.
The project is able to produce 6,5 mln. energy per year, thus is to save 2 mln.m3 gas.
6Faig Mammadov @ 2012
� Establishment of ABEMDA
� Established Experimental Polygon and Training Center in Gobustan for researches of local gridconnections with global electricity networks
� 13.09.2011: President Đlham Aliyev participated in opening seremony of Experimental Polygon and Training Center
� Total area: 38 ha
� Installed wind turbines: 3 X 0,9 megawatt = 2.7megawatt
� Solar panels park: 1,8 megawatt
� Biomass equipment: 1 megawatt
� Other equipments: Regulatory equipments, water reservouar, test area, workshop.
Dispatcher center: There is opportunity of testing the equipments and experiments studies in established center. Management of polygon and training Center carried out in Dispatcher center.
Freeze camera - Capacity:330 cubic meter, +5 / - 5 C.Installed lightning system and greenhouse works on
renewable energy.7Faig Mammadov @ 2012
� ALTEN GROUP manages alternative energy projects in Azerbaijan and all around the globe. Our energy solutions are developed by a specialist team of industry professionals, which comprises experts from the Solar, Wind, Biogas and Hydropower market sectors.
� ALTEN GROUP is Azerbaijan’s largest alternative energy service provider, with service divisions operational throughout the country. We offer competitively priced, turnkey renewable energy services for commercial, governmental and utility customers using proven technology.
� Additionally, the company operates a purpose built production facility, which focuses on the design and manufacture of small biogas and greenhouse systems, solar streetlights and garden lamps.
� ALTEN GROUP offers a complete service, offering full solutions for Solar, Wind, Biogas and Hydropower projects.
8Faig Mammadov @ 2012
Support to Azerbaijan Energy Sector:
� Loan ammount: EUR 61 mln.
�Future projects: EUR 130 mln.
�Cooperation with SAARES
� Evaluation of potential of Re projects together with SAARES and foreign and local consultants
�Azerbaijan Wind Atlas (2012)
9Faig Mammadov @ 2011
Total budget: $300,000 (Norvegian Government)
Period: August 2006 – Dec 2010
Aims:
� Support for establishment of RE structures
Activities:
� Strengthening of potential and policy for Ministry of Ecology
Law frames for CDM
� Establishment of Azerbaijan CDM strategy
� Preparation of list of potential CDM Projects in Azerbaijan
10Faig Mammadov @ 2011
� Total budget : $1.5 mln. (Norvegian Government)
� Period: February 2007 – Dec 2010Activity:
� Analysis of law environment and changes� Analysis of the potential of small HydroPower Stations
� Analysis of investment environment� Establishment of Small HydroPower Stations in Azerbaijan
Result: Decided to realize current project:Promoting Development of Sustainable Energy in Azerbaijan
11Faig Mammadov @ 2011
� Total budget: $1.440 mln (Financed by EU and Norvegian Government)
� Period: January 2011 – June 2013
Activities:
� 1. Establishment of Small HydroPower Stations;
� 2. Awareness of Sustainable energy, PR works;
� 3. Evaluation of RE potential and economic efficiency
� 4. Preparation of pilot projects on wind, solar and biomass.
12Faig Mammadov @ 2012
Thank you for your attention
Faig Mammadov,
“Promoting Development of Sustainable Energy in Azerbaijan”,
Local consultant
Tel: +99 450 2821934, +99455 711 07 13
Email: [email protected]
13